SECCM LABS Construction Site and Building Access Parking Restriction Universal Access August 2018 – December 2019

Upload: others

Post on 05-Feb-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • SECCM LABS Construction

    Site and Building Access Parking RestrictionUniversal AccessAugust 2018 – December 2019

  • SECCM LAB PURPOSE AND HIGHLIGHTSAugust 3, 2017

    CONTEMPORARY EXPERIENTIAL LEARNING FACILITIES:

    • Experiential Learning Labs in Computing, Electrical, Mechanical and Civil Engineering, and Construction Management.

    • The return of HAWKWORKS, the Construction Management and Engineering fabrication space to campus

    • Renovation of the existing SECCM facility provides additional general purpose laboratory spaces and classroom space for science and other programs.

    SITE / LANDSCAPING IMPROVEMENTS:

    • The project will be well landscaped replacing existing trees at a rate of two to one.

    • Creation of outdoor spaces for casual meetings and relaxation.

    LIFE SAFETY UPGRADES:

    • Development of a campus-wide Fire Pump, reducing the number of diesel generators, significantly reducing our carbon footprint.

    • Sprinklers will be added to the existing SECCM building enhancing fire protection.

    • An emergency backup power generator serving the adjacent academic buildings enhances area security and safety.

    UNIVERSAL ACCESS:

    • The project enhances accessible routes to and from FCAS and the southern campus.

    • Removal of four exterior stairs, and eliminating steps up to FCAS allowing all members of our community to travel the same paths.

    SECCM LAB PROJECT BENEFITS

  • SECCM LAB CONTRACTOR ACCESSS AND PARKING PLANAugust 2018 – December 2019

    CONTRACTOR PARKING AND SITE ACCESSAugust 2018 – December 2019

    MT. HOPE BRIDGE

    RT. 136

    CONTRACTOR PARKINGPOINT OF ENTRY:

    NORTH ENTRANCE

    CONTRACTOR PARKING

    DELIVERIES OLD FERRY ROAD

    CONTRACTOR NON VEHICULAR ACCESS ROUTE

  • SECCM LAB FENCING PLANAugust 2018 – December 2019

    SITE FENCING PLAN

    • Construction area will enclose the area between FCAS, SECCM, the Quad and Gabelli.

    • From time to time the fence location will be adjusted to accommodate specific activities.

    • Access in this area is restricted to Construction Personnel.

    STUDENTS, UNAUTHORIZED STAFF AND FACULTY ARE NOT ALLOWED WITHIN THE FENCE FOR ANY REASON.

    SECCM LAB

    SECCM

    GABELLI

    FCAS

    Lot 9

  • ACCESS TO FCAS BUILDINGDuration of Project

    ACADEMIC BUILDING ACCESS

    FCASSTEPS

    UNIVERSAL

    GABELLI

    SECCM

    AVOID THIS AREA

    EMERGENCY EXITS ONLY

    Lot 9

  • Preferred Pedestrian RoutesDuration of Project

    PREFERRED TRANSIT ROUTES AND ENTRANCES

    This map indicates the major preferred transit routes around the construction site.

    Faculty Parking on Old Ferry road should access campus via the stairs and access through Stonewall complex.

    Lot 9 users should avoid transit in front of the construction entrance.

    HANDICAP PARKING

    GSB

    FCASSECCM

    AVOID THIS AREA

    Lot 9

  • UNIVERSAL ACCESSAugust 2018 – December 2019

    HANDICAP PARKING

    GABELLI

    FCAS

    SECCM

    UNIVERSAL ACCESS• Transit between the Center and South

    Campus should be along the Campus loop road east of Gabelli.

    • The dashed green line shows the preferred Transit Route, between Stonewall and Gabelli.

    • HANDICAP PARKING, in lot 9 will be relocated. Access into Campus from this area should be through FCAS.

    • Internal traffic should avoid Transit through Lot 9.

    • This map indicates only the Universal Routes around the construction site.

    UNIVERSAL ROUTE

    UNIVERSAL ENTRANCE

    AVOID THIS AREA

    Accessible Building Entrance

    Accessible Route Lot 9

  • LOT 9 and OCCASIONAL DELIVERY PARKING PLAN

    LOT 9 Parking Restrictions AFTER September 30, 2018• Lot 9 may experience

    temporary closures. 24 hour notice will be provided.

    • The access Lot 9 Gate will be removed during construction. UNAUTHORIZED VEHICLES WILL BE TOWED

    • PARKING IN THE AREA SHADED YELLOW IS AT THE USERS RISK. AREA WILL BE HEAVILY TRAVELED BY CONSTRUCTION EQUIPMENT DEDICATED CONTRACTOR

    PARKING

    CLOSED FOR DELIVERIES

    FCASSECCM

    GSB

    AVOID THIS AREA

    NO GATE

    Lot 9