sewer system standard detail city of stanwood

17
City of Stanwood SEWER SYSTEM STANDARD DETAIL

Upload: others

Post on 02-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

City of StanwoodSEWER SYSTEM STANDARD DETAIL

TYPICAL PRESSURE SEWER SERVICE DETAILCity of StanwoodSEWER SYSTEM STANDARD DETAIL

TYPICAL E-1 GRINDER PUMP INSTALLATIONCity of StanwoodSEWER SYSTEM STANDARD DETAIL

GRINDER PUMP INSTALLATIONCONCRETE BALLAST

PRECAST

POURED IN PLACE

City of StanwoodSEWER SYSTEM STANDARD DETAIL

SEWER SYSTEM STANDARD DETAIL

City of Stanwood

SEWER SYSTEM STANDARD DETAIL

City of Stanwood

NOTES:

APPROVED FOR PUBLICATION

DATESTATE DESIGN ENGINEER

Washington State Department of Transportation

SHEET 1 OF 1 SHEET

NOTES

1.

2.

Install sewer saddle with gasket and stainless steel clamps

for connection to existing sewers. Install wye or tee sewer

fitting with gaskets for new sewer installations.

Mark location of sewer stub in accordance with Contracting

Agency requirements.

SEE NOTE 1

PROPERTY LINE

SEE NOTE 1

CAP

SEE NOTE 2TEE BRANCH

SEWER MAIN

CAP

SEE NOTE 2

45 33/64 ELBOW

WYE BRANCH

SEWER MAIN

LESS THAN 90 33/64

45 33/64

4" OR 6" DIAM. SEWER PIPE

(SEE CONTRACT)

TEE CONNECTION

PLAN VIEW

ELEVATION VIEW

PLAN VIEW

ELEVATION VIEW

WYE CONNECTION

DR

AW

N B

Y:

AD

AM

CO

CH

RA

N

2% MIN., 45^ MAX.

2% MIN., 45^ MAX.

PROPERTY LINE

4" OR 6" DIAM. SEWER PIPE

(SEE CONTRACT)

STANDARD PLAN B-85.20-00

FOR SANITARY SEWER USE

SIDE SEWER CONNECTION

STAT

EOFWASHINGTON

REGISTERED

PROFESSIONAL ENGI

NEER

EXPIRES JULY 1, 2007

15588

MAT

THEW J. WITECKI

NO

TE

:

TH

IS P

LA

N I

S N

OT

A L

EG

AL

EN

GIN

EE

RIN

G D

OC

UM

EN

T

BU

T A

N E

LE

CT

RO

NIC

DU

PL

ICA

TE

. T

HE

OR

IGIN

AL

, S

IGN

ED

BY

TH

E E

NG

INE

ER

AN

D A

PP

RO

VE

D F

OR

PU

BL

ICA

TIO

N,

IS K

EP

T O

N

FIL

E A

T T

HE

WA

SH

ING

TO

N S

TA

TE

DE

PA

RT

ME

NT

OF

TR

AN

S-

PO

RT

AT

ION

. A

CO

PY

MA

Y B

E O

BT

AIN

ED

UP

ON

RE

QU

ES

T.

Harold J. Peterfeso 06-01-06

APPROVED FOR PUBLICATION

DATESTATE DESIGN ENGINEER

Washington State Department of Transportation

SHEET 1 OF 1 SHEET

1.

2.

3.

4.

TEE

OFFSETDEAD END BEND

VALVEPLUGGED TEE

PLUGGED CROSS PLUGGED CROSSUNBALANCED CROSS

TWO 1" DIAM. RODS

(SEE NOTE 4)

PLAN VIEW PLAN VIEW PLAN VIEW

PLAN VIEW

PLAN VIEWPROFILE VIEW

STANDARD PLAN B-90.40-00

PLAN VIEW

THRUST AT FITTINGS IN POUNDS

SOIL TYPE

SIZE

4"

6"

8"

10"

12"

14"

16"

250

250

250

250

250

250

250

3,140

7,070

12,565

19,635

28,275

38,485

50,265

4,440

9,995

17,770

27,770

39,985

54,425

71,085

2,405

5,410

9,620

15,030

21,640

29,455

38,470 19,615

15,015 7,545

9,855

5,54511,030

7,660 3,850

2,4654,905

2,760 1,385

6151,225

EDCBA

TEE AND

DEAD

ENDS

MUCK, PEAT, ETC.

SOFT CLAY

SAND

SAND AND GRAVEL

SAND AND GRAVEL CEMENTED WITH CLAY

HARD SHALE

0

1,000

2,000

3,000

4,000

10,000

TEST

PRESSURE

(PSI)

SAFE BEARING LOAD

(PSF)

(USE COLUMNS B ~ E )

(USE COLUMN A )(USE COLUMN B )

(USE COLUMN A )(USE COLUMN B )(USE COLUMN A )

NOTES

11.25°

BEND

22.5°

BEND

45°

BEND

90°

BEND

Contractor to provide blocking adequate to withstand full test pressure.

Divide thrust by safe bearing load to determine required area (in square

feet) of concrete to distribute load.

Areas to be adjusted for other pressure conditions.

Provide two 1" minimum diameter rods on valves up through 10" diameter.

Valves larger than 10" require special tie rod design.

CONCRETE THRUST BLOCK

STAT

EOFWASHINGTON

REGISTERED

PROFESSIONAL ENGI

NEER

EXPIRES JULY 1, 2007

15588

MAT

THEW J. WITECKI

NO

TE

:

TH

IS P

LA

N I

S N

OT

A L

EG

AL

EN

GIN

EE

RIN

G D

OC

UM

EN

T

BU

T A

N E

LE

CT

RO

NIC

DU

PL

ICA

TE

. T

HE

OR

IGIN

AL

, S

IGN

ED

BY

TH

E E

NG

INE

ER

AN

D A

PP

RO

VE

D F

OR

PU

BL

ICA

TIO

N,

IS K

EP

T O

N

FIL

E A

T T

HE

WA

SH

ING

TO

N S

TA

TE

DE

PA

RT

ME

NT

OF

TR

AN

S-

PO

RT

AT

ION

. A

CO

PY

MA

Y B

E O

BT

AIN

ED

UP

ON

RE

QU

ES

T.

Harold J. Peterfeso 06-08-06

APPROVED FOR PUBLICATION

DATESTATE DESIGN ENGINEER

Washington State Department of Transportation

SHEET 1 OF 1 SHEET

PIP

E Z

ON

E

CONCRETE AND DUCTILE IRON PIPE

6"

6"

TRENCH WIDTH

(SEE NOTE 3)

15% O.D.

85% O.D.

(SEE NOTE 4)

THERMOPLASTIC PIPE

6"

6"

O.D

.

METAL PIPE

6"

6"

PIP

E Z

ON

E

PIPE ZONE BACKFILL

(SEE NOTE 1)

PIPE ARCHES

PIP

E Z

ON

E

6"

CLEARANCE BETWEEN PIPES

FOR MULTIPLE INSTALLATIONS

MINIMUM

DISTANCE

BETWEEN

BARRELS

12" to 24"

30" to 96"

102" to 180"

18" to 36"

43" to 142"

148" to 200"

12"

DIAM. /2

48"

12"

SPAN /3

48"

GRAVEL BACKFILL FOR

PIPE ZONE BEDDING

(SEE NOTE 2)

GRAVEL BACKFILL FOR

PIPE ZONE BEDDING

(SEE NOTE 2)

GRAVEL BACKFILL FOR

PIPE ZONE BEDDING

(SEE NOTE 2)

PIPE ZONE BACKFILL

(SEE NOTE 1)

TRENCH WIDTH

(SEE NOTE 3)

GRAVEL BACKFILL FOR

PIPE ZONE BEDDING

(SEE NOTE 2)

PIPE ZONE BACKFILL

(SEE NOTE 1)

PIP

E Z

ON

E

FOUNDATION LEVEL

FOUNDATION LEVEL

FOUNDATION LEVEL

FOUNDATION LEVEL

TRENCH WIDTH

(SEE NOTE 3)

TRENCH WIDTH

(SEE NOTE 3)

50

%

O.D

.

50

%

O.D

.

85

% R

ISE

15% RISE

6"

NOTES

1.

2.

3.

4.

PIPE ZONE BEDDING

AND BACKFILL

See Standard Specifications Section 7-08.3(3) for Pipe Zone Backfill.

See Standard Specifications Section 9-03.12(3) for Gravel Backfill for Pipe Zone Bedding.

See Standard Specifications Section 2-09.4 for Measurement of Trench Width.

For sanitary sewer installation, concrete pipe shall be bedded to spring line.

SIZEPIPE

STANDARD PLAN B-55.20-00

CIRCULAR PIPE

(DIAMETER)

PIPE ARCH

(SPAN)

METAL ONLY

STAT

EOFWASHINGTON

REGISTERED

PROFESSIONAL ENGI

NEER

EXPIRES JULY 1, 2007

15588

MAT

THEW J. WITECKI

NO

TE

:

TH

IS P

LA

N I

S N

OT

A L

EG

AL

EN

GIN

EE

RIN

G D

OC

UM

EN

T

BU

T A

N E

LE

CT

RO

NIC

DU

PL

ICA

TE

. T

HE

OR

IGIN

AL

, S

IGN

ED

BY

TH

E E

NG

INE

ER

AN

D A

PP

RO

VE

D F

OR

PU

BL

ICA

TIO

N,

IS K

EP

T O

N

FIL

E A

T T

HE

WA

SH

ING

TO

N S

TA

TE

DE

PA

RT

ME

NT

OF

TR

AN

S-

PO

RT

AT

ION

. A

CO

PY

MA

Y B

E O

BT

AIN

ED

UP

ON

RE

QU

ES

T.

Harold J. Peterfeso 06-01-06