SHOP DRAWING REVIEW COMMENTS - 1 - PROJECT: Durham Meadows Waterline Remedial Design CONTRACT NO: W912WJ19C0002 AECOM PROJECT NO.: 60494812 ENGINEER’S SUBMITTAL NO.: 02630-1 REVISION IDENTIFIER: CONTRACTOR’S SUBMITTAL NO.: 02630-1 REVISION IDENTIFIER: SUBJECT: Storm Drainage Utilities REVIEW CODES: A – Approved as submitted. B – Approved, except as noted on drawings. Resubmission not required. C – Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D – Will be returned by separate correspondence. E – Disapproved. Refer to attached comments. F – Receipt Acknowledged. X – Receipt acknowledged, does not comply with contract requirements, as noted. G – Other action required. The Engineer’s review is for general conformance with the design concept and Contract Documents. Markings or comments shall not be construed as relieving the Contractor from compliance with the Contract plans and specifications or from departures there from. The Contractor remains responsible for details and accuracy, for confirming and correlating all quantities and dimensions, for selecting fabrication processes, for techniques of assembly, and for performing work in a safe manner. AECOM Technical Services, Inc. DATE: 1 August 2019 REVIEWER: R. Berlandy The review is provided to assist the contractor in the management of construction. It should not be considered complete. In order to maintain continuity between submittals, the previous comment numbers have been retained. The shop drawing review comments follow: COMMENT NUMBER REFERENCE CODE COMMENT 1. 02630 2.01 C A Reinforced Concrete Pipe and rubber gasket. 2. 02630 2.02 B Catch basin components: Provide Type A galvanized steel grates. Catch basin sump depths to conform to dimensions indicated on drawings. 3. 02630 B Reinforced concrete culvert end sections: Conform to CT DOT standards. 4. C-3 B Contractor shall verify all dimensions.

Upload: others

Post on 05-Jan-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates

SHOP DRAWING REVIEW COMMENTS

- 1 -

PROJECT: Durham Meadows Waterline Remedial Design

CONTRACT NO: W912WJ19C0002 AECOM PROJECT NO.: 60494812

ENGINEER’S SUBMITTAL NO.: 02630-1 REVISION IDENTIFIER:

CONTRACTOR’S SUBMITTAL NO.: 02630-1 REVISION IDENTIFIER:

SUBJECT: Storm Drainage Utilities

REVIEW CODES: A – Approved as submitted. B – Approved, except as noted on drawings.

Resubmission not required. C – Approved, except as noted on drawings. Refer to attached comments. Resubmission required.

D – Will be returned by separate correspondence.

E – Disapproved. Refer to attached comments.

F – Receipt Acknowledged.

X – Receipt acknowledged, does not comply with contract requirements, as noted.

G – Other action required.

The Engineer’s review is for general conformance with the design concept and Contract Documents. Markings or comments shall not be construed as relieving the Contractor from compliance with the Contract plans and specifications or from departures there from. The Contractor remains responsible for details and accuracy, for confirming and correlating all quantities and dimensions, for selecting fabrication processes, for techniques of assembly, and for performing work in a safe manner. AECOM Technical Services, Inc.

DATE: 1 August 2019 REVIEWER: R. Berlandy The review is provided to assist the contractor in the management of construction. It should not be considered complete. In order to maintain continuity between submittals, the previous comment numbers have been retained. The shop drawing review comments follow:

COMMENT NUMBER

REFERENCE CODE COMMENT

1. 02630 2.01 C A Reinforced Concrete Pipe and rubber gasket. 2. 02630 2.02 B Catch basin components: Provide Type A galvanized steel grates. Catch

basin sump depths to conform to dimensions indicated on drawings. 3. 02630 B Reinforced concrete culvert end sections: Conform to CT DOT standards. 4. C-3 B Contractor shall verify all dimensions.

Page 2: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates

TRA

NSM

ITTA

L O

F SH

OP

DR

AW

ING

S, E

QU

IPM

ENT

DA

TA, M

ATE

RIA

L SA

MPL

ES, O

RM

AN

UFA

CTU

RER

'S C

ERTI

FIC

ATE

S O

F C

OM

PLIA

NC

EFo

r use

of t

his

form

, see

ER

415

-1-0

; the

pro

pone

nt a

genc

y is

CEC

W-C

E

SEC

TIO

N I

- REQ

UES

T FO

R A

PPR

OVA

L O

F TH

E FO

LLO

WIN

G IT

EMS

(Thi

s se

ctio

n w

ill b

e in

itiat

ed b

y th

e co

ntra

ctor

)

TO:

FRO

M:

CO

NTR

AC

T N

O.

THIS

IS A

:

PR

OJE

CT

TITL

E A

ND

LO

CA

TIO

NS

PE

CIF

ICA

TIO

N S

EC

. NO

. (C

over

onl

y on

e se

ctio

n w

ith e

ach

trans

mitt

al)

THIS

TR

AN

SM

ITTA

L IS

FO

R: (

Che

ck o

ne)

DA

TETR

AN

SM

ITTA

L N

O.

NE

W T

RA

NS

MIT

TAL

7/10

/201

902

630-

1

Dur

ham

Mea

dow

s W

ater

line

Rem

edia

l Des

ign,

0263

0-S

torm

-Dra

inag

e S

yste

m

W91

2WJ1

9C00

02W

ES

TOV

ER

RE

SID

EN

T O

FFIC

E57

0 P

atrio

t Ave

nue

Box

70

Chi

cope

e, M

A 0

1022

-163

4

Ludl

ow C

onst

ruct

ion

Co.

, Inc

.19

Car

mel

ina'

s C

ircle

,Lu

dlow

MA

0105

6

01FI

OG

AD

AC

RD

A/C

RD

A/G

AS

ITE

M N

O.

(See

Not

e3) a.

DE

SC

RIP

TIO

N O

F S

UB

MIT

TAL

ITE

M(T

ype

size

, mod

el n

umbe

r/etc

)

b.

SU

BM

ITTA

L TY

PE

CO

DE

(See

Not

e 8)

c.

NO

. OF

CO

PIE

S

d.

CO

NTR

AC

T R

EFE

RE

NC

ED

OC

UM

EN

TS

PE

C. P

AR

AN

O.

e.

DR

AW

ING

SH

EE

T N

O.

f.

FOR

CO

NTR

AC

TOR

US

E

g.

VA

RIA

TIO

N(S

eeIn

stru

ctio

n N

o.6) h.

FOR

CE

US

EC

OD

E(N

ote

9)

i.

1P

reca

st C

oncr

ete

Sho

p D

raw

ing

02 -

SH

OP

DR

AW

ING

S0

1.05

.A.1

AN

o6

Sho

p D

raw

ings

Cas

t in

Pla

ce S

truct

ures

05 -

DE

SIG

N D

ATA

02.

04A

No

Rem

arks

from

Con

tract

or

ENC

LOSU

RES

RET

UR

NED

(Lis

t by

item

No.

)D

ATE

SEC

TIO

N II

- A

PPR

OVA

L A

CTI

ON

NA

ME,

TIT

LE A

ND

SIG

NA

TUR

E O

F A

PPR

OVI

NG

AU

THO

RIT

Y

I cer

tify

that

the

abov

e su

bmitt

ed it

ems

have

bee

n re

view

ed in

det

ail a

ndar

e co

rrec

t and

in th

e st

rict c

onfo

rman

ce w

ith th

e co

ntra

ct d

raw

ings

and

spec

ifica

tions

exc

ept a

s ot

herw

ise

stat

ed.

NA

ME

AN

D S

IGN

ATU

RE

OF

CO

NTR

AC

TOR

EN

G F

OR

M 4

025-

R, J

UL

2015

RE

PLA

CE

S E

DIT

ION

OF

MA

R 2

012,

WH

ICH

IS O

BS

OLE

TEP

age

1 of

1

Page 3: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 4: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 5: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 6: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 7: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 8: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 9: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 10: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 11: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 12: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 13: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 14: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 15: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 16: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 17: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 18: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 19: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
berlandyr
Typewritten Text
4' Sump Required
Page 20: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 21: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
berlandyr
Typewritten Text
4' Sump Required
Page 22: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
Page 23: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
berlandyr
Typewritten Text
4' Sump Required
Page 24: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
berlandyr
Typewritten Text
4' Sump Required
Page 25: SHOP DRAWING REVIEW COMMENTS · 2019-10-24 · engineer’s submittal no.: 02630-1 revision identifier: contractor ... equipment data, material samples, or manufacturer's certificates
berlandyr
Typewritten Text
4' Sump Required