silver spring international middle school and sligo creek elementary school … · 2019-06-13 ·...

23
Silver Spring International Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community Information Meeting

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Silver Spring InternationalMiddle School and Sligo Creek Elementary School Addition Project

June 12, 2019

Community Information Meeting

Page 2: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Meeting Agenda

Meeting Agenda

• Site Plan Update

• Construction Challenges

• Construction Sequencing Alternates

• Program Analysis

• Transportation Analysis

• Holding School Options

• Parkside Elementary School

• Communications

Page 3: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Existing Site Circulation

Page 4: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Existing Site Circulation

Page 5: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community
Page 6: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

133 SSIMS parking spaces87 SCES parking spaces

Page 7: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Construction Challenges

• Safety and Security• Current enrollment

• SCES: 669 students• SSIMS: 1129 students

• SSIMS Program Impacts• Main entrance• Administrative areas• 2 music rooms• 6 science classrooms• 1 classroom

• Parking• SSIMS (front lot): *133 spaces

• Available during construction: ± 86 spaces • Space for construction laydown area required

• SCES (side and back lots): *87 • Available during construction: ± 69 total spaces

• Before/ After Care• Potential interior space relocation

• Purple Line• Concurrent construction projects/ increased site congestion

Page 8: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Construction Sequencing Alternatives

• Relocatable Classrooms- Feasibility Assumption• Opportunities

• Walkers could still walk to school• Same commute times, bell and bus schedule would

remain the same• Challenges

• Security/ remote location/ transverse outdoors to class

• Parking/ site congestion/ restricted drop-off and pickup

• Combined administration area• Potential comingling of ES and MS students• No water in relocatables• Elevation change/ ADA compliance • Extended construction duration (TBD)

• To Do• Install potential fire lane for access• Install ADA ramps• Interior renovation of administration area• Relocate existing science rooms to existing interior

space • Construction Analysis

Page 9: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Construction Sequencing Alternatives

• Alternate #1-Relocate SCES to holding facility• Opportunities

• Students and staff in one location• away from construction noise/ traffic• Alleviate parking/ less congestion onsite • Students bused to/from SCES for before and aftercare • MS and ES students would remain separated

• Challenges• Finding available space• Existing conditions of available space/ retrofit • Increased commute times• Walkers would have to ride bus

• Possible Options• Commercial Properties• Existing MCPS Holding Facilities

• Fairland, Grosvenor, Radner• Other County Facilities

• i.e. Parkside

Page 10: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Construction Sequencing Alternatives

• Alternate #2-Relocate K-2 grade levels of SCES to holding facility• Opportunities

• Alleviate parking/ less congestion onsite • Students bused to/from SCES for before and aftercare • MS and ES students would remain separated

• Challenges• Finding available space, existing conditions of available space• Increased commute times• Walkers (attending alternate facility) would have to ride bus• Combined administration area/ Operational logistics, separation of staff• Parking/ site congestion/ restricted drop-off and pickup at SCES

• To Do• Potential Lease negotiations • Interior renovation of administration area• Construction Analysis

• Possible Options• MCPS schools with extra capacity• Other County Facilities

• i.e. Parkside

Page 11: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Program Analysis

Existing Program To Relocate - Lower Level

Page 12: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Program Analysis

Existing Program To Relocate - First Floor

Page 13: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Program Analysis

Existing Program To Relocate - Second Floor

Page 14: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Temporary Space Plan

Lower Level

Page 15: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Temporary Space Plan

First Floor

Page 16: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Temporary Space Plan

Second Floor

Page 17: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Transportation Analysis

Transportation • Existing stops/ routes will remain the

same with possible additions if necessary

• Pick up/ drop off stops will be created for current walkers in their areas.

• Kidsco before care (6:30am-9:15am) and after care (3:30pm - 6:30pm) is anticipated to remain at SCES, bus to and from holding facility will be provided

• Potential shuttle service between two facilities for staff

Page 18: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Holding School Options

Fairland Center

• Address: 13313 Old Columbia Pike, Silver Spring, MD 20904

• Travel Distance from SCES: • 1st Tier Timing: Left Sligo Creek ES @ 8:15 arrived at Fairland

Center 8:30 (7 miles)

• 2nd Tier Timing: Left Sligo Creek ES @ 9:10 arrived at Fairland Center 9:25 (7 miles)

• General: Currently leased to a private school (Kennedy Krieger School, serving those with learning & intellectual disabilities)

• Key Facilities Report: https://www.montgomeryschoolsmd.org/departments/facilities/kfi/reports/992.pdf

Page 19: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Holding School Options

Grosvenor Center:

• Name: Grosvenor Center

• Address: 5701 Grosvenor Ln, Bethesda, MD 20814

• Distance from SCES: • 1st Tier Timing: Left Sligo Ceek ES @ 8:30 arrived

Grovesnor @ 8:55 (8 miles)

• 2nd Tier Timing: Left Sligo Creek ES @ 9:00 arrived @ Grovesnor at 9:20 (8 miles)

• General: Currently occupied by Luxmanor ES during construction

• Key Facilities Report: https://www.montgomeryschoolsmd.org/departments/facilities/kfi/reports/993.pdf

Page 20: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Holding School Options

Parkside ES:

Name: Parkside Elementary School

Address: 9500 Burnett Ave, Silver Spring, MD 20901

Distance from SCES: 1st Tier Timing: Left Sligo Creek ES @ 8:20 arrived at Parkside 8:30 (1.6 miles)

2nd Tier Timing: Left Sligo Creek Es @ 9:00 arrived @ Parkside 9:06 (1.6 miles)

General: Currently owned by Montgomery County, occupied by M-NCPPC as office space, anticipated move out summer 2019

Key Facilities Report: N/A

Page 21: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Parkside Elementary School

Parkside ES: Proposed Holding Facility

Interior Renovation: ± 15,000 gsf

Page 22: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Parkside Elementary School

Parkside ES: Proposed K-2 School Facility

Page 23: Silver Spring International Middle School and Sligo Creek Elementary School … · 2019-06-13 · Middle School and Sligo Creek Elementary School Addition Project June 12, 2019 Community

Communications

• Communications • Representative project group

• Meets regularly to discuss the project• Relays important information to the larger community

• SCES PTA • Jennifer Gans, Joe Shashaty

• School Representatives• SCES: Principal Swift (Interim)• SCES: Principal Rand• SSIMS: Principal Bryant

• MCPS DOC• Project Manager: Seth Feriano

• Architect• Greg Lukmire

• Construction Manager• TBD

• Transportation• Sinisha Pavlovich

• MCPS Project Webpage• https://www.montgomeryschoolsmd.org/departments/facilities/construction/project/ssims.aspx

• Previous meeting slide shows • Meeting minutes