Page 1: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5SIPROTEC 5

© Siemens AG 2013. All rights reserved.

Page 2: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

Siemens Protection Portfoliofor all areas of application

GenerationSIPROTEC 4

TransmissionSIPROTEC 4

SIPROTEC 5

DistributionSIPROTEC 4SIPROTEC

IndustrySIPROTEC 4SIPROTEC

SIPROTEC 5 CompactReyrolle

SIPROTEC Easy

CompactReyrolle

SIPROTEC Easy

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 2 Smart Grid Division

Page 3: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC: Highest-measured MTBF

Siemens SIPROTEC Reliability Other vendors: 1 failure / year every 100-300 units *Siemens SIPROTEC: 1 failure / year every 600 units in averagey y g

* Others may not include initial product failures

Measured MTBF (years) for SIPROTEC Family

1,200.00

1,400.00

800.00

1,000.00

,

7SD6 Differential7SA5 Distance

400.00

600.00

7SA5 Distance7UT5 Transformer7SJ6 Feeder

0.00

200.00

2004 2005 2006 2007 2008 2009 2010

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 3 Smart Grid Division

2004 2005 2006 2007 2008 2009 2010

Page 4: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC: Highest Relay Software Stability

14

16# of Upgrades per Year

Frequent updates89 upgrades in 8 years

10

12

6

8

10

USA MarketSIEMENS

2

4

6

0

2

2005 2006 2007 2008 2009 2010 2011 2012

Very Stable8 upgrades in 8 years

When software is stable, only addition of features cause new releases (1/year).

Frequent firmware updates cause serious time consumption and additional cost in maintenance besides reliability concerns

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 4 Smart Grid Division

Frequent firmware updates cause serious time consumption and additional cost in maintenance, besides reliability concerns.

Page 5: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Innovation Highlights

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 5 Smart Grid Division

Page 6: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Perfect Tailored Fit

Base Modules Front Panels / HMI Expansion Modules Communication Modules

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 6 Smart Grid Division

Page 7: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Perfect Tailored Fit

Base Module Expansion Modules Up to19'' rack

+ =+ + +

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 7 Smart Grid Division

Page 8: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

Mounting of an Expansion Module

Robust and stable connection between

partsparts

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 8 Smart Grid Division

Page 9: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Front Panel (HMI)

Description Fieldfor LEDs 16 LEDs (red)

Base Module Expansion Module

16 LEDs (red)

Description Fieldfor LEDs

Context Sensitive Keys

for LEDs16 LEDs (green or red, selectable)

LED Acknowledgeand Reset of latched

information Cursor Keys

Numerical Keysand Function Keys

Key Switch S5 “Remote/Local”

Control of Switching ElementsUSB plug-in

Description Field

Key Switch S1 “Interlocking Off / Normal”

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 9 Smart Grid Division

gfor Function Keys

Page 10: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Designed to Communicate

Ethernet moduleElectrical and Optical modules without / with integrated switch

Universal SerialElectrical and Optical modules

Up to 8 communication portsin one device

without / with integrated switch p

Electrical module with RS485 interfaceElectrical Ethernet module

with two electrical ports

Optical long distance module with two 1300 or 1550 nm interfacesOptical Ethernet module with

two optical ports

Fiber optical module withEN

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 10 Smart Grid Division

Fiber optical module with820 nm interface

* Wave division multiplexer

EFP

Page 11: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Holistic Workflow

With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment

Application templates in DIGSI 5

finished right at the beginning Graphically Linked

Application templates in DIGSI 5 (i.e., line protection)

Select the application template, which defines the complete functional scope

Customize application as required to individual requirementsindividual requirements

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 11 Smart Grid Division

Page 12: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Innovative Terminal Technology

Terminal Blocks are Removable (Pre Wire your

Excellent for retrofitting or maintenance

Terminal Blocks are Removable (Pre Wire your Retro Fit Projects)

CT’s Integrated in the Blocks

CT’s Auto Short for Safety!

No Bare Copper or Metallic Surface pp

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 12 Smart Grid Division

Page 13: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: Security and Safety Inside

Beyond NERC CIP Cyber-security ComplianceMulti-level Cyber-security Chain

Encryption of the communication line between DIGSI 5 and the SIPROTEC 5 relay

Connection password according to NERC-CIP requirements

R di f tt tRecording of access attempts in a non-volatile safety log

Safety-critical operations require the input of confirmation codes

Sophisticated self-monitoring routines locate and report device disturbances immediately and accurately q pand accurately

Proven functions for the protection of equipment and users were continually enhanced over 5 generations

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 13 Smart Grid Division

Page 14: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC 5: 1 ½ Breaker Application

MP U 3p

BB I 230kV

MP I 3p

MP I 3p 7Sx8

A_Q0

A Q9

7SL87P1C5036

MP U 1p

MP U 3p

MP U 3p

MP I 3p 7Sx8

r-B

us

A_Q9

MP U 1p

MP I 3p

MP I 3p

MP I 3p 6MD8 iam

eterB_Q0

C_Q9

6MD86P1G4312

MP U 3p

Di

I/O Unitfor Additonal Indications7SL87 6MD85

MP I 3p

MP I 3p 7Sx8

C_Q0

6MD8

(i.e. MCB Trips etc.)7SL87

P1C50366MD85P1G499

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 14 Smart Grid Division

BB II 230kV

Page 15: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

SIPROTEC SoftwareSIGRA – The Standard for Fault Analysis

SOESOEAnnunciation

MeasurementsOscillography

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 15 Smart Grid Division

Page 16: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

Wide Area Grid Monitoring – SIGUARD

Infrastructure & Cities Sector – Smart Grid Division © Siemens AG 2013. All rights reserved.Page 16 Smart Grid Division

Page 17: SIPROTEC 5SIPROTEC 5 - Siemens · SIPROTEC 5: Holistic Workflow With SIPROTEC 5, you are almost finished right at the beginning Primary and Secondary Equipment Application templates

Thank you for your attention!