smart grid demonstrations- contributing to industry ...smartgrid.epri.com/doc/17 nist smart grid...

13
Smart Grid Demonstrations- Contributing to Industry Standards and Interoperability Mark McGranaghan 2 © 2009 Electric Power Research Institute, Inc. All rights reserved. Topics • NIST Interoperability Standards Development Overview • Examples of Priority Action Plans Storage and Distributed Generation Distribution Grid Management • EPRI Coordination with Standards Development - Intelligrid • Coordination with OpenSG and Standards Organizations • Microgrids Coordination

Upload: duongkhuong

Post on 16-Sep-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Smart Grid Demonstrations-Contributing to Industry Standards and Interoperability

Mark McGranaghan

2© 2009 Electric Power Research Institute, Inc. All rights reserved.

Topics

• NIST Interoperability Standards Development Overview• Examples of Priority Action Plans

– Storage and Distributed Generation– Distribution Grid Management

• EPRI Coordination with Standards Development - Intelligrid• Coordination with OpenSG and Standards Organizations• Microgrids Coordination

3© 2009 Electric Power Research Institute, Inc. All rights reserved.

One View of Standards Development

4© 2009 Electric Power Research Institute, Inc. All rights reserved.

NIST Interoperability Standards Development Process – Phase 1

• 3 workshops held between April & August

• Over 1300 participants

• Identify “Low-Hanging Fruit”standards

• Develop Smart Grid applications and requirements

• Develop Action Plans for Priority Standards Development Activities

5© 2009 Electric Power Research Institute, Inc. All rights reserved.

EPRI Report to NIST

• Interoperability Framework Principles and Strategies

• Smart Grid Conceptual Model

• Cyber Security Considerations for the Smart Grid

• Smart Grid Applications and Requirements

• Smart Grid Standards Assessment and Profile

• Prioritized Actionshttp://www.nist.gov/smartgrid/

6© 2009 Electric Power Research Institute, Inc. All rights reserved.

Existing Standards –NIST expanded initial list to 31 standards

7© 2009 Electric Power Research Institute, Inc. All rights reserved.

Conceptual Reference Diagram

8© 2009 Electric Power Research Institute, Inc. All rights reserved.

Priority Action Plans (plus Security Task Group)

# Priority Action Plan1 IP for the Smart Grid2 Wireless Communications for the Smart Grid3 Common Pricing Model4 Common Scheduling Mechanism5 Standard Meter Data Profiles6 Common Semantic Model for Meter Data Tables7 Electric Storage Interconnection Guidelines8 CIM for Distribution Grid Management9 Standard Demand Response Signals

10 Standard Energy Usage Information11 Common Object Models for Electric Transportation12 IEC 61850 Objects/DNP3 Mapping13 Time Synchronization, IEC 61850 Objects/IEEE C37.118

Harmonization14 Transmission and Distribution Power Systems Model Mapping

9© 2009 Electric Power Research Institute, Inc. All rights reserved.

NIST Phase 2 and Phase 3 Plan

9

PHASE 1Recognize a set of

initial existing consensus standards

and develop a roadmap to fill gaps

PHASE 2Establish public/private

Standards Panel to provide ongoing recommendations

for new/revised standards to be recognized by NIST

PHASE 3Conformity Framework

(including Testing and Certification)

March September2009 2010

10© 2009 Electric Power Research Institute, Inc. All rights reserved.

Smart Grid

Demo

Initiative

Renewable Integration(174/173)

EPRI Follow-Up on NIST Priority Actions

Distribution(128)

Smart DistributionApplications

(124)

Energy Storage(94)

IntelliGrid

(161)

EPRI

Interface

&

Coordinator

Electric Transportation

(18)

Efficient T&D(172)

Energy Efficiency(170)

# NIST Priority Action Plan

1 IP for the Smart Grid

2 Wireless Communications for the Smart Grid

3 Common Pricing Model

4 Common Scheduling Mechanism

5 Standard Meter Data Profiles

6 Common Semantic Model for Meter Data Tables

7 Electric Storage Interconnection Guidelines

8 CIM for Distribution Grid Management

9 Standard Demand Response Signals

10 Standard Energy Usage Information

11 Common Object Models for Electric Transportation

12 IEC 61850 Objects/DNP3 Mapping

13 Time Synchronization, IEC 61850 Objects/IEEE C37.118 Harmonization

14 Transmission and Distribution Power Systems Model Mapping

11© 2009 Electric Power Research Institute, Inc. All rights reserved.

Program 161 – IntelliGrid

PS161A – IntelliGrid Technology Transfer and Industry

Coordination

PS161B – Infrastructure for Intelligent Transmission Systems

PS161E – Security Issues for the Power System Communication,

Information, and Control Infrastructure

PS161D - Infrastructure and Technology for Advanced

Metering, Integrating Demand Response & Energy Efficiency

PS161C – Infrastructure for

Intelligent Distribution Systems

12© 2009 Electric Power Research Institute, Inc. All rights reserved.

Example – Energy Storage Integration

• Develop Scoping Document – ES-DER interconnection and operational interface requirements

for the full spectrum of application issues• Develop Use Cases to identify interconnection and object modeling

requirements• Update or augment the IEEE 1547 distribution level standards series

as appropriate to accommodate the wide range of ES-DER system requirements.

• Augment the IEC 61850-7-420 object models for ES-DER through IEC TC57 WG17.

• Initiate development of transmission level standards for ES-DER.• Harmonize the distribution and transmission level standards, where

possible.

13© 2009 Electric Power Research Institute, Inc. All rights reserved.

Energy Storage Scoping Document Outline

• Executive Summary/Introduction• Applications for Dispatchable ES-DER• Electrical Interconnection of ES-DER• Regulatory Issues for ES-DER• Business Issues for ES-DER• General Standards and Implementation Guidelines for

ES-DER• Specific Standards needs for ES-DER

Technologies/Applications• Detailed Timeline and Specifications for High Priority

Standards

14© 2009 Electric Power Research Institute, Inc. All rights reserved.

Example – CIM for Distribution

• Task 1: UML model for MultiSpeak• Task 2: Team for UML tools (CIMug)• Task 3: Team for interoperability testing (CIMug)• Task 4: WG14 Modelling Team Status Webconference• Task 5: Create SG use case team • Task 6: Use case master list • Task 7: Use cases refined • Task 8: Review and assign use cases (WG19)• Task 9: Develop models (CIM and 61850)

15© 2009 Electric Power Research Institute, Inc. All rights reserved.

Common Information Model (CIM) and the IEC 61968 Interface

OutageManagement

Interface Adapter

DistWiresModel

EMS

TransWiresModel

DAC

Interface Adapter

CustomerInfo. System

VRU

EventHistory

HumanResources

DistributionAutomation

DataWarehouse

PlanningSystems

Interface Adapter

IEC 61968 CompliantMiddlewareServices

InformationExchange

Model

WorkManagement

...

= IEC 61968 Compliant Interface

GIS Financial

16© 2009 Electric Power Research Institute, Inc. All rights reserved.

IEC 61850 and CIM

17© 2009 Electric Power Research Institute, Inc. All rights reserved.

Accomplishments

• CIM for Distribution Overview• CIM for Distribution

development plan in conjunction with IEC TC57 WG 14

• Contribution of CIM for Distribution plan for NIST PAP 08

• CIM interface development for OpenDSS

• Plan for Interop Testing• Vendor Training

18© 2009 Electric Power Research Institute, Inc. All rights reserved.

EDF R&D : Créer de la valeur et préparer l’avenir

61850

61850

EMSApps

DMSApps

OMSApps

MeteringApps

ERPapplications

SCADA

61850

InterControl Center

link

6185061850

Post

eHT

B-H

TA

-Tra

nche

- Pro

cédé

6185

0

CIM

6185

0

AMMapplications

DLM

SC

OSE

M

CIM

CIM

T ASE

- 2

CIM

MeteringSystem

CIM

6185

0

Entreprise Service Bus (ESB)

ERPapplications

ESB

ESB

Market Management Systems

CIM

61850

6185

0

61850

SCADA

Generating ManagementSystem Apps.

ESB

CIM

CIM

DistributionTransmissionRemote ControlSystem

GenerationManagementSystem

MarketManagementSystem

AMMsystem

CIM

IEC-61850

IEC-61850

DER

EOLIEN

Poste HTB-HTAPoste HTB-HTA

6185

0

61850

Post

eHT

A-B

T

RTU METER

61850

Hou

se-h

o ld

Post

e H

TB

-HT

A-T

ranc

he-P

rocé

61850

CIM

19© 2009 Electric Power Research Institute, Inc. All rights reserved.

Example CIM Development Needs

• Support for unbalanced and single phase systems (basic distribution need)

• Distribution automation technologies and controls• Advanced metering (Part 9)• Advanced load/customer models

– Load profiles by customer class– Demand response and direct load control– Voltage dependency– Price dependency

• Distributed renewables and DG • Distributed storage systems• Microgrids and Controls

20© 2009 Electric Power Research Institute, Inc. All rights reserved.

Distribution Model as Center of Future DMS

Distribution

ModelGIS OMS

AMI/MDMS/CIS

OutageData

Planning/ Forecasting

Asset

Management

SCADA DA VVC Efficiency DG DSM, PHEV

DMS

21© 2009 Electric Power Research Institute, Inc. All rights reserved.

Cyber Security Work Program

Use Case

Analysis

Use Case

Analysis

High-Level Security

Requirements

High-Level Security

Requirements

Risk AssessmentVulnerabilitiesThreat Agents

Impacts

Standards Assessment

Conformity Assessment

22© 2009 Electric Power Research Institute, Inc. All rights reserved.

Security Requirements Development

23© 2009 Electric Power Research Institute, Inc. All rights reserved.

Open Smart Grid

23

Open Smart Grid(OpenSG)Subcommittee

OpenHANTask Force

Open AMI-ENTTask Force

AMI-NetworkTask Force

SG SystemsWorking Group

SG Communications (UtiliComm)Working Group

SG Security(UtiliSec)

Working Group

UtilityAMIInterest Group

AMI-SecurityTask Force

Network InteropTask Force

SG Conformance(CWG)

Working Group(Proposed)

OpenADRTask Force

OpenADETask Force

24© 2009 Electric Power Research Institute, Inc. All rights reserved.

Standards Development Coordination –Getting Utility Input

EPRI

Technical & Facilitation

EEI

Policy & Facilitation

OpenSG

61850ug

DNP3 Users group

CIMug

IEEE

IEC

... ...

...

25© 2009 Electric Power Research Institute, Inc. All rights reserved.

EPRI Smart Grid Resource Centerwww.smartgrid.epri.com - & Use Case Repository

26© 2009 Electric Power Research Institute, Inc. All rights reserved.

Some important conferences for coordination

• Microgrids Symposium– 2009 San Diego– 2010 Vancouver– http://der.lbl.gov/new_site/DER.htm

• IDER Conferences– 2006 Napa– 2008 Nice, France– 2010 Albuquerque– http://www.conference-on-integration.com/

• DOE RDSI Peer Review Meetings– 2008 New Jersey (http://events.energetics.com/rdsi2008/)– 2009 San Diego (with Microgrids Symposium)