KUMARAGURUCOLLEGE OF TECHNOLOGY
COIMBATORE-641006
SOFTWARE DEVELOPMENT LAB
--------------------------------------------------
LABORATORY MANUAL
DEPARTMENT OF MCA
1
CONTENTS
Exercise no. Title of the Exercise Page no.
I Rational Administrator 3
II Vision Document 11
III Use Case Document 20
IV Requirement Management Plan 24
V Use Case Diagram 38
VI Sequence Diagram 43
VII Collaboration Diagram 47
VIII Activity Diagram 50
IX Rational Purify 54
X Rational Quantify 57
XI Rational Robot 62
XII Rational Test Factory 66
XIII Rational Test Manager 70
2
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 1
Lab Code / Lab : Software development lab
Course / Branch : MCA.
Title of the exercise/experiment : Rational Administrator
______________________________________________________________
STEP 1: INTRODUCTION
a) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To create groups and users after setting the project with appropriate requirement
and test data sources. The groups are like manager, tester and test designer.
Also the users are to be assigned to appropriate groups.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
b) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
3
c) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Open Rational administrator by clicking start
Programs Rational software Rational
administrator.
2 Select File new Project and enter the project
name and location.
3 Enter the password with which we can connect
to, configure or delete the project.
4 Read the summary of the project settings
provided and configure the project and click the
finish button.
5 If the configure project now option is selected ,
the configure project dialog box opens.
6 Create an associated requisitepro project with
the required template.
7 Create an associated Test Data source- choose
the type of data store.
8 Right click and select the connect option on the
project name.
9 Create test group by right clicking test group (in
tree structure) and selecting the Insert Test
Group option.
10 Name the test group and set it as default group
and edit the privilege based on the need.
11 Create a Test user by right cliking test user(in
the tree structure) and selecting the insert test
user option.
12 Enter the user ID and other necessary details.
4
And click ok, the test user is created.
Note:
d) Calculations
Not applicable.
e) Inference and analysis:
5
6
7
8
9
STEP 3: PRACTICE/TESTING
Questions with answers:
Use the Rational administrator and do the following work.
a) Create the following test groups and assign group permissions.
i) Managers ii) Testers iii) Test Designers
b) Create five users and attach them to appropriate groups.
1. Note: Furnish suitable descriptions wherever required
10
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 2
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA.
Title of the exercise/experiment : Vision Document.
______________________________________________________________
STEP 1: INTRODUCTION
a) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To prepare a vision document for a project using Rational requisite pro.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
b) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
c) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Open Rational Requisitepro by clicking Start
11
ProgramsRational Software Rational
Requisite pro,
2 Select FileNew Project and enter the project
name and location.
3 Right click the Features and vision document in
the left pane.
4 Select NewDocument Enter document name
5 Double click the newly created vision document.
6 Edit the template based on the project and add
requirements.
7 Save the document.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
d) Calculations
Not applicable.
e) Inference and analysis:(Sample document of Keyboard typing tutor.
Keyboard Typing TutorKUMARAGURU
Version 1.0
12
Revision History
Date Version Description Author
10/07/2009 1.0 Initial Release N.Jayakanthan
13
Table of Contents
1. Introduction 1
1.1 Purpose 11.2 Scope 11.3 Definitions, Acronyms and Abbreviations 11.4 References 1
2. Positioning 1
2.1 Business Opportunity 12.2 Problem Statement 12.3 Product Position Statement 1
3. Stakeholder and User Descriptions 2
3.1 Stakeholder Summary 23.2 User Summary 23.3 Key Stakeholder / User Needs 2
4. Product Overview 2
4.1 Summary of Capabilities 2
5. Product Features 2
5.1 Login 25.2 Course 5.3 Sentence drills 35.4 Paragraph drills 35.5 Free drills 35.6 Game 3
6. Constraints 3
7. Quality Ranges 4
8. Other Product Requirements 4
8.1 System Requirements 4
9 Documentation Requirements 4
9.1 User Manual 4
14
KUMARAGURU1. Introduction
The purpose of this document is to collect, analyze and define high-level needs and features of the Keyboard Typing Tutor. It focuses on the capabilities needed by the stakeholders, and the target users, and why these needs exist. The details of how the Keyboard Typing Tutor fulfils these needs are detailed in the use-case and supplementary specifications.
1.1 Purpose
This system serves as a guide to learn fingering in a quick and more efficient manner. The primary objective of the project, Keyboard Typing Tutor is to devise software which acts as a very good platform to people who wishes to train them in fingering.
1.2 Scope
In view of the fact that the versatility and speed is growing to be the most important factor of any system, the need of any such system comes into the picture. Computerized system possesses these properties and it is very useful. All the above criteria are met in this project to reduce all the uncertainty.
1.3 Definitions, Acronyms and Abbreviations
See the glossary.
1.4 References
www.w3school.com www.knowledgeisland.com
2. Positioning
2.1 Business Opportunity
The Keyboard Typing Tutor is used to reduce the complexity of learning the fingering. The traditional process will take more time, very less efficiency, so we go in for the next level of learning.
With the various levels of typing offered, the user can learn fingering in an efficient way by moving across various levels and test their skills when needed.
2.2 Problem Statement
The problem of The manual training process.
affects Students and other users.
The impact of which is Time consuming and less efficiency.
A successful solution would Calculating the accuracy percentage and speed.
15
2.3 Product Position Statement
For Students
Who Wish to improve their typing speed
The Keyboard Typing Tutor is a software
That Enables quick and efficient learning
Unlike The existing manual training
Our product Provides in-built features to keep a check on accuracy and speed
3. Stakeholder and User Descriptions
This section describes the users of the Keyboard Typing Tutor. The users of the Keyboard Typing Tutor: the students and others who wish to learn typing.
3.1 Stakeholder Summary
Name Role
Students Ensures that their typing skills has improved.
3.2 User Summary
Name Description Stakeholder
Students Learns typing in a quick and more efficient way.
Self-represented
3.3 Key Stakeholder / User Needs
A User Survey was conducted to determine the user problems with the existing system and to solicit user input on improvements. The complete survey results are included in the Stakeholder Requests Document. A summary of the survey results are listed below in order of relative importance from high to low
Need Priority Concerns Current Solution Proposed Solutions
Quick learning High Time intensive work
The students have to take up courses to learn typing.
Computerized system which eases the learning process.
Efficiency High Inefficiency The typing efficiency cannot be effectively measured.
Computerized system which calculates the typing efficiency then and there.
16
4. Product Overview
4.1 Summary of Capabilities
Customer Support System Customer Benefit Supporting FeaturesEasy to use The system provides a very good user interface that
can be accessed by any user.Quick and Efficient learning Making the user interface easy, eventually makes the
learning process quick.
Accuracy calculations ensure efficiency.
5. Product Features
5.1 Login
The system prompts for a user name. This is done to keep track of the sessions.
5.2 Course
Provide effective help
Indicate mistakes
Calculate accuracy
Highlight the key to be typed and the finger to be used
The system should provide a full course that enables the user to train him with the basic characters and its combinations. Efficient help should be provided by displaying a sample of a computer screen and a keyboard. This will be helpful in knowing about the arrangement the keys in the keyboard. The tutor should also provide visual aid to the user by highlighting the key to be typed in the keyboard and the finger to be used and the respective hand. The accuracy should be calculated based on the text displayed in the sample screen and the text the user types in.
5.3 Sentence drills
Provide sentences to explore formatting
Sentence drills should provide training to the user to explore the formatting of text in various contexts. All the aid that is to be provided for the course has to be provided for the sentence drills too.
5.4 Paragraph drills
Provide training for full length paragraphs
Reload Paragraphs
Paragraph drills should train the user for a full length paragraph without providing any help. Here comes the real test, the user’s typing skill can be tested here because the aids are not provided. Since it is the first challenge to be placed by the user, the system should provide a provision to reload the existing paragraph or move to the previous paragraph until he is satisfied with his performance.
17
5.5 Free drills
Get the text to be practiced from the user
Free drills should facilitate the user to train him for any text he desires. This process can be terminated by the user based on his satisfaction. All the aids that are to be provided for other features should be provided here too.
5.6 Game
Get the type of game
Option to select the speed
Game should allow the user to check his typing skills learnt so far. And should allow the user to select the type of game he needs to play based on his comfort and the speed in which the game is to be played based on his skill.
6. Constraints
Usage of backspace key is strictly prohibited.
7. Quality Ranges
This section defines the quality ranges for performance, robustness, fault tolerance, usability, and similar characteristics for the Keyboard Typing Tutor.
Usability: The System shall be easy-to-use and shall be appropriate for the people who wish to train them in fingering.
8. Other Product Requirements
8.1 System Requirements
The software can run in any windows operating system. The software that should be available for this application are Visual Basic and
Microsoft Access.
9. Documentation Requirements
9.1 User Manual
The User Manual shall describe use of the System from any lay man’s perspective. The User Manual shall include:
← Minimum System Requirements ← All System Features
The User Manual page dimensions shall be in A4 size. The User Manual shall be available as hardcopy.
18
STEP 3: PRACTICE/TESTING
(For the exercise/experiment, prepare a list of all possible questions (with
answers) that are likely to be asked in the viva-voce of the final lab examination.)
Questions with answers:
2. Prepare Vision document for your project with all necessary detail
using requisite pro.
19
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 3
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA.
Title of the exercise/experiment : Use case document.
______________________________________________________________
STEP 1: INTRODUCTION
a) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To prepare a use case document for the project using rational
requisitepro.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
b) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
c) Procedure for doing the exercise/experiment:
Steps Description (in full)
20
1 Open the Rational Requisite pro by selecting
Start ProgramsRational SoftwareRational
requisite pro.
2 Select File New Project and enter project
name and location.
3 Right click the use case document in the left
pane.
4 Select NewDocument Enter document
name.
5 Repeat steps 3 and 4 for each use case
document to be created.
6 Double click the newly created use case
document.
7 Edit the template based on the project and add
requirements.
8 Save the requirements.
d) Calculations
Not applicable.
e) Inference and analysis:(Sample usecase for the project Keyboard typing
tutor).
Keyboard Typing TutorKUMARAGURUCourse
Version 1.0
21
Revision HistoryDate Version Description Author
15/07/2009 1.0 Initial Release D.Sumitha
K.Prabhavathi
Table of Contents
1. Course 1
1.1 Brief Description 1
2. Flow of Events 1
2.1 Basic Flow 1
3. Special Requirements 1
4. Preconditions 1
5. Post Conditions 1
6. Extension Points 1
22
KUMARAGURUCourse Course
Brief Description
This use case allows the actor to train him with the basic characters and its combinations. The actors starting this use case are the students and other users who wish to learn typing.
Flow of Events
The use case begins when the actor selects the “course” option.
Basic Flow
Enter the text
1. The system displays a blank space to enter the text corresponding to the text displayed.
2. The system provides visual aid by highlighting the key to be pressed and the finger to be used.
3. The system checks the text displayed and the text typed.
4. The accuracy calculated is displayed.
Alternative Flows
If the actor chooses to return to main menu, the system should display the menu.
Special Requirements
Nil
Preconditions
Login Before this use case begins the Actor should have logged in to the system.
Post Conditions
There is no post conditions associated with this use case.
Extension Points
There is no extension point associated with this use case.
STEP 3: PRACTICE/TESTING
Questions with answers:
1.Prepare a use case document for your project using Rational
RequisitePro.
KUMARAGURU23
COLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 4
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Requirement Management plan.
______________________________________________________________
STEP 1: INTRODUCTION
f) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To prepare the requirement management plan for the given project using
rational requisite pro.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
g) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
a) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Requirement management plan document sets
out guidelines for establishing the requirements
documents, types attributes and traceability to
24
manage project requirements.
2 Open the Rational Requisite pro by selecting
StartProgramRational Software Rational
Requisite pro.
3 Select FileNew Project and enter project name
and location.
4 Double click the requirement management plan
in the left pane.
5 Edit the template based on the project.
6 Save the document.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
b) Calculations
Not applicable.
c) Inference and analysis:(Sample RMP for the project Keyboard typing
tutor).
Keyboard Typing TutorKUMARAGURU
Version 1.0
25
Revision HistoryDate Version Description Author
08/07/2009 1.0 Initial Release D.Sumitha
K.Prabhavathi
26
Table of Contents
1. Introduction 4
1.1 Purpose 41.2 Scope 41.3 Definitions, Acronyms, and Abbreviations 41.4 References 41.5 Overview 4
2. Requirements Management 4
2.1 Organization, Responsibilities, and Interfaces 42.1.1 Customer 42.1.2 User 42.1.3 Stakeholder42.1.4 Project Guide 42.1.5 Project Coordinator 42.2 Contact Table 42.3 Tools, Environment, and Infrastructure 5
3. Requirements Artifacts 5
3.1 Artifact Description 53.1.1 Document Types 53.1.2 Requirement Types 63.2 Traceability 63.2.1 Traceability Criteria for Requirement Types 63.3 Reports and Measures 7
4. Milestones 8
4.1 Inception 84.1.1 Evaluation Criteria 84.1.2 Artifacts 84.2 Elaboration 94.2.1 Evaluation Criteria 94.2.2 Artifacts 94.3 Construction 104.3.1 Artifacts 104.4 Transition 124.4.1 Evaluation Criteria 124.4.2 Artifacts 12
5. Training and Resources 13
27
KUMARAGURU10. Introduction
10.1 Purpose
The purpose of this plan is to establish and document a systematic approach for eliciting, organizing, and documenting the requirements of the system. This plan also establishes and maintains agreement between the customer and the project team on the changing requirements of the system.
10.2 Scope
This plan provides guidelines for the management of Keyboard Typing Tutor.
10.3 Definitions, Acronyms, and Abbreviations
For common vocabulary for this project, please refer to the Glossary document.
10.4 References
Rational Unified Process®, Version 2003 Copyright © 1987 – 2003. Rational Software Corporation
10.5 Overview
This document contains specific details and strategies for managing the requirements of the Keyboard Typing Tutor. The document details how requirements are organized and administrated within our project.
It specifies milestones to be reached and standards to be adhered to so that we can ensure and evaluate fulfillment of the requirements we specify.
11. Requirements Management
11.1 Organization, Responsibilities, and Interfaces
11.1.1 User
A person who will use the system that is developed.
11.1.2 Stakeholder
An individual or organization that is materially affected by the outcome of the system.
11.1.3 Project Guide
The role with overall responsibility for the project. The Project Guide needs to ensure tasks are scheduled, allocated and completed in accordance with project schedules, budgets and quality requirements.
11.1.4 Project coordinator
The Project Coordinator is responsible for ensuring that project standards are correctly and verifiably followed by all project staff.
11.2 Contact Table
Role Name Organization Contact
User Students KCT 0422-2669401
Stakeholder Students KCT 0422-2669401
Project Guide Ms. R.Vanitha KCT 0422-2669401
Project coordinator Mr.S.Hameed Ibrahim KCT 0422-2669401
11.3 Tools, Environment, and Infrastructure
Tool Description License Info
Technical Support
Website
Rational RequisitePro
For managing requirements.
www.rational.com
28
Rational purify For identifying memory leaks and usage
www.rational.com
Rational Test Manager
To create test hierarchy and to do functional testing and performance testing
www.rational.com
Rational Test factory
To analyze code coverage information
www.rational.com
Rational Manual Test
To do manual testing www.rational.com
Rational Pure Coverage
To pin point areas of code that have not been tested
www.rational.com
Rational Robot To perform load testing www.rational.com
Rational SoDA For automated documentation www.rational.com
Rational Quantify To pin point performance bottlenecks
www.rational.com
12. Requirements Artifacts
12.1 Artifact Description
12.1.1 Document Types
Document Type Description Default Requirement Type
Vision (VIS) Conditions or capabilities of this release of the system
Feature (FEAT)
Use-Case Specification (UCS)
Use case description and elaboration. Use Case (UC)
Glossary (GLS) Used to capture common vocabulary. Glossary Item (TERM)
Requirements Management Plan (RMP)
This document type describes requirements and strategies specific to the management and development of the project.
Default for documents without requirements (NONE)
12.1.2 Requirement Types
Requirement Type Description Attributes
Feature (FEAT) An externally observable service provided by the system, which directly fulfills a stakeholder need.
Priority, Type, Status, Difficulty, Stability, Risk, Planned Iteration, Actual Iteration, Origin, Contact
29
Name, Enhancement Request, Defect, Obsolete
Use Case (UC) A description of system behavior, in terms of sequences of actions. A use case should yield an observable result of value to an actor.
Property, Priority, Status, Difficulty, Stability, Risk, Affects Architecture, Contact Name, Planned Iteration, Actual Iteration, Enhancement Request, Defect, Obsolete
Glossary Item (TERM) A term used in the project’s common vocabulary.
12.2 Traceability
12.2.1 Traceability Criteria for Requirement Types
Requirement Type Guidelines Notes
Feature (FEAT) Every Feature with “Approved” status or greater must trace to one or more Supplementary Requirements.
Glossary Item (TERM) Every Glossary term must have a unique and consistent definition throughout all project documents and artifacts.
Use Case (UC) Each Use case should trace to a feature in the vision document.
12.3 Reports and Measures
For reports and measures on this project, use the Requirement Metrics tool, which is available from the Tool menu. In Requirement Metrics, create reports based on requirement types or saved views and query on the following filters:
Attribute Value:
An Attribute Value filter returns the requirements whose attributes have values that match your criteria. The choices you make depend on the data type of the attribute you select in the Attributes drop-down list.
Stakeholder Request
Feature
Use Case
30
Attribute Value Change:
An Attribute Value Change filter returns the requirements with a changed attribute value that matches your BEFORE and AFTER selections. The choices you make depend on the data type of the attribute you select in the Attributes drop-down list. If several changes have been made to the attribute value, your BEFORE selection must specify the value which immediately preceded the current (AFTER) value. To report any change in an attribute value of the selected requirement type, use the Select All buttons for the BEFORE and AFTER selections.
Base Filter:
The Base filter defines the requirement type for a query. Every query is specific to a single requirement type. When you use a saved RequisitePro view defined in the Views Workplace, the Base filter serves as the first filter for requirements. The Base filter cannot be deleted, and is only changed by selecting a new view from the Choose a Requirement View drop-down list.
Children:
The Children filter returns the requirements that have the number of direct children that matches your selection criteria. You must choose which operator to use and enter at least one numeric value. If you choose the "Between" or "Not Between" operator, you must also enter a second numeric value. The default setting (> 0) reports all requirements of the selected type that have any children.
Parent Change
A Parent Change filter returns the requirements whose parent relationship has changed from your BEFORE selection to your AFTER selection. The selections allow you to report requirements that were changed from or to any parent, no parent, or one or more selected parents which you choose. When reporting changes to selected requirements, if a requirement had several changes of parent assignments, your BEFORE selection must specify the value which immediately preceded the current (AFTER) value.
Requirement Creation:
The Requirement Creation filter returns all requirements of the specified requirement type. Typically, this filter is used with the Time Period option to determine which requirements have been created in a specified time period.
Requirement Text Change:
A Requirement Text Change filter returns the requirements whose text has changed the number of times you specify. The filter allows you to choose comparison operators, such as "equal to" (=), "greater than" (>), etc., when specifying the number of times that the text has changed.
Traceability Change:
A Traceability Change filter returns the requirements that had a trace relationship either removed or added, depending on your selection.
View Descriptions:
Query Name Description Requirement Type
Attributes Attribute Value Range
Features displays all requirements of the Feature Type
FEAT all all
Glossary Terms displays all requirements of the Glossary Term Type
TERM all all
31
Use Case Survey displays all requirements of the Use Case Type
UC all all
Requirements traced to Features
Displays traceability between all requirements to features.
ALL to FEAT traceability matrix
Use Cases traced to Features
displays traceability between Use Cases and Features
UC to FEAT traceability matrix
13. Milestones
13.1 Inception
13.1.1 Evaluation Criteria
Stakeholder concurrence on scope definition and cost/schedule estimates
Agreement that the right set of requirements has been captured and that there is a shared understanding of these requirements.
Agreement that the cost/schedule estimates, priorities, risks, and development process are appropriate.
All risks have been identified and a mitigation strategy exists for each.
The project may be aborted or considerably re-thought if it fails to reach this milestone.
13.1.2 Artifacts
Tasks/Artifacts
Description Start Date End Date
Requirements Management Plan This document sets forth our strategy for managing the project requirements
08/jul/2009
Vision Document This document brings together our business proposal and plan with a dynamic vision of the features we propose to deliver.
Use Cases A series of documents and requirements describing how the system will interact with external entities.
Executable The first iteration should deliver an executable product for
32
testing.
Priority/difficulty All requirements should be assigned a priority and difficulty.
13.2 Elaboration
At the end of the elaboration phase is the second important project milestone. At this point, you examine the detailed system objectives and scope, the choice of architecture, and the resolution of the major risks.
13.2.1 Evaluation Criteria
The product Vision and requirements are stable.
The architecture is stable.
The key approaches to be used in test and evaluation are proven.
Test and evaluation of executable prototypes have demonstrated that the major risk elements have been addressed and have been credibly resolved.
The iteration plans for the construction phase are of sufficient detail and fidelity to allow the work to proceed.
The iteration plans for the construction phase are supported by credible estimates.
All stakeholders agree that the current vision can be met if the current plan is executed to develop the complete system, in the context of the current architecture.
Actual resource expenditure versus planned expenditure is acceptable.
The project may be aborted or considerably re-thought if it fails to reach this milestone.
13.2.2 Artifacts
Tasks/Artifacts
Description Start Date End Date
Outline the iteration plan, risks, and architectural objectives.
After the previous iteration was assessed and the project scope and risk reevaluated, the evaluation criteria for the architecture are outlined, considering the "architectural risks".
Use-Case Analysis To get a general feeling of the obvious classes needed, the system requirements, the glossary and the use-case view and the team's general domain knowledge to sketch the outline of the subsystems, possibly in a layered fashion have to be considered.
Implementation: Plan the integration.
A system integrator now studies the use cases that are to be implemented, and defines the order in which
33
subsystems should be implemented, and later integrated into an architectural prototype..
13.3 Construction
Evaluation Criteria
The evaluation criteria for the construction phase involve the answers to these questions:
Is this product release stable and mature enough to be deployed in the user community?
Are all the stakeholders ready for the transition into the user community?
Are actual resource expenditures versus planned still acceptable?
Transition may have to be postponed by one release if the project fails to reach this milestone.
13.3.1 Artifacts
Tasks/Artifacts
Description Start Date End Date
Implementation: Plan system-level integration.
Integration planning takes into account the order in which functional units are to be put together to form a working/testable configuration. The choice depends on the functionality already implemented, and what aspects of the system need to be in place to support the overall integration and test strategy.
Analysis & Design: Refine Use-Case Realizations.
Designers refine the model elements identified in previous iterations by allocating responsibilities to specific model elements (classes or subsystems) and updating their relationships and attributes. New elements may also need to be added to support possible design and implementation constraints. Results of the analysis need to be followed by review(s).
Test: Define Evaluation Mission
The tester gains agreement with stakeholders on the test objectives for this iteration and defines the details of the approach - what will be
34
tested and how.
Implementation: Develop Code and Test Unit
Implementers develop code, in accordance with the project's programming guidelines and they fix defects and provide any feedback that may lead to design changes based on discoveries made in implementation.
Implementation: Plan and Implement Unit Tests.
The implementer needs to design unit tests so that they address what the unit does (black-box), and how it does (white-box). Under black-box (specification) testing the implementer needs to be sure that the unit, in its various states, performs to its specification, and can correctly accept and produce a range of valid and invalid data. Under white-box (structure) testing the challenge for the implementer is to ensure that the design has been correctly implemented, and that the unit can be successfully traversed through each of its decision paths.
Implementation: Test Unit within Subsystem.
Unit Test focuses on verifying the smallest testable components of the software. Unit tests are designed, implemented, and executed by the implementer of the unit.
Implementation: Integrate System.
The purpose of system integration is to combine the currently available implementation model functionality into a build. The system integrator incrementally adds subsystems, and creates a build that is handed over to testers for overall integration testing.
35
13.4 Transition
13.4.1 Evaluation Criteria
The primary evaluation criteria for the transition phase involve the answers to these questions:
Is the user satisfied?
Are actual resources expenditures versus planned expenditures acceptable?
At the Product Release Milestone, the product is in production and the post-release maintenance cycle begins. This may involve starting a new cycle, or some additional maintenance release.
13.4.2 Artifacts
Tasks/Artifacts
Description Start Date End Date
Project Management
The delivery of reliable software, with acceptable performance and complete functionality. Change Requests (mainly defects and feedback from beta testing) are the input for continuing development. Based on the number and severity of the Change Requests, risk management activities should be invoked.
The production of end-user support and installation material, and the formal aspects of acceptance test has to be planned.
Implementation The planning for implementation is driven by the feedback from beta test and other Change Requests raised during test by the project itself. As defects are fixed and subsystems mature, they are integrated into builds for testing. In transition, the main work is in fixing defects in components, not adding new components. Unit testing is still required, but the purpose in transition is to verify changes and avoid regression, not complete functional verification.
Deployment Deployment Planning at this stage in transition is concerned with establishing the schedule and resources for development of end-user support material, acceptance testing, and production, packaging and distribution of software deployment units.
36
Configuration Management
The configuration management activities continue in parallel with the remaining implementation and test with increasing emphasis on the formality of change control.
All requests for change will require sanction by project coordinator.
Finally, as part of acceptance, it is usually necessary to do a Functional Configuration Audit (FCA) and a Physical Configuration Audit (PCA).
14. Training and Resources
Online materials Rational user manuals Tutorials and training sessions Text under reference books
TEP 3: PRACTICE/TESTING
Questions with answers:
3. Setup your project with appropriate Requirements Management
Plan template.
4. Prepare Software Requirements Specification(SRS) document for your
project.
37
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 5
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Use case diagram.
______________________________________________________________
STEP 1: INTRODUCTION
h) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To develop a use case diagram for the project using Rational rose.
Use case diagram present a high level view of how the system is used as
viewed from actors perspective.
A use case diagram contain 1)Actor – things outside the system. Use
cases system-boundaries identifying what the system should do.
Interaction and relationship between actors and use cases in the system
including the associations , decencies and generations.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
d) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
38
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
e) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Select Start Programs Rational
softwareRational rose enterprise edition.
2 Select rational unified process from the ‘create
new model dialog box’.
3 Right click the logical view from the tree
structure in the left pane. And select NewUse
case diagram.
4 The toolbar consists of actors, use case,
unidirectional association, generation and
dependency.
5 Use the tools to draw the use case diagram.
Note:
f) Calculations
Not applicable.
g) Inference and analysis:(sample )
39
Use Case Diagrams:
Login
Take up the course
Parctice Sentences
Practice Paragraphs
Practice any text using free drills
Test your skills - Game
Student
Use Case Diagram depicting the overall operations
40
Update the text to be typed
Administrator
Enter the given text
Make use of the visual aid
View the accuracy percentage
Return to the Main Menu
Student
Use Case Diagram depicting the Course Module
41
Update the text to be typed
Administrator
Select the speed of the game
Select the type of the game
Enter the text
Select between play, pause and redo
Check on the time left for each text
View the points and result
Exit
Student
Use Case Diagram depicting the Game Module
42
STEP 3: PRACTICE/TESTING(For the exercise/experiment, prepare a list of all possible questions (with
answers) that are likely to be asked in the viva-voce of the final lab examination.)
Questions with answers:
5. What is use case diagram?
6. Prepare the use case diagram using Rational rose for the your
software.
43
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 7
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Sequence diagram.
______________________________________________________________
STEP 1: INTRODUCTION
i) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To develop a sequence diagram for the given project using Rational
Rose.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
h) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
44
i) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 A sequence diagram is a graphical view of a
scenario that shows the object interaction in a
time based sequence – what happens first, what
happens next.
2 An object has state , behavior and identity. A
message icon represents the communication
between the object indicating an action will
follow. The message icon is a horizontal, solid
arrow connecting the line together.
3 Focus of control (FOC) is an advance notational
technique that enhances sequence diagram. It
shows the period of time during which an object
as performs an action, either directly or through
identifying procedure.
4 Select start Programs Rational Software
Rose Enterprise Edition.
5 Select Rational unified process from the ‘Create
new model dialog box.
6 Right click the logical view from the tree
structure in the left pane and select New
sequence diagram.
7 The toolbar consists of objects, object message
to self, return message.
8 Use the tools to draw the sequence diagram.
Note:
j) Calculations
Not Applicable.
k) Inference and analysis(sample)
45
Sequence Diagrams:
Student : StudentStudent : StudentSystem : <Process
Name>System : <Process
Name>Drills : <Process
Name>Drills : <Process
Name>Admiinistrator : Administrator
Admiinistrator : Administrator
1. Enter the user Name
2. Check for existing user or accept new user
3. Display the menu
4. Select from the menu
5. Invoke the drill
6. Display the options
7. Select a drill
8. Invoke the appropriate drill
9. Display the interface
10. Update the text
11. Enter the text
12. Check the correctness
13. Calculate accuracy
14. Display the accuracy percentage
15. Return to the Main Menu
16. Exit
Sequence Diagram depicting all the Drill Modules
46
Student : StudentStudent : StudentSystem : <Process
Name>System : <Process
Name>Game : <Process
Name>Game : <Process
Name>Admiinistrator : Administrator
Admiinistrator : Administrator
1. Enter the user Name
2. Check for existing user or accept new user
3. Display the menu
4. Select from the ...
5. Invoke the game
6. Display the options
7. Select the type and speed of the game
10. Update the text
11. Enter the text
12. Check the correctness
13. Calculate accuracy
14. Display the points and result
8. Invoke the game based on the specified opt...
9. Display the interface
15. Exit
Sequence Diagram depicting all Game Module
47
STEP 3: PRACTICE/TESTING
Questions with answers:
7. What is sequence diagram?
8. Develop sequence diagram for your project using Rational Rose.
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 8
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Collaboration diagram
______________________________________________________________
STEP 1: INTRODUCTION
j) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To develop a collaboration diagram for the project.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
l) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
48
m) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Collaboration diagram is an interaction diagram
that’s shows the order of message that
implement an operation or transaction.
2 An object has a state, behavior and identity.
3 Message represent the communication between
messages.
4 Select startProgramsRational software
Rational rose Enterprise Edition.
5 Right click the logical view from the tree
structure in the left pane. Select New
Collaboration diagrams.
6 The toolbar consists of object, class interface,
object link, link message.
7 Use the tool to draw collaboration diagram.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
n) Calculations
Not applicable.
o) Inference and analysis:
49
Student : Student
System : <Process Name>
Drills : <Process Name>
Admiinistrator : Administrator
1: 1. Enter the user Name
4: 4. Select from the menu
15: 15. Return to the Main Menu
2: 2. Check for existing user or accept new user
3: 3. Display the menu
16: 16. Exit
5: 5. Invoke the drill
8: 8. Invoke the appropriate drill
12: 12. Check the correctness
13: 13. Calculate accuracy
6: 6. Display the options
9: 9. Display the interface
14: 14. Display the accuracy percentage
7: 7. Select a drill
11: 11. Enter the text
10: 10. Update the text
STEP 3: PRACTICE/TESTING
Questions with answers:
9. Prepare a collaboration diagram for your project using Rational
rose.
50
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 8
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Activity diagram.
______________________________________________________________
STEP 1: INTRODUCTION
k) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To develop activity diagram for the project.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
p) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
q) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Activity represents the performance of the task
51
or duty in a work flow.
2 It represent specific location where the
workflow may branch based upon guard
conditions.
3 Select StartProgramsRational Software
Rational rose enterprise edition
4 Select Rational unified process ‘Create New
Model Dialog Box’
5 Right click the logical view and select
NewActivity diagram.
6 The tool bar consists of state, activity, start
state, end state, state transition, transition to
self, horizontal synchronization, decision.
7 Use the tool to draw the activity diagram.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
r) Calculations
Not applicable.
s) Inference and analysis:(Sample).
52
Enter User Name
Look f or Existing User
Accept New User
Display Menu
Select f rom the menu
Check the choice
Drill Games
Select a Drill
Course Sentence Drill Paragraph Drill Free Drill
Enter the text Enter the Sentences
Enter the Paragraph
Enter the text to be practiced
Calculate the Accuracy
Display the accuracy Percantage
Select the ty pe and speed of the game
Inv oke the timer
Enter the text
Exit
Return to Main Menu
New User
Existing User
53
STEP 3: PRACTICE/TESTING
Questions with answers:
10. What is activity diagram.
11.Define activity.
12.Draw an activity diagram for your project using Rational rose.
54
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 9
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Rational purify.
______________________________________________________________
STEP 1: INTRODUCTION
l) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To run the application using rational purify and collect the summary of
error and leak data.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
m) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
n) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Select StartProgramsRational Software
55
Rational purify.
2 Select FileRun in the program name select the
.exe file.
3 In collect frame click error and leak data and
click run.
4 The output of the error and memory leaks are
displayed.
5 Repeat steps 2 and 3 for coverage, error and
leak data in the collect frame.
6 The errors and memory allocations are
displayed.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
o) Calculations
Not applicable.
p) Inference and analysis:
56
Error and Leak Data
Coverage, Error and Leak Data
STEP 3: PRACTICE/TESTING
(For the exercise/experiment, prepare a list of all possible questions (with
answers) that are likely to be asked in the viva-voce of the final lab examination.)
Questions with answers:
1. Run your application using Rational Purify and collect coverage, error & leak
data. Create suitable filter settings & extract the report.
Output: a) Summary of memory leaks & memory usage,
b) Processing time and c) Displayed errors, warnings and
bytes leaked.
57
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 10
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Rational quantify.
______________________________________________________________
STEP 1: INTRODUCTION
q) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To collect , analyze and compare the performance the project.
Rational quantify is a run time analysis tool offers software developers and
testers a practical solution for identifying bottlenecks and then reducing or
eliminating them through systematic engineering,
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
t) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
58
2 TURBO C 60
u) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Select StartProgramRational software
Rational quantify.
2 Click FileRun. In the run program dialog box ,
select the .exe file.
3 Click run. A call graph indicating the most
expensive path and functioning in the models
are displayed.
4 The function details button can be clicked which
displays the percentage of fours, callers and
descendants for functions.
5 Click on the function list icon in the toolbars to
display the function calls and time.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
v) Calculations
Formulae used with explanations
Sample calculations
w) Inference and analysis:
59
Run Summary
60
Call Graph
Function Detail
Function List
61
STEP 3: PRACTICE/TESTING
Questions with answers:
13. Using Rational Quantify, collect, analyze and compare the
performance data for your project.
62
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 11
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Rational Robot.
______________________________________________________________
STEP 1: INTRODUCTION
r) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To record and playback the test script using Rational Robot for performance.
Rational Robot can be used to develop two kind of scripts.
1.GuI scripts for function testing
2.Vu and VB script for performance testing.
Rational Robot used to:
Perform full function testing.
Perform full performance testing.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
x) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR 60
63
RAM 80 GB HDD MACHINE
2 TURBO C 60
y) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Select StartProgramsRational Robot
2 Select GUI script and enter name for it.
3 A GUI record dialog box appears with options
and choose project.
4 Select the stop button in GUI record dialog box
after completion.
5 The script is generated
6 Select playback button and give a name in the
playback dialog box
7 Give the build name.
8 Rational robot starts playing back the entire
process.
9 Report is generated with pass and fail indication
of each function.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
z) Calculations
Not applicable.
aa) Inference and analysis:
64
Create a GUI Script
Record GUI Script
65
Status Report
Robot Script
STEP 3: PRACTICE/TESTING
Questions with answers:
14. Record and play back the test script using Rational Robot for
performance testing.
66
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 12
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA.
Title of the exercise/experiment : Rational Test Factory.
______________________________________________________________
STEP 1: INTRODUCTION
s) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To run the application, instrument, map and pilot it using Rational Test
factory and collect, code coverage information and mapping summary.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
bb) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
cc) Procedure for doing the exercise/experiment:
67
Steps Description (in full)
1 Start program Rational softwareRational
Test factory.
2 Select the user and Rational Project
3 New project wizard dialog box opens, select the
executable and programming language.
4 Select tools Instrument. Add the project files
and the path to rebuild.
5 Click on the “Instrument button” the project will
run, and the instrumentation and rebuild will be
completed.
6 SelectToolsApplication ManagerAut
executable, select the depth as single level and
click finish.
7 A mapping summary will be generated
8 The script will run and report on code coverage
will be generated
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
dd) Calculations
Not applicable.
ee) Inference and analysis:
68
Instrument
69
Application Manager
STEP 3: PRACTICE/TESTING(For the exercise/experiment, prepare a list of all possible questions (with
answers) that are likely to be asked in the viva-voce of the final lab examination.)
Questions with answers:
15. Instrument, map and pilot run your application under test (AUT) using
Rational Test Factory. Collect a) Code coverage information and b)
Mapping summary.
16.What is test factory?
17.What is auto pilot?
70
KUMARAGURUCOLLEGE OF TECHNOLOGY
LABORATORY MANUAL
Exercise/Experiment Number: 14
Lab Code / Lab : P07CA504 Software development lab.
Course / Branch : MCA
Title of the exercise/experiment : Rational Test manager.
______________________________________________________________
STEP 1: INTRODUCTION
t) OBJECTIVE OF THE EXERCISE/EXPERIMENT
To develop test case hierarchy , specify test preconditions , post conditions with
acceptance criteria using Rational Test manager.
STEP 2: ACQUISITION
(The full material for the following topics is to prepared)
ff) Facilities/material required to do the exercise/experiment:
Sl.No. Facilities/material required Quantity
1 P IV 3.0 GHZ 2GB DDR
RAM 80 GB HDD MACHINE
60
2 TURBO C 60
gg) Procedure for doing the exercise/experiment:
Steps Description (in full)
1 Click Start ProgramsRational
softwareRational Test manager.
71
2 Select the user and the rational project.
3 Select the File New Test planEnter name
and description and click ok
4 In the new dialog box opened for the test plan,
right click the test plan and Insert test case
folder and Enter n name and click ok
5 Right click the new test case folder and insert
test case.
6 Enter the name and description, click on the
Implementation Tab and under Automated
implementation, click SelectGUI Select a
test script and click ok. Give the precondition,
post condition and acceptance criteria.
7 Right click the test case and select run.
8 The script will run and the test case results will
be displayed.
9 Select the analysis tab on the left pane
10 Expand the listing reports
11 Select the reports for the following listings
Build, log, script, user, test plan and click run to
generate the reports.
Note:
(Diagrams like circuit diagrams, chart like process charts and so on are to be
provide as per the requirement of the exercise.)
hh) Calculations
Not applicable.
ii) Inference and analysis:
72
Test Case Execution
Test Case Results
73
Build Listing
Log Listing
74
Script Listing
User Listing
75
Test Plan Listing
STEP 3: PRACTICE/TESTING
(For the exercise/experiment, prepare a list of all possible questions (with
answers) that are likely to be asked in the viva-voce of the final lab examination.)
Questions with answers:
18. What is test manager?
19.Record and play back the test script using Rational Robot for
performance testing. Use Rational Test Manager to review and analyze
test log details.s