Solar Energy20 October, 2010
Monterey Institute for International Studies
Chris Greacen, Palang Thai
![Page 2: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/2.jpg)
Outline• The sun’s energy• Passive solar, cooking, water heating, electricity• Photovoltaics (PV)
– Basic market trend– How PV works
• Basic types of solar electric systems• Grid-connected systems
– Components– Net metering– Calculating simple payback– (with detour on Peak Sun Hours, array tilt, shading)
• Off-grid– Components
• Lead acid batteries• Charge controllers• Inverters
– System sizing overview
![Page 3: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/3.jpg)
![Page 4: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/4.jpg)
World power consumption:
15 TW
![Page 5: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/5.jpg)
Thermal
Electricity
Solar thermal electricity Photovoltaics
Water heatingCookingHome heating/cooling
![Page 6: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/6.jpg)
COMMON GROUND: “Zero Net Energy”
Community
LOPEZ COMMUNITY LAND TRUSTLopez Island, WA
![Page 7: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/7.jpg)
![Page 8: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/8.jpg)
![Page 9: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/9.jpg)
Solar water heating
![Page 10: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/10.jpg)
Generating electricity from sunlight• Solar thermal electric • Photovoltaics (PV)
![Page 11: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/11.jpg)
How solar thermal electric works
www.greenterrafirma.com
![Page 12: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/12.jpg)
Concentrating Solar Power (Solar Thermal
Electric)
![Page 13: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/13.jpg)
Solar Energy Generating Systems (SEGS)
Kramer Junction, CA
![Page 14: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/14.jpg)
www.greenterrafirma.com
![Page 15: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/15.jpg)
How PV works
![Page 16: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/16.jpg)
Current/Voltage (IV) curve for solar cell
![Page 17: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/17.jpg)
![Page 18: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/18.jpg)
![Page 19: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/19.jpg)
![Page 20: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/20.jpg)
Off-grid array-direct system
Image source: Solar Energy International SEI
![Page 21: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/21.jpg)
Off-grid direct current (DC) system with batteries
Image source: Solar Energy International SEI
![Page 22: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/22.jpg)
![Page 23: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/23.jpg)
Pico-PV (small DC systems) Barefoot Power
0.5W
1.0W
1.5W
2.5W
15W
5W
10W
3.6V 12V
![Page 24: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/24.jpg)
Off-grid system with AC & DC loads
Image source: Solar Energy International SEI
![Page 25: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/25.jpg)
Small (300 Watts): Solar Nexus Bigger (3 kW):
Trace
![Page 26: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/26.jpg)
Grid connected (AC)
Image source: Solar Energy International SEI
![Page 27: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/27.jpg)
Net metering
Image source: Real Goods
![Page 28: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/28.jpg)
Image source: Solar Energy International SEI
![Page 29: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/29.jpg)
Image source: Solar Energy International SEI
![Page 30: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/30.jpg)
Photovoltaics
![Page 31: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/31.jpg)
Net Metering in the USA
State policy
Voluntary utility program(s) only
www.dsireusa.org / April 2009
*State policy applies to certain utility types only (e.g., investor-owned utilities)
WA: 100
OR: 25/2,000*
CA: 1,000*
MT: 50*
NV: 1,000*
UT: 25/2,000*
AZ: no limit*
ND: 100*
NM: 80,000*
WY: 25*
HI: 100KIUC: 50
CO: 2,000co-ops & munis:
10/25
OK: 100*
MN: 40
LA: 25/300
AR: 25/300
MI: 20*
WI: 20*
MO: 100
IA: 500* IN: 10*
IL: 40*
FL: 2,000*
KY: 30*
OH: no limit*
GA: 10/100
WV: 25
NC: 20/100*
ME: 100
VT: 250
VA: 20/500*
NH: 100
MA: 60/1,000/2,000*
RI: 1,650/2,250/3,500*
CT: 2,000*
NY: 25/500/2,000*
PA: 50/3,000/5,000*
NJ: 2,000*
DE: 25/500/2,000*
MD: 2,000
DC: 1,000
40 states &
DC have adopted a
net metering policyNote: Numbers indicate system capacity limit in kW. Some state limits vary by customer type, technology and/or system application. Other limits may also apply.
![Page 32: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/32.jpg)
Feed-in tariffs
• long-term contracts for the electricity produced
• purchase prices that are methodologically based on the cost of renewable energy generation.
![Page 33: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/33.jpg)
Thai feed-in tariffs
Assumes exchange rate 1 Thai baht = 0.029762 U.S. dollars
Fuel Adder Additional for diesel offsetting areas
Additional for 3 southern provinces
Years effective
Biomass Capacity <= 1 MW $ 0.015 $ 0.030 $ 0.030 7 Capacity > 1 MW $ 0.009 $ 0.030 $ 0.030 7
Biogas <= 1 MW $ 0.015 $ 0.030 $ 0.030 7 > 1 MW $ 0.009 $ 0.030 $ 0.030 7
Waste (community waste, non-hazardous industrial and not organic matter)
Fermentation $ 0.074 $ 0.030 $ 0.030 7 Thermal process $ 0.104 $ 0.030 $ 0.030 7
Wind <= 50 kW $ 0.134 $ 0.045 $ 0.045 10 > 50 kW $ 0.104 $ 0.045 $ 0.045 10
Micro-hydro 50 kW - <200 kW $ 0.024 $ 0.030 $ 0.030 7 <50 kW $ 0.045 $ 0.030 $ 0.030 7
Solar $ 0.238 $ 0.045 $ 0.045 10
Tariff = adder(s) + bulk supply tariff + FT chargeSolar tariff = $0.24 + $0.05 + $0.03 = $0.32/kWh
![Page 34: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/34.jpg)
ww
w.p
ea.c
o.t
h
call
cente
r 1
12
9
34การไฟฟ�าส่�วนภู�มิ�ภูาค
การไฟฟ�าส่�วนภู�มิ�ภูาคPROVINCIAL ELECTRICITY AUTHORITY
2006 2007 2008 20090
50
100
150
200
250
300
350
Wind
Hydro
MSW
Solar
Cogener-ation
Biogas
Biomass
รวมิ
Year
MW (31 August 2009)
Generating Capacity supply to Grid from 2006 - August 2009
![Page 35: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/35.jpg)
![Page 36: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/36.jpg)
• System size: 3 kW
Grid-connected Solar PV
![Page 37: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/37.jpg)
Bangkok Solar 1 MW PV
• Bangkok• Project size: 1 MW
Grid-connected Solar PV
![Page 38: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/38.jpg)
How do you estimate how much electricity it will produce?
How long does it takes to pay for itself?
![Page 39: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/39.jpg)
Solar panel produces more power when it faces the sun
![Page 40: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/40.jpg)
![Page 41: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/41.jpg)
![Page 42: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/42.jpg)
Seasonal array tilt
36.6 degrees in Monterey
![Page 43: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/43.jpg)
![Page 44: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/44.jpg)
1200
1000
800
600
400
200
Wat
ts/m
²
8:00 10:00 14:00 16:006:00 18:00
Peak Sun Hours
Peak Sun HoursSan Francisco: 5.4 PSH annual average, tilt at latitude*
*Source: http://rredc.nrel.gov/solar/old_data/nsrdb/redbook/sum2/23234.txt
![Page 45: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/45.jpg)
annual average peak sun hours (PSH)
![Page 46: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/46.jpg)
Anacortes, WA = 3.7 PSH per day annual averageSan Francisco = 5.4 PSH
![Page 47: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/47.jpg)
Energy produced
kWh per year = (PSH) x (peak kW of array) x (solar panel derating) x (inverter efficiency) x 365
Example:
5.4 hours x 2.5 kW x 85% x 95% x 365 = 4000 kWh
![Page 48: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/48.jpg)
Grid-tied solar simple payback period
• Installed cost $7K to $9K per kW2.5 kW * $8,000 = $20,000
• Value of annual electricity offset:$0.25/kWh * 4000 kWh/year = $1000/yr
• Simple Payback:$20,000 / $1000/yr = 20 years
(assuming no subsidies)
![Page 49: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/49.jpg)
Financial sketch: MW-scale solar project in Thailand
• Project size: 1 MW• Cost estimate: $4
million• Tariffs:
– TOTAL: $0.33/kWh for 10 years
• Simple Payback: 6.5 years
• 10-year IRR: 14%
Discounted accumulated cashflow
(120,000,000)
(100,000,000)
(80,000,000)
(60,000,000)
(40,000,000)
(20,000,000)
-
20,000,000
40,000,000
0 2 4 6 8 10
bah
t
Note: project is real. Financials are conjecture. 10% discount rate, 4% inflation
![Page 50: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/50.jpg)
Off-grid systemsDC SYSTEMS
SYSTEMS WITH AC LOADS
![Page 51: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/51.jpg)
![Page 52: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/52.jpg)
Thai solar home systems
![Page 53: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/53.jpg)
Solar for computer training centers in seven Karen refugee camps
Thai-Burma border
• 1 kW PV hybrid with diesel generator• Each powers 12 computers
![Page 54: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/54.jpg)
Solar panelCharge controller
Battery
Loads
Off-grid system components
![Page 55: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/55.jpg)
Solar panelCharge controller
Battery
Loads
Off-grid system components
![Page 56: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/56.jpg)
PbO2
PbSep
arat
or
+ -
H2SO4
Lead Acid Batteries• Two electrodes
– Negative electrode Lead (Pb).
– Positive electrode Lead dioxide (PbO2).
• Electrolyte – Sulphuric Acid
(H2SO4).• Sulfation, equalizing
![Page 57: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/57.jpg)
Lead Acid Batteries
![Page 58: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/58.jpg)
Lead Acid Battery Types
• Starting, Lighting and Ignition (car battery)– Shallow cycle: 10% DOD– Deep discharge drastically reduces battery life.– Thin plates maximize surface area and current.
• Deep cycle – e.g. golf cart and forklift– Deep cycle: 60% to 80% DOD– Thick plates or tubes withstand deep discharge.
![Page 59: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/59.jpg)
Lead Acid Battery Cycle Life
• Number of cycles to a particular DOD.• Cycle life decreases with increasing DOD.• Sulphation is the main cause of failure.
0% 50% 100%
Depth of Discharge (DOD)
Car battery
Deep cycle battery
2000
4000
Cyc
les
to 8
0%
cap
aci
ty
![Page 60: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/60.jpg)
Solar panelCharge controller
Battery
Loads
Off-grid system componentsCharge Controller
![Page 61: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/61.jpg)
Charge controller
• Ensures that battery is not over-charged
• For small DC systems, often features a Low Voltage Disconnect (LVD) to ensure that battery is not over-discharged
• Fancy big ones sometimes have Maximum Power Point Tracking (MPPT) that squeezes more power out of solar panels
![Page 62: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/62.jpg)
Off-grid system components
![Page 63: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/63.jpg)
Inverter• Converts Direct Current (DC) to
Alternating Current (AC) to power ‘regular’ loads
• Sometimes includes battery charger
• Typically can surge to 3X rated power
![Page 64: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/64.jpg)
Inverter Waveforms
• Square Wave
• Modified Square Wave
• Sine Wave
![Page 65: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/65.jpg)
Back-of-the-envelope steps for designing an off-grid solar
electric system1. Load analysis
2. Specify capacity of solar panel, battery, charge controller, and inverter (if necessary)
3. Wire sizing
![Page 66: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/66.jpg)
ITEM LOAD(Watts)Ceiling Fan 10-50Clock Radio 5Clothes Washer 1450Electric Clock 4Iron 1500Sewing Machine 100Table Fan 10-25Refrigerator/Freezer (19 Cu Ft) 1000 Wh/dayRefrigerator/Freezer (12 Cu Ft) 470 Wh/dayRefrigerator/Freezer (4 Cu Ft) 210 Wh/dayBlender 350Coffee Pot 1200Microwave (.5 Cu Ft) 750Electric Range 2100Incandescent (100W) 100Incandescent (60W) 60Compact Fluorescent (60W equivalent) 16Incandescent (40W) 40Compact Fluorescent (40W equivalent) 11CB Radio 10CD Player 35Cellular Phone 24Computer Printer 100Computer (Desktop) 80-150Computer (Laptop) 20-50Stereo (average volume) 15Stereo (Large Full volume) 150TV (12 inch black and white) 15TV (19 inch color) 60VCR 40Band Saw (14”) 1100Circular Saw (7.25”) 900Disc Sander (9”) 1200Drill (1/4”) 250
![Page 67: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/67.jpg)
Load analysis
Qty LoadWatts each
Watts total
Hours per day
Watt hours
per day
2 light 13 26 4 104
1laptop
computer 50 50 5 250
1tv (19 inch
color) 60 60 1 60
1 DVD player 30 30 1 30
1 circular saw 900 900 0.25 225
1 blender 350 350 0.25 87
Totals 1416 756
![Page 68: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/68.jpg)
Load analysis
Qty LoadWatts each
Watts total
Hours per day
Watt hours
per day
2 light 13 26 4 104
1laptop
computer 50 50 5 250
1tv (19 inch
color) 60 60 1 60
1 DVD player 30 30 1 30
1 circular saw 900 900 0.25 225
1 blender 350 350 0.25 87
Totals 1416 756
Inverter
![Page 69: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/69.jpg)
Load analysis
Qty LoadWatts each
Watts total
Hours per day
Watt hours
per day
2 light 13 26 4 104
1laptop
computer 50 50 5 250
1tv (19 inch
color) 60 60 1 60
1 DVD player 30 30 1 30
1 circular saw 900 900 0.25 225
1 blender 350 350 0.25 87
Totals 1416 756
Solar panels,
batteries
![Page 70: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/70.jpg)
Solar panel derating: 15%
Loss from Wiring: 3%
Loss from Battery: 15%
![Page 71: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/71.jpg)
How many solar panels?What size controller?
Battery size?
Qty Load Watts each Watts total Hours per day Watt hours2light 13 26 4 1041 laptop computer 50 50 5 2501tv (19 inch color) 60 60 1 601DVD player 30 30 1 301circular saw 900 900 0.25 2251blender 350 350 0.25 87.5
Totals 1416 756.5
Solar panel derating 85%Battery efficiency 85%Wiring efficiency 97%Inverter efficiency 90%Total efficiency 63%Total adjusted watt hours per day (= watt hours / total efficiency) 1,199 Nominal system voltage 12Adjusted amp-hours per day (= adjusted watthours / system voltage) 99.95 Peak Sun Hours (average) 5.4Amps of solar power required (=Adjusted amp-hours / PSH) 18.51 Imp (amps) per solar panel (Astopower PV120. 120 watt. Imp = 7.1, Isc = 7.7) 7.10 Number of solar panels (= amps solar required / amps per panel) 2.61 Rounded up… 3 Isc per panel 7.7Minimum controller current (amps) = 1.25 x Isc 29 Maximum number of days of autonomy 3Max allowable depth of discharge 0.5Battery ampere-hours (= adjusted amphours x days of autonomy / allowable depth of discharge) 600
![Page 72: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/72.jpg)
Wire sizing• Voltage drop – how much power is lost to heat
V = I R
• Ampacity – how much current the wire can safely conduct
![Page 73: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/73.jpg)
12 Volt 2% Wire Loss ChartMaximum distance one-way in feet
Multiply distances by 2 for 24 volts and by 4 for 48 volts.
http://www.affordable-solar.com/wire.charts.htm
![Page 74: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/74.jpg)
Wire sizing
http://www.csgnetwork.com/voltagedropcalc.html
Typically aim for 3% or less loss
![Page 75: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/75.jpg)
Ampacity table
![Page 76: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/76.jpg)
![Page 77: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/77.jpg)
PV system errors
![Page 78: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/78.jpg)
User error: bypassed controller battery
overcharge1. Villager bypasses broken
controller and charges battery directly from PV
2. Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails.
1
2
![Page 79: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/79.jpg)
User error: Controller bypass leads to burned diode
1
2
1. Villager bypasses broken controller and charges battery directly from PV
2. One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box.
![Page 80: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/80.jpg)
User error: Villager used inefficient 60 W light bulb
Problems found during training surveys
![Page 81: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/81.jpg)
Installation error: Battery failure caused by solar panel installation in shady location
14:00 Saw Kre Ka village, Tha Song Yang District
![Page 82: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/82.jpg)
Installation error: Bad panel locations
![Page 83: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/83.jpg)
“The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket”
![Page 84: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/84.jpg)
Ministry of Interior
PEA
Installation company
End users
$
$
SHS
Existing linkages
warranty
Tax payers
$
![Page 85: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/85.jpg)
Ministry of Interior
PEA
Installation company
End users
$
$
SHS
Missing linkages
warranty
What happens when systems fail? There is no feedback loop from the end users to
installation company, PEA, government or taxpayers
Tax payers
$
![Page 86: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/86.jpg)
Warranty awareness Self-help: local technicians
+ user training
Ministry of Interior
PEA
Installation company
End users
$
$
SHS
Missing linkages
warranty
Tax payers
$
Feedback on status of systems, failure
modes, successful interventions
![Page 87: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/87.jpg)
SHS Warranty• Postcards with warranty
and maintenance information could be distributed by Tambons
• Idea presented at meeting with DLA (Department of Local Administration)
![Page 88: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/88.jpg)
BGET SHS trainings in Tak province
![Page 89: Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai](https://reader030.vdocuments.net/reader030/viewer/2022032803/56649e2b5503460f94b19f1b/html5/thumbnails/89.jpg)
Thank you
This presentation available at:www.palangthai.org/docs