sona installation manual - inclusive play...out obstacles is available around the sona play area for...
TRANSCRIPT
14 December 2015
Version 1.1Sona installation manual
EN_Installation manual_Sona_v1.1 - 2 -
Contents
Yalp sports- & play equipment
T: 0031 547 289 410
Page35
678
91011
13141516171819
20
212223
24
25
This manual contains all information you need to assemble and install this product. Make sure you check all safety chapters and follow the instructions to prevent dangerous situations.If you have any remarks or improvements, pleasecontact us.
Have fun with the product!
1 Preparation, Tools list & Attention!2 Sona isometric view
3 Parts - Sona4 Parts - Mounting5 Dimensions
6 Placing FunkyFloor7 Indoor8 Outdoor: foundation
9 The arch10 Polyester caps11 The camera panel12 Electronics13 Closing up14 Finishing touch15 Maintenance
16 3D figure version - Installation
17 Warranty18 Safety certificate19 Final remarks
20 Appendix
21 Versions
EN_Installation manual_Sona_v1.1 - 3 -
Before assembling the product please make sure:• You have all necessary parts• You have the necessary tools
For installing and assembling a Sona it is recommended:• To work with two persons.• To assemble the Sona in a dry environment.• To use soft protection on the floor, to prevent scratches.For installation of the electronics a NEN-EN 1010 certified mechanic is needed.
Make sure a power cable for the Sona is ready on location, with an overlength of at least 2,5 meters. The power supply must be assembled on a separate group with a 30mA ground fault circuit interrupter (GFCI), fused on 10A or 16A.
Ymvk ground cable, 2 cores, 2,5mm². Maximumcable diameter; 18mm
• (electronic) tools for hexagon M8 and M10 bolts/nuts• Power drill• Drill bit 10mm• Security Torx-45 bit (with hole cut-out)• M10 tap• Transparent sealant Installation• Forklift truck/small crane• Engine Leverer• Mini sim card wit ah 3G connection (250 MB/month)
3G Sim card specifications• Minimum of 250 MB/month• 3G data subscription (no prepaid!)• Mini sim card size (see image below)
1 Preparation
Tools l ist
Mini Macro Nano
EN_Installation manual_Sona_v1.1 - 4 -
When placing Sona:• Do not place Sona within 50m of nearest housing facade. Rule of thumb: Sona with sound level on 5 is not audible at nearest house.• Do not place the Sona within fastly moving shadows. For example near flag poles, tree braches, etc. Shadows may interfere with the game play.• Make sure the play area receives a sufficient amount of light. Outdoor ambient light is sufficient. Indoor, good light conditions are necessary for the camera to ‘see‘ clearly.• When using artificial lights, make sure the contrast and lenght of shadows is limited: Place the lights high, and close to the play area.• Make sure at least 1,5m of free space with out obstacles is available around the Sona play area for safety reasons.• Make sure the side of the Sona with the button (above nr. 2 on the play floor) is closest to the power supply. This way, cable lengths and power loss are limited.• ave a 3G SIM Card ready to install in the Sona for online management.• Sona must be placed from west to east as
shown below.
Attention!
North
East
South
West
1,5 m
EN_Installation manual_Sona_v1.1 - 5 -
2 Sona isometric view
EN_Installation manual_Sona_v1.1 - 6 -
polyester clamp
PCS199-221
Hinge tube
PCS199-065_C
FunkyFloor
PCS199-501
Installation mould
PCS199-599
Button plate
PCS199-017
Camera panel
PCS199-002
Plate
PCS199-024
arch frame
PCS199-101
Polyester cap
PCS199-401
11
1112
16 1 1
11122
Grey parts are pre-installed
3 Parts - Sona
EN_Installation manual_Sona_v1.1 - 7 -
Hex bolt M8x20
PCS100-240
Hex bolt M8x35
PCS100-247
Hex bolt M8 x 40
PCS100-243
Hex bolt M10x50
PCS100-245
Bolt secured M10x30
PCS100-213
Torque nut M8
PCS100-271
Hex nut M8
PCS100-276
Torque Nut M10
PCS100-274
Hex nut M16
PCS100-277
Washer M8
PCS100-281
Washer M10
PCS100-282
Washer M16
PCS100-284
anchor bolt M16
PCS100-231
Rope
PCS100-508
Transparent sealant
PCS100-5076 1 1 126
161 12 3 12
24316112
4 Parts - Mounting
EN_Installation manual_Sona_v1.1 - 8 -
3782mm
149in
940mm 37in4965mm 195in4000mm 157in
4500mm177in
4500mm
177in
3800m
m150
in
5 Dimensions
EN_Installation manual_Sona_v1.1 - 9 -
FunkyFloor
PCS199-501 1
Titel PP Blad
1:10001-01-2015
Plaats EH
1.1
A3
©Yalp 2015
0 cm 1 2 3 4 5 6 7 8 9
Datum :
Papier formaat
Teken schaal
Door :
Revisie :
10
Tekst voor extra informatie
Gegeven maten zijn binnenzijde betonband!
Nieuwenkampsmaten 127672 DE Goor
tel: 0547-289410fax: 0547-289411
4500480045
00
4800
The FunkyFloor play area is 4500x4500 mm. The FunkyFloor is delivered with additional material, in size 4800x4800 mm.
1. Place the Funky Floor on concrete tiles. Fold the edges (30 cm) around the tiles.
2. Cut holes for the anchors.
3. Add Sand to the Funky Floor: 25 kg/m² of quartz sand.
6 Placing FunkyFloor
EN_Installation manual_Sona_v1.1 - 10 -
A
B
Torque Nut M10
PCS100-274
Washer M10
PCS100-282 6 3
A
B
3
Mount bow on top of anchors in concretefloor using 100-275 and 100-283 (both 6x).Do not tighten yet.
Connect the arches together with 100-245 (3x), 100-274 (3x) and 100-282 on both sides (6x). Usethe top holes on the side. Do not tight-en yet.
A
B
Continue on page 13
arch frame
PCS199-101
Hex bolt M10x50
PCS100-245 3 2
7 Indoor
1. Put the arch frames up on top of the anchor bolts (A). Make sure the power cable goes through the foot (at the side of the 2 on the floor)
2. Secure the Sona to the ground with anchor bolts. We advice to use Hilti HSA stud anchors M16x65 (not included in package).
EN_Installation manual_Sona_v1.1 - 11 -
Washer M16
PCS100-284
Hex nut M16
PCS100-277
Installation mould
PCS199-599
anchor bolt M16
PCS100-231
12
12
1
642
49m
m + -10 10
167,
3in
+ -0,4
0,4
4789
mm
+ -10 1018
8,6i
n + -0,
40,
4
A
Parallel!
700mm 27,5in
270m
m10
,6in
350mm 13,8in
4249
mm
+ -10 1016
7,3i
n + -0,
40,
4
4789
mm
+ -10 1018
8,6i
n + -0,
40,
4
A
Parallel!
700mm 27,5in
270m
m10
,6in
350mm 13,8in
8 Outdoor: foundation1. Put the anchor bolts in the concrete
foundation, use the wooden installation mould (which is part of the wooden Sona crate) to mark the places for the anchor bolts and put the power cable in place.
EN_Installation manual_Sona_v1.1 - 12 -
1300mm 51in
700m
m28in
M
1300mm 51in
600m
m24in
700mm 28in
270m
m11in
700mm 28in
350mm 14in
395m
m16in
542mm 21in
1300mm 51in
700m
m28in
Power cable. >2,5m above ground
150mm
Concrete
Anchor bolts 3x
anchor bolt M16
PCS100-231
FunkyFloor
PCS199-501 61
1300mm 51in
700m
m28in
M
1300mm 51in
600m
m24in
700mm 28in
270m
m11in
700mm 28in
350mm 14in
395m
m16in
542mm 21in
1300mm 51in
700m
m28in
Make sure the power cable has at least 2,5m overlength.The power supply must be assembled ona separate group with a 30mA ground fault circuitinterrupter (GFCI), fused on 10A or 16A.
* Give appendix “installation preparations” to the installation team.** For surfaces other than concrete, like tiles, please contact us.
1300mm 51in
700m
m28in
M
1300mm 51in
600m
m24in
700mm 28in
270m
m11in
700mm 28in
350mm 14in
395m
m16in
542mm 21in
1300mm 51in
700m
m28in
EN_Installation manual_Sona_v1.1 - 13 -
A
B
arch frame
PCS199-101 2
Torque Nut M10
PCS100-274
Hex nut M16
PCS100-277
Washer M10
PCS100-282
Washer M16
PCS100-284 12
6 3
12
A
B
Hex bolt M10x50
PCS100-245 3
Mount bow on top of anchors in concretefloor using 100-275 and 100-283 (both 6x).Do not tighten yet.
Connect the arches together with 100-245 (3x), 100-274 (3x) and 100-282 on both sides (6x). Usethe top holes on the side. Do not tighten yet.
A
B
1. Put the arch frames up on top of the anchor bolts (A). Make sure the power cable goes through the foot (at the side of the 2 on the floor).
2. Connect the arches at the top (B).
9 The arch
EN_Installation manual_Sona_v1.1 - 14 -
1. Install the polyester caps in place.
2. Mount the polyester caps to the steel arches.
3. Tighten all bolts
polyester clamp
PCS199-221
Polyester cap
PCS199-40116 2
Hex bolt M8x20
PCS100-240
Hex bolt M8 x 40
PCS100-243
Hex nut M8
PCS100-276
Washer M8
PCS100-281 1612 1612
CC
Install polyester caps199-401
After installing thecaps, tighten all thebolts in the arch.
Use a power drill to drill holes inthe top of the polyester caps on theinside and secure them with bolt100-240 and nut 100-276 to the steelframe.
Tighten the polyester cap to the steelframe with the polyester clamps 199-221and bolts 100-243 + washers 100-281.
10 Polyester caps
EN_Installation manual_Sona_v1.1 - 15 -
Tighten the polyester cap to the steelframe with the polyester clamps 199-221and bolts 100-243 + washers 100-281.
Hinge tube
PCS199-065_C 1
Camera panel
PCS199-002 1
Torque nut M8
PCS100-271 1
Hex bolt M8x35
PCS100-247 1
Step 1: Slide part 199-065 onthe axis of 199-002.
Step 2: Insert the assembly in the arch. Put the fixed end of the axis in first.
Step 3: Slide part 199-065 back through the hole on the opposite side and lock it in place with bolt 100-247 and nut 100-271.
4. Insert the curved steel camera panel into the arch. Lock it with the bolt.
11 The camera panel
C1 C1 C3C1 C1 C3C1 C1 C3
D Final result.
The hinge side is located on the power side of the sona. Note that this is also the side where number 2 of the floor is positioned.
EN_Installation manual_Sona_v1.1 - 16 -
Important: The power supply must beassembled on a separate group with a30mA ground fault circuit interrupter(GFCI), fused on 10A or 16A. For examplewith a protection box of the type: MerlinGerin, MG 10A-B 19791 DPNA VIGI 30MA.
Cable 1: Camera USB cable.
Audio
Light set
VentingUSB camera
Power IN
SIM
Ethernet Button
Upper side Yin computer
Bottom side Yin computer
Cable 2: Cable to speaker onother side
Pow
er s
uppl
y
Power socket
3G 3G
Button
Speakers
Camera
Yincomputer
Antenna’s
5. Connect the power cable to the power socket. This must be done by a NEN- EN 1010 certified mechanic. Connect the plug.
6. Connect other cables (picture). Button, camera usb from the top, audio cables. Check the electronics. See schematic view below as a check.
12 Electronics
EN_Installation manual_Sona_v1.1 - 17 -
Bolt secured M10x30
PCS100-213
Bolt secured M10x30
PCS100-213
Rope
PCS100-508 14
20
Button plate
PCS199-017
Plate
PCS199-024 11
Hinge
Secure rope to cap and in topof Sona
Connect thebutton to theelectronicbox in theSona.
7. Close the cap. Tie the safety rope on the inside of the camera panel and knot this to the arch frame for safety, the rope must not be longer than 1m. Use bolts 100-213 to close up. Make sure cables do not get stuck between the hinge!
13 Closing up
8. Close the sides with 199-017 (button, on hinge side and number 2 side) and 199-024. cap. Close up with bolts 100-213.
EN_Installation manual_Sona_v1.1 - 18 -
Transparent sealant
PCS100-507 19. Close the top gap with transparent sealant to make Sona watertight.
10. Now Sona is ready to play. Look in the product manual how to get it online, and do all settings.
Let’s play!
14 Finishing touch
EN_Installation manual_Sona_v1.1 - 19 -
15 Maintenance
Keep camera hole clean ofcobwebs or other kind ofdebris.
The Funky floor is filled with quartz sand.
The sand can be swept away by intensive use,sweep it back with a broom.
When the filling sand is lost, replace it withquarts sand, washed and dried with a dimensionof > 0,2 and < 1,0 mm.
EN_Installation manual_Sona_v1.1 - 20 -
E
Washer M10
PCS100-282
Torque Nut M10
PCS100-274
Hex bolt M10x50
PCS100-245 2 42
Polyester cap AB
PCS199-402 2
AB foot flange
PCS199-610 1D
DETAIL D SCALE 1 : 5
Connect flangeto arch with 2x bolts
SONA ANGRY BIRDS
This version of the sona is equipped with a 3D figure. The figure can be mounted on a foot flange, which is placed on top of the Sona. The polyester caps are a special version, with circle cutouts for the foot lange.
1. After setting up the arch (step 4 in the installation manual), mount the flange into place on top of the arch.
16 3D Figure version
Slide down flange 199-610 on the Sona construction.Bolt shut with 100-254 (2x), 100-274 (2x) and 100-282 (4x)
Make sure the power cablesgo through the middle hole,and do not get stuck!
EN_Installation manual_Sona_v1.1 - 21 -
1. Warranty time period:For defects in structural strenght, material and production
Funky floor: 8 years (according to the warranty conditions of the supplier)
Metal construction 5 yearsPolyester caps 5 yearsPlastics: 5 yearsElectronics 3 years, descending 1st year: 100% coverage 2nd year: 66% coverage 3rd year: 33% coverage
2. Warranty ConditionsThe warranty covers the free delivery of spare parts to the warehouse of the retail dealer in question.Faulty parts have to be replaced by Lappset components. The inspection of delivery has to be donebefore installation and possible damages have to be informed immediately. The delivery time forspare parts is one week from the factory.
4. Application of warranty:Warranty will only apply under the condition that the product has been installed and maintainedcorrectly according to the instructinos administered by Lappset.
5. Exclusion of warrantyTeh warranty does not cover normal wear and tear, surface corrosion of the metal parts, discoloredsurfaces, light splitting or deformation of the wood, other cosmetic issues, and faults induced byinappropriate use or vandalism. The warranty does not cover the change of faulty parts (dismantlingand installation costs).
17 Warranty
EN_Installation manual_Sona_v1.1 - 22 -
18 Safety certificate
EN_Installation manual_Sona_v1.1 - 23 -
19 Final remarks
Environment
Yalp is committed to sustainable business practices, values and standards are of paramount importance. The social commitment begins with our employees, but also in dealing with you. As a supplier of toys and sports products, we are aware of the social role that we play. We take responsibility on the core themes of:
ISO 9001:2008-certified quality management system
ISO 14001:2004-certified environmental management system.
Maintenance
- Polyester maintenance
We recommend that you at least once year clean the polyester caps using a cotton or a strong paper cloth and water with a mild detergent. Remove small scratches by using regular car wax and polish products.
- Steel maintenance
We recommend that you regularly (at least once a year) clean the steel structure with a cotton or strong paper cloth and a cleaning substance without diluent.
- Fixation check
All screws and bolts need to be checked. Are they still fixed? If not, fix it! We recommend to check this at least once a year.
- Electronic check
You have to check all wires for cuttings and corrosion. When you see any damage that can cause any kind of dangerous situation, please contact the supplier. We recommend to check this at least once a year.
Service and support
When you are having problems and can’t manage to solve them yourselves, please contact us.
Wessel Hof
T; 0031 547 289 410
Have fun playing the Sona!
EN_Installation manual_Sona_v1.1 - 24 -
20 Appendix
Sona
A3
1:5
02
7-0
1-2
01
5
RB
1.1
Nie
uw
enkam
psm
ate
n 1
2
7672
DE
Goor
info
@yalp
.nl
ww
w.y
alp
.nl
tel:
0547-2
89410
fax: 0
547-2
89411
©Y
alp
2015
0 c
m1
23
45
67
89
Datu
m
:
Papie
r fo
rma
at
Teken s
ch
aa
lD
oo
r :
Re
vis
ie :
150mm[5 7/8"]
450mm
[17 3/4"]
1200m
m[4
7 1
/4"]
200mm
[7 7/8"]
IMP
OR
TA
NT
!W
hen p
laced
in a
gra
ss s
urr
oundin
g a
t le
ast one
ro
w o
f tile
s is r
eco
mm
en
de
d.
ø8 x
#150m
mø
8 x
#150m
mø
8 x
#150m
m
4500m
m[1
77
1/8
"]
4500mm[177 1/8"]
350m
m[1
3 3/
4"]
350m
m[1
3 3/
4"]
270m
m
[10
5/8"
]
787m
m
[31"
]
787m
m
[31"
]
270m
m
[10
5/8"
]
4249
mm
[167
1/4
"]
YA
3500
4500m
m
4500mm
800m
m[3
1 1
/2"]
550mm
[21 5/8"]
23
0v c
ab
le, m
inim
al
2m
overlength
above
the g
round
De
tail
co
ncre
te foundation (
sch
aa
l 1:1
0)
Overv
iew
pre
pa
ratio
ns
Overv
iew
aft
er
insta
llatio
n
Focus p
oin
ts:
- A
nchors
should
be
exactly in
pla
ce, use
the
insta
llation m
ould
- T
he foundation s
hould
be
levelle
d, it c
an
be
made a
little
spherical fo
r b
ett
er
dra
inage
- N
ote
the
pow
er
cable
in
one o
f th
e le
gs,
this
ca
ble
ente
rs the
Sona a
t th
e b
utt
on s
ide
. T
his
is
where
the
num
ber
2 is o
n the
flo
or.
-
Mesure
ments
in
mm
Wo
rk s
equence:
- D
ig o
ut th
e s
oil
- A
pp
ly a
sand
foundation
- A
pp
ly the fra
mew
ork
fo
r th
e c
oncre
te-
Insta
ll th
e a
nchors
and
rein
forc
em
ent nets
(øx8
x#
15
0m
m)
- P
our
the
concre
te, about 5m
³ is
needed if
the
dim
en
tio
ns a
s in the
dra
win
g a
re u
sed
EN_Installation manual_Sona_v1.1 - 25 -
Version/Date:
v1.1/16-12-2015
21 Versions
Adjustments
-Split the Installation manual in ‘Assembly’ and “Installation’-Added chapter 6 and 7