Page 1: South East Atlanta

 

Southeast Atlanta Green Infrastructure Initiative Phase I

Design and Construction Data City of Atlanta Department of Watershed Management72 Marietta StreetAtlanta, GA 30303

BGR Joint VentureApril 17, 2013

Prepared By Adam CarducciReviewed By Joe Crooms, P.E.RohadFox Construction Services

Page 2: South East Atlanta

Add Intersection paver treatment at Dodd and Central intersection.

Increase width of paver strip to 10' (minimum) for driving lanes.

Have sidewalk repair work done as noted in pictures, including areas

where major cracking, scouring and tree root  intrusion occur.

Have clogged catch basins and inlets cleaned out.

Confirm structural integrity of catch basin structures proposed to be

tapped into.

Have point repair on catch basin lids and panel covers performed.

As proposed in the 4/15/2013 meeting, a good placement of paver

neighborhood marker would be at Fulton and Windsor Street for the

Mechanicsville neighborhood.

Action Items needed

Page 3: South East Atlanta

1. Dodd at Central2. Pulliam St.3. Pulliam St.4. Richardson ( Between Central and Pulliam)5. Richardson ( Between Central and Pulliam)6. Richardson ( Between Central and Pulliam)7. Windsor St8. Pulliam St.9. Windsor St.10.Central St.11.Windsor St12. Windsor St

Page 4: South East Atlanta

Better served by an intersection treatment, rather than pavers as shown on the map.

Page 5: South East Atlanta

Sand and vegetative overgrowth on top of inlet on Pulliam

Page 6: South East Atlanta

Evidence of water overtopping sidewalk on Pulliam.

Page 7: South East Atlanta

Vegetative overgrowth on Richardson sidewalk( Between Central and Pulliam).

Page 8: South East Atlanta

Tree root intrusion on Richardson sidewalk ( Between Central and Pulliam)

Page 9: South East Atlanta

Standing water on south side of Richardson ( Between Central and Pulliam)

Page 10: South East Atlanta

Severely cracked sidewalk on Windsor

Page 11: South East Atlanta

Evidence of slow draining water in gutter on Pulliam.

Page 12: South East Atlanta

Severely cracked sidewalk on Windsor

Page 13: South East Atlanta

Evidence of slow draining water in gutter on Central

Page 14: South East Atlanta

Severely scoured sidewalk On Windsor

Page 15: South East Atlanta

Clogged Catch Basin on Windsor

Page 16: South East Atlanta

Summary of Activities and Recommendations

Contact Information

Adam CarducciField EngineerROHADFOX - RCCSC171 17th Street NW, Suite 1625Atlanta, GA 30363[P] 404.880.9888 [M] 404.849.4009[F] [email protected] www.rccsc.net

Joe Crooms, P. E.Project ManagerROHADFOX - RCCSCProgram Management, Construction Management171 17th Street NW, Suite 1625Atlanta, GA 30363[P] 404.880.9888[M] 404.771.9007[F] [email protected]