    Mariner sanctioned Dec. 2012

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    Largest CAPEX commitment on the

    UKCS for over a decade

    Gross investment of more thanUSD 7 billion

    Half to be spent between 2013-

    2017

    Statoils experience and technology will

    unlock large reserves Approx. 2 billion boe in place

    More than 250 mboe reserves

    Production for 30 years

    Average production of ~55,000

    bbls/d over the plateau period2017-2020

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    3/41

    Inefficient recovery process & low recovery rate

    Low flow rates

    Early water break-through

    High water-cut

    High development costs

    Many, advanced wells required

    Efficient well artificial lift system

    Large liquid & moderate oil capacity

    Produced water treatment for re-injection

    Special attention to crude handling

    Meeting crude specifications

    Storage, transportation and marketing

    High TAN-valueWhy offshore heavy oil is challenging!

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    4/41

    BRESSAY

    MARINER

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    5/41

    BRESSAY

    MARINER

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    6/41

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    7/41

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    8/41

    1977: 2D seismicacquired across

    9/12 (P254)

    1980: P335licence awarded

    to Union Oil(Mariner)

    1981:Marinerdiscovered 9/11-

    1 well

    1982: 2D seismicacquired across

    9/11 (P335)

    1982: wells 2, 3& 4 drilled

    1991: P726licence awardedto ConocoPhillips

    (Mariner East)

    1994: Hessbecomes

    operator of P335

    1995-1996: 3Dseismic acquired

    1996: Texacobecomes

    operator of P335& P726

    1996-1997: wells5 to 12 drilled,including EWT

    2005: Chevronbecomes

    operator of P335

    2005: 3D seismicreprocessed

    2008: Statoilbecomes

    operator of P335& P767

    2008: HR 3D andcore area OBS

    acquired

    2012: Broadband3D acquired

    2017: FIRST OIL

    Mariner: project history

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    9/41Mariner

    Mariner is currently one of the

    largest undeveloped resources in

    the UKCS.

    Discovered in 1981.

    With nearly 2 billion barrels STOIIP

    So why has Mariner remained

    undeveloped for so many years?

    Heavy oil 1114 degrees API

    Highly Viscous / High TAN

    Offshore North Sea environment

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    10/41Palaeocene Stratigraphy

    East Shetland Platform

    500m

    1000m

    1500m

    (Modified. from J. Gjelberg)

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    11/41

    9/11a- 7 Maureen core

    Maureen seismic sectionMaureen well correlation

    9/11a- 7 Maureen well logs & image logs(Ahmadi, et al. 2003, Millennium Atlas)

    Maureen Resevoir

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    12/41Maureen depositional model

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    13/41Maureen stepped OWCs

    Reference case Maureen compartments

    Fault rock types

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    14/41

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    15/41

    Heimdal channels

    Direct sediment by-

    pass down delta front

    slope during low-stand

    Clinoforms/timelines

    Maureen Formation

    Lista Formation

    Lower Heimdal Middle Heimdal

    Upper Heimdal Late stage Lista

    Heimdal depositional model

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    16/41

    MAUREEN

    LISTA

    DORNOCH

    injectite cross-cutting primary reflection analogue to upper sands

    Structure map

    Post depositional remobilisation

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    17/41Post depositional remobilisation

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    18/41

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    19/41

    Rock Physics Template

    VP/VS

    Acoustic Impedance

    BASE TERTIARY

    LISTA

    DORNOCH

    Seismic sectionSeismic gather

    Seismic challenges

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    20/41

    Heimdal sands prove difficult to image

    on seismic streamer data and so the

    current Heimdal reservoir model is

    stochastic.

    Ocean Bottom Seismic (OBS) survey

    gives a good image of the sands, but

    has lower resolution.

    In 2012 Statoil acquired a full field

    broadband survey (currently beingprocessed).

    primarily aims to better resolve

    the Heimdal channels.

    A better handling of the Heimdal will

    enable a deterministic reservoirmodel, which can be utilised for

    Heimdal well placements.

    Seismic challenges

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    21/41

    Mariner Drainage Strategy

    Drainage Strategy

    Pressure maintenance / Reservoir Flooding by

    Produced Water Re-Injection

    Maureen Reservoir:

    17 Horizontal Producers

    5 Slanted Injectors

    Produced first

    Heimdal Reservoir:

    Inverted Nine-Spot Pattern

    39 Dual, Slanted Producers

    32 Single, Slanted Injectors

    Seven wells planned for further appraisal

    Inverted-nine-spot

    pattern, 400 x 400 m

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    22/41

    MarinerProduction Profiles

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    23/41

    Heimdal Water

    InjectorsHeimdal Dual Oil

    Producers

    Maureen Water

    Injectors

    Maureen Oil Producers

    Mariner Field

    Maureen Main

    17 Producers

    5 Water Injectors

    Heimdal

    46/39 Dual MLTs

    32 Water Injectors

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    24/41

    Many Challenges.

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    25/41

    Mariner Well Types

    Heimdal Short Injector

    Maureen Short Injector

    Maureen Long Injector

    Maureen Short Producer

    Maureen Medium Producer

    Maureen Long Producer

    Heimdal Medium Injector

    Heimdal Long Injector

    Heimdal Ext Reach Injector

    Heimdal Long Producer

    Heimdal Short Producer

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    Well Type Days

    Single Maureen Producer 46.0

    Single Maureen Water Injector 47.0

    Heimdal MLT Producer 73.0

    Heimdal Water Injector 41.0

    Heimdal MLT sidetrack 70.0

    Heimdal WI sidetrack 37.0

    Time

    D illi O ti H i d l MLT W ll

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    26/41

    Window

    Position

    Drilling OperationsHeimdal MLT Wells

    Pump

    Position

    13 3/8in

    Casing

    Reservoir

    Target

    Target

    Box

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    27/41

    WellDesign

    27

    Sand Control Packer

    Sand Screens

    Zone Isolation

    7-5/8' tubing

    5-Chemical Injection Valve

    Production packer

    Ball Valve, 5-

    Safety Valve, 5-

    Seal Assy f/Sand Control packer

    Packer

    ESP

    Pump

    ESP

    Motor

    ESP

    Seals

    ESP Cable

    ESP Discharge

    Slim Tubing Disconnect

    Slim Tubing Back-Flow Valve

    2-7/8" Tubing

    Producer

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    28/41

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    29/41

    Mariner Platform

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    30/41

    Mariner Platform

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    31/41

    Intervention and Completion Unit (ICU)

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    32/41

    Intervention and Completion Unit (ICU)

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    33/41

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    Intervention and Completion Unit (ICU)

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    34/41

    The field development concept

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    35/41

    Mariner FacilitiesWorld map

    UK, London:

    PU and LQ engineering (CB&I)

    Drilling engineering (RDS)

    Jacket engineering (SNC Lavalin)

    Heavy lift (Saipem Ltd) South Korea, Okpo:

    PU and Drilling construction

    Ulsan:

    LQ and Wellhead extension

    construction

    Singapore: EPC

    Contract for Jack-Up

    Rig to Sembcorp M.

    @Jurong Yard

    China: Flare boom

    construction

    Spain, Cadiz:

    Jacket construction Dragados)

    South Korea, Geoje

    (Option): FSU construction

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    Aberdeen:Home Office

    Singapore: CB&I

    PU engineering

    (back office)

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    36/41

    Aberdeen

    Projected benefits for the UK

    Significant tax revenues

    Operations centre in Aberdeen

    700 long term jobs

    Knowledge and technology transfer

    for future UK projects

    Local contractors for support

    services, maintenance &

    modifications

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    37/41

    Technical advances unlocking Mariner

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    Isometrix Seismic

    Conventional Streamer Seismic

    OBC Seismic

    Multi-lateral wells

    Objective: higher reservoir

    exposure and reduced cost

    Concept: branched wells

    Advanced

    geosteering

    Objective: improved well

    placement

    Concept: advanced

    logging-while-drilling tools

    Autonomous inflow

    control valves

    Objective: reduced inflow

    of water in oil producers

    Concept: self-adjusting

    valves

    Optimised water

    injection strategy

    Objective: improved

    sweep in the reservoir

    Concept: optimise number

    and placement of injectors

    Infill wells

    Objective: higher reservoir

    exposure

    Concept: identify new

    drilling targets

    Polymer injection

    Objective: improved

    sweep in the reservoir

    Concept: inject polymer to

    increase water viscosity

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    38/41

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

    First Steel Cut Rolled Leg Section

    Diameter 2m

    Thickness 80mm

    Weight approx.10 tons

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    39/41

    Acknowledgements

    Statoil UK Ltd.

    JX Nippon Exploration and Production (U.K.) Limited

    Alba Resources Limited,

    a wholly owned subsidiary of Cairn Energy PLC

    Mariner Field : a challenging UK heavy oil development: Statoil - SPE Meeting 25 Sep

  • 8/11/2019 SPE Aberdeen Mariner-250913- Final

    40/41

    Animations

    Jacket Installation

    8.30 mins

    Topsides Installation

    7.02 mins

    Cat J Jackup5.58

    mins

    Cat J working at

    Mariner2.13 mins