Standard Professional Practice 2010

TRANSCRIPT

  • 5/21/2018 SPP 2010

    1/91

    FLEA 2013 REFRESHER

    PROFESSIONAL PRACTICE

    ARCH. A2JAVILLO, uap

  • 5/21/2018 SPP 2010

    2/91

    CHAPTER 2

    ARCH. A2JAVILLO, uap

    PROFESSIONAL PRACTICE

  • 5/21/2018 SPP 2010

    3/91

    STANDARD PROFESIONAL

    PRACTICE 2010

    PROFESSIONAL PRACTICE

  • 5/21/2018 SPP 2010

    4/91

    SPP DOC 201: PRE-DESIGN SERVICES

    SPP DOC 202: REGULAR DESIGN SERVICES

    SPP DOC 203: SPECIALIZED ARCHITECTURAL SERVICES SPP DOC 204a: FULLTIME SUPERVISION SERVICES

    SPP DOC 204b: CONSTRUCTION MANAGEMENT SERVICES

    SPP DOC 205: POST-CONSTRUCTION SERVICES

    SPP DOC 206: COMPREHENSIVE ARCHITECTURAL SERVICES

    SPP DOC 207: DESIGNBUILD SERVICES

    SPP DOC 208: ARCHITECTURAL DESIGN COMPETITION

    SPP DOC 209: PROFESSIONAL ARCHL CONSULTING SERVICES

    SPP DOCUMENTS OUTLINE

  • 5/21/2018 SPP 2010

    5/91

    General:

    1. Establish the things on how things work and what activities

    are there before even the signing of the contract2. Focus on the services of an Architect.3. Be wary of the minimum basic fees that the Architect will be

    compensated for

    4. The importance of how will the Architect be compensatedin the whole or for each phase in the development of theproject

    5. Then, how to be compensated and to be paid is also a

    different matter.

    STANDARD PROFESSIONAL PRACTICE 2010

  • 5/21/2018 SPP 2010

    6/91

    General:

    6. Architects are not only for the Architectural Design of the

    project, there are a lot of services that can be focusedthrough but requires some specialization

    7. Differentiate the functions of the Project Manager andConstruction Manager

    8. A practice which lets the Architects Design and to also BuildObligations of the Owner for the Project

    9. Liabilities and Limitations of each Professional in the Fieldincluding the Architect

    10. Ways to be selected for the Project by different methodsand applications

    STANDARD PROFESSIONAL PRACTICE 2010

  • 5/21/2018 SPP 2010

    7/91

    SELECTION OF THE ARCHITECT

    Direct Selection

    For relatively Small Projects

    1. Reputation

    2. Personal or Business Acquaintance from a Friend

    3. Recommendation from an Architect or a Client (Former)

    4. Recommendation from an another client

  • 5/21/2018 SPP 2010

    8/91

    SELECTION OF THE ARCHITECT

    Comparative Selection

    There is analysis of CVs, skills, experience, reputation, and

    even projects erected

    Though, the process involved is:1. Invitation

    2. Pre-Qualification3. Interview4. Verification5. Evaluation and Ranking

    6. Negotiation

  • 5/21/2018 SPP 2010

    9/91

    SELECTION OF THE ARCHITECT

    Design Competition

    Used for Civic or Monumental Projects where Architects or

    Firms are involved.

    Advantages:1. Opportunities for RLAs to showcase their works without

    being liable to the Code of Ethical Conduct2. The point where Architects can submit design proposals in

    a same time3. A time when an Architect can do design concepts parallel

    to the other Designing Architects.

  • 5/21/2018 SPP 2010

    10/91

    SELECTION OF THE ARCHITECT

    Advantages:4. The client or committee has the widest range of options to

    choose to

    5. If, Government, they dont need to expend anything forthe design, they just need to pick on where they willaward the project (Architectural Design)

    Disadvantages:

    1. Expensive and Time Consuming (For the Applicants)2. Time and Effort required may discouraged qualified firms

    from entering3. Unscrupulous Clients will seek free services under the guise

    of the Design Competition where there is a breach underthe Ownership and Copyrights

    4. Not really done on Small Projects

  • 5/21/2018 SPP 2010

    11/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    What is Pre-Design Services? Its the most basic services that will be provided by an architect

    (RLA) to a client with the evolution of new standards of newregulated professional practices, laws and technologies

    What is the benefit of Pre-Design Services to the c lient?

    Client can be involved on the project analysis To establish parameters for optimizing building needs Find the constraints in the project as early as possible

  • 5/21/2018 SPP 2010

    12/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    The Scope of Pre Design Services are:

    Consultation

    Pre-Feasibility Studies Feasibility Studies Site Selection and Analysis Site Utilization and Land-Use Studies

    Architectural Research Architectural Programming Space Planning Space Management Studies

    Value Management Design Brief Preparation Promotional Services

    *None c re a t ive p ro je c ts / Pa yments m a d e MDPE

  • 5/21/2018 SPP 2010

    13/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    The Scope of Pre Design Services are:

    Consultation

    Oral and Written advices or direction Make evaluation and appraisals in regards to the project

    Pre-Feasibility

    Initial assessment of a projects soundness Important for Early Decision making of the client

    Feasibility Studies

    Detailed analysis for the project viability Present to Futuristic Analysis on how will the project will

    do in time

    *None c re a t ive p ro je c ts / Pa yments m a d e MDPE

  • 5/21/2018 SPP 2010

    14/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    The Scope of Pre Design Services are:

    Site Selection and Analysis

    Evaluate Site and proper analysis for the mostappropriate location of the project

    Site Utilization and Land-Use Studies

    Identify Project Development Controls Surrounding Environment if applicable to the site

    Architectural Research

    Primary and Secondary Facts for basis of conclusion

    *None c re a t ive p ro je c ts / Pa yments m a d e MDPE

  • 5/21/2018 SPP 2010

    15/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    The Scope of Pre Design Services are:

    Architectural Programming

    Horizontal and Vertical requirement in regards tosolution

    Space program in regards to envisioned space(ambiance, cost range, etc.)

    Space Planning Determines adequate size and configuration of the

    projectSpace Management Studies

    Space requirements Organizational structure and functional set-up Basis for Architectural Design and Planning

    *None c re a t ive p ro je c ts / Pa yments m a d e MDPE

  • 5/21/2018 SPP 2010

    16/91

    SPP DOCUMENT 201 : PRE-DESIGN SERVICES

    The Scope of Pre Design Services are:

    Value Management

    Cost Management to minimize cost

    Design Brief Preparation Project Terms of Reference

    Concepts, Objectives and Requirements for ArchitecturalServices

    Promotional Services

    Generate Financial Support and Acceptance fromGovernment or Public

    Architect as agent of the Owner

    *None c re a t ive p ro je c ts / Pa yments m a d e MDPE

  • 5/21/2018 SPP 2010

    17/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Reg u la r De sig n Se rvic e s, Wha t is it?

    As the Owners representative, to translate the needs and

    requirements of spaces and forms Starts if the owner outlines the requirements to the Architect Works and activities which covers various aspects of the

    project

    Timeline of an Architects Services up to project completion Systematic and Method of Payments from the Owner Involvement of Minimum Basic Fees under the Project

    Construction Cost

    * Pa ym ents MBF : Pro je c t C o nstruc t io n C o st

  • 5/21/2018 SPP 2010

    18/91

    The Scope of Pre Design Services are:

    Project Definition Phase

    Schematic Design Phase

    Design Development Phase

    Contract Document Phase

    Bidding and Document Phase

    Bidding and Document Phase

    Construction Phase

    * Pa ym ents MBF : Pro je c t C o nstruc t io n C o st

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

  • 5/21/2018 SPP 2010

    19/91

    PAYMENT SCHEDULES

    Project Definition Phase (Mobilization).25k

    Schematic Design Phase15%

    Design Development Phase..40%

    Contract Document and Bidding Phase..90%

    Retention Fee.10%

    (C iv il Lia b ility :5% / Sup e rv isio n :5%)

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * DEGREE O F COMPLEXITY

  • 5/21/2018 SPP 2010

    20/91

    ARCHITECTS FEE: ARCHITECTURAL PROJ ECTS CLASSIFICATIONS

    Group 1 SIMPLE Projects ( no partition ) 6%

    Group 2 MODERATE Structures ( have interior partitions) 7%

    Group 3 EXEPTIONAL Structures (requires consultant ) 8%

    Group 4 RESIDENTIAL ...10%

    Group 5 MONUMENTAL ..12%

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * S-M -E-R-M

  • 5/21/2018 SPP 2010

    21/91

    ARCHITECTS FEE: ARCHITECTURAL PROJ ECTS CLASSIFICATIONS

    Group 6 REPETITIVE .80% 60% 40%

    Group 7 HOUSING 60% 30%

    Group 8 EXTENSIVE DETAILING ...5%

    Group 9 ALTERATIONS / RENOVATION ......150%

    Group 10 CONSULTATION ARBRITATION .......P200/ 500

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * R-H-E-A -C

  • 5/21/2018 SPP 2010

    22/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP I : Simple (No WALLS)

    IndustrialWa re ho use s, Ind ustria l Bu ild ing s, Ha ng a rs ,Prin ting Pla n ts,

    Fre ig h t Fa c ilit ie s, Ma nufa c tu ring Pla n ts , Ind ustria l Pla n ts,

    A rm o rie s, Se rvic e s G a ra g e s, Pa c ka g ing a nd Pro c e ssing

    Pla n ts

    Structures with no WallsPub lic M a rke ts , Ba ke rie s, Pa rking Struc tu re s , Sim p le Lo ft-

    Typ e Bu ild ing s, Ha b ita b le Ag ric ultu ra l Build ing s

    * G ROUP I MBF: 6% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    23/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP II : Moderate (With WALLS)

    PresentationA rt G a lle rie s, Exhib it io ns Ha lls & Disp la y Struc ture s

    EducationSc ho o ls, C o lle g e Bu ild ing s, Do rm ito rie s, Lib ra rie s

    GovernmentC ity Tow n Ha lls & C ivic C entre s, C o rre c t io na l & De te nt io n

    Fa c ilitie s, C o urt House s & Ha lls o f Justic e , Po lic e Sta tio ns,

    Po sta l O ffic e s, Fire Sta tions

    Banking and FinanceBa nks, Exc ha ng e s & o the r Bu ild ing s, Fina nc ia l Institu tio ns

    * G ROUP II MBF: 7% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    24/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP II : Moderate (With WALLS)

    RecreationalBow lo d rom e s, Pa rk, Pla yg ro und , Re c re a tio n, Priva te

    C lub s, Ra c e Tra c ks

    MallsMa ll C om p le xe s, Re ta il / Who le sa le , Re sta ura nt , Fa st

    fo o d , Sp e c ia lty Sho p s , Sho p p ing C entre s, Sho w ro om s,Sup e rm a rke ts, Hyp e rm a rke ts, Se rvic e C entre s, M a ll

    Complexes

    ReligiousConve n ts , Mo na ste rie s, Sem ina rie s, Churc he s , Re lig io us

    Fa c ilit ie s

    * G ROUP II MBF: 7% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    25/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP II : Moderate (With WALLS)

    IndustrialPub lish ing Pla n ts

    Residential Dwelling (Multi-Level)Mo te ls & Ap a rtm e nts, M ult i-Sto re y Ap a rtm ents, Nursing

    Hom es, Re sid e nt ia l C o nd o Se rv ic e d Ap a rtm ents

    InstitutionalWe lfa re Bu ild ing s

    High Rise (Business & Mercantile)O ffic e Build ing & C ond o , M ixe d Used Build ing s, C a ll

    C e n tre s, La und rie s, C le a n ing Fa c ilit ie s

    * G ROUP II MBF: 7% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    26/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP III : Exceptional (requires consultant)

    Terminals (Transportation)Airports, Dry and Wet Ports, Transportation Facilities &

    Systems

    HealthVeterinary Hospitals, Laboratories / Testing Facilities,

    Medical Arts Offices and Clinics Hospital & MedicalBuildings, Public Health Centres

    Recreational

    Marinas, Resort Complexes, Aquarium

    * G ROUP II MBF: 7% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    27/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP III : Exceptional (requires consultant)

    Sports (Olympic & Massive)Stadia, Gymnasium

    Telecommunication BuildingsIndustrial, Breweries, Cold Storage Facilities

    InstitutionalMortuaries

    Middle to Executive Class (Residential & Institutional)Convention Facilities, Auditoriums, Theatres, Hotels

    Science (Research & Development)Nuclear Facilities, Observatories, Research Facilities

    * G ROUP II MBF: 7% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    28/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP IV : Residential

    Sing le De ta c he d (Ab so lute ly No Firew a ll)

    Sing le A t ta c he d o r Dup le x

    Row ho use s o r Sho p -Ho use s

    Sm a ll Ap a rtm e nts

    Tow nho use s

    * G ROUP IV MBF: 10% (1979 UAP DOCS)

  • 5/21/2018 SPP 2010

    29/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * G ROUP V MBF: 12% (1979 UAP DOCS)

    GROUP V : Monumental

    Exp o sit io n & Fa ir Bu ild ing s

    Ma uso le um s, M em o ria ls a nd M onum ents

    Museums

    Sp e c ia lize d De c o ra tive Build ing s

  • 5/21/2018 SPP 2010

    30/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP VI : Repetitive (No changes in Drawing and Specifications)

    As lo ng a s sa m e p la ns a nd sp e c if ic a t io n a re use d , it c a n b e

    e rec ted a nyw here o r a t a ny lo c a t io n

    1st M BF o f Struc ture

    2nd 80% o f MBF

    3rd 60% o f M BF 4th 80% o f MBF

    (UAP DO CS 1979 )

  • 5/21/2018 SPP 2010

    31/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    GROUP VII : Housing Projects relative on One Single Site(Subdivision)

    Subdivision planning always stays in a single development Housing types based from Group IV

    1st = 10% o f M BF = A

    2nd 10th = A + (60% o f MBF x N) 11th Ab o ve = B + (30% o f MBF x N)

    (UAP DO CS 1979 )

  • 5/21/2018 SPP 2010

    32/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * GROUP VII MBF: 15% (1979 UAP DOCS)

    GROUP VIII : Extensive Details

    Built-In Eq uip m ent

    Sp e c ia l Fitt ing s, Sc re e ns a nd C o un te rs

    A rc h ite c tu ra l Inte rio rs

    Deve lo p m ent Pla nning o r De sig n

  • 5/21/2018 SPP 2010

    33/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * G ROUP IX MBF: MBF + 50% (1979 UAP DOCS)

    GROUP IX : Alterations, Renovations, Rehabilitations, Retrofit andExpansions, Additions belonging to Groups 1 to 5

  • 5/21/2018 SPP 2010

    34/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    * G ROUP X MBF: (1979 UAP DOCS)

    GROUP X :Consultation (Architectural Works

    Opinion and Advice

    Clarifications and Explanations

    Technical Matters

    Consulta t io n : 200

    A rb itra tio n : 500

  • 5/21/2018 SPP 2010

    35/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Owners Responsibilities

    Provide full information to the requirements of the project

    Designate a representative on his behalf

    Render decisions to the documents submitted by the Architect

    Issue orders to the General Contractor through the Architect

    Pay for Architectural and all other Engineering Allied Services

  • 5/21/2018 SPP 2010

    36/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Owners Responsibilities

    Furnish the Architect at the owners expense;

    Survey of the Site Topographical & Relocation Surveys Grades & Lines Site Development Controls

    Utility Lines (Private and Public) Zoning Compliances Clearances & Deeds of Restrictions Soil Investigations & Test Borings

    Soil and Sub-Soil Conditions Annotations to Titles

  • 5/21/2018 SPP 2010

    37/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Owners Responsibilities

    Pay for Design and Consulting Services on other specialty

    systems

    Arrange for Legal, Auditing, Insurance, Counseling and otherServices

    Pay for all Reimbursable Expenses including VAT (ProjectBasis)

    If anything may impair the implementation of the project, awritten notice to the Architect

  • 5/21/2018 SPP 2010

    38/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Conditions of Minimum Basic Fee (Architects Fee)

    Based from the Project Construction Cost

    Other Services Specialized Allied Services (Fee for Allied RLPs) will be paid

    by the Owner. Yet, The Architect who coordinated thework will receive a Coordination Fee.

    Scale Models, 3D Models and Walk Thru

    Shall be paid by the Owner and a Coordination Fee forthe Architect

  • 5/21/2018 SPP 2010

    39/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Per Diem and Travelling Expenses

    50.0 Kilometers from Home, shall be chargeable to theowner

    Extra Sets of Contract Documents

    Chargeable to the Owner

    Change Orders Extra Time and Resources will be chargeable to the Owner

    Special Consultants With the Consent of the Architect, will be paid by the Owner

  • 5/21/2018 SPP 2010

    40/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Work Suspended or Abandoned : Commutative : Periodical

    Schematic Phase 15%(MBF) 15% - 25K (MBF)

    Design Development Phase . 40%(MBF). 25% (MBF)

    Contract, Bidding,Construction Phase 90%(MBF) 50% (MBF)

  • 5/21/2018 SPP 2010

    41/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Different Periods of Construction

    Construction Phase if 6 Months ore more Fee of Remaining Works = Doubled

    Separate Services

    Interiors (Specialized Allied Services) MBF+(12~20% AI Cost, UAP DOCS 1979)

  • 5/21/2018 SPP 2010

    42/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Full Time Construction Services

    Recommendation of the Architect, Approval and be Paidby the Owner

    If No PM or CM, Full Time Construction Supervisor will be on

    Control of the Architect

    Make Periodic Reports to the Owner and the Architect inregards to Progress

  • 5/21/2018 SPP 2010

    43/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    Other Conditions on Services

    Ownership of Documents

    Without a Written Agreement, all designs, drawings, models,specifications, etc. duly signed by the Architect areprotected by the Intellectual Property Act

    Cost Records Owner shall furnish the Architect a copy of records of

    expenses of the project

  • 5/21/2018 SPP 2010

    44/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    CA&E Service Agreement [Design Development Phase Only]

    GROUP IV : Single Attached

    PCC : 10,000,000

    MBF in Percentage : 10% (UAP 1979)

    MBF in Amount : 1,000,000

    DD CF : 400,000

    LEGEND: SCP Sc hem a tic De sig n Pha se Fe e

    DDP De sig n De ve lo p m ent Pha se Fe e CDP Contra c t Doc um ent Pha se Fe e

    PG Pro g re ss Billing

    * sa m p le c om p u ta t io ns

  • 5/21/2018 SPP 2010

    45/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    CA&E Service Agreement [Design Development Phase Only]

    Mobilization Component (Mobilization) 25,000

    PDP 1 ~ 15 days after the completion of Project Definition Phase(30% of CF Less the amount paid at Mobilization)[400,000 x .40] Mob 95,000

    SDP 1 ~ 15 days after the completion of Schematic Design Phase

    (60% of CF Less the amount paid at Mob and PDP[400,000 x .60] Mob PDP 120,000

    DDP 1 ~ 15 days after the completion of Design Development Phase(100% of CF Less the amount paid at Mob/PDP/SCP

    [400,000 x 1.0] Mob-PDP-SCP 160,000

    DESIGN DEVELOPMENT COMPONENT FEE(40% from the Minimum Basic Fee) 400,000

    * sa m p le c om p u ta t io ns

  • 5/21/2018 SPP 2010

    46/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    DA&E Service Agreement [Complete up to Construction Phase]

    GROUP IV : Single Attached

    PCC : 10,000,000 Mob - Mobilization Fee

    MBF in Percentage : 10% (UAP 1979)

    MBF in Amount : 1,000,000

    LEGEND: SCP Sc hem a tic De sig n Pha se Fe e

    DDP De sig n De ve lo p m ent Pha se Fe e

    CDP Contra c t Doc um ent Pha se Fe e PG Pro g re ss Billing

    * sa m p le c om p u ta t io ns

  • 5/21/2018 SPP 2010

    47/91

    SPP DOCUMENT 202 : REGULAR DESIGN SERVICES

    DA&E Service Agreement [Complete up to Construction Phase]

    Mobilization Fee (Mobilization) 25,000 SCP 1 ~ 15 days after the completion of Schematic Design Phase

    (15% of MBF Less the amount paid at Mobilization)[1,000,000 x .15] Mob 125,000 DDP 1 ~ 15 days after the completion of Design Development Phase

    (40% of MBF Less the amount paid at Mob and SCP[1,000,000 x .40] Mob SCP 250,000

    CDP 1 ~ 15 days after the completion of Contract Document Phase(90% of MBF Less the amount paid at Mob/SCP/DDP

    [1,000,000 x .90] Mob-SCP-DDP 500,000 PG Progress Billing [Remaining 10% of SPPCC] [1,000,000 x .10]

    (5% of MBF for PCS or Project Construction Supervision) 50,000

    (5% of MBF for Civil Liability) 50,000

    MINIMUM BASIC FEE BASED FROM PCC

    (Residential Group IV / 10% @ UAP 1979) 1,000,000

    * sa m p le c om p u ta t io ns

  • 5/21/2018 SPP 2010

    48/91

    The Scope of Specialized Allied Services are:

    A rc hite c tura l Inte rio rs

    Ac oustic Desig n

    A rc hite c tura l Lig ht ing a nd Desig n

    Site Deve lo pm ent Pla nning

    Physic a l Pla nning (Ma ste r Deve lopm ent)

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    49/91

    The Scope of Specialized Allied Services are:

    Com p rehensive Pla nning

    Histo ric a nd Cultura l He rita g e

    Sec urity a nd Eva lua tio n Pla nning

    Build ing System Desig n

    Fa c ilitie s Ma intena nc e Sup p o rt

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    50/91

    The Scope of Specialized Allied Services are:

    Build ing Testing & Comm issio ning

    Build ing Env iro nm enta l Ce rtific a tio n

    Fo rensic A rc hite c ture

    Build ing Ap p ra isa l

    Struc tura l Conc ep tua liza tio n

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    51/91

    Preliminary Services :

    Contra c t Doc um enta tio n and Rev iew

    Post Desig n Se rvic e s (Inc lud ing Construc tio n Ma na g em ent)

    Disp ute A vo id a nc e a nd Reso lutio n

    A rc hite c tura l Resea rc h Me tho d s

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    52/91

    Preliminary Services :

    Sp ec ia l Build ing / Fa c ility Pla nning a nd Desig n

    Build ing Com ponents

    Mana g em ent o f A rc hite c tura l Stud ie s

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    53/91

    Specialized Allied Services

    Physic a l Pla nning

    In te rio r De sig n 12% - 20% La nd sc a p e 10% - 15%

    Ac o ust ic 10% - 15%

    Comprehens ive

    o

    Physic a l C om p o ne nto Ec o nom ic Pla nning

    o So c io -C ultu ra l

    o Tra nsp o rta tio n

    o Leg a l a nd Adm in ist ra t ive C iv il Wo rks like ro a d s, d ra ina g e , sew e ra g e , p ow e r a nd

    c omm un ic a t io n is 4% o f d e ve lo p m ent c o st

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    54/91

    Physical Planning Fee

    Typ e I Site De ve lo p m ent

    o

    50 HAS .. 5000/ HAS = Ao 50 100. A + 4500/ HAS = B

    o 100 200 B + 4000/ HAS = C

    o 200+. C + 3000

    Typ e II Sub d iv isio n Pla nn ing , Reg io na l Pla nn ing , Pro vinc ia l

    Capi ta ls

    o 100 HAS. 3000/ HAS = A

    o 100 200 A + 2300/ HAS = Bo 200+. B + 2000/ HAS = C

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    55/91

    Physical Planning Fee

    Typ e III Sub d iv isio n Pla nn ing (Rura l)

    o 1000 HAS. 2000/ HAS = A

    o 100 200. A + 1500/ HAS = B

    o 200+..... B + 1000/ HAS = C

    SPP DOCUMENT 203 : SPECIALIZED ARCHL SERVICES

    * MBF: a s p e r 1979 UAP DO CS

  • 5/21/2018 SPP 2010

    56/91

    SPP DOCUMENT 204A : FULLTIME SUPERVISION SERVICES

    Full Time Supervision Services

    Q ua lity Co ntro l

    Eva lua t io n o f C o nstruc t io n Wo rk

    Pre p a ra t io n o f Da ily Insp e c t io n Rep o rts

    Filling o f Do c um ents

    A rc h ite c t o f Re c o rd o r C o nsult ing A rc h ite c t

    * Fu ll Tim e Sup e rv isio n : 1.0 1.5%

    * C o nstruc t io n M a na g e r : 1.5 3.0%

    * Pro je c t M a na g e r : 2.0 5.0%

  • 5/21/2018 SPP 2010

    57/91

    SPP DOCUMENT 204B : CONSTRUCTION MANAGEMENT SERVICES

    Construction Management

    Coo rd ina t io n a nd Sup e rv isio n

    Co st a nd Tim e C ontro l

    Qua lity Co ntro l o f Wo rk

    Keep ing o f Re c o rd s

    A rc hite c t s w ho a re a lso c o ntra c to rs o f the p ro je c t is a lso

    lia b le to b e CM s.

    * Fu ll Tim e Sup e rv isio n : 1.0 1.5%

    * C o nstruc t io n M a na g e r : 1.5 3.0%

    * Pro je c t M a na g e r : 2.0 5.0%

    S OC 20 OS CO S C O S C S

  • 5/21/2018 SPP 2010

    58/91

    Building & Facilities Administration

    Build ing M a in te na nc e

    G ro und s a nd La nd sc a p ing Sup e rv isio n

    Build ing Eq u ip m ent Ma in te na nc e

    Busine ss Deve lo pm ent a nd M a na g em ent

    Po st-C o nstruc t io n Eva lua tio n

    SPP DOCUMENT 205 : POST-CONSTRUCTION SERVICES

    * Pe rc e nta g e o f G ro ss Renta ls, m a inte na nc e a nd se c urity fee s 4-6%* Mo nth ly Sa la ry Fe e

    SPP DOCUMENT206 COMPREHENSIVE SERVICES

  • 5/21/2018 SPP 2010

    59/91

    SPP Docs 201 205

    Op e ra tes a s a m em b e r o f Ow ne r-A rc h itec t -Eng ine e r-

    Cont rac to r Cont ra c to r m en a nd eq u ip m ent , p ro je c t d e live ry a s p e r

    con t r a c t

    Ow ne r fund s a nd fina nc e

    The p ro je c t m a na g e r p la ns, p ro g ra m s, m o nito rs a c t iv it ie s,a d v ise r o f m a teria l c o st a nd c o nst ruc t io n m e thod s, a nd

    e xe rc ise o ve ra ll c o st c o ntro l.

    Func tio ns o n Pre -C o nstruc t io n

    Func t io ns o n C o nstruc t io n Pha se

    SPP DOCUMENT 206 : COMPREHENSIVE SERVICES

    * PM : 2-5% (1979 UAP DOCS)

    SPP DOCUMENT207 DESIGN BUILD SERVICES

  • 5/21/2018 SPP 2010

    60/91

    Design Build by Administration 7% o f PCC

    If G ro up 4 o r Re sid e n tia l , it s 10% MBF + 7% o f De sig nBuild b y Ad m inistra t io n m a king it 17%

    Design Build by Guaranteed Maximum Cost

    Lum p Sum If the c o st d o e s no t e xc e e d 10%, the A rc h itec t a nd

    Ow ne r w ill p a y fo r it 50/ 50.

    If the c o st d o e s e xc e e d 10%, the A rc hite c t w ill p a y fo r

    a ll o f it.

    SPP DOCUMENT 207 : DESIGN BUILD SERVICES

    * MBF a s p e r (1979 UAP DO CS)

    SPP DOCUMENT207 DESIGN BUILD SERVICES

  • 5/21/2018 SPP 2010

    61/91

    Design Build by Administration

    Project Group IV (10% UAP DOCS 1979)PCC 5,000,000

    Design Build by Administration (MBF) [7% of PCC UAP DOCS 1979][5,000,000 x .07] 350,000

    MBF (Regular Design Services) [10% of PCC UAP DOCS 1979]

    [5,000,000 x .10] 500,000

    TOTAL FEE BY PERCENTAGE [Design Build By Administration] 7% (1979)[Regular Design Services Group IV] 10% (1979)

    17% of PCC

    TOTAL FEE BY AMOUNT 350,000 + 500,000 850,000

    SPP DOCUMENT 207 : DESIGN BUILD SERVICES

    *sam p le c om p u ta t ion

    SPP DOCUMENT207 DESIGN BUILD SERVICES

  • 5/21/2018 SPP 2010

    62/91

    Design Build by Guaranteed Maximum Cost

    Project Group IV (10% UAP DOCS 1979)PCC 5,000,000

    Design Build by Guaranteed Cost [10% of PCC SPP DOCS 2010][5,000,000 x .10] 500,000

    MBF (Regular Design Services) [10% of PCC UAP DOCS 1979][5,000,000 x .10] 500,000

    TOTAL FEE BY PERCENTAGE [Design Build By Guaranteed Cost] 10% (2010)[Regular Design Services Group IV] 10% (1979)

    20% of PCC

    TOTAL FEE BY AMOUNT (Work Done) 500,000 + 500,000 1,000,000

    SPP DOCUMENT 207 : DESIGN BUILD SERVICES

    *sam p le c om p u ta t ion

    SPP DOCUMENT207 DESIGN BUILD SERVICES

  • 5/21/2018 SPP 2010

    63/91

    Design Build by Guaranteed Maximum Cost

    IF THERE WILL BE AN ASSUMED SAVINGS Original PCC as Base Value 5,000,000say from 5,000,000 as PCC

    Total PCC consumed is only 4,500,000

    SAVINGS 500,000

    Shared Between Owner and Architect 250,000

    TOTAL FEE BY AMOUNT + SAVINGS SHARED FROM THE OWNER 1,250,000

    SPP DOCUMENT 207 : DESIGN BUILD SERVICES

    *sam p le c om p u ta t ion

    METHODSOF COMPENSATION

  • 5/21/2018 SPP 2010

    64/91

    Multiple of Direct Personnel Expenses (MDPE)

    Ve ry p re va le nt in Pre -De sig n Se rvic e s

    A lw a ys b a se d in Te c hn ic a l Ho urs, Exp e nse s, Ad d it io na l

    C o st , a nd num b e r o f Sta f fs

    No n-C re a t ive Wo rks

    The re is a lw a ys a m ultip lie r (1.5 ~ 2.5) [SPP 2010]

    METHODS OF COMPENSATION

    METHODSOF COMPENSATION

  • 5/21/2018 SPP 2010

    65/91

    Percentage of Construction Cost (PCC)

    Ve ry Fle xib le , e a sy to a p p ly a nd is re la te d to the Size a nd

    Typ e o f Pro je c t

    Wo rld w id e use d for c om p ensa t io n in Arc h ite c tura l

    Se rv ic e s

    Sim ila r to the c o nc e p t o f b e ing c ha rg e d to re a lto rs, a nd

    developers

    The m o st c omm on m etho d o f c om p ensa t io n w h ic h is Fa ir fo r b o th p a rt ie s

    METHODS OF COMPENSATION

    METHODSOF COMPENSATION

  • 5/21/2018 SPP 2010

    66/91

    Professional Fee + Expenses

    When th e re is a c o nt inu ing re la t io nship invo lving a se rie s

    o f p ro je c ts

    The re is a fixe d sum o ve r a nd a b o ve the re im b ursem ent

    fo r the Arc h itec t s Tim e a nd O ve rhe a d

    METHODS OF COMPENSATION

    METHODSOF COMPENSATION

  • 5/21/2018 SPP 2010

    67/91

    Per Diem, Honorarium + Reimbursable Expenses

    If the c lie nt re q ue st the A rc h ite c t to d o w o rk w hic h w ill

    re q uire d his p e rso na l t im e1. Pro je c t re la ted m ee t ing s, c o n fe re nc e s o r t rip s

    2. O c u la r insp e c t io n o f p o ssib le p ro je c t sites

    3. C o n fe rring w ith o thers re g a rd ing investm e nts o r

    ve nture s a nd the like4. O u t o f Poc ke t Exp enses

    Arc h itec t a c ts o n the b e ha lf o f the ow ne r

    Mixed Methods of Compensation

    METHODS OF COMPENSATION

    PROFESSIONAL PRACTICE

  • 5/21/2018 SPP 2010

    68/91

    CODE OF ETHICS

    ARCH. A2JAVILLO, uap

    PROFESSIONAL PRACTICE

    CODE OF ETHICS

  • 5/21/2018 SPP 2010

    69/91

    RESPONSIBILITIES IN RELATION TO:

    PEOPLE

    CLIENT

    CONTRACTORS, DEALERS AND AGENTS

    CO LLEAGUES AND SUBORDINATES

    CODE OF ETHICS

    PEOPLE

  • 5/21/2018 SPP 2010

    70/91

    PEOPLE

    Resp e c t, c o nse rve the va lue s o f na tura l, histo ric a l, a nd c ultura l

    he rita g e o f the c omm un ity in w h ic h he c re a tes Arc h itec tu re

    a nd he lp im p ro ve the e nv iro nm ent a nd life in a susta ina b le

    manner .

    Prom o te the inte re st o f the p ro fe ssio n a nd p ro fe ssio na l

    o rg a niza t io n a nd a lso sha re te c hnic a l p ro fessio n to o the r a llie d

    fie ld s.

    Ob se rve the la w s, re g ula t io ns o f the G o ve rnm ent , c om p ly w ith

    the C o d e o f Eth ic a l c o nd uc t a nd the Sta nd a rd s o f Pro fessio na l

    Pract ice.

    PEOPLE

  • 5/21/2018 SPP 2010

    71/91

    PEOPLE

    No p a id a d ve rt isem en t , b u t c a n m a ke fo r the a d va nc ing o f

    p ub lic know le d g e o f the Arc h itec t s func t io n in so c ie ty.

    No a d ve rt isem ent o f h is w o rks a nd sa y s no to p a ida d ve rt isem ent o f b uild ing m a te ria ls, c o nst ruc t io n o r e q uip m ent .

    Doe s no t d e c e ive p eo p le b y p ro fessio na l c om p e te nc e , henc e ,

    it m ust b e p ro ved b y t ra c k re c o rd s a nd e xp e rie nc e .

    CLIENT

  • 5/21/2018 SPP 2010

    72/91

    CLIENT

    A lw a ys p ro te c t the c lie nts inte re st to e nsure a c o nt inue d

    e xiste nc e o f g o o d re la t io nship .

    Do n t o ffe r FREE p re lim ina ry ske tc he s, b ut in a w a y sho w thec lie nt e xam p le s o f yo ur p ro fessio na l e xp e rie nc e s.

    Dire c t the c lie nt a b o ut the se rv ic e s a nd stra ig ht it out the

    c o rre sp o nd ing FEES .

    If the p ro je c t is q ue st io na b le e sp e c ia lly re g a rd ing Fina nc e , te ll

    the c lie nt a b o ut the situa t io n e ve n lo o sing a p ro sp e c t ive jo b .

    CLIENT

  • 5/21/2018 SPP 2010

    73/91

    CLIENT

    Exp la in the c o nd it io na l c ha ra c ter o f est im a tes a nd in no c a se

    g ua ra nte e a ny e st im a te s o r c o st o f w o rk.

    Eve n tho ug h w o rking for the c lie nt s p ro je c t , c o nsid e r thep e o p le a nd c omm unity in it , e sp e c ia lly life a nd sa fe ty .

    Und e r the M BF sta te d o n the SPP , c le a rly b ill the c lie nt fo r the

    se rvic e s re nd e re d .

    Must b e c om p ensa ted w ith the Pro fe ssio na l Fe e ind ic a ted

    a nd d o e s no t a c c e p t a ny fo rm o f o the r re turns from the c lie n t .

    CLIENT

  • 5/21/2018 SPP 2010

    74/91

    CLIENT

    A lw a ys p ro v id e a se rv ic e a g re em ent o r a ny kind o f ne g o t ia t io n ,

    m ed ia t io n, a rb itra t io n o r o the r a lte rna t ive s to se tt le d isp ute s.

    Info rm s the c lie nt a t a ll t im e s the p ro g re ss o f wo rk fo r the c lie nt sb e ha lf a nd fo r a ny issue s tha t m a y a ffe c t the q ua lity a nd c o st o f

    work.

    CONTRACTORS DEALERSAND CLIENT

  • 5/21/2018 SPP 2010

    75/91

    CONTRACTORS, DEALERS AND CLIENT

    Doe s no t a c c e p t Fre e p ro fessio na l e ng ine e ring w o rks a nd

    se rv ic e s tha t c a n c ha ng e the a rc h itec t s o p in io n .

    Do e s no t se e k c omm issio n, d isc o un ts, fee s, g if ts, o r fa vo rs froma g ents o r firm s ha nd ling b uild ing m a te ria ls a nd e q uip m ent tha t

    w ill p ut the a rc h ite c t in a re c ip ro c a l fra m e o f m ind . Disc o unt s

    sho u ld b e c re d ited to the c lie n t .

    COLLEAGUESAND SUBORDINATES

  • 5/21/2018 SPP 2010

    76/91

    COLLEAGUES AND SUBORDINATES

    Doe s no t re nd e r se rv ic e s w itho ut a ny Se rv ic e Ag re em ent .

    A lw a ys a b id e to the M BF a c c o rd ing to the SPP .

    Sha ll no t use d o na t io ns o f p ro fessio na l se rvic e a s a d e vic e to

    o b ta in c om p e t it ive a d va n ta g e e xc ep t fo r w o rthy c iv ic o r

    re lig io us p ro je c ts.

    Sha ll no t e nte r a s a c om p e t ito r e sp e c ia lly If the a rc hite c t is

    d ire c t ly invo lve d in the form ula t io n o f the p ro g ra m .

    Sho uld no t ta ke o r p a r-ta ke in a ny p ro je c ts tha t is a lre a d y in thesc o p e o f a n a no ther a rc h itec t .

    COLLEAGUESAND SUBORDINATES

  • 5/21/2018 SPP 2010

    77/91

    COLLEAGUES AND SUBORDINATES

    Sha ll no t c rit ic ize , d isc re d it a no the r a rc hite c t o r the la t te r s w o rk.

    Dec line s from a sso c ia t ing in e nte rp rise s tha t c a n ne g a t ive ly

    a ffe c t h is na m e , the p ro fe ssio n a nd the o rg a niza t io n.

    Sha ll no t sig n w o rks o f o the r p e rso ns no t und e r h is sup e rvisio n .

    If ow ning a f irm , c om p a ny o r p ro fessio n, sha ll p ro v id eem p lo yee s a su ita b le w o rking e nv iro nm ent , a nd c om p e nsa te

    them fa irly.

    PROFESSIONAL PRACTICE

  • 5/21/2018 SPP 2010

    78/91

    UAP DOC 301:

    GENERAL CONDITIONS

    ARCH. A2JAVILLO, uap

    PROFESSIONAL PRACTICE

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    79/91

    CONTRACT DOCUMENTS: consists of the following: Agreement General conditions Special provisions Specifications Drawings

    OWNER: person ordering the project for execution

    ARCHITECT: commissioned by the owner

    ENGINEER: person so named in the contract document

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    80/91

    PROJECT REPRESENTATIVE : full time construction inspectorhired by owner assisting in the supervision of the work.

    CONTRACTOR: person or firm whose proposal has beenaccepted & contract awarded

    SUB-CONTRACTOR: having direct contact with contractor,acts in behalf of the contractor in executing any part of thecontract

    SURETY :person, firm, or corporation providing guarantee forcontractors bonds

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    81/91

    PROPOSAL: offer of a bidder

    PROPOSAL BOND : paid by the contractor as a bidder to the

    client for 5%of the estimated cost of the project.- it guarantees that the bidder will enter into a contract withthe owner for the construction of the work if the contract isawarded to him.

    PAYMENT BOND : (15%) approved form of security furnished bythe contractor asguarantee to pay all obligations arising fromthe contract.- the owner will release it after2 months, same with theperformance bond.

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    82/91

    PERFORMANCE BOND : (15%) approved form of securityfurnished by the contractor as a guarantee to execute work inaccordance with terms of the contract.

    - Is designed to protect the owner from having a third partyresponsible for completing the work if the contractor doesnot.

    - The owner will release it after 2 months, same with thepayment bond.

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    83/91

    GUARANTEE BOND : (30%) approved form of security furnishedby the contractor to guarantee to the quality of materials andworkmanship performed.

    - Is released 12 monthsafter the date of final payment.

    AGREEMENT: contract between owner and contractorundertaking the project

    ADVERTISEMENT/ INVITATION TO BID : notice or invitation issuedto bidders giving information of the magnitude and extent ofthe project, nature, etc.

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    84/91

    BIDBULLETIN : additional information on contract documents

    INSTRUCTION TO BIDDERS: list of instructions on preparation &

    conditions for award of contract

    DRAWINGS: graphical representation of work

    SPECIAL PROVISIONS: instructions that supplement or modifydrawings, specs, & general conditions of the contract.

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    85/91

    SPECIFICATIONS: written or printed description of workdescribing qualities of materials and mode of construction

    SUPPLEMENTARY SPECS: additional info issued as an additionor amendment to provisions of specs.

    SCHEDULE OF MATERIALS AND FINISHES: outline specsenumerating type and trade names of materials used

    BREAKDOWN OF WORK AND CORRESPONDING VALUES: list ofwork and corresponding value in materials & labor includingprofit and overhead allowance.

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    86/91

    WRITTEN NOTICE : info, advice or notification pertinent to theproject

    ACT OF GOD/ FORCE MAJEURE : catastrophes, phenomena ofnature, misfortunes and accidents which human prudencecannot foresee or prevent.

    TIME LIMITS: duration of time allowed by the contract forproject completion

    LOCAL LAWS: laws, ordinances, and government regulationsapplicable to the project

    DEFINITIONS OF TERMS

    DEFINITIONSOF TERMS

  • 5/21/2018 SPP 2010

    87/91

    WORK: includes labor and materials, equipment,transportation, faculties necessary for completion of theproject

    FURNISH : purchase and/or fabricate and deliver to thejobsite

    INSTALL: build in, mount in positions, connect or apply

    PROVIDE : furnish and install

    DEFINITIONS OF TERMS

    FLEA 2013 REFRESHER

  • 5/21/2018 SPP 2010

    88/91

    FLEA 2013 REFRESHER

    nothing follows

    FLEA 2013 REFRESHER

  • 5/21/2018 SPP 2010

    89/91

    0 3 S

    see next chapter

    FLEA 2013 REFRESHER

  • 5/21/2018 SPP 2010

    90/91

    d om inus illum ina t io m ea

    FLEA 2013 REFRESHER

  • 5/21/2018 SPP 2010

    91/91

    ARCH. A2JAVILLO, uap