status of the spl cavities at cern i.aviles & n. valverde on behalf of spl team 1i. aviles &...
TRANSCRIPT
![Page 1: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/1.jpg)
I. Aviles & N. Valverde 1
Status of the SPL cavities at CERN
I. Aviles & N. Valverde on behalf of SPL team
Lund, 11 December 2013
![Page 2: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/2.jpg)
I. Aviles & N. Valverde 2
OverviewCopper cavityNiobium cavityToolingConclusions
Lund, 11 December 2013
Overview
![Page 3: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/3.jpg)
I. Aviles & N. Valverde 3Lund, 11 December 2013
Cavity
Helium tank
Inter-cavitysupport
Thermal shieldVacuum vessel
RF coupler
Thermal shield tie-rod
Cold-to-warmtransition
Magnetic shielding
Insulation vacuum relief plate
Cryogenic circuit burst disk
Gate valve
Two-phase pipe
Cavity tuner
Double-walledtube
He phase separator
Cryogenic lines port
Overview
Thanks to R. Bonomi and V. Parma
![Page 4: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/4.jpg)
I. Aviles & N. Valverde 4
Overview
Lund, 11 December 2013
Bulk Niobium 5Cells cavity
Stainless steel (316L /316LN) helium tank designed by CERN, supplied by CEA and welded to the cavity at CERN.Design already validated by CERN.
4 niobium cavities under fabrication at RI – delivery beginning 2013
Tuners provided by CEA. Under testing at CERN
Pumping line & Magnetic shield to be provided IPN Orsay.
![Page 5: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/5.jpg)
I. Aviles & N. Valverde 5
Cooper cavity
Lund, 11 December 2013
Two copper cavities fabricated in order to:Learn during the fabrication processRF measurementsBead pull measurementValidation of the tooling for the niobium cavitySurface treatments
![Page 6: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/6.jpg)
I. Aviles & N. Valverde 6
Copper cavity
Lund, 11 December 2013
Cell-by-cell tuning system with RF bead-pull measurements
Mechanical measurements: frequency shift with respect to stress
and deformation
Measured cavity frequency change vs. mechanical deformation of cell no 4.
![Page 7: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/7.jpg)
I. Aviles & N. Valverde 7
-4 -3 -2 -1 0 1 2 3 4 5
-0.5
-0.4
-0.3
-0.2
-0.1
0.0
0.1
0.2
0.3
0.4
Deformation in fonction of the frequency
∆f [MHz]
Def
orm
ation
of t
he c
avit
y [m
m]
Copper cavity
Lund, 11 December 2013
Cavity tuner: measurement of cavity detuning versus mechanical deformation.
![Page 8: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/8.jpg)
Reparation monocell from RI at CERN
Machining (preparation before brazing)
Brazing between niobium tube and Stainless steel (316LN) flange.
The monocell has being repaired in order to continue with the electropolishing and cold tests
![Page 9: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/9.jpg)
Reparation monocell from RI at CERNEB Welding from the outside (W#1) and inside (W#2)Full penetration: 2.4 mm
EB Welding from the outside (W#3) Full penetration: 1.7 mm
Cross section of the EB weld (W#1 +W#2)
Cross section of the EB weld (W#3)
![Page 10: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/10.jpg)
I. Aviles & N. Valverde 10
Niobium cavity at RI
Lund, 11 December 2013
4 niobium cavities fabricated by Research Instruments (RI) will arrive to CERN this year.
1 already at CERN
3 cavities will be delivered middle of December
![Page 11: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/11.jpg)
I. Aviles & N. Valverde 11
Niobium cavity at CERN
Lund, 11 December 2013
Spinning of half-cells and beam tubes at HEGGLI Dimensional control by CMM
RF measurements.
![Page 12: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/12.jpg)
SpinningMachiningCutting cell lengthRF measurementCP (chemical polishing)
Spinning
Machining – Welding preparation (Iris & rings)
CPNb
HAL
F-CE
LLS RF
measurements
Assembly half-cell+ half-cell+ stiffening ring=> Dumb-bellDegreasing + CP (8 h before EBW)EBW half-cell + half-cellDegreasing +CP (8 hours before EBW)EBW dumb-bell+ stiffening ringRF measurementsTrimming equators RF measurementsGrinding and CP (if needed)
DU
MB-
BELL
S
EBWEBWCP EB
W
Trimming equators
Grinding and CP (if needed)
EBWDegreasing +CP
Nb
SpinningNecking-outMachiningCP
Spinning
Necking-out Mach
ining
CP
BEAM
TU
BES
Niobium cavity at CERN
![Page 13: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/13.jpg)
Nb
Machining SS Flange + Nb beam tube + SS insertDegreasing + CPBrazingMachining-Removal of SS insert
Machining
Brazing
SS
TAN
K CO
NN
ECTO
R
EBW2
Assembly beam tube + ports=> end groupDegreasing + CP ( 8h before EBW)Electron beam welding (EBW)
CP
END
GRO
UP
Machining SS Flange + Nb tube + SS insert Degreasing + CPBrazingMachining- Removal of SS insert
Brazing
Machining
Nb
SS
FLAN
GES
SS
Degreasing
BEAM
FLA
NG
ES Machining SS Flange + Nb beam tube + SS insertDegreasing + CPBrazingMachining-Removal of SS insert
Brazing
Machining
SS
Degreasing
SSN
b
SS
Niobium cavity at CERN
![Page 14: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/14.jpg)
RF measureme
nts
Trimming
EBW
EBW
RF measureme
nts
EXTR
EMIT
Y 1
EBW
CP
Cp
Assembly end group+ tank connector + half-cell=> extremity 1Degreasing + CP ( 8h before EBW)EBW end group + tank connectorDegreasing + CP ( 8h before EBW)EBW end group + half-cellRF measurementsTrimming equator RF measurements
Assembly end group + half-cell=> extremity 2Degreasing + CP ( 8h before EBW)EBW end group + half-cellRF measurementsTrimming equator RF measurements
EBW
Trimming
RF measureme
nts
RF measureme
nts
EXTR
EMIT
Y 2
CP
Niobium cavity at CERN
![Page 15: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/15.jpg)
Final assemblyCP - 8 h before each EBW
EB Tack weld EBW EB Tack weld
EB Tack weld EB Tack weld
EBW
EBW EBW
Niobium cavity at CERN
![Page 16: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/16.jpg)
Ancillaries
5 stainless steel helium tanks (designed by CERN) will be delivered by CEA in January
![Page 17: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/17.jpg)
Ancillaries
Electron beam welding tooling designed and fabricated at CERN
![Page 18: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/18.jpg)
Ancillaries
Tooling for electropolishing
Tooling for cold tests
Tooling already fabricated and
available at CERN
![Page 19: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/19.jpg)
Conclusions
• Copper cavities have proven to be very useful for the different testing campaigns carried out during the last year. The results obtained will be extremely valuable for the tuning operation of the niobium cavities
• 4 niobium five – cell cavities will be delivered to CERN by the end of the year
• A fifth niobium cavity is under fabrication at CERN
• 5 helium tanks will be supplied by CEA in January 2014
![Page 20: Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d185503460f949edb60/html5/thumbnails/20.jpg)
Thank you very much
QUESTIONS??