step 2. step 1. · 2014-12-26 · 63 14 venue • portland, eg 2 •..24 • ww.postergarde.om v.sa...

2
630 NW 14th Avenue Portland, Oregon 97209 800.707.0204 www.PosterGarden.com Varia.Sophora 20ſt Wave STEP 1. Layout all the parts on the floor in this form. Assembly will be done flat on the floor, not standing up. Organize the parts for the TOP frame and BASE frame. STEP 2. Start in this corner. Push the buon with your thumb while sliding the tubes together. Twist as needed to click the buon into the hole. Some buons may already be inserted into one end of each tube. Face all buons towards the inside of the frame. Sckers are next to the correct buon hole. Build the Base and the Top separate.

Upload: others

Post on 18-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STEP 2. STEP 1. · 2014-12-26 · 63 14 venue • Portland, eg 2 •..24 • ww.PosterGarde.om V.Sa ft Wave STEP 1. Layout all the parts on the floor in this form. Assembly will be

630 NW 14th Avenue • Port land, Oregon 97209 • 800.707.0204 • www.PosterGarden.com

Varia.Sophora20ft Wave

STEP 1. Layout all the parts on the floor in this form. A

ssembly w

ill be done flat on the floor, not standing up. Organize the parts

for the TOP fram

e and BASE fram

e.

STEP 2. Start in this corner. Push the button w

ith your thumb w

hile sliding the tubes together. Tw

ist as needed to click the button into

the hole. Some butt

ons may already be inserted into one end of each

tube. Face all buttons tow

ards the inside of the frame. Stickers are

next to the correct button hole. Build the Base and the Top separate.

Page 2: STEP 2. STEP 1. · 2014-12-26 · 63 14 venue • Portland, eg 2 •..24 • ww.PosterGarde.om V.Sa ft Wave STEP 1. Layout all the parts on the floor in this form. Assembly will be

ASSEMBLED VIEW:

STEP 6. Once zipped closed, the display is ready to stand up. There are openings sewn at the top for installing lights. The electrical cords can be run inside of the graphics and out the bottom where the zipper shuts. Fit the light peg into the hole on top of the tube.

STEP 5. When the zipper reaches the bottom the fabric becomes tighter. Pull the fabric firmly with one hand around the bottom tube while zipping the bottom closed with the other hand.

STEP 4. With the completed frame laying down on the floor, begin installing the graphics sliding the fabric over the top corners of the frame, like a pillow case. Switching from the right and left side, slide the fabric down a little bit at a time.

STEP 3. When all the tubes for the top and the tubes for the base are together, connect the top to the base.