Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Upload: ann-miles

Post on 18-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage and StreetMaintenance and Construction

Presentation for the Flooding and Drainage CommitteeSeptember 28, 2010

Page 2: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Overview – Stormwater Drainage System

•2,800 miles of Roadside Storm Ditches

•3,600 miles of Storm Sewer Line

•14 Stormwater Pump Stations

•1,900 Outfalls

•9 Detention Basins

Page 3: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Overview – City Streets and Bridges

•16,000 lane-miles

•2,400 lane-miles –Major Thoroughfares

•5,600 lane-miles - Collectors

•8,000 lane-miles - Local Streets

•1,619 Bridges

•2,400 Traffic Signals

Page 4: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage Maintenance

•Major Off-Road Ditch Inspection & Maint.

•$2,408,231

•244 miles

•Herbicide Application

•$424,395

•16,000 Acres

Page 5: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

•Off-Road Drainage Easement Mowing

•$388,746

•255 miles

•Remove Litter From Drainage Easements

•$1,200,000

•8,500 Cubic Yards

Storm Drainage Maintenance

Page 6: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage Maintenance

•Roadside Ditch Maintenance (De-silt & Re-Grade)

•$12,584,751

•275 miles

•Right-of-Way Mowing

•$3,498,716

•6,784 miles

Page 7: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage Maintenance•Storm Water Inspections

•$1,574,212

•1,400 Inspections

•Outfall Inspections & Representative Monitoring

•$483,508

•418 Inspections

•Inlet/Manhole & Line Inspections•$3,218,296

•60,000 Inlets / Manholes

•240 miles of Line

Page 8: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage Maintenance

•Inlet/Manhole & Line Cleaning and Repair

•$8,728,408

•21,788 Manholes and Inlets

•89 miles of Line

•Gutter Sweeping

•$1,507,459

•21,500 lane-miles

Page 9: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Street Maintenance

•Pothole Repair

•$936,026

•2,000 Tons

•Skin Patching

•$6,552,185

•14,000 Tons

Page 10: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Street Maintenance

•Concrete Repair

•$6,347,459

•262,000 Cubic Feet

•Overlay

•$9,693,729

•140 Lane lane-miles

Page 11: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

•Bridge / Barricade Maintenance

•$3,044,741

•5,350 Total

Street Maintenance: Bridges

Page 12: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

•Maintain Traffic Signs

•$2,675,114•40,000 Units

•Maintain Pavement Markings

•$1,315,276•4,300,000 Linear Feet

•Maintain Traffic Signals

•$5,839,346•6,450 Units

•Maintain Freeway Lighting

•$1,263,543 •15,000 Units

Street Maintenance

Page 13: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Maintenance Total

O & M FY11

•Storm: $33.0 M

•Street: $48.8 M

Page 14: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Stormwater: Design & Construction

•Drainage Improvement Projects

•$50,700,000

•1,628 Acres

•LDP (Local Drainage Program)

•$2,400,000

•26 Sites

•Detention•$4,500,000

•Subregional Design

Page 15: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Street Construction

•MT Overlay

•$7,000,000

•56 lane-miles

•MT Reconstruction

•$79,900,000

•57 lane-miles

•MT Construction

•$14,140,000

•10 lane-miles

Page 16: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Street Construction: Neighborhood Street Reconstruction

•Curb & Gutter

•$15,000,000

• 7.5 lane-miles

Page 17: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Street Construction: Bridges

•Wooden Bridge Structure Replaced with Wood or Concrete

•$1,186,059

•8 Structures Total – 4 wood, 4 concrete

Page 18: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Capital Totals

CIP FY11

•Storm: $57,600,000

•Street & Bridge: $87,170,000 (PIB & Metro)

Total: $144,770,000

Page 19: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Select FY 11 Capital Projects:

Storm Drainage

•Local Drainage Projects

•Kirkwood Drive (Briar Forest)

•Whiteheather, Phase III

•Astoria Boulevard (Scarsdale)

•Brays Village

•Bellaire West

Page 20: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Select FY 11 Capital Projects: Street & Bridge

•NSR 450 (East End)

•Morningside Improvements

•Yale Paving: Tidwell to Parker

•Sabo Paving: Kingspoint to Fuqua

•Cambridge Paving: Holly Hall to IH 610

•Hirsch: Kelley to Crosstimbers

•Little York: TC Jester to Alabonson

•Parker: Hardy to Eastex

Page 21: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Capital ProjectsCIP FY 11 to 15

Storm: ~$57M per year

Street: ~$100M per year

Page 22: Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010

Storm Drainage and StreetMaintenance and Construction

Presentation for the Flooding and Drainage CommitteeSeptember 28, 2010