Overview – Stormwater Drainage System
•2,800 miles of Roadside Storm Ditches
•3,600 miles of Storm Sewer Line
•14 Stormwater Pump Stations
•1,900 Outfalls
•9 Detention Basins
Overview – City Streets and Bridges
•16,000 lane-miles
•2,400 lane-miles –Major Thoroughfares
•5,600 lane-miles - Collectors
•8,000 lane-miles - Local Streets
•1,619 Bridges
•2,400 Traffic Signals
Storm Drainage Maintenance
•Major Off-Road Ditch Inspection & Maint.
•$2,408,231
•244 miles
•Herbicide Application
•$424,395
•16,000 Acres
•Off-Road Drainage Easement Mowing
•$388,746
•255 miles
•Remove Litter From Drainage Easements
•$1,200,000
•8,500 Cubic Yards
Storm Drainage Maintenance
Storm Drainage Maintenance
•Roadside Ditch Maintenance (De-silt & Re-Grade)
•$12,584,751
•275 miles
•Right-of-Way Mowing
•$3,498,716
•6,784 miles
Storm Drainage Maintenance•Storm Water Inspections
•$1,574,212
•1,400 Inspections
•Outfall Inspections & Representative Monitoring
•$483,508
•418 Inspections
•Inlet/Manhole & Line Inspections•$3,218,296
•60,000 Inlets / Manholes
•240 miles of Line
Storm Drainage Maintenance
•Inlet/Manhole & Line Cleaning and Repair
•$8,728,408
•21,788 Manholes and Inlets
•89 miles of Line
•Gutter Sweeping
•$1,507,459
•21,500 lane-miles
Street Maintenance
•Pothole Repair
•$936,026
•2,000 Tons
•Skin Patching
•$6,552,185
•14,000 Tons
Street Maintenance
•Concrete Repair
•$6,347,459
•262,000 Cubic Feet
•Overlay
•$9,693,729
•140 Lane lane-miles
•Bridge / Barricade Maintenance
•$3,044,741
•5,350 Total
Street Maintenance: Bridges
•Maintain Traffic Signs
•$2,675,114•40,000 Units
•Maintain Pavement Markings
•$1,315,276•4,300,000 Linear Feet
•Maintain Traffic Signals
•$5,839,346•6,450 Units
•Maintain Freeway Lighting
•$1,263,543 •15,000 Units
Street Maintenance
Maintenance Total
O & M FY11
•Storm: $33.0 M
•Street: $48.8 M
Stormwater: Design & Construction
•Drainage Improvement Projects
•$50,700,000
•1,628 Acres
•LDP (Local Drainage Program)
•$2,400,000
•26 Sites
•Detention•$4,500,000
•Subregional Design
Street Construction
•MT Overlay
•$7,000,000
•56 lane-miles
•MT Reconstruction
•$79,900,000
•57 lane-miles
•MT Construction
•$14,140,000
•10 lane-miles
Street Construction: Neighborhood Street Reconstruction
•Curb & Gutter
•$15,000,000
• 7.5 lane-miles
Street Construction: Bridges
•Wooden Bridge Structure Replaced with Wood or Concrete
•$1,186,059
•8 Structures Total – 4 wood, 4 concrete
Capital Totals
CIP FY11
•Storm: $57,600,000
•Street & Bridge: $87,170,000 (PIB & Metro)
Total: $144,770,000
Select FY 11 Capital Projects:
Storm Drainage
•Local Drainage Projects
•Kirkwood Drive (Briar Forest)
•Whiteheather, Phase III
•Astoria Boulevard (Scarsdale)
•Brays Village
•Bellaire West
Select FY 11 Capital Projects: Street & Bridge
•NSR 450 (East End)
•Morningside Improvements
•Yale Paving: Tidwell to Parker
•Sabo Paving: Kingspoint to Fuqua
•Cambridge Paving: Holly Hall to IH 610
•Hirsch: Kelley to Crosstimbers
•Little York: TC Jester to Alabonson
•Parker: Hardy to Eastex
Capital ProjectsCIP FY 11 to 15
Storm: ~$57M per year
Street: ~$100M per year