stormwater management at honey creek resort park
DESCRIPTION
Stormwater Management at Honey Creek Resort Park. Donna Lutz Steve Jones. Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course 28 family & group cabins RV campground Boat Ramp, Boat Docks Beach - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/1.jpg)
Stormwater Managementat Honey Creek Resort Park
Donna LutzSteve Jones
![Page 2: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/2.jpg)
Concept:Iowa’s First Destination Resort Park• Lodge
108 rooms, conference center, restaurant, indoor water park
• 18-hole golf course•28 family & group cabins•RV campground•Boat Ramp, Boat Docks•Beach•Day use area, paved/unpaved trails•Ped Bridge to exisiting park
![Page 3: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/3.jpg)
Lodge Complex$19 million project
![Page 4: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/4.jpg)
Lodge opened Sep 19, 2008
![Page 5: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/5.jpg)
Cabins available June 2009
Pedestrian Bridge 2010?
![Page 6: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/6.jpg)
![Page 7: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/7.jpg)
HCRP is intended to exemplify a sustainable approach to development, by protecting the natural environment of both the site itself and the neighboring Rathbun Lake. To meet this goal both water quality monitoring and stormwater management must be part of the development plans.
Water Quality Monitoring
Stormwater Management & Design
![Page 8: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/8.jpg)
Before, During Constructionand Not Quite Done
![Page 9: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/9.jpg)
Boat ramp and RV Park
Lodge Construction
![Page 10: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/10.jpg)
Water Quality MonitoringGoal : To protect Rathbun Lake from
contaminants due to construction activities at HCRP
Work Plan:• Baseline monitoring • Construction monitoring • Post-construction / Operational
monitoring??Components:
Lake (near shore and offshore)Surface and integrated depth samples
Stormwater inputsStatic/first flush and automated samplers
![Page 11: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/11.jpg)
HCRP WQ Monitoring Sites
![Page 12: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/12.jpg)
Monitoring ProtocolStorm Events
First flush samples with static samplers at many locations
Automatic sampling at prime location for 12 -24 hours
Parameters- Solids (total, suspended
and volatile) Turbidity, pH and
Conductivity
In –lake SamplingNear shore
locationsDepth integrated
samples for solids and nutrients
Depth profiles (YSI) for temp, DO, conductivity
Other parameters - BTEX, pesticides,
nutrients, metals
![Page 13: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/13.jpg)
Static stormwater samplers
![Page 14: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/14.jpg)
Site nearest Lodge Construction
![Page 15: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/15.jpg)
![Page 16: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/16.jpg)
In-stream sampling for BTEX
![Page 17: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/17.jpg)
Automated stormwater sampling
![Page 18: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/18.jpg)
Automated stormwater sampling
![Page 19: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/19.jpg)
![Page 20: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/20.jpg)
![Page 21: Stormwater Management at Honey Creek Resort Park](https://reader035.vdocuments.net/reader035/viewer/2022062323/568161e3550346895dd1fd5d/html5/thumbnails/21.jpg)
Most important aspect:Communication to Steve aboutmonitoring results and site inspections