strategic initiatives

4
Air Force Center for Engineering and the Environment I n t e g r i t y - S e r v i c e - E x c e l l e n c e Mr. Ken Rogers, P.E. Chief, Strategic Acquisitions Strategic Initiatives

Upload: george

Post on 21-Jan-2016

41 views

Category:

Documents


0 download

DESCRIPTION

Strategic Initiatives. Mr. Ken Rogers, P.E. Chief, Strategic Acquisitions. AFCEE Contract Toolbox. Worldwide Planning, Program, & Design 08 (4PA-E08) 5 year IDIQ…$3B capacity…22 Full Scope, 7 Reduced Scope Global Engr, Integration & Tech Assistance (GEITA Bridge) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Strategic Initiatives

Air Force Center for Engineering and the Environment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Mr. Ken Rogers, P.E.

Chief, Strategic Acquisitions

Strategic Initiatives

Page 2: Strategic Initiatives

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

AFCEE Contract Toolbox

Worldwide Planning, Program, & Design 08 (4PA-E08) 5 year IDIQ…$3B capacity…22 Full Scope, 7 Reduced Scope

Global Engr, Integration & Tech Assistance (GEITA Bridge) 1 year A&AS 2-3 month options…$200M capacity…3 F&O, 1

small firm Heavy Engineering, Repair, and Construction (HERC)

5 year IDIQ…$6 - $15B capacity…15 (19) F&O, 4 (0)-8(a) firms Environmental, Construction, Operations & Services

(ECOS09)—100% SB set aside 5 year IDIQ…$350M total…$95M services…10 Small firms

Worldwide Environmental Restoration and Construction 2009 (WERC09) 5 year IDIQ plus 3 years for PBC…$3B capacity…23 F&O, 16

small, 3-8(a), 2 SDVOSB

2

F&O = Full and Open

Page 3: Strategic Initiatives

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

AFCEE Toolbox

Upcoming Acquisitions: GEITA Bridge follow-on

Expected Award Nov11 EOS

Market Research—Requirements Definition Expected Award FY11

3

Call Mr. Ken Rogers(210-395-8815)if you have questions about AFCEE Contract Toolbox

Page 4: Strategic Initiatives

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Contract Timelines

4

Contract 1Q-11 2Q-11 3Q-11 4Q-11 1Q-12 2Q-12 3Q-12 4Q-12 1Q-13 2Q-13 3Q-13 4Q-13 1Q-14 2Q-14 3Q-14 4Q-14 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 2Q-16 3Q-16 4Q-16

4PAE08                                              

4PAE13 SS SS SS SS SS SS SS

GEITA BRIDGE

GEITA11 SS SS SS SS        

EOS SS SS SS SS SS SS

HERC                                              

HERC14 SS SS SS SS SS

WERC09                        

WERC15 SS SS SS SS SS SS SS SS

ECOS09                        

SATOC

AFCAP

AFCAP16 SS SS SS SS SS SS SS

RESS

RESS16 SS SS SS SS SS SS SS