7/29/2019 Sub Division Colour.
1/15
Division : P.R.E.Division Haveri
Sub-Division : P.R.E.Sub-Division,Ranebennur.
Taluk Panchayath : Taluk Panchayath Ranebennur
Gram Panchayath :
Head of Account
Estimated Cost ;Rs 200000.00
Administrative approved by :
Technical Sanction by :
Estimated prepared by : Sri.S.H.Karaddi. JE
Estimated Scrutinised by :
Assistant Executive Engineer
Section Officer PRE Sub Division Ranebennur
FACE SHEET
PUj g ;- gug vP AiPPAiP CAiAvgg AZAiv ge EAdAijAU
REPORT PUjU 2012-13 13 Ai tP
Aid (Plq) Czz g 2.00 PUUCzAi qAiVz gug vPAiP PAiP CAiAvgg AZAiv geEadAijAU ES G sU Pbj Plq zg iq
n CP LmU CrPAq CAzd
CAzd wPAi qr J.Dg-2012-13 CrPAq vAiij AdgwUV Vz.
P;- 2012-13 13Ai tP Ai
-
7/29/2019 Sub Division Colour.
2/15
-
7/29/2019 Sub Division Colour.
3/15
g 200000
P;- 2012-13 13Ai tP
CAzd v
PlP Pg
f AZAiv j
AZAiv ge EAdAijAU G-sUP PAiP CAiAvgg PAii
gug
PUj g ;- gug vPAiP PAiP CAiAvgg
AZAiv ge EAdAijAU ES GsU Pb Pl z
-
7/29/2019 Sub Division Colour.
4/15
Sl. Item of work Unit Basic
Rate
Cement
Bags
Require
d
Add Diff
cost of
Cement
(Rs.300-
250)/bags=
50.00
Total Rate Add Area
Weightage
3%
Net Rate
1 Dismantlining plastering and removing
the debries with a lead (PWD SR-2012-13
Sqm 15.4 15.4 0.462 15.86
2 Providing 20mm thick cement plaster insingle coat with cement mortar 1:4 to
Sqm 171 0 171 5.13 176.13
3 7.17 KSRB 7.17 : Providing,
fabricating, assembling and fixing in
Sqm 4618 4618 138.54 4756.54
4 Providing and finishing external walls
in two coats with waterproof cement
Sqm 43.65 43.65 1.31 44.96
5 Earth work excavation for foundation of
buildings,water supply,sanitary lines and
Cum 187 187 5.61 192.61
6 Providing and laying in position plain
cement concrete of mix M-100 with
Cum 4081 0 4307 122.43 4429.43
7 Providing and constructing
granite/trap/basalt rubble stone masonry
Cum 2228 0 2228 66.84 2294.84
8 KSRB 2.5 : Earthwork excavation ( indeposited soil ) and filling sides of
Cum 167 167 5.01 172.01
9 KSRB 4.2.7 : Providing and laying in
position reinforced cement concrete of
Cum 5508 0 5508 165.24 5673.24
10 Providing and constructing burnt brick
masonry with approved quality of non
Cum 3818 0 3818 114.54 3932.54
11 KSRB 4.9.2 : Providing H.Y.S.D. steel (
Cold, Twisted ) reinforcement for R.C.C
Qtl 6986 6986 6986.00
12 Providing 18mm thick cement plaster in
single coat with cement mortar 1:3 to
Sqm 181 0 181 5.43 186.43
13 KSRB15-3-13 : Providing 12mm thickcement plaster in single coat with
Sqm 141 0 141 4.23 145.23
14 Providing and removing centering
shettering strutting, propping etc., for
Sqm 282 282 8.46 290.46
15 KSRB 4-6.2 : Providing andremoving centering, shuttering,
Sqm 239 239 7.17 246.17
16 KSRB 4.2.10 : Providing and layingin position reinforced cement
Sqm 398 398 11.94 409.94
17 KSRB 4-6.10 :Providing and
removing centering, shuttering,
Sqm 204 204 6.12 210.12
18 KSRB 9.4-3 : Providing Matti / Nandiwood frames of doors, windows,
Cum 48310 48310 1449.3 49759.30
19 KSRB 9-7.2 : Providing and fixing inposition fully panelled Matti/Nandi
Sqm 2156 2156 64.68 2220.68
20 KSRB 9-16.2 : Providing and fixing inposition Matti/Nandi wood fully
Sqm 2812 2812 84.36 2896.36
21 Providing and applying painting twocoats (excluding priming coat) on new
Cum 71 71 2.13 73.13
PUj g ;- gug vP AiPPAiP CAiAvgg AZAiv ge
P;- 2012-13 13Ai tP Aid
Rate Analysis
-
7/29/2019 Sub Division Colour.
5/15
22 Providing and fixing M.S bars towindows and ventilators including
Kgs 98 98 2.94 100.94
23 KSRB 15-14.1 : Providing andapplying two coats with oil bound
Sqm 50 50 1.5 51.50
24 Providing Gopi colour washing to new
wall surface in two coats with lime and
Sqm 7.7 7.7 0.231 7.93
25 KSRB 14.7-2 : Providing and layingred oxide flooring 40 mm thick, with
Sqm 456 456 13.68 469.68
26 KSRB 7.5 : Providing and fixing pulland push type rolling shutters of
Sqm 2,750 2750 2750.00
27 Supply Plain Glass (P-XIII, I-371PWD SR DWD 2012-2013)
Sqm 420 420 12.6 432.60
28 Providing and fixing in positionanodized aluminium windows and
Sqm 2,894 2894 86.82 2980.82
29 KSRB 7.6 : Providing and f ixing topcovers made out of 20 guage M.S.
Mtr 525 525 525.00
30 KSRB 7.14 : Providing, fabricating,assembling and fixing in position
Sqm 3815 3815 3815
29 KSRB 24-10 : Removing the old paintor polish from wood and / or wood
Sqm 31.85 31.85 31.85
Section Officer Assistant Executive Engineer
PRE Sub Division Ranebennur
-
7/29/2019 Sub Division Colour.
6/15
Sl. Item of work Unit Nos L B D Qnty Rate Amount
1 Earth work excavation forfoundation of buildings,water
supply,sanitary lines and electrical
conduits either in pits or in trenches
1.5m and above in width,in hard
soil not exceeding 1.5m in depth
including dressing the bottom and
sides of pits and trenc
Cum
Canopy Columns 2 1.2 1.2 1.5 4.324.32 192.61 832
2 Providing and laying in positionplain cement concrete of mix M-75
with OPC cement @ 180 kg with
40mm and down size graded ganite/
metal coarse aggreate @ 0.85 cum
and fine aggreate @0.57 cummachine mixed,concrete laid in
layers not exceeding 15cms.th
Cum
Columns 2 1.2 1.2 0.1 0.290.3 4429.43 1285
3 Dismantlining plastering and
removing the debries with a lead
(PWD SR-2012-13 INO-37.50
PNO-270
Sqm
AEE Chamber wall length 1 3.45 5.15 17.77Celing 1 17.2 3.3 56.76
74.53Deduction
Doors 2 1.2 2.1 5.04windows 1 1.2 0.9 1.08
ESTIMATE ABSTRACT
PUj g ;- gug vPAiP PAiP CAiAvggAZAiv e EAdAi AU ES G sUP;- 2012-13 13Ai tP Aid
-
7/29/2019 Sub Division Colour.
7/15
6.12
Net Qty 68.41 15.86 1085
4 Providing 20mm thick cement
plaster in single coat with cement
mortar 1:4 to stone masonry
including rounding off cornerswherever required smooth
rendering, : Providing and
removing scaffolding, including
cost of materials, labour, curing
complete as per specifications, P-
120, I-15.19 PWD SR DWD2012-
Sqm
AEE Chamber wall length 1 17.2 3.3 56.7656.76
Deduction
Doors 2 1.2 2.1 5.04windows 1 1.2 0.9 1.08
6.12
Net Qty 50.64 176.13 8919
-
7/29/2019 Sub Division Colour.
8/15
5 7.17 KSRB 7.17 : Providing,
fabricating, assembling and fixing
in position anodized aluminium
doors using following aluminium
mat finish or glossy finish, outer
frame plain section
101.6x44.45mm thickness
3.18mm,section weight 2.404
kg/m, door shutters vertical
section 44.62x44.45mm thickness
3.18mm, section weight
1.505kg/m, top section
47.62x44.45mm thickness
3.00mm, section weight
1.426kg/m bottom section
114.3x44.45 thickness 3.18mm,
section weight 2.646kg/ m, door
central section 49.91x44.45mm
thickness 3.00mm, section weight1.495 kg/m glazing clips
19x17.3x11mm thickness 0.9mm
section weight 0.124kg/m;
aluminium sections anodized 12
to 15 microns cut to length joint
metred corners grinded, the
shutters pivoted opening
arrangement with heavy duty
aluminium alloy automatic door
closures floor mounted, providing
Sqm
Main door 1 1.2 2.1 2.52 4756.54 11986
6 KSRB15-3-13 : Providing12mm thick cement plaster insingle coat with cement mortar1:3, to ceiling including roundingoff corners wherever requiredsmooth rendering, : Providingand removing scaffolding,including cost of materials,labour, curing complete as perspecifications (P-120, I-15.21,
PWD SR DWD2012-13)
Sqm 1 3.45 5.15 17.77 145.23 2581
Celing plastering
-
7/29/2019 Sub Division Colour.
9/15
7 Providing and finishing external
walls in two coats with
waterproof cement paint of
approved brand and shade to
give an even shade after
throughly brooming the surface to
remove all dirt and loose
powdered material, free from
mortar drops and other foreign
matter cost of materials, labour,
complete as per specifications (P
125, I-15.53, PWD SR
DWD2012-13)
Sqm
LW 1 14.7 4.88 71.74SW 1 13.8 4.88 67.34window chejja 2 13.8 0.6 16.56
2 9.5 0.6 11.402 7 1.05 0.6 8.82
First floor room outer walls 1 18.12 3.3 59.80235.66
Deductions
Windows 15 1.2 1 18.00Front opening 4 1.5 2 12.00
1 3.5 3 10.5040.50195.16 44.96 8774
8 KSRB 15-14.1 : Providing and
applying two coats with oil bound
washable distemper of approvedbrand and shade on wall surface
including priming coat with
distemper primer after throughly
brooming the surface free from
mortar drops and other foreign
matter including preparing the
surface even and sand paper
smooth, cost of materials, labour,
complete as per specifications.
(P.No.123, I.No. 15.49 PWD SR
2012-13)
Out side room wall 1 20 3.3 66.00Varandha walls 1 24.3 3.3 80.19Celing out side Room 1 5.45 4.55 24.80Celing varandha 1 7.6 4.55 34.58
205.57 51.50 10587
-
7/29/2019 Sub Division Colour.
10/15
9 Providing and constructing burntbrick masonry with approved
quality of non modular bricks
ground moulded of lstandard size
of class designation 35 with cement
mortar 1:6 for basement and
superstructure with cost of
materials,labourcharges,scaffolding curing
complete as per specifications, (P-
30, I-6.2, PWD SR DWD2012-13)
Cum
Canopy Columns 2 0.3 0.3 2.00 0.36wall up slab 1 3.65 0.23 0.60 0.50Parapet 1 10.95 0.23 0.60 1.51
2.37 3932.54 9320
10 KSRB 4.2.7 : Providing and
laying in position reinforcedcement concrete of mix M-25with OPC cement @ 340 kg with20mm and down size gradedganite/ metal coarse aggreate@ 0.70 cum and fine [email protected] cum with superiplasticiser @ 3ltrs confirming toIS 9103-1999 reaffirmed-2008machine mixed concretelaid in layers not exceeding 15cms thick, vibrated for R.C.C.beams, columns of all sizes in
foundation plinth andsuperstructure ground floor levelfor roof slab staircase lintelscolumns, including cost of allmaterials, labour, HOM ofmachinery, curing, complete asper specifications.SpecificationNo. KBS 4.1, 4.6 (PWD SR-12-13 PNO-15 INO-4.16)
Cum
Beams all around conopy 1 14.6 0.23 0.30 1.01
Canopy slab 1 4.45 5.25 0.12 2.80Columns 2 0.23 0.35 1.1 0.18
2 0.23 0.35 3.00 0.482 1.2 1.2 0.3 0.86
5.33 5673.24 30238
-
7/29/2019 Sub Division Colour.
11/15
11 KSRB 4.9.2 : Providing H.Y.S.D.steel ( Cold, Twisted )
reinforcement for R.C.C work
including straightening, cutting,
bending, hooking, placing in
position, lapping and / or welding
wherever required, tying with
binding wire and anchoring to theadjoining members wherever
necessary complete as per design
(laps, hooks and wastage shall not
be measured and paid) cost of
materials, labour, HOM of
machinery complete as per
specifications. Specification No.
KBS 4.6.3 Lift charges for steel of
all diameters for additional floors
over ground floor per q floor height
of 3.5 m. or part thereof cost of
labour, complete, (P-19, I-4.46,PWD SR DWD2012-13)
Qtl
Columns + Lintels + Plinth 90 5.33 4.80 6986.00 33512
12 Providing 18mm thick cementplaster in single coat with cement
mortar 1:3 to brick masonry
including rounding off corners
wherever required smooth
rendering, : Providing and
removing scaffolding, including
cost of materials, labour, curing
complete as per specifications, (P-120, I-15.15, PWD SR DWD2012-
Sqm
Walls above beam 2 3.65 0.60 4.38Brick columns 2 2.4 0.90 4.32Parapet 1 10.95 1.43 15.66
24.36 186.43 4541
13 Providing and removing centeringshettering strutting, propping etc.,
for columns, pillars, piers,
abutments, post and struts, square I
rectangular I polygon in planincluding cost of all materials,
labour complete as per
specification., (P-17, I-4.32, PWD
SR DWD2012-13
2 4.25 1.06 9.01 290.46 2617
-
7/29/2019 Sub Division Colour.
12/15
14 KSRB 4-6.2 : Providing andremoving centering, shuttering,
strutting, propping etc., and
removal of form work for flat
surface such as suspended floors,
roofs, landings, balconies and likes,
thickness upto 200 mm including
cost of all materials, labourcomplete as per specificaitons.
Specification No. KBS 4.6.2 (P-16,
I-4.29 PWD SR DWD2012-13)
Sqm 1 3.65 3.65 13.32 246.17 3280
15 Supply Plain Glass (P-XIII, I-371PWD SR DWD 2012-2013)
Sqm 40 0.3 0.3 3.60
432.601557
16 KSRB 24-10 : Removing the oldpaint or polish from wood and / or
wood based surface with paint
remover of approved brand /
manufacturer and making surface
even including cost of materials,
labour, complete as per
specifications(P-135, I-16.5 PWD
SR DWD2012-13 .Doors 1 2 1 2.1 4.20
Windows 4 2 0.9 1.2 8.6412.84 31.85 409
16 Providing and applying paintingtwo coats (excluding priming coat)
on new wood surface and /or wood
based surface with enamel paint togive an even shade cleaning the
surface of all dirt and foreign
matter sand papering including cost
of mateirls labour complete
(P.No.103, I.No. 15.60.1 PWD SR
2012-13)
Doors 1 2 1 2.1 4.20Windows 4 2 0.9 1.2 8.64
12.84 73.13 939
-
7/29/2019 Sub Division Colour.
13/15
17 KSRB 7.14 : Providing,fabricating, assembling and fixing
in position anodized aluminium
partitions using sections in
combination of plain, single
grove and double grove as per
requirements for the frames of
overall size 101.6mm x 44.45mm,
3.18mm.thick having section
weight, plain sections 2.40kg/m
single grove section 2.541kg/m.
and double grove section 2.683
kg/m and bottom member
114.3mmx44.45mm 3.18mm
thick weight 2.646 kg/m;
aluminium louvres of size
77.6mmx27.6mm 1.7mm. thick
section weight 0.483kg/m;
bottom portions provided with12mm. thick prelaminated sheet
both side of approved colour
lamination exterior grade;
aluminium sections of mat finish
or glossy finish using section,
spacing of vertical member shall
not exceed 0.6 m. c to c; sections
are cut to the required lengths,
joints mitered and corners grinded
subdividing frames tennoned and
Sqm
Alluminium partitions forvarandha
1 4.55 2.1 9.56
Deduct door portions -1 2.1 1.2 -2.527.04 3815.00 26858
-
7/29/2019 Sub Division Colour.
14/15
18 Providing and fixing in positionanodized aluminium windows
and ventilators as per approved
drawings with sliding shutters
using double track window frame
section of size 61.85x31.75mm.
With 1.2mm thick, bottom section
weight 0.695 kg/m, sides and top
sections 1.3 mm. thick weight
0.659 kg/m; and shutter
comprising top and bottom
section of size 40mmx18mm,
1.25mm thick 0.417 kg./m;
shutter outer side 40mmx18mm,
1.25mm.thick weight 0.417 kg/m,
shutter interlock section
40mmx26.7mm, 1.1mm thick,
weight 0.469 kg/m. the shutters
mounted on nylon rollers withapproved quality of fixtures such
as aluminium handles tower bolts
etc.; and providing and fixing
5.5mm. thick plain glass for
shutters fitted with rubber
beading aluminium sections
anodised 12 to 15 microns,
including cutting to required
length, joints mitred subdividing
the frame tenonned and rivetted
Sqm
Windows 2 2.05 1.65 6.772 2.05 1.65 6.77
13.54 2980.82 40360199681
Name Boards Misc and rounding
off
319
200000
Section Officer Assistant Executive Engineer
PRE Sub Division Ranebennur
-
7/29/2019 Sub Division Colour.
15/15
(this