    Division : P.R.E.Division Haveri

    Sub-Division : P.R.E.Sub-Division,Ranebennur.

    Taluk Panchayath : Taluk Panchayath Ranebennur

    Gram Panchayath :

    Head of Account

    Estimated Cost ;Rs 200000.00

    Administrative approved by :

    Technical Sanction by :

    Estimated prepared by : Sri.S.H.Karaddi. JE

    Estimated Scrutinised by :

    Assistant Executive Engineer

    Section Officer PRE Sub Division Ranebennur

    FACE SHEET

    PUj g ;- gug vP AiPPAiP CAiAvgg AZAiv ge EAdAijAU

    REPORT PUjU 2012-13 13 Ai tP

    Aid (Plq) Czz g 2.00 PUUCzAi qAiVz gug vPAiP PAiP CAiAvgg AZAiv geEadAijAU ES G sU Pbj Plq zg iq

    n CP LmU CrPAq CAzd

    CAzd wPAi qr J.Dg-2012-13 CrPAq vAiij AdgwUV Vz.

    P;- 2012-13 13Ai tP Ai

  • 7/29/2019 Sub Division Colour.

    2/15

  • 7/29/2019 Sub Division Colour.

    3/15

    g 200000

    P;- 2012-13 13Ai tP

    CAzd v

    PlP Pg

    f AZAiv j

    AZAiv ge EAdAijAU G-sUP PAiP CAiAvgg PAii

    gug

    PUj g ;- gug vPAiP PAiP CAiAvgg

    AZAiv ge EAdAijAU ES GsU Pb Pl z

  • 7/29/2019 Sub Division Colour.

    4/15

    Sl. Item of work Unit Basic

    Rate

    Cement

    Bags

    Require

    d

    Add Diff

    cost of

    Cement

    (Rs.300-

    250)/bags=

    50.00

    Total Rate Add Area

    Weightage

    3%

    Net Rate

    1 Dismantlining plastering and removing

    the debries with a lead (PWD SR-2012-13

    Sqm 15.4 15.4 0.462 15.86

    2 Providing 20mm thick cement plaster insingle coat with cement mortar 1:4 to

    Sqm 171 0 171 5.13 176.13

    3 7.17 KSRB 7.17 : Providing,

    fabricating, assembling and fixing in

    Sqm 4618 4618 138.54 4756.54

    4 Providing and finishing external walls

    in two coats with waterproof cement

    Sqm 43.65 43.65 1.31 44.96

    5 Earth work excavation for foundation of

    buildings,water supply,sanitary lines and

    Cum 187 187 5.61 192.61

    6 Providing and laying in position plain

    cement concrete of mix M-100 with

    Cum 4081 0 4307 122.43 4429.43

    7 Providing and constructing

    granite/trap/basalt rubble stone masonry

    Cum 2228 0 2228 66.84 2294.84

    8 KSRB 2.5 : Earthwork excavation ( indeposited soil ) and filling sides of

    Cum 167 167 5.01 172.01

    9 KSRB 4.2.7 : Providing and laying in

    position reinforced cement concrete of

    Cum 5508 0 5508 165.24 5673.24

    10 Providing and constructing burnt brick

    masonry with approved quality of non

    Cum 3818 0 3818 114.54 3932.54

    11 KSRB 4.9.2 : Providing H.Y.S.D. steel (

    Cold, Twisted ) reinforcement for R.C.C

    Qtl 6986 6986 6986.00

    12 Providing 18mm thick cement plaster in

    single coat with cement mortar 1:3 to

    Sqm 181 0 181 5.43 186.43

    13 KSRB15-3-13 : Providing 12mm thickcement plaster in single coat with

    Sqm 141 0 141 4.23 145.23

    14 Providing and removing centering

    shettering strutting, propping etc., for

    Sqm 282 282 8.46 290.46

    15 KSRB 4-6.2 : Providing andremoving centering, shuttering,

    Sqm 239 239 7.17 246.17

    16 KSRB 4.2.10 : Providing and layingin position reinforced cement

    Sqm 398 398 11.94 409.94

    17 KSRB 4-6.10 :Providing and

    removing centering, shuttering,

    Sqm 204 204 6.12 210.12

    18 KSRB 9.4-3 : Providing Matti / Nandiwood frames of doors, windows,

    Cum 48310 48310 1449.3 49759.30

    19 KSRB 9-7.2 : Providing and fixing inposition fully panelled Matti/Nandi

    Sqm 2156 2156 64.68 2220.68

    20 KSRB 9-16.2 : Providing and fixing inposition Matti/Nandi wood fully

    Sqm 2812 2812 84.36 2896.36

    21 Providing and applying painting twocoats (excluding priming coat) on new

    Cum 71 71 2.13 73.13

    PUj g ;- gug vP AiPPAiP CAiAvgg AZAiv ge

    P;- 2012-13 13Ai tP Aid

    Rate Analysis

  • 7/29/2019 Sub Division Colour.

    5/15

    22 Providing and fixing M.S bars towindows and ventilators including

    Kgs 98 98 2.94 100.94

    23 KSRB 15-14.1 : Providing andapplying two coats with oil bound

    Sqm 50 50 1.5 51.50

    24 Providing Gopi colour washing to new

    wall surface in two coats with lime and

    Sqm 7.7 7.7 0.231 7.93

    25 KSRB 14.7-2 : Providing and layingred oxide flooring 40 mm thick, with

    Sqm 456 456 13.68 469.68

    26 KSRB 7.5 : Providing and fixing pulland push type rolling shutters of

    Sqm 2,750 2750 2750.00

    27 Supply Plain Glass (P-XIII, I-371PWD SR DWD 2012-2013)

    Sqm 420 420 12.6 432.60

    28 Providing and fixing in positionanodized aluminium windows and

    Sqm 2,894 2894 86.82 2980.82

    29 KSRB 7.6 : Providing and f ixing topcovers made out of 20 guage M.S.

    Mtr 525 525 525.00

    30 KSRB 7.14 : Providing, fabricating,assembling and fixing in position

    Sqm 3815 3815 3815

    29 KSRB 24-10 : Removing the old paintor polish from wood and / or wood

    Sqm 31.85 31.85 31.85

    Section Officer Assistant Executive Engineer

    PRE Sub Division Ranebennur

  • 7/29/2019 Sub Division Colour.

    6/15

    Sl. Item of work Unit Nos L B D Qnty Rate Amount

    1 Earth work excavation forfoundation of buildings,water

    supply,sanitary lines and electrical

    conduits either in pits or in trenches

    1.5m and above in width,in hard

    soil not exceeding 1.5m in depth

    including dressing the bottom and

    sides of pits and trenc

    Cum

    Canopy Columns 2 1.2 1.2 1.5 4.324.32 192.61 832

    2 Providing and laying in positionplain cement concrete of mix M-75

    with OPC cement @ 180 kg with

    40mm and down size graded ganite/

    metal coarse aggreate @ 0.85 cum

    and fine aggreate @0.57 cummachine mixed,concrete laid in

    layers not exceeding 15cms.th

    Cum

    Columns 2 1.2 1.2 0.1 0.290.3 4429.43 1285

    3 Dismantlining plastering and

    removing the debries with a lead

    (PWD SR-2012-13 INO-37.50

    PNO-270

    Sqm

    AEE Chamber wall length 1 3.45 5.15 17.77Celing 1 17.2 3.3 56.76

    74.53Deduction

    Doors 2 1.2 2.1 5.04windows 1 1.2 0.9 1.08

    ESTIMATE ABSTRACT

    PUj g ;- gug vPAiP PAiP CAiAvggAZAiv e EAdAi AU ES G sUP;- 2012-13 13Ai tP Aid

  • 7/29/2019 Sub Division Colour.

    7/15

    6.12

    Net Qty 68.41 15.86 1085

    4 Providing 20mm thick cement

    plaster in single coat with cement

    mortar 1:4 to stone masonry

    including rounding off cornerswherever required smooth

    rendering, : Providing and

    removing scaffolding, including

    cost of materials, labour, curing

    complete as per specifications, P-

    120, I-15.19 PWD SR DWD2012-

    Sqm

    AEE Chamber wall length 1 17.2 3.3 56.7656.76

    Deduction

    Doors 2 1.2 2.1 5.04windows 1 1.2 0.9 1.08

    6.12

    Net Qty 50.64 176.13 8919

  • 7/29/2019 Sub Division Colour.

    8/15

    5 7.17 KSRB 7.17 : Providing,

    fabricating, assembling and fixing

    in position anodized aluminium

    doors using following aluminium

    mat finish or glossy finish, outer

    frame plain section

    101.6x44.45mm thickness

    3.18mm,section weight 2.404

    kg/m, door shutters vertical

    section 44.62x44.45mm thickness

    3.18mm, section weight

    1.505kg/m, top section

    47.62x44.45mm thickness

    3.00mm, section weight

    1.426kg/m bottom section

    114.3x44.45 thickness 3.18mm,

    section weight 2.646kg/ m, door

    central section 49.91x44.45mm

    thickness 3.00mm, section weight1.495 kg/m glazing clips

    19x17.3x11mm thickness 0.9mm

    section weight 0.124kg/m;

    aluminium sections anodized 12

    to 15 microns cut to length joint

    metred corners grinded, the

    shutters pivoted opening

    arrangement with heavy duty

    aluminium alloy automatic door

    closures floor mounted, providing

    Sqm

    Main door 1 1.2 2.1 2.52 4756.54 11986

    6 KSRB15-3-13 : Providing12mm thick cement plaster insingle coat with cement mortar1:3, to ceiling including roundingoff corners wherever requiredsmooth rendering, : Providingand removing scaffolding,including cost of materials,labour, curing complete as perspecifications (P-120, I-15.21,

    PWD SR DWD2012-13)

    Sqm 1 3.45 5.15 17.77 145.23 2581

    Celing plastering

  • 7/29/2019 Sub Division Colour.

    9/15

    7 Providing and finishing external

    walls in two coats with

    waterproof cement paint of

    approved brand and shade to

    give an even shade after

    throughly brooming the surface to

    remove all dirt and loose

    powdered material, free from

    mortar drops and other foreign

    matter cost of materials, labour,

    complete as per specifications (P

    125, I-15.53, PWD SR

    DWD2012-13)

    Sqm

    LW 1 14.7 4.88 71.74SW 1 13.8 4.88 67.34window chejja 2 13.8 0.6 16.56

    2 9.5 0.6 11.402 7 1.05 0.6 8.82

    First floor room outer walls 1 18.12 3.3 59.80235.66

    Deductions

    Windows 15 1.2 1 18.00Front opening 4 1.5 2 12.00

    1 3.5 3 10.5040.50195.16 44.96 8774

    8 KSRB 15-14.1 : Providing and

    applying two coats with oil bound

    washable distemper of approvedbrand and shade on wall surface

    including priming coat with

    distemper primer after throughly

    brooming the surface free from

    mortar drops and other foreign

    matter including preparing the

    surface even and sand paper

    smooth, cost of materials, labour,

    complete as per specifications.

    (P.No.123, I.No. 15.49 PWD SR

    2012-13)

    Out side room wall 1 20 3.3 66.00Varandha walls 1 24.3 3.3 80.19Celing out side Room 1 5.45 4.55 24.80Celing varandha 1 7.6 4.55 34.58

    205.57 51.50 10587

  • 7/29/2019 Sub Division Colour.

    10/15

    9 Providing and constructing burntbrick masonry with approved

    quality of non modular bricks

    ground moulded of lstandard size

    of class designation 35 with cement

    mortar 1:6 for basement and

    superstructure with cost of

    materials,labourcharges,scaffolding curing

    complete as per specifications, (P-

    30, I-6.2, PWD SR DWD2012-13)

    Cum

    Canopy Columns 2 0.3 0.3 2.00 0.36wall up slab 1 3.65 0.23 0.60 0.50Parapet 1 10.95 0.23 0.60 1.51

    2.37 3932.54 9320

    10 KSRB 4.2.7 : Providing and

    laying in position reinforcedcement concrete of mix M-25with OPC cement @ 340 kg with20mm and down size gradedganite/ metal coarse aggreate@ 0.70 cum and fine [email protected] cum with superiplasticiser @ 3ltrs confirming toIS 9103-1999 reaffirmed-2008machine mixed concretelaid in layers not exceeding 15cms thick, vibrated for R.C.C.beams, columns of all sizes in

    foundation plinth andsuperstructure ground floor levelfor roof slab staircase lintelscolumns, including cost of allmaterials, labour, HOM ofmachinery, curing, complete asper specifications.SpecificationNo. KBS 4.1, 4.6 (PWD SR-12-13 PNO-15 INO-4.16)

    Cum

    Beams all around conopy 1 14.6 0.23 0.30 1.01

    Canopy slab 1 4.45 5.25 0.12 2.80Columns 2 0.23 0.35 1.1 0.18

    2 0.23 0.35 3.00 0.482 1.2 1.2 0.3 0.86

    5.33 5673.24 30238

  • 7/29/2019 Sub Division Colour.

    11/15

    11 KSRB 4.9.2 : Providing H.Y.S.D.steel ( Cold, Twisted )

    reinforcement for R.C.C work

    including straightening, cutting,

    bending, hooking, placing in

    position, lapping and / or welding

    wherever required, tying with

    binding wire and anchoring to theadjoining members wherever

    necessary complete as per design

    (laps, hooks and wastage shall not

    be measured and paid) cost of

    materials, labour, HOM of

    machinery complete as per

    specifications. Specification No.

    KBS 4.6.3 Lift charges for steel of

    all diameters for additional floors

    over ground floor per q floor height

    of 3.5 m. or part thereof cost of

    labour, complete, (P-19, I-4.46,PWD SR DWD2012-13)

    Qtl

    Columns + Lintels + Plinth 90 5.33 4.80 6986.00 33512

    12 Providing 18mm thick cementplaster in single coat with cement

    mortar 1:3 to brick masonry

    including rounding off corners

    wherever required smooth

    rendering, : Providing and

    removing scaffolding, including

    cost of materials, labour, curing

    complete as per specifications, (P-120, I-15.15, PWD SR DWD2012-

    Sqm

    Walls above beam 2 3.65 0.60 4.38Brick columns 2 2.4 0.90 4.32Parapet 1 10.95 1.43 15.66

    24.36 186.43 4541

    13 Providing and removing centeringshettering strutting, propping etc.,

    for columns, pillars, piers,

    abutments, post and struts, square I

    rectangular I polygon in planincluding cost of all materials,

    labour complete as per

    specification., (P-17, I-4.32, PWD

    SR DWD2012-13

    2 4.25 1.06 9.01 290.46 2617

  • 7/29/2019 Sub Division Colour.

    12/15

    14 KSRB 4-6.2 : Providing andremoving centering, shuttering,

    strutting, propping etc., and

    removal of form work for flat

    surface such as suspended floors,

    roofs, landings, balconies and likes,

    thickness upto 200 mm including

    cost of all materials, labourcomplete as per specificaitons.

    Specification No. KBS 4.6.2 (P-16,

    I-4.29 PWD SR DWD2012-13)

    Sqm 1 3.65 3.65 13.32 246.17 3280

    15 Supply Plain Glass (P-XIII, I-371PWD SR DWD 2012-2013)

    Sqm 40 0.3 0.3 3.60

    432.601557

    16 KSRB 24-10 : Removing the oldpaint or polish from wood and / or

    wood based surface with paint

    remover of approved brand /

    manufacturer and making surface

    even including cost of materials,

    labour, complete as per

    specifications(P-135, I-16.5 PWD

    SR DWD2012-13 .Doors 1 2 1 2.1 4.20

    Windows 4 2 0.9 1.2 8.6412.84 31.85 409

    16 Providing and applying paintingtwo coats (excluding priming coat)

    on new wood surface and /or wood

    based surface with enamel paint togive an even shade cleaning the

    surface of all dirt and foreign

    matter sand papering including cost

    of mateirls labour complete

    (P.No.103, I.No. 15.60.1 PWD SR

    2012-13)

    Doors 1 2 1 2.1 4.20Windows 4 2 0.9 1.2 8.64

    12.84 73.13 939

  • 7/29/2019 Sub Division Colour.

    13/15

    17 KSRB 7.14 : Providing,fabricating, assembling and fixing

    in position anodized aluminium

    partitions using sections in

    combination of plain, single

    grove and double grove as per

    requirements for the frames of

    overall size 101.6mm x 44.45mm,

    3.18mm.thick having section

    weight, plain sections 2.40kg/m

    single grove section 2.541kg/m.

    and double grove section 2.683

    kg/m and bottom member

    114.3mmx44.45mm 3.18mm

    thick weight 2.646 kg/m;

    aluminium louvres of size

    77.6mmx27.6mm 1.7mm. thick

    section weight 0.483kg/m;

    bottom portions provided with12mm. thick prelaminated sheet

    both side of approved colour

    lamination exterior grade;

    aluminium sections of mat finish

    or glossy finish using section,

    spacing of vertical member shall

    not exceed 0.6 m. c to c; sections

    are cut to the required lengths,

    joints mitered and corners grinded

    subdividing frames tennoned and

    Sqm

    Alluminium partitions forvarandha

    1 4.55 2.1 9.56

    Deduct door portions -1 2.1 1.2 -2.527.04 3815.00 26858

  • 7/29/2019 Sub Division Colour.

    14/15

    18 Providing and fixing in positionanodized aluminium windows

    and ventilators as per approved

    drawings with sliding shutters

    using double track window frame

    section of size 61.85x31.75mm.

    With 1.2mm thick, bottom section

    weight 0.695 kg/m, sides and top

    sections 1.3 mm. thick weight

    0.659 kg/m; and shutter

    comprising top and bottom

    section of size 40mmx18mm,

    1.25mm thick 0.417 kg./m;

    shutter outer side 40mmx18mm,

    1.25mm.thick weight 0.417 kg/m,

    shutter interlock section

    40mmx26.7mm, 1.1mm thick,

    weight 0.469 kg/m. the shutters

    mounted on nylon rollers withapproved quality of fixtures such

    as aluminium handles tower bolts

    etc.; and providing and fixing

    5.5mm. thick plain glass for

    shutters fitted with rubber

    beading aluminium sections

    anodised 12 to 15 microns,

    including cutting to required

    length, joints mitred subdividing

    the frame tenonned and rivetted

    Sqm

    Windows 2 2.05 1.65 6.772 2.05 1.65 6.77

    13.54 2980.82 40360199681

    Name Boards Misc and rounding

    off

    319

    200000