STATE OF CONNECTICUT
DEPARTMENT OF TRANSPORTATION
M E M O R A N D U M
Subject:
Project Number 42-317
Combined Roadway and Structure Geotechnical Report Resurfacing, Bridge and Safety Improvements from Maple Street to Pitkin Street in the Town of Glastonbury and City of East Hartford
Date: December 6, 2018
to:
Mrs. Susan M. Libatique Trans. Principal Engineer Bureau of Engineering
and Construction
from:
Leo L. Fontaine Trans. Principal Engineer Bureau of Engineering and Construction
1. Transmitted are the following: Roadway Geotechnical Report Structure Geotechnical Report Plans: Correspondence:
2. This transmittal is being made: In response to request dated October 13, 2017 Initiated by this office
3. Comments:
4. Please take the following action: Please review and forward to
Please review for incorporation into the design of the project For your use and information
Attachment
Robert Pion/RAP cc: Eric Tallarita Andrzej Mysliwiec – Michael Piteo Nilesh Patel – Laurie LaRocca Leo Fontaine – Michael McDonnell
To: Susan M. Libatique 2 Project No.: 42-317 From: Leo L. Fontaine Date: December 6, 2018
Geotechnical Report-Transmittal Format Project Description: This project is located on Route 2 from Maple Street to Pitkin Street in the Town of Glastonbury and the City of East Hartford. The project consists of resurfacing, bridge and safety improvements as well as drainage improvements. The total project length is approximately 2.8 miles. The project includes closure of the interchange 5B, on/off ramps. The bridge rehabilitations are limited to deck and parapet modifications at each bridge in the project limits. The eastbound land or Route 2 will be widened between Main Street and Sutton. A retaining wall will be installed to minimize wetland impacts from the widening. The retaining wall will begin at approximate station 427+90 and will end at approximate station 433+90 for a total wall length of 600 feet. The maximum wall height will be approximately 10 feet and most of the wall will retain less than 5 feet of soil. Most of the roadway work along the project length is limited to minor fills (up to 8 feet in height) for the widened portions of the exiting Route 2 embankments. A new culvert will be installed under Route 2 by jacking a 36” reinforced concrete pipe into place at approximate station 137+45.
Geotechnical Information and Site Conditions: General Information Surficial Geology: USGS mapping indicates that the soil consists of alluvium overlying fines between Pitkin Street and Willow Street and sand overlying fines exists from Willow Street to the Maple Street.
Bedrock Geology: USGS mapping indicates that the bedrock geology is comprised of Portland Arkose.
Subsurface Exploration To supplement existing information, a subsurface investigation was
performed between January and March of 2018 by personnel from Atlantic Testing Laboratories, Ltd of Canton, New York. The subsurface investigation consisted of drilling a total of 25 borings. Seventeen (17) Type B roadway borings were drilled. The roadway borings have the prefix “R-.” Most of the roadway borings are located at proposed sign foundation locations. Three (3) Type A cased wash structure borings were drilled at the proposed pipe jacking location and five (5) Type A cased wash borings were drilled in the vicinity of the proposed retaining wall. The borings located at the proposed pipe jacking have the prefix “B-,” and the borings at the proposed retaining wall have the prefix “RW-.” See the Boring Location Plans in Appendix 2 for locations. All the roadway borings were drilled a minimum depth of 32 feet and all the structure borings were drilled to a minimum depth of 40 feet. Bedrock was not encountered on any of the borings.
The purpose of the exploration was to collect soil / rock samples, identify types, depths and thicknesses of geologic strata, and collect in-situ test data to be used in the design of the new retaining walls. Zero-hour groundwater levels were observed in each borehole at the completion of drilling. All borings were backfilled with drill cuttings at the completion of drilling. Refer to Appendix 4 for copies of the boring logs.
To: Susan M. Libatique 3 Project No.: 42-317 From: Leo L. Fontaine Date: December 6, 2018
To determine the relative soil density and to recover soil samples for classification, Standard Penetration Testing (SPT) was performed at intervals of 5 feet beginning at the ground surface. Undisturbed piston samples of the varved clay were taken and tested for shear strength. All soil samples were hand classified in the field. RQD values were determined from the NX rock core samples. Subsurface Conditions (based upon boring results) The soil generally consists of layers of sand, sandy gravel and silty sand overlying a thick layer of varved clay; which starts as medium stiff to stiff in the top few feet then becomes very soft.
Thickness (ft)
Description
5 - 36 Sand – Loose to dense sand with minor constituents of gravel and silt
2 – 25 Silty Sand – Loose to dense sand with little to some silt 0 – 26 Sandy Gravel – Loose to dense layers of sand and gravel in
varying percentages. 0 – 10 Varved Clay – Glacial Lake deposits of medium stiff to stiff
gray varved clay from Glacial Lake Hitchcock. 0 – 65 Varved Clay – Glacial Lake deposits of very soft to soft gray
varved clay from Glacial Lake Hitchcock. Bedrock – Bedrock was not encountered on any of the
borings.
Zero-hour groundwater observations show that the groundwater surface elevations vary from 9 to 36 but generally the groundwater surface will be encountered at approximate elevation 25 in most areas along the project. The groundwater surface is 4 feet or more below the ground surface at each boring location. Refer to the boring logs for groundwater observations. Laboratory testing on representative samples were performed to evaluate strength properties of the soil. See Appendix E for laboratory testing results.
Settlement
Immediate, consolidation and secondary settlement was evaluated for proposed embankment widenings and a proposed retaining wall. Compression indices and coefficient of consolidation used in evaluating both magnitude and time rate of consolidation settlement of the varved clay were taken from the final JHRAC report “Field Consolidation of Varved Clay” (Dr. Richard Long, University of Connecticut, JHR 78 113, Project 70-3, April 1978). Use of the field data generated indices/coefficients from the report take into account the anisotropic nature of the varved clay and the influence the silt layers have upon its compressive behavior under load.
To: Susan M. Libatique 4 Project No.: 42-317 From: Leo L. Fontaine Date: December 6, 2018
Soil Strength
The overall (global) stability of the proposed slopes was analyzed at the Service Limit State using laboratory data and limiting equilibrium methods. AASHTO LRFD criteria for overall stability was met, using a resistance factor of 0.65 for portion of slopes that contain/support structures and 0.75 for portion of slopes that do not contain/support structures. The jacking and receiving pits for the proposed pipe jacking will need to be designed to ensure overall stability of the existing embankment during construction. In order to provide adequate overall stability for the Route 2 embankment the minimum tip elevation for steel sheet piling at the jacking and receiving pits will be approximately -20. Ultimately, design of the jacking and receiving pits will be the responsibility of the Contractor.
Roadway Recommendations:
Fill Slopes: o Removal of topsoil: Topsoil should be removed in accordance with the
Standard Specification Form 816-Section 2.02.03 o Maximum fill slope rates: 1 (V) to 2 (H) o Slope treatments for slope surface: Use standard turf establishment with
erosion control matting. o The fill slopes located in the vicinity of the proposed retaining wall (between
approximate stations 433+50 and 438+50 should be constructed of lightweight fill for the purpose of settlement mitigation. Excavation and replacement of standard embankment soil with lightweight fill should result in reduction in earth load and no settlement below the wall.
o The fill slopes located at other locations can be constructed of standard embankment soil. The maximum amount of immediate and consolidation settlement is less than 1 inch. It is estimated that 90% of the calculated primary consolidation settlement will be 90% complete in 4 years. Secondary consolidation of the soil will continue after the primary consolidation but the total secondary settlement is calculated to be less than a ½“.
Earth Cut Slopes: o Maximum cut slope rates: 1 (V) to 2 (H) o Treatment for slope surface: Use standard turf establishment with erosion
control matting. o Earth excavation shrink value: 10% o Rock excavation is not anticipated in roadway excavation.
Sign Foundations: o Borings were drilled in vicinity of proposed sign foundations. The proposed
sign foundations will be design-build items. The Contractor can use the borings drilled at these locations to design the foundations, so include all boring logs on the plans and show the boring locations on the plans.
To: Susan M. Libatique 5 Project No.: 42-317 From: Leo L. Fontaine Date: December 6, 2018 Retaining Wall (Station 427+90 to 433+90) Recommendations:
The proposed retaining wall will be founded within the widened embankment and a portion of the proposed wall will be located above the existing box culvert which carries Route 2 over Pewterpot Brook. An MSE wall, utilizing lightweight fill as its backfill, is recommended as it is best suited for mitigating settlement problems caused by anticipated differential settlements across the length of the wall and settlement of Pewterbox Brook culvert below the wall. Using lightweight fill to construct the MSE wall results in nominal net stress increase and nominal settlement in the subsoil.
o The retaining wall design parameters are shown on the Geotechnical Wall
Design Parameters Sheet in Appendix H. Use of lightweight fill to construct the wall results in nominal settlement (immediate and consolidation settlement anticipated to be <0.5 inches).
o Allowable bearing pressure of the MSE wall is 1.5tsf. o The plans should include a typical showing the MSE wall details. The typical
should be revised to call for using Lightweight Fill to construct wall. Refer to Appendix H for clarification.
o Provide backwall drainage using structure underdrain. The underdrains can outlet into proposed drainage structures along the wall, i.e. the proposed catch basins at stations 427+00, 430+60 and 431+60.
o There should be a minimum of 2 feet of soil between the bottom of the retaining wall leveling pad and the top of the Pewterpot Brook culvert.
o Temporary Earth Retaining System (TERS) will be needed to support the roadway during retaining wall installation. The most feasible TERS is cantilever steel sheet piling.
Pipe Jacking Recommendations: o Use Class V pipe for the jacked pipe. o The borings indicate that groundwater should be below the bottom of
excavation/pipe jacking for this proposed structure. o The proposed jacked pipe is located roughly at the interface of in-situ varved
clay (at the bottom half of the pipe) and predominantly sand (at the top half of the pipe). It's anticipated that the pipe jacking method selected by the Contractor would either include a shield at the leading end of the jacked pipe (to minimize sloughing of the sand), or permeation grouting prior to jacking to stabilize the sand. The pipe jacking subcontractor will be responsible to determine the means and methods to safely and effectively accomplish the pipe jacking.
o TERS will be needed for the jacking and receiving pits. The most feasible TERS option is cantilever steel sheet piling.
o Include the following statements in the pipe jacking special provision included in the contract; “Design of the jacking and receiving pits must demonstrate that the overall (global) stability of the Route 2 embankment will be maintained. In order to provide adequate overall stability, the minimum tip elevation for steel sheet piling is approximately elevation -20 assuming a typical section such as PZ-27 or stronger. The jacking and receiving pits must
To: Susan M. Libatique 6 Project No.: 42-317 From: Leo L. Fontaine Date: December 6, 2018
provide adequate water cut-off so that dewatering will allow jacking the pipe in the dry.”
Construction Considerations: o Include a structural pay item for Retaining Wall in the contract. Attached
(Appendix G) is a revised version of the Departments owned “Retaining Wall” special provision. The revised special provision requires use of lightweight fill to backfill the wall.
o Maximum cut slope rates for establishing temporary sheeting limits shall be: 1(V) to 1½(H)
o Reuse (or non-reuse) of excavated material requirements: The on-site sand and gravel can be re-used on site as subgrade soil.
o The existing sand and gravel subgrade should provide a firm stable base for placement of pavement, as long as it is prepared in accordance with Form 816-Section 2.09.
Appendix Information: A. Project Location Plan B. Boring Location Plan C. Final Edited Boring Logs D. Generalized Soil Profile E. Laboratory Testing Data F. USGS Mapping G. Special Provisions H. MSE Retaining Wall Typical Section
Geotechnical Proprietary Wall Design Parameters
Project No. 42-317
Retaining Wall No. 1
Geotechnical Design Parameters
Max. Allowable Bearing Pressure 1.5 tsf
Sliding Resistance Use and in-situ soil φ of 340
Soil Unit Weight, γ : 60 pcf using lightweight fill
Lateral Earth Pressure(static): 33 psf
Live Load Surcharge-Uniform Earth Pressure: 250 psf
Foundation Design Details
Minimum Embedment Depth: 4 ft.
Backwall Drainage: Bagged Stone and Weepholes
Subgrade Preparation: 1ft of Granular Fill
Maximum Temporary Cut Slope: 1(V):1.5(H)
Acceptable Wall Types: MSE Retaining Wall
Additional Comments
• Design recommendations based on 2016 AASHTO LRFD and ConnDOT Bridge Design Manual.
• Preliminary plans/cross sections provided show the bottom of footing to be between elevation
25.5+ and 32.5+.
• Include the following logs on the wall plan sheets: RW-1, RW-2, RW-3, RW-4 and RW-5
Lightweight Fill
Appendices Table of Contents
Appendix A Project Location Plan
Appendix B Boring Location Plan
Appendix C Final Edited Boring Logs
Appendix D Generalized Soil Profile
Appendix E Laboratory Testing Data
Appendix F USGS Mapping
Appendix G Special Provisions
Appendix H Revised Bridge Plate No. 3.4.10b
Appendix A
Project Location Plan
SUBSET TITLE
Plans For
SUBSET NO.
DRAWING TITLE
BEEN PERSONALLY CHECKED BY THE UNDERSIGNED.
NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE
THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS
DISTRICT 1 DISTRICT 2
DISTRICT 3
DISTRICT 4
LOCATION PLAN
NOT TO SCALE
GENERAL NOTES:
DRAWING NO.
WOODSTOCK
THOMPSON
ASHFORD EASTFORD
POMFRET
BROOKLYN
HAMPTONCHAPLINMANSFIELD
PUTNAM
STERLINGPLAINFIELD
CANTERBURY
SCOTLAND
WINDHAM
LEBANON
HEBRON
EAST
HAMPTON COLCHESTER
GRISWOLD
STONINGTON
STONINGTONNORTH
LEDYARD
WATERFORD
MONTVILLE
BOZRAH
FRANKLIN
EAST
LYME
SALEM
SPRAGUE
LISBON
EAST HADDAM
LYMECHESTER
ESSEX
OLD
CLINTON
COLUMBIA
HADDAM
KILLINGWORTH
WESTBROOK
DEEP RIVER
LYME
MARLB
ORO
UG
H
VOLUNTOWN
PORTLAND
PRESTON
REDDING
NEW
FAIRFIELD
BETHEL
NEWTOWN
BROOKFIELD
ROXBURY
SOUTHBURY
OXFORD
WOODBURY
SHERMAN
NEW
MILFORD
KENT
SHARON GOSHEN
WARREN
WASHINGTONBETHLEHEM
MORRIS
LITCHFIELD
HARWINTON
WATERTOWN
CANAAN
NORTH
NORFOLK
CORNWALL
COLEBROOK
WINCHESTER
HARTLAND
BARKHAMSTED
NEW
HARTFORDCANTON
GRANBY
SUFFIELD
EAST
GRANBY
SIMSBURY
AVON
SEYMOUR
ANSONIA
DERBY
PROSPECT
PLYMOUTH
BURLINGTON
FARMINGTON
CANAAN
RIDGEFIELD
SALISBURY
WALLINGFORD
WO
OD
BRID
GE
BETHANY
HAMDEN
SHELTON
MONROE
EASTON
WESTON
WILTON
CANAAN
NEW
GREENWICH
DARIEN
WESTPORT
FAIRFIELD
TRUMBULLORANGE
MILFORD
STR
ATFO
RDBRIDGEPORT
EAST H
AVEN
BRANFORD
GUILFORD
NORTH
BRANFORDHAVEN
NORTH
NAUGATUCK
MIDDLEBURY
MADISON
NORWALK
WEST H
AVEN
SAYBROOK
OLD
LONDON
NEW
WATER
BRIDGE-
FALLS
BEACON
MIDDLETOWN
MERIDEN
CHESHIRE
SOUTHINGTONWOLCOTT
BRISTOL PLAINVILLE
CROMWELLBERLIN
BOLTON
GLASTONBURY
ANDOVER
MANCHESTER
HARTFORD
BRITAIN
NEW
HARTFORD
WEST EAST
BLOOMFIELD
WINDSOR
SOUTH
WINDSOR
WINDSOR
EAST
ENFIELD SOMERS STAFFORD UNION
WILLINGTON
TOLLAND
ELLINGTON
VERNON
COVENTRY
DURHAM
NE
WIN
GT
ON
LOCKS
WINDSOR
FIELD
MIDDLE-
CONNECTICUT DEPARTMENT OF TRANSPORTATION
WETHERSFIELD
SHEET COUNT
*SUBSET
Plans For
LIST OF SUBSETS
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
AND CHANGE ORDERS
NOT INCLUDE ADDENDUMS
SHEET COUNT DOES
*THE INITIAL SUBSET
STATE OF CONNECTICUT
SUBSET 01 - GENERAL
LIST OF DRAWINGS
N
DE
PA
RT
ME
N
TOF TRAN
S
PO
RT
ATI
ON
C
ONNECTICUT
M A S S A C H U S E T T S
RH
OD
E
IS
LA
ND
N
E
W
Y
O
R
K
DRAWING NO.
SHEET NO.
PRELIMINARY DESIGN REVIEW
STATE PROJECT NO.
TORRINGTON KILLINGLY
GROTON
STAMFORD
DANBURY
WATERBURY
01.01
STANDARD CONVENTIONS
Edge Of Road
Concrete Pavement
Dirt Road
B.C.L.C.
Granite Curb
Guide Rail
Concrete Median Barrier
Bit. Walk
Conc. Sidewalk
Railroad Tracks
Chain Link Fence
Rustic Fence
Pipe Fence
Board Fence
Water Edge
Stream
Ditch
Swamp
Building
TOWN LINE
Highway Line
Street Line
Property Line
PLLot Line
STATE LINE
Easement Line
Limit Of Marsh
Stone Wall
Ledge Outcrop
Inland Wetland Limits
Power Line
Transmission Tower
Riprap
Retaining Wall
Evergreen Tree
Shrub
Tree Line
Hedge Row
Grid ArrowNorth Arrow W/No. Coor.
. .
Deciduous Tree
INCOMPLETE AND/OR INACCURATE INFORMATION.
MAY BE LIABLE FOR CLAIMS RESULTING FROM THE DISSEMINATION OF UNOFFICAL,
AVAILABLE BY ANY MEANS ARE NOT AUTHORIZED BY THE DEPARTMENT TO DO SO AND
PERSONS AND/OR ENTITIES WHICH REPRODUCE AND/OR MAKE SUCH INFORMATION
FROM OFFICAL SOURCES WITHIN THE DEPARTMENT.
PARTIES TO OBTAIN ALL BIDDING RELATED INFORMATION AND DOCUMENTS
IT IS THE RESPONSIBILITY OF EACH BIDDER AND ALL OTHER INTERESTED
DISCLAIMER
RESPONSIBILITY
MAINTENANCE
ROAD LENGTH
RESPONSIBILITY
MAINTENANCE
F.A.P. #
G-01
G-01TITLE SHEET
1GENERAL01
33HIGHWAYS03
23TRAFFIC05
6STRUCTURE04
Town of
Town of
PROJECT #
CDM SMITH
DESIGNED BY:
42-317
EAST HARTFORD
IMPROVEMENTS ON ROUTE 2
RESURFACING, BRIDGE AND SAFETY
IMPROVEMENTS ON ROUTE 2
RESURFACING, BRIDGE AND SAFETY
EAST HARTFORD
15215 FEET STATE ROUTE 2
0042_0317 STATE0032(191)
FEDERAL AID PROJECT NO. 0032(191)
END STATE PROJECT NO. 42-317
FEDERAL AID PROJECT NO. 0032(191)
BEGIN STATE PROJECT NO. 42-317
517
502
384
84
8484
DE
PA
RT
ME
N
TOF TRAN
S
P
C
ONNECTIC
RT
ATI
ON
O
UT
N
44
44
SOUTH WINDSOR
GLASTONBURY
MA
NC
HES
TE
R
WETHERSFIELD
HA
RTFO
RD
PROJECT LOCATION
55
52
6
446
6
15
15
2
5
2
2 3
22
LOCATION OF PROJECT
"HIGHWAY CAPACITY MANUAL, 2010"
CONNECTICUT DEPARTMENT OF TRANSPORTATION "HIGHWAY DESIGN MANUAL, 2013"
AASHTO "A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS, 2011"
6. DESIGN STANDARDS:
5. DESIGN SPEED: 60 MPH
4. HIGHWAY CLASSIFICATION: URBAN FREEWAY
3. VERTICAL DATUM BASED ON NAVD 88
2. 400 FOOT GRID BASED ON NAD 83/2007
SUPPLEMENTAL SPECIFICATIONS, DATED JULY 2015; AND SPECIAL PROVISIONS
FOR ROADS, BRIDGES AND INCIDENTAL CONSTRUCTION, FORM 816, DATED 2004;
CONNECTICUT DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS
1. CONSTRUCTION SPECIFICATIONS:
17EROSION AND SEDIMENTATION CONT.06
MORTON
LA.
JE
RR
Y
OVERBROOK
HEATHER
CLOVERDALE
DR.
RD.
ST.
SU
NN
YD
ALE
RD.#2
#1
SUNNYREACH
DR.
NA
UB
UC
NA
UB
UC
BROAD
BE
DF
OR
D
AVE.
ST.
PORTER
DR.
#1
#2
AVE.
HOCKANUMLA.PA
RK
DU
NH
AM
LA.
#3
NASS
AU
CIR.
ST.
S
TREET
KOHLER
ST.
AV
E.
Pewt
erpo
t
HIGHCT.
HIG
H
CARTER ST.
MAIN
WADSWORTH ST.
Hockanum
2
DR.
COLT ST.
#2
RIV
ER
SID
E
Willow
2
15
5
516
WILLOW
ST.
COLT #1
ST.
PHILLI
PS
ST.H
IL
LS
ON
ST.
CROSBY
ST.
KIN
GC
T.
#2
CT.#1
KIN
G
ENSIGN
ST.
WIL
L
OW BROOK
RD.
2
3
3
MAIN
517
HIG
H
ST.
STREET
Brook
CHARTER
OA
K
BRID
GE
BROWN
JUDSON AVE.
LILACST.
SISSON
ST.
SMITH
WHITING
DR.
DR.
RD.
ST.
ST.
ST.
ST.
PRATT
PL.
CH
EL-
TO
N
CH
EL
TO
N
ST.
RISLEY
SM
AR
T
J
AIDEE
LA
WR
EN
CE
PL
AIN
DR.
517
502
15
ST.
BREWER
SILVER
Hockanum
MAPLE
LA
FA
YE
TT
E
AVE.
AV
E.
AVE
.
WA
SHIN
GT
ON
#3
EL
MS
VIL
LA
GE
DR.
CIR.
ST.
#2
ST.
RAYMOND
SUFFOLK
LA
N
HAM
LA.
DR.
NORWI
CH
LA.
RD.
CANTER BUR
Y
ST
.HA
N
DE
LC
T.
MID
DLE
DR.
DR.
DR.
DR.
WO
OD
YC
RES
T
DR.
CR
E
SCENT
EV
AN
SHA
ND
EL#1
DR.
JEFF
ERSON
NA
SS
AU
LA.
DR.#1
#2
#3
GRAHAM
LEICHTNER
DR.
LA.
ST.
RD.
RD.
RD.
HOLMES
ST.
GLE
NN
MILL
HA
MIL
TO
NR
D.
Brook
HOLLI
STER
HOLLISTER
PRINCETON
LA.
BREWER
RO
XB
UR
Y
TRINITY
LA.
DO
B
SO N DR.
RD.
SA
LE
M
LORRAINE
CT.
CARPENTERGO
RD
ONMITCHELL
CT.
MIT
CH
EL
L
MO
N
TAGUE CIR.
DR.
DR.
SH
AD
YCRES
T
CR
ES
CE
NT
CT.
DR.
DR.
DR.
FE
RN
CR
ES
T
PIN
EC
RES
T
WOODYCREST
WOODYC
RES
T
CT.
CR
OSS
DR.
BR
ANCH
DR.
RD.
KENNED
Y
CARRIAGE
DR.
OL
AY
TO
N
HOLLY
RD.
RD.
S
PAU LDIN
G
CI
R.
RIVA
Brook
LIN
MO
N
TCLAIR
502
Brook
WILBUR
CUMBERLAND DR.
GOULD
DR.
GO
UL
DCIR.
RD.
Will
ow
SILVER
EC
HO
LA.
GO
LD
ST.
CL
EM
EN
T
518
LANE
WARREN
DR.#2
DR.
MA
RTIN
CIR.
WARREN
WHIT
NE
Y
ST.
ME
RC
ER
AVE.
846
5
MAIN
MAIN
ST.
BLINN ST.
JU
NE
MA
Y
ST.
ST.
CARROLRD.
PITKINST.
ST.
ST.
ME
AD
OWHARTLAND
ST.
ST.
500
DA
RLIN
ASH
DR.
SO
UT
H
PR
OS
PE
CT
ST.
CHAPEL
ST.
ST.
ST.
WA
RD
GARVAN
TOWERRD.
CA
RR
OL
L
CT.
CENTRAL
ST.
LA.
BR
EW
ER
AVE.
LOCUST
CT. SIM
MO
NS
518
Hockanum
TICUT
56
54
55
57
58
58
C
O
N
N E
C T I C
U T
Bk.
Pewterpot
H
502
T
O
W
N
SC
OT
T
ROBERTS
ST
WIN
DIN
GLA.#1
ST.
WOODYCREST
SA
LE
SAUNDERS
River
56
5
WILLYS ST.
EXT.
RO
BE
RTS
ST.
.
55
OX
FORD
SCOTT
#1
SC
OT
T
ST.
CA
MB
RID
GE
AVE.
SUTT
ON
MIL
BR
OOK
EAST
RIVER
DR.
EXT.
JA
YC
E
ST.
EAS
T
RIVER
N
ST.
SUMMER
A.
ASELTON
MEMORIAL
HIGHWAY
#1
VETERANS
OF
FOREIG
N
WARS
HIG
HW
AY
ROAD
RIV
ER
DR.(PVT)
ST.
WILBUR
CROSS
HW
Y.
ME
MO
RIA
L
CARTWAYLA.
FO
OT
PA
TH
LA.
44
2027
7
44
6
8
1
5
2027
6
9
2
202
91
95
95
95
84
395
84
84
HAVEN
NEW
HARTFORD
NORWICH
THOMASTON
HILLROCKY
Project Number 42-317
Appendix B
Boring Location Plan
O/
H
SIG
N
DELIN.
HHHHHH
CB"CL"
CB"CL" CB
"CL"
ASH60"
DELIN
RCCE15"
HH
"C"CB
HH
HH HH
DELIN
HH
HH HH
DELIN
CB
"C
L"
MHST
M
CB"CL"
POST
OPTIC
FIBER
"C"CB
RCP
15"
RCP
18"
15" R
CP15" RCP
15" R
CP
15" RCP
15" RCP
15" R
CP
15" RCP
BT=25.41FL=27.41TF=30.41
BT=25.32FL=27.32NWFL=27.32SWFL=27.32ETF=30.42
BT=26.08FL=28.18NWFL=28.28SETF=30.68
BT=26.54FL=28.74SEFL=28.84NETF=31.24
BT=26.54FL=26.54NWFL=26.54SFL=26.64ETF=31.44
BT=25.73FL=26.23SWFL=26.13SFL=26.33NTF=30.03
LOCATEDNOT
OUTLET
BT=24.55FL=26.95NFL=26.95SETF=31.05
CB)
OPEN
(CAN'T
ENDWALL
ENDWALL
133SPUR-
CO
NC
CU
RB C
ON
C
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CURB
ON-RAMP ROUTE 2 WEST
OFF RAMP TO MAPLE STREET
GRASS
109
SPUR-HH
HH
BM
BM
BM
BO
X
ELEC
108
SPUR-
CH LNK FENCE
WOODS
WOODS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
"CL"CB
"CL"CB
"CL"CB
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
BT=36.68
FL=38.58SW
FL=38.68NE
TF=42.78
"CL"CB
BT=31.02
FL=31.02
TF=35.02
"CL"CB
BT=36.15
FL=36.25
TF=39.55
"CL"CB
FL=29.75
FL=30.47
END
FIND
CAN'T
CP 1A
502.73'S43°0'4"E
499.13'N31°46'19"W
125.5
9'
N70°36'3
5"E
S33°54'45"E
520.78'
382.18'
S57°7'17"E
471.39'
N85°4
2'2
7"E
S55°39'59"E
777.65'
B.M. A-4
DH N.W. COR. CONC. BASE OF SUPP.
POLE @ RT.2 ON-RAMP
FROM MAPLE ST.
Elev. 31.36
NGVD 1988 NAD 83/2007
B.M. A-5
DH S.W. COR. CONC. BASE OF LT.
POLE. TOP OF ON-RMP TO RT 2 W.
FROM MAPLE ST.
Elev. 39.05
NGVD 1988 NAD 83/2007
B.M. A-6
DH N.E. COR. CONC. BASE OF LT.
POLE. 1ST POLE NORTH OF OV'HD
SIGN "EXIT 5A-MAIN ST.-.5MILE"
Elev. 36.99
NGVD 1988 NAD 83/2007
CHD(FND)
(N/F)
CHD
(N/F)
CHD
(N/F)
CHD
(N/F)CHD
(N/F)CHD
(N/F)
CHD
A-5006RAN.
A-5057
RAN.
A-5056RAN.
A-5005RAN.
(FND)CHD
(FND)CHD
(FND)CHD
(FND)CHD
(FN
D)
CH
D
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)
I.P.
(FND)MON
MAPLE ST
REET
HH
HHHH
POLESPAN
BOXELEC
#5199SNET
#5257HELT
#2842CL&P
WOODS
HH
WINGWALL
WINGWALL
#NO
WOODS
WOODS
HH
CH.LNK.FENCEC.L.F.
HH
HH
BASE
CONC
HH
BASE
CONCHH
DELIN.
DELIN.
HHDELIN.
WOODSWOODS
WOODS
WOODS
BOX
ELECBOX
ELEC
CONC CURB
CONC CURB
HH
ROUTE 2 WESTBOUND
ROUTE 2 EASTBOUND
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
10+00
11+00
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+007+487+48
0+00
1+00
2+00
3+00
4+00
5+006+00 7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
600+00601+00 602+00
603+00
604+00
605+00
606+00
607+00
608+00
609+00
610+00
611+00
612+00
613+00
614+00
615+00
616+00
617+00
618+00
400+00401+00 402+00
403+00
404+00
405+00
406+00
407+00
408+00
409+00
410+00
411+00
412+00
413+00
414+00
415+00
416+00
417+00
418+00
BRUSH
R-1
107
27.85
15"FLARED
155
29.18
15"FLARED
221
29.35
235
29.75
NO FLR
195
30.03
207
30.28 157
30.34
208
30.40
"C" CB
149
30.40
147
30.42
191
30.47
15"NO FLR
216
30.49
145
30.68
R-2
156
30.77
217
30.78
209
30.91
146
31.00
206
31.00
185
31.01
104
31.05
184
31.17
154
31.20
143
31.24
211
31.29
150
31.33
116
31.36
A-4
215
31.40
210
31.40
6
31.43
A-5006
106
31.44
231
31.44
212
31.45
230
31.56
232
31.58
148
31.63
229
31.70
233
31.70
222
31.72
219
31.87
214
31.87
179
31.89
105
31.93
218
31.94
213
31.98
220
32.13
144
32.15
200
32.18
PLASTIC
183
32.21
228
32.22
178
32.22
176
32.24
175
32.25
186
32.25
234
32.29
223
32.44
181
32.45
182
32.55
177
32.58 180
32.71
152
32.72
224
32.73 227
32.73
226
32.73225
32.74
122
32.97
204
33.06
153
33.07
60"ASH
205
33.07
123
33.22
188
33.22
190
33.23
121
33.24
189
33.25187
33.31
201
33.36
203
33.40
120
33.58
126
33.61
202
33.63
102
33.76
174
33.78
172
33.91
125
34.01
173
34.04
164
34.11
162
34.31
171
34.66
163
34.76
FBR OPTC POS
127
34.99
11
602
35.02
161
35.03
124
35.23
133
35.26
SPUR-133 133
35.26
SPUR133
135
35.44
117
35.80
DELIN.
103
36.10
118
36.11
108
36.17
SPUR-108
119
36.23
170
36.85
236
36.99
BM-A6
165
37.74
136
37.80
166
37.90
1322
38.08
cp 1a
57
38.08
A-5057
1_1
38.08
CP-1A
101
38.81
100
38.85
109
38.96
SPUR-109
12
602
39.55
167
39.84
SIGN
168
40.91
Project Number 42-317 Route 2 Safety Improvements
Sheet 1 of 6Boring Location Plan
City of East Hartford
169
42.46
10
602
42.78
137
43.02
151
44.37
138
44.41
139
46.78
142
49.64
141
49.94
140
50.16
E 10
34000
N 828800
E 10
34400
N 828400
E 10
34800
N 828000
E 10
34800
N 827600
MA
TC
H
MA
RK
SH
EE
T 2
83
CO
ORDIN
ATE G
RID
AD
CO
NNECTIC
UT
CP 2A
Matc
h M
ark S
heet 2
WA
LL
WALL
WA
LL
HYD.
ROUTE 2 WESTBOUND
ROUTE 2 EASTBOUND
ROUTE 2 WESTBOUND
ROUTE 2 EASTBOUND
MBR
MBR
MBR
MBR
MBR
MBR
CO
NC
CU
RB
CO
NC
CU
RB
CONC CURB
MBR
MBR
MBR
3-CABLE
GUIDE RAIL
3-CABLEGUIDE RAIL
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
MBR
MBR
MBR
MBR
MBR
MBR
MBR
3-CABLE GUIDE RAIL
MBR
MBR
CONC CURB
CONC CURB
CONC CURB
CONC. C
URB
CONC. CURB
CO
NC. C
URB
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
GRAN
GRAN
GRAN
GRAN
WOODS
WOODS
WOODS
BM
BM
BM
BM
BM
#5492
CL&P
BIT.WALK
#2662
CL&P
GRAVEL LOT BLOCK
CINDER
BRICK &
1 STY
DUMPSTERSC.L.F.
DBL. HH
HH
CO
NC.W
AL
K
CO
NC.W
AL
K
CO
NC.W
AL
K
CO
NC.W
AL
K
#5561
CL&P
#2544
CL&P
HH
WG's
UNKNOWN
OUTLET
GG
GG
18''RCCE
18"R
CP
18"RCP
15"RCP
15"RCP
15"
RC
P
15"RCP
#2922
SNET
WG's
MH
SAN
#2941
SNET
CONC. DR.
CONC.WALK
CONC.WALK
24'' RCP
24'' RCP
WOODS
PAD
CONC
HH
C.L.
F.
C.L.F.
RCP
36"
RCP
24" WOODS
HH
HH
15'' C
MP
WOODS
BASE
CONC
DBL.HH
2397
SPUR-
2088
SPUR-
2352
SPUR-
2396
SPUR-
C.L.F.
RCP
24"
C.L.F.
C.L.F.
WATER
BASE
CONC HH
POLE
CAM.
HH's
WOODS
WOODS
HH's
6"C
MP
18'' R
CP
HH's
15'' RCP
BCLC
BCLC
OFF-RAMP
BCLC
BCLC
BCLC
BOXELEC
BCLC
SHED
1•STY.
#246
#242
BIT.D
R.
BIT.D
R.
GRAN
GR
AN
GR
AN
BCLC
15'' RCP
MH
SAN
(CAN'T OPEN)
#519SNET
PV'M
T.
CO
NC.
CO
NC
BIT.
BIT.
CO
NC.
GRAN.CB.
ON POLE
TC BOX
CO
NC.W
AL
K
MH
WATER
W
G
WG
WG's
CO
NC.W
ALK
WOODS
ON-R
AMP
WOODS
WOODS
WO
ODS
ANCHORG.RAIL
OAK24"
BCLC
BCLC
BCLC
BCLC
HH's
WOODS
SAN.MH
BM
10
1
20
2
30
3
40
4
5
8
11
9
21
41
12
22
32
13
23
33
14
24
34
15
25
35
16
26
36
17
27
37
18
28
38
19
29
39
c8
c1
c17
c2
c27
c3
c35
c4
c5
c6
c9
c7
c18
c36
c10
c19
28
c10
c20
c29
c11
c21
c30
c12
c22
c31
c13
c23
c32
c14
c24
c33
c15
c25
c33a
c16
c26
c34
15'' R
CP
15''
RCP
15'' R
CP
6"C
MP
CMP
12"
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
48'' RCP
B.M. A-7
DH S.W. COR. BASE OF LT. POLE
ON RT. 2. 2ND POLE SOUTH OF
SUTTON AVE. BRIDGE#00381
Elev. 46.51
NGVD 1988 NAD 83/2007 B.M. A-9
DH N.W. COR. END OF CONC. WALL
@ SUTTON AVE. & CAMBRIDGE DR.
Elev. 31.50
NGVD 1988 NAD 83/2007
B.M. A-8
DH N.W. COR. BASE OF LT. POLE
ON RT.2, ADJACENT TO
SUTTON AVE. ON-RAMP
Elev. 43.37
NGVD 1988 NAD 83/2007
B.M. B-1
DH S.W.COR. CONC. BASE OF
CAMERA POLE NEAR OV'HD SIGN
"EXIT 5A-RT 2 HARTFORD"
Elev. 42.68
NGVD 1988 NAD 83/2007
B.M. B-2
DH N. SIDE OF ROUND BASE OF LT.
POLE. 1ST LT. POLE WEST OF
BRIDGE #00380
Elev. 59.09
NGVD 1988 NAD 83/2007
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CH
D
N/F
CH
D
N/F
CHD
N/F
CHD
N/FC
HD
N/F
CH
D
(FN
D)
MO
N
N/F
CHD
N/FCHD
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
CHD(FND)
(FN
D)
CH
D
19+00
20+00
21+00
22+0022+4522+45
00+-0
1+00
2+00
3+
00
3+
21
3+
21
100+00
100+00
100+00
101+00
102+00
103+00
104+00
105+00
106+00
107+00108+00 109+00
110+00
111+00
112+00
113+00
113+86
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+0017+00 18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
27+81
27+81
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+0017+30
17+30
618+00
619+00
620+00
621+00
622+00
623+00
624+00
625+00
626+00
627+00
628+00
629+00
630+00
631+00
632+00
633+00
634+00
635+00636+00 637+00
638+00
639+00
640+00
641+00
642+00
643+00
644+00
645+00
646+00
418+00
419+00
420+00
421+00
422+00
423+00
424+00
425+00
426+00
427+00
428+00
429+00
430+00
431+00
432+00
433+00
434+00
435+00436+00 437+00
438+00
439+00
440+00
441+00
442+00
443+00
444+00
445+00
446+00
368.33'
112.52'
10.8
2'
368.33'
162.62'
93.36'
61.62'
161.02'
163.16'
0.36'
730.00'
368.33'
Project Number 42-317
City of East HartfordSheet 2 of 6
Boring Location Plan
Route 2 Safety Improvements
RW-1
RW-4
2244
15.84
BOX CULVERT
2245
15.95
FL OF CULV
2439
16.09
2204
16.70
24RCP2212
16.74
2246
16.99
2372
16.99
2213
17.14
2243
17.34
2211
17.41
2440
17.42
2438
18.16
2247
18.29
Fl of CULVE
2214
18.33
2368
18.40
2441
18.42
2249
18.52
2248
18.57
2369
18.76
2210
18.76
2250
18.83
2436
18.87
2109
18.90
2200
19.07
2215
19.09
2242
19.21
2107
19.21
2443
19.30
2194
19.36
2437
19.37
2108
19.44
2232
19.47
2218
19.48
2222
19.572219
19.59
2253
19.59
2217
19.60
2254
19.62
2201
19.64
2252
19.65
2251
19.70
2203
19.71
2229
19.74
2442
19.75
2230
19.76
2106
19.77
2131
19.78
36"Rcp
2431
19.85
2209
19.91
2153
19.92
2216
19.95
2202
19.96
2264
20.03
2162
20.03
24" Rcp
2265
20.05
2158
20.07
2154
20.19
2139
20.21
2142
20.28
2152
20.29
2105
20.33
2157
20.35
2263
20.40
2151
20.41
2140
20.41
2138
20.48
2424
20.50
2141
20.51
2206
20.52
2207
20.52
2205
20.56
2423
20.56
2262
20.57
2208
20.57
2261
20.63
2104
20.63
2150
20.64
2182
20.67
2266
20.67
2429
20.73
48"RCP
2132
20.80
2110
20.82
2267
20.95
2195
20.97
BRUSH
2111
21.02
2268
21.07
2260
21.14
2149
21.19
2148
21.20
2134
21.28
2241
21.28
2181
21.29
2371
21.31
2259
21.31
2199
21.32
2370
21.34
2143
21.36
2133
21.38
TOP OF BANK
2240
21.40
2144
21.43
TOP OF BANK
2135
21.43
2239
21.60
2136
21.61
2147
21.72
2137
21.75
2197
21.92
2198
21.94
BRUSH
2116
22.01
2193
22.03
2120
22.06
2125
22.08
2099
22.10
2130
22.13 2126
22.21
2233
22.21
BOX CULVERT
2145
22.21
2112
22.27
2156
22.30
2256
22.33
2234
22.39
BOX CULVERT
2255
22.42
2146
22.49
2435
22.67
2432
22.71
2258
22.74
2238
22.84
2221
22.882220
22.90
2196
22.90
2228
22.902227
22.96
2231
22.97
2115
23.16
2425
23.20
2155
23.22
2235
23.39
2257
23.43
2119
23.52
2117
2129
23.54
23.54
2161
2127
23.55
23.55
2159
23.56
2118
23.59
2160
23.62
2433
23.67
2236
23.69
2237
23.71
2113
23.73
2114
23.74
2434
23.76
Pewterpot Brook Culvert
2224
23.87
2226
23.89
2223
23.90
2225
23.94
2426
24.13
2183
24.26
2122
24.59
2123
24.61
2124
24.62
2121
24.62
2422
24.64
2192
24.68
2184
25.05
2098
25.47
18"CMP
18"
CM
P
18"
CM
P
UNKNOWNOUTLET
DIRT LOT
2128
25.53
2421
25.54
CO
NC
CU
RB
MH
SAN
15"
RC
P
15"
RC
P
#2237
CL&P
#2941s
SNET
BIT
WOODS
CONC CURB
WOODS
(PV'D OVER)
SAN.MH
15'' RCP
15'' R
CP
WOODS
BRUSH
POLE
SPANHH
SIGNAL
#2901
CL&P
BM
HH
FE
NC
E
CH
LN
K
MH's
BELL
ANCHOR
G.RAIL
ON POLE
TC BOX
CONC.WALK
GRASS
GRASS
(PV'D OVER)
SAN.MH
GRASS
GRASS
CONC.WALK
WOODS
WOODS
WOODS
LOOPS
HH
HH's
B.M. E-1
DH N.W. COR. CONC. BASE
OF SPAN POLE
Elev. 34.95
NGVD 1988 NAD 83/2007
WETLANDS
APPROX.LOC.
WETLANDS
APPROX.LOC.
WETLANDS
APPROX.LOC.
WETLAN
DS
APPR
OX.L
OC.
WETLANDS
APPROX.LOC.
2428
25.97
2427
26.18
2420
26.21 2419
26.22
2100
26.27
2417
26.51 2418
26.54
2361
27.71
2101
27.80
2097
27.81
2367
27.97
BRUSH
BRUSH
2366
28.43
2352
29.09
spur2352
2360
29.26
2185
29.26
2359
29.29
2354
29.34
H2O METER
2358
29.50
2355
29.53
H2O MTR
2026
29.90
2027
29.99
BR
US
H
2028
30.01
2038
30.13
2039
30.15
2012
30.19
2013
30.20
CHAMBER
#3439
SNET
CONC.WALK
CONC.WALK
GRAN.
GRAN.
GRASS
GRASS
WG
MH
SAN
MH
SAN
MH
SAN
(CAN'T OPEN)
(FILLED)
(CAN'T OPEN)
2356
30.24
YARD DRAIN
2015
30.29
2362
30.37
2189
30.44
2096
30.71
2025
30.74
2014
30.91
2102
30.92
2092
31.07
2051
31.08
2023
31.08
2365
31.32
2050
31.36
Snet#2941s
2024
31.40
2089
31.41
2021
31.45
2093
31.48
2353
31.53
2006
31.53
2090
31.54
52
31.57
cp 5b-2 52
31.57
cp-5b-2 2373
31.57
2095
31.60
2094
31.61
2022
31.62
2007
31.63
2008
31.64
CL&P#5492
H
2009
31.86
2357
31.97
2004
32.00 2003
32.00
2005
32.03
2016
32.09
2054
32.14
2053
32.14
2052
32.14
2315
32.29
2084
32.32
2076
32.34
2077
32.34
2075
32.34
2085
32.36
2314
32.37
2103
32.40
2190
32.42
2074
32.43 2073
32.44
2091
32.45
2070
32.45
2072
32.47
2010
32.47
BRUSH
2187
32.51
2002
32.52
2017
32.53
2066
32.55
2065
32.56
2064
32.59 2063
32.59
2062
32.62
2061
32.62
2060
32.63
2011
32.63
2055
32.63
2186
32.64
2324
32.66
2081
32.67
2082
32.67
2083
32.71
2020
32.74
2080
32.75
2086
32.75
2079
32.76
2019
32.76
2078
32.77
2379
32.80
2071
32.85
2067
32.89
2325
32.93
2087
32.93
2378
32.94
2056
32.99
2059
33.04
2058
33.05
2057
33.05
2313
33.06
2191
33.07
2069
33.08
SU
TT
ON
AV
EN
UE
2068
33.10
2018
33.16
2326
33.35
PAVED OVER
2317
33.38
2163
33.48
2323
33.56
2331
33.61
PAVED OVER
2380
33.74
2327
33.85
2319
33.88
MAIN STREET
2312
34.11
2391
34.17
FL
2320
34.20
spur 23202320
34.20
spur-23202392
34.22
2329
34.22
2374
34.27
spur-23742322
34.28
(sheared)?
2318
34.38
2316
34.46
2330
34.55
2328
34.59
2383
34.73 2384
34.80
2311
34.87
2334
34.97
bm-E1 2375
34.97
BRUSH
2333
35.30
2269
35.39
2270
35.42
2381
35.46 2382
35.48 2385
35.58
2386
35.69
2029
36.19
2164
36.23
2389
36.37
2390
36.37
2388
36.47
2040
36.47
2387
36.47
2309
36.76
2271
36.90
2272
36.94
2332
36.95
2308
37.37
2364
37.40
2088
37.65
spur2088
2041
37.81
2310
37.95
WALL
2030
38.09
2398
38.45
2165
38.56
2397
38.82
SPUR-2397
2397
38.82
spur2397
RW-3
2363
39.02
hwy sign
2341
39.05
H
15
602
39.71
2274
39.79
2275
39.83
2273
39.83
2047
39.84
2276
39.85
2046
39.89
2034
40.21
2035
40.28
RW-2
51
41.85
cp-5b-1 51
41.85
cp 5b-1 51
41.85
CP-5B-1 2430
2444
41.85
41.85
BRUSH
BRUSH
O/
H
SIG
N
2167
2167
42.59
42.59
2167
2167
2396
42.62
spur2396 2396
42.62
SPUR-2396
2277
42.67
b1
2188
42.68
14
602
43.16
2340
43.18
town ?
13
602
43.34
2399
43.37
2394
43.38
2166
43.40
2339
43.60
3242
43.62
a-3242
BRUSH
2342
44.22
2344
44.25
2343
44.26
2345
44.33
RW-5
2168
44.47
2346
44.52
2393
44.62
2350
44.75
2349
44.85
2278
45.31
2305
45.50
2348
45.50
2347
45.64
2304
45.72
2294
45.72
2306
45.76
2281
45.782287
45.82
2302
45.91
2303
45.92
2307
45.94
2282
45.98
SIGN
2300
46.01
2286
46.07
2295
46.12
2298
46.16 2299
46.16
2301
46.19
2279
46.24
2296
46.26
2280
46.28
2285
46.30
2288
46.32
2297
46.36
2283
46.39
2289
46.45 2293
46.48
2290
46.54
2284
46.57
2292
46.66
2291
46.77
2395
46.83
1
47.16
cp-1b
17
602
47.43
16
602
47.45
2031
47.55
2042
47.592048
48.01
2033
48.03
2045
48.04
2044
48.04
2036
48.05
2043
48.062049
48.06
2032
48.11 2037
48.17
2171
48.73
2169
48.74
2170
48.78
2173
50.73
2172
51.30
2177
51.85
2337
51.88
2413
51.96
2178
52.05
2179
52.06
2180
52.08
2174
52.72
2175
52.90
2176
52.98
SIGN
2415
54.36
2
57.13
cp-2b2
57.13
cp-2B
18
602
58.55
2410
58.65
2335
58.95
2336
59.03
2338
59.08 2321
59.10
bm-b2 59.09
2416
59.15
B2
2414
59.26
2411
59.76
19
602
59.83
3
59.95
cp-3b3
59.95
cp-3B
2412
60.20
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
NOR DO THEY REPRESENT A PROPERTY BOUNDARY OPINION
NECESSARILY BEING OBTAINED AS THE RESULT OF A FIELD SURVEY,
FROM VARIOUS SOURCES AND ARE NOT TO BE CONSTRUED AS
5.) THE PROPERTY AND STREET LINES DEPICTED HAVE BEEN COMPILED
1. ) SURVEY BY DISTRICT 1 SURVEYS
EAST HARTFORD ROUTE 2
E 10
32000
E 10
32000
N 830400
E 10
33200
N 830000
E 10
33600
N 829600
E 10
32800
N 829600
E 10
33600
N 829200
MA
TC
H
MA
RK
MA
TC
H
MA
RK
SH
EE
T
3
SH
EE
T
1
83
CO
ORDIN
ATE G
RID
AD
CO
NNECTIC
UT
BRUSH
BRUSH
N/FCHD
N/F
CHD
N/F
CHD
(top sheared)
RAN. A-333
CHD(FND)
N/FCHD'S
CH
D(F
ND)
CHD(FND)
CHD(FND)
(FN
D)
CH
D'S
(FN
D)
CH
D
Matc
h M
ark S
heet 1
Matc
h M
ark S
heet 3
BOX
ELEC
HIG
H STREET
HY
D.
1000
1100
1170
1001
1151
1093
1193
1092
1186
1107
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MBR
MBR
MBR
MBR
MBR
3-CABLE GUIDE RAIL
MB
R
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
MBR
MBR
MBR
MBR
CONC CURB
CO
NC
CU
RB
CO
NC
CURB
CO
NC
CURB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
HH
WG's
PIPEVENT
GG
GG
CO
NC. W
AL
K
CO
NC. W
AL
K
CO
NC. W
ALK
CO
NC. W
AL
K
CO
NC. W
AL
K
CO
NC. W
ALK
BCLC
WG
#3445
SNET
GR
AN.
CU
RB
ANCHORCONC
WOODS
DELIN
WOODSLIGHT
#3444
SNET
WOODS
HH
HH
CONC.BARR
MBR
BCLC
BCLC
BCLC
MBR
HHHH
#3770
HELT
WG's
WG
BOX
ELEC
WG
#5297
SNET
BO
X's
ELEC
#3443
SNET
HH
WOODSLT.
(36")
PINELGE.
WOODS
MH
ELEC
BCLCBIT.
MPL
12"
SH
RU
BS
PIN
E
12"
BCLC
C.L.F.BUILDING
BRICK
4 STY
PA
DS
CO
NC
PA
DS
CO
NC
#12
44
SNET
EARTH DRAIN
AGE DIT
CH
C.L.F.
BO
X
ELEC
TO
WER
MTL.
ANC
HO
R
CO
NC
CO
NC. W
ALK
WOODS
WOODS
DELIN
POSTF.O.
WIT.
DELIN
BM
BM
ANCHORCONC
HH
HH's
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLCBCLC
BCLC
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
HH
HH
DELIN
POLECAM.
HHANCHOR
DELIN
BCLC
EARTH DITCH
EARTH DITCH
WOODSLIGHT
FENCE
CH LNK BCLC
BCLC
ROWSHRUB
ANCHOR
DELIN
WOODS
LIGHT
WOODS
LIGHT
ANCHOR
POSTS
WOOD
POSTF.O.WIT.
BCLC
WOODS
HHHH
HH
HH
HH#2695
SNET
#2694
SNET
WG's
WG
WG
WG
HYD
MH
SAN
POST
WIT.
POST
WIT.
GG
BOX
ELEC
WOODS
LT.
BC
LC
BC
LC
BC
LC
BCLC
BCLC
#2693
SNET
#2692
SNET
POLE
CAM
MH's
SAN
HH
HH
CONC.BARR
POST
WIT.
HH
#
NO
BOX
ELEC
C.L.F.
C.L.F.
BM
BM
BM
BM
EARTH DITCH
PAD
CONC
B.M. E-2
DH S.E. COR. CONC. BASE
OF SPAN POLE
Elev. 40.24
NGVD 1988 NAD 83/2007
1
2
3
4
5
7
8
9
wlc37
wlc38
wlc39
wlc40
wlc41
wlc42
wlc43
wlc44
WETLANDSAPPROX.LOC.
RCP
18"
36"R
CP
36"R
CP
15"RCP
12"R
CP
24"R
CP
24"RCP
15'' R
CP
15'' C
MP
24'' RCP
15'' R
CP
15'' R
CP
15'' C
MP
24'' RCP
15'' R
CP
24'' RCP
24'' R
CP
12'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP15'' RCP
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
18'' C
MP
15'' R
CP
15'' RCP
15'' R
CP
15'' RCP
18'' R
CP
18'' RCP
15'' C
MP
8"C
MP
CH LNK.FENCE WALL
WA
LL
WATER
MAIN
APPR
OX.L
OC.
WATER
MAIN
APPR
OX.L
OC.
GAS
MAIN
APPR
OX.L
OC.
WAT
ER
MAIN
APP
RO
X.L
OC.
18'' RCP
18'' RCP
12'' R
CP
15'' R
CP
6"C
MP
15'' RCP
GRAN
GRAN
GRAN
GRAN
ROUTE 2 EASTBOUND
ROUTE 2 WESTBOUND
ROUTE 2 EASTBOUND
ROUTE 2 W ESTBOUND
BRUSH
RAN. A-1938
B.M. B-3
DH N.W. COR. CONC. FRAME HH
@ TOP OF RT 2 ON-RAMP
FROM HIGH ST.
Elev. 51.97
NGVD 1988 NAD 83/2007
B.M. B-4
DH S.W. COR. CONC. BASE ELEC.BOX
NEAR OVERHEAD SIGN "EXIT 4-
1.25 MILES" ON RT. 2
Elev. 38.40
NGVD 1988 NAD 83/2007
B.M. B-5
DH E. SIDE OF RND. BASE OF LT.
POLE 210' N. OF HIGHWAY ADVISORY
SIGN
Elev. 42.24
NGVD 1988 NAD 83/2007
B.M. D-2
DH S.W. COR. CONC. BASE OF ELEC.
BOX @ ENSIGN ST. &
RIVERSIDE DR.
Elev. 39.14
NGVD 1988 NAD 83/2007
(N/F)
CHD
(FND)
CHD
(FND)
CHD
(FND)CHD
N/FCHD
(FND)CHD
N/F
CHD
N/F
CHD
N/F
CHD
(FND)
CHD
N/F
CHD
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)CHD
(FND)CHD
N/FCHD
(FND)CHD
(FN
D)
CH
D
N/F
CH
D
N/F
CH
D
N/F
CHD
N/FCHD
A-3230
RAN.
RA
N. A-346
PINE
12"
PINE
15"
27+81
27+81 0+00
1+00
2+00 3+00 4+00 5+00 6+00 7+008+00
9+00
10+00
11+0011+2311+23
0+
00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+0012+7812+78
10+00
11+00
12+00
13+00
14+00
15+00
646+00
647+00
648+00
649+00
650+00
651+00
652+00
653+00
654+00
655+00
656+00
657+00
658+00
659+00
660+00661+00
662+00 663+00664+00
665+00
666+00
667+00
668+00
669+00
670+00
671+00
672+00
673+00
446+00
447+00
448+00
449+00
450+00
451+00
452+00
453+00
454+00
455+00
456+00
457+00
458+00
459+00
460+00461+00
462+00 463+00464+00
465+00
466+00
467+00
468+00
469+00
470+00
471+00
472+00
473+00
1985.73'
81.63'
448.99'
269.59'
0.0
4'
286.68'
356.02'
1985.73'
BC
LC
R-7
RAN. A-1941
#2725
SNET
1238
28.71
15"RCP1237
28.85
1246
29.58
1247
29.60
1264
30.60
1233
30.70
1236
30.87
1248
30.92
1245
30.97
1235
31.11
1244
31.211251
31.22
1234
31.261254
31.32
1242
31.36 1241
31.36
1240
31.38 1239
31.42
1255
31.57
1258
31.61
1134
31.64
12"NO FLR
1139
31.77
1130
31.79
1136
31.80
1133
31.82
1142
31.93
1135
31.93
1140
32.05
1129
32.09
1131
32.13
1141
32.15
1138
32.20
1243
32.27
1143
32.32
1132
32.43
1137
32.43
1187
32.43
1256
32.61
1122
32.69
1121
32.69
1257
32.69
1120
32.74
1127
32.75
1119
32.85
1128
32.93
1123
32.94
1249
33.05
1253
33.09
1124
33.10
1252
33.13
1118
33.13
1115
33.24
1125
33.34
1101
33.34
1160
33.34
1117
33.35
1250
33.36
1168
33.38
1261
33.48
1145
33.51
1149
33.53
1116
33.54
1104
33.60
1126
33.63
1172
33.66
1155
33.69
1103
33.74
1154
33.79
1171
33.80
1144
33.80
1260
33.81
1146
33.84
1147
33.86
1157
33.88
1175
33.88
1102
33.91
1114
33.92
1193_1
33.93
1193
1152
33.94
1178
33.98
1173
33.98
1156
33.99
BRUSH
BRUSH
1110
34.01
1183
34.02
1177
34.03
1174
34.07
1259
34.09
EN
SIG
N
ST
RE
ET
1271
34.14
1176
34.14
1153
34.17
1184
34.28
1232
34.29
1263
34.48
1180
34.48
1113
34.51
1158
34.57
1111
34.62
1148
34.65
1268
34.66
1159
34.77
R-4
1185
34.78
1112
34.78
1179
34.79
1262
34.79
1182
34.80
1231
34.82
1016
34.95
1181
35.08
1165
35.11
1166
35.29
1164
35.66
R-5
MH
SA
N
#3445
SNET
24
602
35.83
1015
35.85
1227
35.91
1211
36.20
1212
36.31
1221
36.39
1213
36.44
1163
36.45
1218
36.45
1202
36.46
1201
36.50
1205
36.641209
36.66
1203
36.66
1219
36.69
1204
36.85
1210
36.87
1220
37.02
1215
37.10
H
1214
37.25
1217
37.35
319
1216
37.43
GAS
1208
37.60
1162
37.75
1028
37.78
1206
37.86
1037
37.91
1018
37.96
1029
37.98
BRUSH
1036
38.14
1167
38.34
25
602
38.35
1106
38.39
BMB4 38.40
1197
38.40
BMB4 38.4
1150
38.41
1207
38.48
O/H SIGN
1027
38.51
1019
38.69
1161
38.76
6
38.81
CP-6B
1038
38.82
1026
38.86
1226
38.89
GAS
1108
39.24
1048
39.38
23
602
39.40
1030
39.52
1047
39.60
1035
39.81
1196
39.87
SIGN
SIGN
SIGN
1200
39.96
WALL
1071
40.28
BME2 40.24
1088
40.46
1040
40.62
H
1046
40.71
1039
40.78
1057
40.79
1045
40.87
1062
40.89
Project Number 42-317
City of East HartfordSheet 3 of 6
Boring Location Plan
Route 2 Safety Improvements
1055
40.92
1058
40.96
1059
40.99
SIGN
1054
41.05 1053
41.06
1064
41.07
5
41.10
CP-5B
1044
41.11
1025
41.15
1063
41.15
1060
41.17
1042
41.22
1269
41.23
1061
41.27
1109
41.29
1096
41.34
1009
41.35
SPURA-346
1099
41.37
BMA-346 1098
41.38
BMA-346
1056
41.57
1043
41.58
1065
41.58
1020
41.62
1051
41.64
1050
41.81
1049
41.83
1066
41.87
1041
41.94
1052
41.96
SIGN
1188
42.26
BMB5 42.24
1067
42.30
CL&P3770
1031
42.49
1068
42.68
1086
42.95
1087
42.96
1190
42.98
SIGN
1034
43.20
26
602
43.37
HIG
H ST
REET
1097
43.57
15"R
CP
15"R
CP
15'' R
CP
1085
43.66
1095
43.90
1073
44.07
1094
44.47
1024
44.86
1222
44.86
1080
44.95 1079
44.96
1083
45.00
PIPE VENT
1089
45.03
1084
45.66
1081
45.66
1032
45.76
1033
45.79
1021
45.90
1082
46.01
30
46.35
A-3230
1069
46.43
1023
46.72
1007
46.72
1022
46.75
1008
46.76
1006
47.40
1230
47.49
1189
47.96
1090
47.96
27
602
48.36
22
602
48.99
1223
49.69
1011
49.93
WALL
1005
50.07
1012
50.24
38
50.38
A-19381169
50.39
A-1938 1105
50.40
A-1938
1270
50.71
50.7141
50.71
A-1941 1228
50.72
A-1941
1091
51.03 10
51.03
SP-1010 1010
51.03
SPUR-1010
1224
51.41
1192
51.84
1191
51.84
1017
51.98
BMB3 51.97
WALL
1195
52.14
BMB6 52.13
1229
52.32
28
602
53.78 29
602
53.80
WALL
1194_1
54.63
SP-1194 1194
54.63
SPUR-1194
1225
54.67
1002
56.36
21
602
56.81
1003
56.88
FBR OPTC
1013
57.60
1004
61.45
20
602
61.68
1014
61.83
4
62.01
CP-4B
1070
62.51
E 10
29600
N 832400
E 10
30000
N 832400
E 10
30400
N 832000
E 10
312
00
N 8316
00
E 10
30800
N 8312
00
MA
TC
H
MA
RK
MA
TC
H
MA
RK
SH
EE
T 4
SH
EE
T
2
83
CO
ORDIN
ATE G
RID
AD
CO
NNECTIC
UT
Matc
h M
ark S
heet 2
Match M
ark S
heet 4
SIGN
WALL
O/
H
SIG
N
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
MBR
MBR
MBR
MBR
MBR
MBR MBR
MBR
MBR
MBR
3 CABLE GUIDE RAIL
3 C
ABLE
GUID
E R
AIL
3 CABLE G
UIDE R
AIL
MBR
MBR
MBR
MBR
GUID
E R
AIL
3 C
ABLE
3 CABLE GUIDE RAIL
GUIDE
RAIL
3 CABLE
C.L.F.
C.L.F.
O/
H SIG
N
TREESLI
GHT
GRAV
. DR.
GRAV
. DR.
GRASS
GRASS
GRASS
GRASS
GRASS
EARTH DITCH
EA
RT
H
DIT
CH
ON-R
AMP R
OUTE
2
WES
T
OFF-RAMP
BCLC
BC
LC
BC
LC
BC
LC
BC
LC
CO
NC
CU
RB
CO
NC
CU
RB
CONC CURB
CO
NC
CU
RB
WOODED
WOODED
LIGHTLY WOODED
WOODEDWOODED
WOODED
WOODED
WOODED
LIGHTLY WOODED
TREESLIGHT
TREESLIGHT
WO
ODED
WO
ODED
WOODED
WOODED
BIT.
BIT.
BIT.
BIT.
BCLC
BCLC
HYD
WOODED
WOODED
WOODED
BOXELEC
50
51
52
45
46
47
48
49
wlb6
wlb7
wlb8
wlb1
wlb2
wlb3
wlb4
wlb5
WETLANDS
APPROX.LOC.
POLECAMERA
BCLC
BCLCANCHOR
BIT.
DBL.MBR
DBL.MBR
DBL.MBR
DBL.MBR
DBL.MBR
DBL.MBR
TRAILERBIT
ANCHORBIT.
BCLC
BCLC
BRUSH
CO
NC
CU
RB
#2667
SNET
MBR
CURBGRAN
CURBGRAN
#00377BRIDGE
CO
NC C
URB
BCLC
BOXELEC
24"PINE36"MPL.
24"MPL.
CONC.
W/RAILCONC.WALL
W/RAILCONC.WALL
#2665
SNET
#2673
AT&T
BCLC
BCLC
#2710
SNET#6147
CL&P
#2684
SNET
#2685
SNET
#2686
SNET
CURBGRAN
GRAN.CURB
MH
ELEC.
MH
ELEC.BCLC
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)
CHD
(FND)C
HD
(FND)C
HD
(FND)
CHD
18'' R
CP
15'' R
CP
15'' R
CP15
'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
15''
RCP
15'' R
CP
15'' RCP
15'' RCP
15'' R
CP
15'' R
CP
15'' R
CP
15'' R
CP
CH LNK.FENCE
WG WG
HYD
MH
SAN
SAN.MH
18''
CMP
18'' C
MP
18'' C
MP
MH
SAN
12'' R
CP
12'' R
CP
4019
SPUR-
#2683
SNET
MH
ELEC. WG
12'' R
CPBUCKEYE PIPELINE
APPROX.LOC.GAS MAIN
WG WG
WG's
MH
SAN
MH
WATER
MH
ELEC.
MH'sSAN
12'' R
CP
RCP36"36"RCP
RC
P15"
10"
RC
P
15"RCP
15"
RC
P
15"RCP15"R
CP
15"RCP
15"R
CP
12'' CMP
15'' C
MP
HH'sPSTWD
HH
(FND)
MON
HH
HH
MH
SAN
15"
RC
P
15"RCP 15"RCP
15"R
CP
15"R
CP
15"
RC
P
15'' CMP
4040
SPUR-
15'' C
MP
15''RCE
TREES2 LARGE
APPROX.LOC. 20' SEWER R
IGHT OF WAY
(PER R.O.W
. MAP 42-15
SH. 3 OF 5
)
LIDCONC
4039SPUR-
18'' R
CP
PROPERTY)PRIVATE(MH ONTO MH?18"
RCP
HH
HH
HH
HH
HH
HH
HH
C.L.F.
INDICATING 33"RCP WITHIN
R.O.W.)
(R.O.W
MAP#42-15
SH.3 OF 5
18'' C
MP
10"PVC
10"P
VC
*NOT LOCATED*
18"CMP UNDER HIGHWAY)
INDICATING APPROX. LOC.
(R.O.W MAP#42-15 SH.2 OF 5
*NOT LOCATED*
(PER R.O.W
. MAP#42-15
SH. 3 OF 5
)
12'X10' C
ONCRETE BOX C
ULVERT
APPROX. LOC. P
OSSIBLE
6"
CP
P
CP 9B
CP 8B
CP 7B
5W-2
CP 10B
5W-1
CP 2
D
R.O.W. Map 42-15 Sh. 2 of 5R.O.W.
Map 4
2-15 Sh. 3 of 5
E=1,029,654.877
B.M. G-4
DH S.E. COR. METAL BASE OF
OVERHEAD SIGN (EXIT 5-5A-5B)
Elev. 33.28
NGVD 1988 NAD 83/2007
B.M. C-1
DH N.W, COR. CONC. BASE TO ELEC.
BOX JUST SOUTH OF OVERHEAD
SIGN (EXIT 2E-2W-3-4)
Elev. 41.06
NGVD 1988 NAD 83/2007
B.M. B-9
DH S.W. COR. CONC. BASE TO HH
@ TOP OF RT 2 ON-RAMP
FROM WILLOW ST. EXT.
Elev. 47.28
NGVD 1988 NAD 83/2007
B.M. B-8
DH N.W. COR. CONC. PAD 6'
NORTH OF BRDG.#00377
(RT. 2 E.)
Elev. 53.41
NGVD 1988 NAD 83/2007
B.M. B-10
DH S.E. COR. CONC. BASE TO ELEC.
BOX @ WILLOW ST. EXT. &
ON RAMP TO RT. 2 E.
Elev. 32.75
NGVD 1988 NAD 83/2007
B.M. B-7
DH EAST SIDE OF ROUND BASE TO
LT.POLE (RT.2 E.) OPPOSITE
ELECTRICAL STA.
Elev. 48.24
NGVD 1988 NAD 83/2007
B.M. D-1
DH S.E. COR. CONC. CURB TO
"CL" C.B.
Elev. 33.47
NGVD 1988 NAD 83/2007
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/FCHD
N/FC
HD
N/FC
HD
N/FC
HD
N/FC
HD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/F
CHD
N/FC
HD
N/F
CHD
N/F
CHD
N/F
CHD
BM
BM
BM
BM
BM
BM
BM
A-3231
RAN
Sh. 2 of 5
R.O.W. Map 42-15
ROUT
E 2
EAST
BOUN
D
ROUTE 2 W ESTBOUND
ROUTE 2 EASTBOUND
ROUTE 2 WESTBOUND
392.34'
N26°36'25"W N16°27'8"W
339.83'
N6°42'31"W
522.75'
N10°58'31"W
571.96'
456.34'
S27°36'23"E
514.12'
N56°4
5'5
5"W
371.29'
S58°5
4'8"E
473.26'
N56°2
7'4
3"W
422.73'
N33°24'49"
W
471.6
7'
N42°
38'14
"W
WALL
WALL
WALL
BCLC
BCLC
15+00 16+00 17+00 18+00 19+00 20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+0031+0431+04
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+0058+
1458+
14
60+
00
61+00
62+00
63+00
64+00
65+0066+00
67+00
68+00
69+00
70+00
71+00
5+00
6+00
7+00
673+00674+00
675+00 676+00677+00
678+00
679+00
680+00
681+00
682+00
683+00
684+00
685+00
686+00
687+00
688+00689+00 690+00
691+00
692+00
693+00
694+00
695+00
696+00
697+00
698+00
699+00
700+
00
701+
00
474+00475+00 476+00
477+00
478+00
479+00
480+00
481+00
482+00
483+00
484+00
485+00
486+00
487+00
488+00
489+00 490+00 491+00
492+00
493+00
494+00
495+00
496+
00
497+
00
498+
00
499+
00
500+
00
501+
00
501.90'
483.33'
291.06'
51.71'
5.5
4'
186.57'
581.42'
648.39'
270.24'
123.64'499.74'
Project Number 42-317
City of East Hartford Sheet 4 of 6Boring Location Plan
Route 2 Safety Improvements
B-2
R-18 833228.5
0 10
28965.2
5 8.5
1
R-18
R-7 832443.7
1 1029404.9
9 13.8
7
R-7
4135419
16.91
4131802
16.9618"RCP4136
41918.16
4132999 ST
19.50
4133999
19.58
4130802
19.616"CCMP 4134
419 ST22.84
4087602
23.64
8"C
MP
R-17 833367.5
4 10
29212.7
6 27.4
3
R-17
4046318
28.04CHD
4089613
28.19
4088613
28.19
4090802
28.73
4053602
28.79
BRUSH
4073323
30.04
4052601
30.31
4051601
30.32
4048601
30.80
4050602
31.00
4086304
31.18
4047304
31.26
4049602
31.29
4084602
31.29
4097106
31.64
B-1 8
33470.5
7 10
29379.3
8 31.9
2
B-2 833471.4 10
29428.8 49.5
B-1
LEAK.
BIT.
4055336
32.03
4114605
32.03
4062601
32.04
4074304
32.24
4054336
32.29
4059601
32.30
4112601
32.35
4057601
32.42
4061602
32.44
4113613
32.44
4115304
32.45
4096106 ST
32.48
4099336
32.55FOR GATE
4098336
32.63FOR GATE
4058602
32.734072
51632.75
BM-810
4117601
32.81
WIL
LO
W
ST
RE
ET
4116304
33.26
4137516
33.27BM-G4
4111404 ST
33.28
4100516
33.28BM-G-4
4060608
33.34
4125304
33.36
4127516
33.37BM-D-1
4063608
33.37
4085304
33.45
4011602
33.49
4110304
33.51
B-4 833477.12 10
29549.7
1 33.5
3
B-4
4118407
33.54SNET#2683
4043318
33.57CHD
4078613
33.64
4082401
33.67
4121429
33.67
4081401
33.67
4080401
33.87
4119318
33.87
4108601
33.96
HILLSON STREET
4039322
34.01SPUR-4039
R-8 834966.0
8 10
28618.0
9 34.0
3
R-8
4079401
34.05
4064304
34.08
4122401
34.21
4120409
34.47
4075304
34.48
4124404
34.56
4109613
34.59
4010318
34.61
4069614
34.61
4040322
34.63SPUR-4040
4106304
34.71
4068409
34.78
4076429
34.90
4123304
34.90
4105401
34.91
4007113
34.94
RIVERSIDE DRIVE
4009319
35.05TOW
N MON
4104401
35.10
38602
35.10
4107613
35.26
4065113 ST
35.27
4066113
35.29
4044319
35.30
4092304
35.50
4008322
35.51SPUR 4008
4004113 ST
35.52
4077612
35.54
4006113
35.54
4093304
35.61
4005113
35.65
4103308
35.79
4067113
35.96
4083318
35.99CHD
4070304
36.08
R-9 835070.17 10
28651.5
1 36.0
9
R-9
4095601
37.00
232238.03
CP-2D
232238.03
CP-2D
4038608
39.25
4034608
39.81
BRUSH
BRUSH
4036608
40.22
4035608
40.25
4056608
40.26
4037608
40.73
4033608
43.46
4032608
43.53
BRUSH
(FND)
CHD(FND)
MON
4008SPUR-
BM
4029608
45.15
4031608
45.51
4030608
45.56
4028608
45.694026608
45.84
4027608
45.84
BRUSH
BRUSH
15'' RCP
4022608
46.34
4091601
46.44
4024608
46.93
4023608
46.93
37602
47.04
4042516
47.27BM-
4025608
47.28
4094516
47.72SPUR-4040
532247.74
5W-1
51322
47.74CP-5W
-1
4013601
47.84
SIGN
34602
48.13
4020516
48.25BM-B7
4021601
48.39
4102601
48.93
4001601
49.36
832249.53
4101601
49.93
31602
49.95
3233
35602
50.07
4138601
50.72
4014601
50.74
4019322
51.35SPUR-4019
4000601
51.41
932251.62
CP-9B
4002601
51.72
30602
52.09
36602
52.30
4012516
52.33
732252.34
cp-7B
4018301
53.75
4003601
53.90
4015601
54.07
1032255.00
10B 1032255.00
CP-10B
4016608
55.06
4017608
55.09
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
E 1028400
N 834800
E 1029200
N 834800
E 1029600
N 834400
E 1028800
N 834400
E 1029200
N 834000
E 1029600
N 834000
E 1029600
N 833600
E 1029200
N 833600
MA
TC
H
MA
RK
SH
EE
T
3
MA
TC
H
MA
RK
SH
EE
T 5
83 COORDINATE GRID
AD
CONNECTICUT
Matc
h M
ark S
heet 3
Matc
h M
ark S
heet 5
S.T.H. 1
5 /
WIL
BU
R
CR
OS
S
HW
Y
DELIN.
24" MCE
FLAG PO
LE
DELIN.
DELIN.
DELIN.
DELIN.
4
5
6
7
16
17
18
19
318
318
318
318
318
318
318
318
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(FND)CHD
(FND)CHD
(FND)CHD
(FND)CHD
(FND)
CH
D
(FN
D)
CH
D
(FN
D)
CH
D
(FN
D)
CH
D
"C"C
B
"C"C
B
HH
HH
POSTWOOD
HH
BM
"C"C
B
"C"C
B
BM
BMBM
BM
BM
CO
NC. B
AR
R
CONC. BARR
CONC. BARR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBRMBR
BIT. PARKING
BIT. PARKING
LIGHT WOODS
GRASS
LIGHT WOODS
GRASS
GRASS
BCLC
BCLC
BCLC
BCLC
EARTH DITCH
EARTH DITCH
BCLC
"C"CB
DBL.
"C"CB
"C"CB
"C"CB
CB"CL"
"C"CB
"C"CB
"C"CB
"C"CB
"C"C
B
"C"C
B"C"C
B
"CL"CBDBL.
"C"CB
"C"CB
"C"C
B
"C"C
B
"CL"CB
"CL"CB
"CL"CB
"CL"CB
DIRT PATH
DIRT PATH
DIR
T P
AT
H
DIR
T
PA
TH
C.L.F. A
LO
NG
TO
P
BR. P
AR
A.
WOODEDWOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
EVERGREENS
EVERGREENS
LIGHTLY WOODED
LIGHTLY
WOODED
GRASS
GRASS
GR
ASS
GRASSGRASS
GRASS
GRASS
GRASS
GRASS
GRASS
MBR
MBR
MBR
MBR
MBR
MBR
MBRMBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
MB
R
MBR
MBR
GUIDE RAIL
3-CABLE
GUIDE RAIL3-CABLE
GUIDE
RAIL3-CABLE
GUIDE
RAIL
3-CABLE
HH
GRAVEL/DIR
T DRIV
E
GRAVEL/DI
RT DRI
VE
EART
H
DIT
CH
EART
H
DIT
CH
PAVED DITCH
PA
VE
D
DIT
CH
WOODEDLIGHTLY
EARTH DITCH
LIGHT WOODS
LIGHT WOODS
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BARR
CRASH
15" RCCE
MH
STM
CB
"CL"
CB
"CL"
CB
"CL"
BT=29.66
FL=31.51E
TF=35.21
"CL"CB
BT=39.28
FL=41.58
TF=44.98
"C"CB
FL=35.71
BT=8.53FL=9.43WFL=21.33SWTF=25.33STM MH
TF=37.20
8"SCUPPER
FL=37.38
TF=34.74
8"SCUPPER
TF=31.85
8"SCUPPER
FL=18
.01
"CL"C
B
FL=22.9
2
FL=22.8
5
FL=20.66
FL=24.3
5FL=2
1.25
BT=20.
48
FL=22.9
8SW
FL=22.9
8NE
TF=26.
78
"C"C
B
BT=20.
34
FL=22.3
4
TF=27.
14
"C"C
B
15'' R
CP
15'' C
MP
BT=22.
33
FL=23.6
3S
FL=23.7
3N
TF=29.
63
"C"C
B
BT=22.
01
FL=24.0
1
TF=28.
31
"C"C
B
15'' R
CP
RCP
15"
DE
LIN.
WOOD POST
DELIN.
WO
OD
PO
ST
DELIN.
"C"CB "C"CB
"C"CB
CB"C"
CB
"C"
CB
"C"
FL=(FILLED)
TF=29.45
"C"CB
BT=23.48
(FILLED)
FL=NE ELEV.
FL=26.48SE
TF=29.68
"C"CB
BT=23.31
FL=25.01NW
TF=29.31
"C"CB
BT=23.91
FL=24.01SW
FL=24.01SE
TF=29.41
"C"CB
CB"C"
CB"C"
BT=19.22FL=21.92TF=25.92"C"CB
BT=18.92FL=20.82TF=26.22"C"CB
LOCATEDPIPE NOTEND OF
LOCATEDPIPE NOTEND OF
BT=25.68
FL=27.08
TF=31.78
"C"CB
BT=23.87
FL=26.17SW
FL=25.47NE
TF=30.87
"C"CB
LOCATEDPIPE NOTEND OF
BT=26.85FL=28
.85SWFL=28
.55NETF=33.45"C"C
BBT=28.1
6FL=29.76TF=35.66"C"C
B
MH
STM
LOCATED
PIPE
NOT
END OF
LOC
ATED
PIP
E N
OT
EN
D
OF
LOC
ATED
PIP
E N
OT
EN
D
OF
BT=5.98FL=7.38EFL=6.48WTF=22.48"CL"CB
BT=4
2.5
8
FL=4
4.5
8W
FL=4
4.6
8E
TF=4
9.2
8
"C"C
B
BT=4
3.3
2
FL=4
4.8
2
TF=4
9.3
2
"C"C
B
BT=12.17
FL=17
.04
NW
FL=16
.87
W
FL=12
.47S
FL=12
.77
N
TF=2
0.2
7
"CL"C
B
BT=8.9
3
FL=S. C
AN'T SEE
FL=N. C
AN'T SEE
TF=2
1.23
ST
M
MH
"C"C
B
HH
HH
FL=32.85
BT=32.38FL=33.88TF=38.88"C"C
B
BT=31.24FL=33
.84TF=39.14"CL"CB
FL=30.00
BT=36.76FL=38.36TF=43.36"C"C
B
BT=26.
72
FL=28.2
2
TF=32.
92
"C"C
B
BT=26.
34
FL=28.2
4SW
FL=28.4
4NE
TF=33.
44
"C"C
B
BT=27.
42
FL=29.12
TF=33.
92
"C"C
B
FL=17.11
BT=28.
80FL=
30.9
0NE
FL=30.8
0SW
TF=37.
00"C
"CB
24"
MCE
FL=20.7
4
FL=22.0
4
12''RCE
12''RCE
12'' R
CP
15''MCE
18''M
CE
18'' C
MP
15'' R
CP
15'' R
CP
ENDWALLCONC.
15'' C
MP
24'' C
MP
30''
CMP
48''
CMP
24'' C
MP
15''
CMP
15'' CMP
24'' C
MP
18'' R
CP
15'' C
MP
15'' R
CP
15'' C
MP
15'' R
CP
15"
CM
P
HH HH
15'' C
MP
15'' C
MP
15"
CM
P
15"CMP
15"CMP
BT=27.29
FL=28.09
TF=44.39
DBL"C"CB
HH
HH
HH
18'' R
CP
24'' C
MP
12'' C
MP
15'' RCP
15'' C
MP
15'' C
MP
15'' C
MP
12'' R
CP
202SPUR-
197
SP
UR-
E=1,027,944.136 E=1,027,555.980
B.M. C-5
DH S.W. COR. CONC. BASE OF
LT.POLE @ EXIT 4 OFF-RAMP
RTE 2 E.
Elev. 40.267
NGVD 1988 NAD 83/2007
DH S.W. COR. CONC. FRAME OF HH
ADJACENT TO RTE 15 OVERPASS
B.M. G-1
DH S.E. COR. CONC. BASE OF
ELEC. BOX ADJACENT TO
RTE 15 OVERPASS
Elev.
NGVD 1988 NAD 83/2007
B.M. G-2
DH N.E. COR. CONC. BASE TO LT.
POLE. 3RD LT.POLE S.E. OF
RTE 15 OVERPASS
Elev.
NGVD 1988 NAD 83/2007
B.M. G-3
DH NORTH SIDE ROUND CONC.
BASE OF LT. POLE
Elev. 35.64
NGVD 1988 NAD 83/2007
ELEV 36.067
CP-1D
CP-3C
CP-4C
RAN A-
1969
RAN A-
3232
CP-1C
CP-2C
N/F
CHD
N/F
CHD
N/F
CHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
(FND)CHD
ROUTE 2
EASTBOUND
ROUTE 2 W ESTBOUND
ROUTE 2 W ESTBOUND
ROUTE 2 EASTBOUND
588.03'N26°03'54"W
OFF-R
AMP
298+00
299+
00
300+
00
301+
00
302+00
303+00
304+
00
304+85
304+85
72+00
73+00
73+52
73+52
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
701+00702+00
703+00
704+00
705+00
706+
00
707+
00
708+
00
709+
00
710+
00
711+
00
712+
00
713+
00
714+
00
715+00
716+00
717+00
718+00
719+00720+00 721+00
722+00
723+00
724+00
725+00
726+00
727+00
728+00
502+
00
503+
00
504+
00
505+
00
506+
00
507+
00
508+
00
509+
00
510+
00
511+00
512+00
513+00
514+00515+00 516+00
517+00518+00
519+00520+00
521+00522+00
523+00524+00
525+00526+00
527+00
528+00
529+00
280+00
281+00
282+00
283+00
284+00
250+00
251+00
HO
CK
AN
UM
RIV
ER
BRUSH
BRUSH
BRUSH
State Wetlands
BRUSH
BRUSH
State Wetlands
3234813
17.04
153814
17.11
4140802
18.0115"CMP
152714 st
19.45
3233602
20.27
49419 cl
20.38
50802
20.6615cmp
203815
20.74
151714 st
20.88
113302
21.12
3235613
21.23
111815
21.25
166714
21.46
165714 st
21.70
141999
22.00
47419
22.03 48419
22.05
3237318
22.11
39419 st
22.11
142999
22.25
159802
22.29
114324
22.43
191602
22.48
160999
22.67
196101 cl
22.69
192101 st
22.72
194101
22.78
158999
22.80
204324
22.80
150802
22.85
195101
22.88 193101
22.95
115999
23.05
121999
23.08
122999
23.11118
99923.18
120999 st
23.18
140999 st
23.20
117999
23.29
143999
23.32
45999
23.34 46419
23.38
40419
23.39
116999 st
23.43
157999
23.45
43999
23.5041999 st
23.55 44999 cl
23.60
42999
23.69
161999
23.72
BRUSH
144999
24.10
110324
24.18
108813
24.35
145999 cl
24.47
123999
24.59
156999 st
24.79
162999 cl
25.00
155419
25.07
154419 st
25.09
163419
25.15
164419 cl
25.16
4142612
25.33
148419
25.56
149419 cl
25.58
189608
25.66
119999
25.66
147419
25.69
146419 st
25.70
125419 st
25.82
127419
25.82
126419
25.83 124999
25.87
109324
25.92
187601
25.92
186601
26.22
188608
26.27
112601
26.78
185608
26.92
184608
26.93
130601
27.14
BRUSH
BRUSH
BRUSH
BM
190301
28.17
129601
28.31
201516
28.34bm-c3
131516
28.45bm-c2 4141
51628.46
BM-C2
20322
28.81cp-2c 2322
28.81cp-2c
BRUSH
SIGN
SIGNS
202322
29.03sp-202
3232322
29.03ran-a3232
32322
29.04A-3232
175601
29.31
176601
29.41
178608
29.44
180601
29.45
128601
29.63
179601
29.68
332229.74
cp-3c
106802
30.00
177608
30.50
181601
30.87
105324
31.30
101608
31.46
SIGNS
115601
31.78
R-10
100602
31.85
SIGN
BRUSH
100301
32.79
224802
32.85
229601
32.92
230601
33.44
182601
33.45
State Wetlands
State Wetlands
State Wetlands
232233.78
cp-1d 132233.78
cp-1d
223601
33.92
BRUSH
R-8
102608
34.57
51602
34.74
BRUSH
54602
35.21
222601
35.60
Project Number 42-317
City of East Hartford
Route 2 Safety Improvements
Sheet 5 of 6Boring Location Plan
167516
35.61g3
183601
35.66
53802
35.7112 ccmp
207601
35.72
132235.84
CP-1C 132235.84
cp-1c 232235.84
cp 1c 132235.84
R-9
24322
36.22cp-4c 4322
36.22CP-4C 4322
36.22cp-4c
101608
36.55
104324
36.97
221601
37.00
103608
37.19
52602
37.20
113802
37.38
200324
37.67
220608
37.91
199301
37.95fo
1969322
38.07a-1969 1969
32238.07
r-1969
"C"C
B
208608
38.37
HH
225601
38.88
216601
39.11
226602
39.14
218601
39.20
217601
39.24
107608
39.44
228608
39.61
209608
39.95
O/H SIGN
219516
40.24bm-c5 4143
51640.26
BM-C5
210608
40.75
215601
41.26d
CO
NC. B
AR
R
"C"CB
HH
BT=35.06
FL=37.86
TF=41.26
"C"CB
BT=34.11
FL=
FL=35.81NE
TF=39.11
"C"CB
BT=35.11
FL=35.61SW
FL= TF=39.21
"C"CB
BT=33.64
FL=35.44SW
FL=35.14NE
TF=39.24
"C"CB
BT=29.72
FL=31.82SW
FL=31.72NE
TF=35.72
"C"CB
HH
HH
HH's
LOCATEDPIPE NOTEND OF
BRUSH
BRUSH
211608
42.20
197322
42.89sp-197
227601
43.36
212601
44.39db
198324
44.49
112601
44.98
BRUSH
205601
49.28
206601
49.32
5
E 10
26400
N 836800
E 10
27200
N 836400
E 10
28000
N 836000
MA
TC
H
MA
RK
SH
EE
T
4
SH
EE
T 6
MA
TC
H
MA
RK
ON-
RA
MP
OFF-RAMP
CH
LN
K F
EN
CE
CH
LN
K
FE
NC
E
CH LNK FENCE
Federal Wetlands
Federal Wetlands
State Wetlands
Federal Wetlands
Federal Wetlands
Federal Wetlands
State Wetlands
Federal Wetlands
State Wetlands
Matc
h M
ark S
heet 4
Match M
ark S
heet 6
WALL
WALL
SIGN
O/
H SIG
N
BR
US
H
BRUSH
BRUSH
BC
LC
BC
LC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BC
LC
BC
LC
BC
LC
BC
LC
BCLC
OFF-RAMP
ON-RAMP
OFF-RAMP
MBR
MB
R
MB
R
MBR
MBR
MBR
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
MB
R
MBR
MBR
MBR
MBR
BCLC
BCLC
BCLC
BCLC
BCLC BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
BCLC
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
MB
R
MB
R
MB
R
MB
R
MB
R
MB
R
MB
R
MB
R
BC
LC
BC
LC
BC
LC
BC
LC
BC
LC
MBR
MB
R
MB
R
CO
NC.B
ARR
CO
NC.B
ARR
CO
NC.B
ARR
CO
NC.B
ARR
CONC.BARR
CONC.BARR
CONC.BARR
BC
LC
BC
LC
BC
LC
HH
HH
WOODED
WOODED
WOODED
GRASS
POLECAMERA
BUT POLE
X-WALK
ON POLE
ELEC.BOX
C.L.F.
GRASS
MBR
MBRMBR
MBRMBR
GRASS
GRASS
GRASS
GRASS
BIT
BIT
HH
HH
CO
NC.W
AL
K
HH
HH
MBR
MBR
MBR
MBR
MBR
HEAVY WOODS
HEAVY WOODS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GR
ASS
EVERGREENS
EVERGREENS
TREESLIGHT
WOODED
EARTH DITCH
EARTH DITCH
EARTH DITCH
EARTH DITCH
EARTH DITCH
CONC.BARR
CONC.BARR
CONC.BARR
CONC.BARR
BIT. DRIVE
TREES
LIGHT
MBR
MBR
MBRMBR
MBR
MBRMBR
MBR
MBR
MBR
MBR
MBR
MBR
MBR
PARKING
BIT.
DELIN.
100
130
124
318
318
318
0.00
0.00
0.00
MHSAN
MHSAN
MHELEC
101SPUR-
MHSAN
HH
MHSAN
HH
DELIN
OAK
24"
HH
DELIN
HH
MH
SAN
DELIN.
183
184
318
318
0.00
0.00
HH
HH
HH
HH
181
SPUR-
CH LNK.
FENCE
HH
HH
LIGHT WOODS
LIGHT WOODS
LIGHT
WOODS
GRASS
GRASS
GRASS
GR
ASS
HH
HH
HH
HH
HH
HH
W/LIGHT
EXIT SIGN
BRUSH
BRUSH
BR
US
H
BRUSH
BR
US
H
PO
ST
F.O.
HH
HH
HH
HHHH
#213
2SNET
#213
1SNET
#023
70BRIDGE
#02371BRIDGE
ANCEND
POSTSMETAL
CO
NC.
CU
RB
CR
BG
RN.
POLESPAN
PADCONCTC
BOX
CO
NC.W
AL
K
CO
NC.W
AL
K
BRIDGE
#4441
HELTCO
#02373
BRIDGE
#02372
BRIDGE
W/XW
ALK
SPAN POLE
POLE
SPAN
#2123
SNET
BO
XELEC
PO
LE
LT.
TC BOX
CONC.PAD
CO
NC,W
AL
K
MPL.15"
MHELEC.
HH
HH
BOXELEC
PADCONCPOST
F.O.
PADCONC
BOXELEC
BARR
CRASH
#4559
SNET
#2157
SNET
BIT
HH
MHELEC.
MH
ELEC.
POST
METALHH
GR
AN
CU
RB
END
FLARED
POLE
SPAN
HH
HH
BO
X
TC
HH
POLESPAN
HH
HH
#06110BRIDGE
POSTF.O.
HH
HH
DELIN
#06109BRIDGE
HH
MH
ELE
C.
HH
HH
PO
LE
SP
AN
HH
POLE
SPAN
HHCONC.PAD
BOX ON
ELEC
POSTF.O.
15''
CMP
15'' R
CP
15'' RCP
15'' R
CP
15'' R
CP
15'' R
CP
15'' RCP
RC
P
15"
15'' RCP24''
RCP
30'' RCP
30'' R
CP
18'' R
CP
15'' C
MP
15'' C
MP
12'' C
MP
N/F
OUTLET
N/F
OUTLET
CM
P
12"
12'' R
CP
ACCESS)(CAN'T
CM
P15
"
15" C
MP
15'' R
CP
15'' R
CP
N/FOUTLET
15'' RCP
18'' R
CP
15''
RCP
15'' R
CP
12'' RCP
12'' RCP
18'' R
CP
18'' R
CP
24'' R
CP
24'' C
MP
RCP12"
12'' C
MP
12'' C
MP
12'' R
CP
GA
S
MAIN
AP
PR
OX.L
OC
GA
S
MAIN
AP
PR
OX.L
OC
#2368ABRIDGE
(EXIT 2W)
ROUTE 2 WEST
#02374
BRIDGE TRAFFIC
STR. MH
N/F (B
URIED)
OUTLET
OVERPAVED
MH
12"
CL
AY
15"
CL
AY
48'' RCP
RCP18"
RCP12"
18'' RCP
18'' RCP
15'' RCP15'' RCP
12'' RCP
12'' R
CP
CH LNK.
FENCE
18'' CLAY
260
SPUR-
CH LNK.FENCE
PS 1
CP 10
C
CP 9C
CP 7C
take'S 63-384 (42-246) sheet 14A&28ATAKING LINE
R.O.
W. M
ap 4
2-15 S
h. 5 of 5
R.O.
W. M
ap 4
2-15 S
h. 5
of 5
JOYCE ST. NEAR BRDG. #02370
B.M. TP-27
CHISEL CUT S.W. COR. CONC.BASE
OF 3RD LT. POLE NORTH OF
BRIDGE #06109 (RT.2 EAST)
Elev. 30.45
NGVD 1988 NAD 83/2007
B.M. F-3
DH N.W. COR. CONC. BASE OF LT.
POLE 230' SOUTH OF OVERHEAD
SIGN (EXIT 2W-2E-3)
Elev. 44.44
NGVD 1988 NAD 83/2007
8C
CP
6CCP
5CCP
BM
BM
BM
BM
BM
BM
BM
CHD(FND)
N/FCHD
N/FCHD
(FND)CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/F
CHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
N/FCHD
(FND)CHD
N/FCHD
N/F
CHD
(FND)
CHD
N/F
CHD
(FND)
CHD
EVERGREENS
BR
US
H
729+00
730+00
731+00
732+00
733+00
734+00
735+00
736+00
737+00
738+00
739+00740+00
741+00 742+00 743+00 744+00 745+00 746+00 747+00 748+00 749+00750+00
751+00
752+00
753+00
754+00754+47754+47
530+00
531+00
532+00 533+00 534+00 535+00 536+00 537+00 538+00 539+00 540+00 541+00 542+00 543+00 544+00 545+00 546+00 547+00548+00
549+00
550+00
551+00
552+
00
553+
00
554+
00
555+
00
556+
0055
6+08
556+
08
285+00
286+00
287+00
287+99287+99
251+00
252+00
253+00
254+00
255+00
256+00
257+00257+66257+66
260+00
261+00262+00
263+00 264+00 265+00266+00
267+00
268+00
269+00
270+00
271+00
272+00
273+00
273+72
273+72
884.90'
560.80'
309.02'
1362.82'
416.3
2'
621.35'
37.61'
177.66'
99.51'
155.17'
BRUSH
1534
19 ST10.09
1584
19 CL
10.09
1544
1911.31
15980211.4
015"NO
FLR
1574
1911.4
3
15280212.2518"FLARED
1554
1913.55
170
419 ST
13.56
175
419 C
L13.7
1 18080113.7
112"NO
FLR
1564
1913.7
4
16933613.91
2334
1913.96
16433613.98
16199914.23
16299914.23
163999 C
L14.25
160999 ST14.25
174
419
14.25
171
419
14.4
4
18560214.54
242
81314.63
15"CM
P NO
FL
275
80214.7
4NO
FLARE
2344
1914.80
2324
1914.85
6
SIGNS
2354
1915.08
2314
19 ST15.23
272
419
15.44
271
419
15.45
145
60515.58
11260215.60
143
60515.62
146
60215.7
5
173
419
15.80
172
419
15.83
270
419
15.98
179
999 CL
16.1617
6999 ST16.17
144
61216.19
2364
1916.21
147
60816.23
178
99916.2417
799916.25
142
61316.35
273
419
16.41
18132216.4
1SPUR-181
2694
1916.4
1
2374
19 CL
16.45
140
60116.4
5
PARKING
PARKING
10132216.58SPUR-101
1374
0416.63
141
404
16.65
13961216.66
274
419 C
L16.7
0
12660116.81
16732316.85
1354
0416.87
12260116.92
1684
2917.00
12760117.00
12160117.02
1364
04
ST17.07
13861317.08
2684
1917.08
1344
0417.09
12561317.16
2654
19 ST17.18
1334
04
ST17.21
1_1
32217.34
PS-1
2674
1917.37
11610217.4
3
2664
1917.4
4
13261317.4
4
23032217.4
6SPUR-230
23999917.4
7
PIT
KIN
ST
RE
ET
WA
LL
261999 ST17.51
240
99917.51
26299917.52
264999 C
L17.52
16533617.52
238999 ST17.53
16633617.53
26399917.55
241
999 CL
17.56
114102 ST17.57
11510217.58
11710217.60
12360817.64
1184
0917.7
4
11361217.80
28051617.82
BMF2
13161317.99
1194
0918.4
8
WALL
11150118.7
224
"OAK
10260219.7
2
11032319.86
10332421.36
25481321.7
715"C
MP NO
FL
Project Number 42-317
City of East Hartford Sheet 6 of 6Boring Location Plan
Route 2 Safety Improvements
244
419
22.0424
54
1922.25
247
419
22.94
243
419 ST
23.03
246
419
23.05
248
419
23.36
20111323.7
7
249
419 C
L23.88
R-15
250999 ST24
.48
25299924
.51
25199924
.52 253999 C
L24
.54
BRUSH
20011326.37
15160127.32
15060127.55
12'' R
CP
70
60228.31dgendw
all
18261228.7
3
R-14
20280129.4
412"C
MP FLR
BRUSH
20380130.5612"C
MP NO
FL
10932430.61
E.
RIV
ER
DRIV
E
EX
TE
NSIO
N
21060831.24
20560331.26
19911331.38
TOWERVOLTAGE
HIGH
BRUSH
21760832.17
21460132.27
21360132.4
0
21260132.57
20860832.7
1
21160133.09
10760133.17
149
30133.28FBR O
PTC
148
60833.37
22260133.84
BRUSH
BRUSH
BRUSH
O/H SIGN
20760834
.08
10832434
.11
832234
.178C 832234
.17C
P-8C
332234
.17cp 8c
25660134
.18
21832434
.35
10632434
.44
10460134
.48
279
51634
.56BM
C8
6760134
.72
10560834
.73
6660134
.84
6960134
.92
6560134
.95
6460134
.95
20960835.35
R-16
6260535.4
8
22160135.4
9
6360135.63
6160135.7
7
BRUSH
12032336.07
22360236.10
6060436.32
12"RCP
12'' R
CP
22560236.65
26032236.7
0SPUR260
22460236.7
9
6860137.11
20660137.4
4
5960237.7
8
932238.369C
R-13TREESLIGHT
O/H SIGN
5580239.4
412 ccm
p
2266084
0.09
586024
1.45
2156014
1.50
BRUSH
73224
2.79
CP-7
C
1916034
3.09
JOYCE STREET
576124
3.76
BRUSH
276
6014
4.06
2556014
4.4
9
R-12
BRUSH
1903244
6.44
277
6014
6.96
BRUSH
BRUSH
278
6014
8.30
12'' C
MP
566014
9.80
1896014
9.86
53224
9.96C
P-5C
18832350.33
21632351.4
7
R-11
18660852.4
1
18760852.53
632252.55C
P-6C
20451652.57BM
-C7
E 1026000N 8384
00
E 1026000N 838000
E 1026400N 8384
00
MA
TC
H
MA
RK
SH
EE
T 5
O/
H
SIG
N
DELIN.
ROUTE 2 EASTBOUND
ROUTE 2 WESTBOUND
ROUTE 2 WESTBOUND
ROUTE 2 EASTBOUND
MBR
MBR
MBR
MBR
Matc
h M
ark S
heet 5
Appendix C
Final Edited Boring Logs
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
S-11
GRAVELLYSAND
SAND
SILTY CLAY
Brown c-f SAND, trace f gravel, trace silt
Brown c-f SAND, little f-m gravel, trace silt
Brown c-f SAND, trace silt
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
24
24
24
24
24
24
24
24
24
24
24
10
15
16
24
24
24
24
24
24
24
24
5 4 9 7
3 3 5 6
4 6 9 9
2 2 2 2
WOHWOH 1 2
WOHWOHWOH 2
WORWOHWOHWOH
WORWOHWOH 2
WORWORWOHWOH
WORWOH 1 2
WORWOR 2 3
Core Barrel Type:
Driller: N. Kenney
Engineer: R. Pion
Start Date: 1-24-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 50.5ft
Stat./Offset: 482+55/63' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833471
Easting: 1029379
Finish Date: 1-25-18 Bridge No.:
Hole No.: B-1
NOTES: The boring was drilled at night in 1 continuous work shift fromJanuary 24 to 25, 2018
Sheet1 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 31.9
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @17 after 0 hours
Gray varved SILT and CLAY
END OF BORING 50.5ft
Core Barrel Type:
Driller: N. Kenney
Engineer: R. Pion
Start Date: 1-24-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 50.5ft
Stat./Offset: 482+55/63' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833471
Easting: 1029379
Finish Date: 1-25-18 Bridge No.:
Hole No.: B-1
NOTES: The boring was drilled at night in 1 continuous work shift fromJanuary 24 to 25, 2018
Sheet2 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 31.9
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-20
-25
-30
-35
-40
-45
-50
-55
-60
-65
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @17 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
PAVEMENTSTRUCTURE
SILTY SAND
SAND
SILTY SAND
SAND
SILTY CLAY
Red brown f-c SAND, little silt
Red brown c-f SAND, trace silt
Red brown c-f SAND, trace silt
Red brown f-c SAND, little silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray brown varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
END OF BORING 41ft
24
24
24
24
24
24
24
24
24
13
12
15
12
12
12
12
24
24
14 10 9 12
27 13 11 15
18 14 20 21
12 12 17 13
9 9 12 15
12 10 12 18
4 5 4 10
WOH 2 2 1
WOH 1 1 1
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 1-21-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 41ft
Stat./Offset: 482+51/14' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833471
Easting: 1029429
Finish Date: 1-22-18 Bridge No.:
Hole No.: B-2
NOTES: Pavement structure consists of 6" of bituminous concretepavementThe boring was drilled at night in 1 continuous work shift from January21 to 22, 2018
Sheet1 of 1
No. ofSoil Samples: 9
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 49.5
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
45
40
35
30
25
20
15
10
5
0
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @6 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
GRAVELLYSAND
SAND
SILTY CLAY
Brown c-f SAND, little f gravel, trace silt
Brown c-f SAND, trace silt, with wood pieces
Brown c-f SAND, trace f gravel, trace silt
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
24
24
24
24
24
24
24
24
24
24
12
18
18
24
24
24
24
24
24
24
WOH 2 4 8
2 1 1 2
4 2 1 1
WOH 1 1 1
WOHWOHWOH 2
WOHWOH 1 2
WOHWOH 1 1
WOHWOH 1 2
WOH 1 2 2
WOH 1 1 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 3-1-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 52ft
Stat./Offset: 682+02/62' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833477
Easting: 1029550
Finish Date: 3-1-18 Bridge No.:
Hole No.: B-4
NOTES: Sheet1 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 33.5
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @10 after 0 hours
S-11 SILTY CLAY(con't)
Gray varved SILT and CLAY
END OF BORING 52ft
24 24WOH 1 2 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 3-1-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 52ft
Stat./Offset: 682+02/62' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833477
Easting: 1029550
Finish Date: 3-1-18 Bridge No.:
Hole No.: B-4
NOTES: Sheet2 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 33.5
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-20
-25
-30
-35
-40
-45
-50
-55
-60
-65
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @10 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SILTY SAND
SAND
SILTY SAND
SANDY SILT
Dark brown f-c SAND, some silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown f-c SAND, little silt
Brown f-c SAND, little silt
Gray SILT, little f sand
END OF BORING 32ft
24
24
24
24
24
24
24
14
16
17
24
24
24
22
1 1 1 2
5 4 3 4
2 1 2 3
11 6 6 7
1 1 2 3
WOHWOH 2 2
1 3 3 4
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-15-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 410+33/41' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 828327
Easting: 1034106
Finish Date: 2-15-18 Bridge No.:
Hole No.: R-01
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 25.1
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
25
20
15
10
5
0
-5
-10
-15
-20
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @13.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SILTY SAND
SAND
SILTY SAND
Brown f-c SAND, little silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown f-c SAND, trace silt
Brown c-f SAND, trace silt
Brown f-c SAND, some silt
Gray f-c SAND, little silt
END OF BORING 32ft
24
24
24
24
24
24
24
13
24
20
24
24
24
24
1 1 2 1
7 5 6 5
1 3 4 5
4 5 6 5
2 2 3 2
2 2 2 4
2 3 3 4
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-15-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 610+18/45' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 828415
Easting: 1034202
Finish Date: 2-15-18 Bridge No.:
Hole No.: R-02
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 30.7
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @14.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SILTY SAND
SAND
CLAYEYSILT
SILTY CLAY
Brown f-c SAND, little silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray SILT, trace clay, trace f sand
Gray SILT, little clay, trace f sand
Gray varved SILT and CLAY
END OF BORING 32ft
24
24
24
24
24
24
24
8
17
24
24
12
16
24
2 1 1 2
3 2 1 5
4 6 2 1
5 3 3 6
2 3 4 4
2 2 3 3
WOH 1 1 3
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-14-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 457+95/27' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 831469
Easting: 1030698
Finish Date: 2-15-18 Bridge No.:
Hole No.: R-04
NOTES: The boring was drilled at night in 1 continuous work shift fromFebruary 14 to 15, 2018
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 34.8
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @16.6 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SAND
SILTY SAND
SILTY CLAY
Red brown f-c SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray brown c-f SAND, some silt
Gray varved SILT and CLAY
Gray varved SILT and CLAY
END OF BORING 32ft
24
24
24
24
24
24
24
12
15
13
16
3
20
24
1 2 3 4
6 6 5 5
4 3 2 3
6 5 3 2
5 6 5 8
2 2 3 3
WOH 1 1 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-23-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 657+94/45' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 831570
Easting: 1030758
Finish Date: 2-23-18 Bridge No.:
Hole No.: R-05
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 35.8
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @7 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
PAVEMENTSTRUCTURE
SILTY SAND
GRAVEL
GRAVELLYSAND
SILTY CLAY
Brown c-f SAND, little silt
Dark gray c-f GRAVEL
Brown c-f SAND, little f-m gravel, trace silt
Brown c-f GRAVEL, and c-f SAND, trace silt
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
END OF BORING 31ft
24
24
24
24
24
24
24
12
1
11
12
24
24
12
7 7 7 5
2 2 2 2
1 2 1 2
2 2 3 3
2 2 2 2
WOHWOH 2 2
WOHWOHWOHWOH
Core Barrel Type:
Driller: N. Kenney
Engineer: R. Pion
Start Date: 1-23-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 473+21/301' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 832444
Easting: 1029405
Finish Date: 1-24-18 Bridge No.:
Hole No.: R-07
NOTES: Pavement structure consists of 2" of bituminous concretepavementThe boring was drilled at night in 1 continuous work shift from January23 to 24, 2018
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 13.9
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
10
5
0
-5
-10
-15
-20
-25
-30
-35
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @4.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SAND
CLAYEYSILT
SILTY CLAY
Red brown f-c SAND, trace silt, trace f gravel
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray SILT, little clay
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
END OF BORING 32ft
24
24
24
24
24
24
24
12
15
13
18
24
24
24
7 3 3 4
7 7 7 11
11 5 5 5
1 1 1 1
WOH 1 WOH 1
WOHWOHWOH 1
WOHWOHWOHWOH
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-14-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 500+60/49' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 834966
Easting: 1028618
Finish Date: 2-14-18 Bridge No.:
Hole No.: R-08
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 34.0
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @dry after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SAND
SILTY CLAY
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
Gray varved SILT and CLAY
END OF BORING 32ft
24
24
24
24
24
24
24
13
18
14
16
24
24
24
1 2 2 2
6 9 15 12
3 2 2 4
1 1 1 1
WOHWOH 1 2
WOHWOHWOH 2
WOHWOHWOH 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-28-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 500+87/56' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 835070
Easting: 1028652
Finish Date: 2-28-18 Bridge No.:
Hole No.: R-09
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 36.1
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @27 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
GRAVELLYSAND
SILTY SAND
SAND
Red brown c-f SAND, and c-f GRAVEL, trace silt
Red brown f-c SAND, little c-f gravel, little silt
Red brown f-c SAND, little c-f gravel, little silt
Red brown f-c SAND, little silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, little silt
Red brown f-c SAND, trace silt
END OF BORING 31ft
24
24
24
24
24
24
24
17
13
12
16
15
18
13
14 31 24 26
51 17 15 14
15 15 23 18
21 20 24 29
14 17 17 28
18 20 19 19
8 7 5 8
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-22-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 725+97/49' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 836664
Easting: 1026854
Finish Date: 2-22-18 Bridge No.:
Hole No.: R-10
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 31.8
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
30
25
20
15
10
5
0
-5
-10
-15
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
PAVEMENTSTRUCTURE
GRAVELLYSAND
SILTY SAND
Gray c-f SAND, some c-f gravel, trace silt
Red brown f-c SAND, little c-f gravel
Red brown f-c SAND, little c-f gravel
Red brown c-f SAND, and c-f GRAVEL, trace silt
Red brown c-f SAND, little f gravel, trace silt
Red brown f-c SAND, little f-m gravel, trace silt
Light brown f-c SAND, some silt
END OF BORING 31ft
24
24
24
24
24
24
24
18
16
10
6
15
12
16
41 23 25 30
21 26 59 35
13 11 8 15
23 8 31 51
6 3 2 4
6 3 2 1
15 10 12 24
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-27-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 735+33/28' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 837512
Easting: 1026471
Finish Date: 2-28-18 Bridge No.:
Hole No.: R-11
NOTES: Pavement structure consists of 5" of bituminous concretepavementThe boring was drilled at night in 1 continuous work shift from January27 to 28, 2018
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 52.1
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
50
45
40
35
30
25
20
15
10
5
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @18 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
PAVEMENTSTRUCTURE
SANDYGRAVEL
SILTY SAND
SANDYGRAVEL
GRAVELLYSAND
SILTY SAND
Gray red brown c-f GRAVEL, some c-f sand,trace silt
Red brown f-c SAND, little silt, trace f gravel
Red brown c-f SAND, little silt, trace f gravel
Red brown c-f GRAVEL, little f-c sand, trace silt,trace clay
Red brownc-f GRAVEL, little c-f sand, trace silt
Red brown c-f SAND, little c-f gravel, trace silt
Red brown f-c SAND, little silt, trace f gravel
END OF BORING 31ft
24
24
24
24
24
24
24
12
14
12
12
16
17
16
11 17 14 15
11 7 6 14
29 15 15 22
11 14 10 21
11 17 22 22
18 22 20 16
10 21 21 25
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-26-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 735+35/31' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 837531
Easting: 1026526
Finish Date: 2-27-18 Bridge No.:
Hole No.: R-12
NOTES: Pavement structure consists of 12" of bituminous concretepavementLost wash water return flow at 19'
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 44.7
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
40
35
30
25
20
15
10
5
0
-5
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SANDYGRAVEL
GRAVELLYSAND
SILTY SAND
Gray c-f GRAVEL, and c-f SAND, trace silt
Red brown c-f GRAVEL, some f-c sand, trace silt
Brown c-f GRAVEL, some f-c sand, trace silt
Black c-f SAND, some f-m gravel, trace silt
Brown c-f SAND, little f gravel, trace silt
Brown c-f SAND, little silt, trace f gravel
Gray f SAND, some silt
END OF BORING 31ft
24
24
24
24
24
24
24
17
15
16
10
15
17
10
71 28 29 24
16 16 33 24
12 17 16 13
9 8 11 9
16 14 22 24
16 34 24 21
7 6 6 7
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-28-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 743+01/29' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 838257
Easting: 1026272
Finish Date: 2-28-18 Bridge No.:
Hole No.: R-13
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 38.6
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
PAVEMENTSTRUCTURE
GRAVELLYSAND
SANDYGRAVEL
SILTY SAND
SANDYGRAVEL
SILTY SAND
Red brown c-f SAND, little f-m gravel, trace silt
Red brown c-f SAND, some m-f gravel, trace silt
Red brown f-m GRAVEL, some c-f sand, trace silt
Red brown gray f-c SAND, little silt, little f-mgravel with brick chips
Red brown c-f GRAVEL, some c-f sand, trace silt
Brown f-c SAND, some silt, trace clay
Gray brown f-c SAND, little silt
END OF BORING 31ft
24
24
24
24
24
24
24
18
15
15
14
15
12
53 30 31 36
21 20 14 11
11 10 15 19
14 11 11 13
12 10 8 10
4 4 4 3
2 2 1 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-27-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 743+05/44' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 838273
Easting: 1026342
Finish Date: 2-27-18 Bridge No.:
Hole No.: R-14
NOTES: Pavement structure consists of 9" of bituminous concretepavementLost wash water return flow at 9'
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 29.0
Fall:Fall:
Sampler Type/Size:
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.:
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type:
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
25
20
15
10
5
0
-5
-10
-15
-20
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @18 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
GRAVELLYSAND
CLAYEYSILT
SILTY SAND
Red brown c-f SAND, some f-m gravel, trace silt
Red brown c-f SAND, and f-c GRAVEL, trace silt
Gray c-f SAND, little f-m gravel, little silt
Red brown gray c-f SAND, some c-f gravel, tracesilt
Gray SILT, some clay
Gray SILT, some clay
Gray f-c SAND, little silt
END OF BORING 31ft
24
24
24
24
24
24
24
18
14
13
13
15
21
14
5 3 9 16
23 26 12 15
5 6 6 8
11 17 18 18
5 4 2 3
WORWORWOH 1
4 5 9 9
Core Barrel Type:
Driller: N. Kenney
Engineer: R. Pion
Start Date: 1-23-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 546+75/74 LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 838541
Easting: 1026121
Finish Date: 1-23-18 Bridge No.:
Hole No.: R-15
NOTES: Rollerbit through 2.5' boulder from 6.5 to 9 feet Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 24.1
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
20
15
10
5
0
-5
-10
-15
-20
-25
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @9 after 0 hours
0
S-1
S-2
S-3
C-1
S-4
S-5
S-6
S-7
PAVEMENTSTRUCTURE
GRAVELLYSAND
SANDYGRAVEL
GRAVELLYSAND
SANDYGRAVEL
SILTY SAND
Dark gray c-f SAND, and c-f GRAVEL, trace silt
Red brown f-c GRAVEL, and c-f SAND, trace silt
Red brown f-c GRAVEL, and c-f SAND, trace silt,with cobbles
Red brown c-f SAND, little f-m gravel, trace siltwith brick chips
Gray f-c GRAVEL, and c-f SAND, trace silt
Gray f-c SAND, some silt
Gray f-c SAND, some silt
END OF BORING 31ft
24
24
0
60
24
24
24
24
14
15
0
5
17
10
0
15
34 19 15 22
19 12 13 9
50/0 0 0 0
7 8 10 9
13 13 16 14
6 1 1 2
3 2 3 5
Core Barrel Type: NQ2
Driller: N. Kenney
Engineer: R. Pion
Start Date: 1-22-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 31ft
Stat./Offset: 546+58/58' RtTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 838541
Easting: 1026199
Finish Date: 1-23-18 Bridge No.:
Hole No.: R-16
NOTES: Pavement structure consists of 7" of bituminous concretepavementRoller bit ahead of casing from 5 ' to 9'
Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 35.4
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @21.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
GRAVELLYSAND
WOOD
GRAVELLYSAND
CLAYEYSILT
Dark brown c-f SAND, some f gravel, trace silt
Dark brown c-f SAND, trace f gravel, trace siltwith pieces of bituminous pavement
Dark brown c-f SAND, trace f gravel, trace silt
Black wood piece
Black c-f SAND, trace f gravel, trace silt
Gray SILT, little clay
Gray SILT, little clay
END OF BORING 32ft
24
24
24
24
24
24
24
8
16
16
8
16
24
24
1 2 5 5
3 2 1 3
3 2 2 2
2 4 4 4
1 4 2 2
1 1 1 1
WOH 1 1 1
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-28-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 23+81/141' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833368
Easting: 1029212
Finish Date: 2-28-18 Bridge No.:
Hole No.: R-17
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 27.4
Fall:Fall:
Sampler Type/Size:
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.:
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type:
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
25
20
15
10
5
0
-5
-10
-15
-20
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @dry after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
SILTY SAND
GRAVELLYSAND
SILTY CLAY
Brown f-c SAND, some silt
Gray f-c SAND, some silt
Gray brown c-f SAND, and f-c GRAVEL, trace siltwith brick chips
Gray varved CLAY, and SILT
Gray varved CLAY, and SILT
Gray varved CLAY, and SILT
Gray varved CLAY, and SILT
END OF BORING 32ft
24
24
24
24
24
24
24
14
20
13
24
24
24
24
WOH 1 2 1
WOH 1 1 1
1 6 7 6
WOHWOHWOHWOH
WOHWOHWOH 1
WOHWOH 1 2
WOH 1 1 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 1-22-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 32ft
Stat./Offset: 22+71/403' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 833229
Easting: 1028965
Finish Date: 1-22-18 Bridge No.:
Hole No.: R-18
NOTES: Sheet1 of 1
No. ofSoil Samples: 7
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 8.5
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 3.5" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
5
0
-5
-10
-15
-20
-25
-30
-35
-40
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @dry after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
PAVEMENTSTRUCTURE
SAND
SILTY SAND
WOOD
SAND
SILTY CLAY
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, little silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, little silt
Brown wood pieces
Brown c-f SAND, trace silt
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
20
16
19
20
18
18
6
17
20
14
13 13 13 19
11 13 17 17
9 15 15 23
10 15 19 21
12 17 25 32
12 15 15 15
21 7 18 18
7 7 10 11
7 7 8 13
2 3 3 3
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-21-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 427+91/31' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829709
Easting: 1033022
Finish Date: 2-21-18 Bridge No.:
Hole No.: RW-1
NOTES: Pavement structure consists of 5" of bituminous concretepavement on 5" of Portland cement concrete pavement
Sheet1 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 42.2
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
40
35
30
25
20
15
10
5
0
-5
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @13.5 after 0 hours
S-11 Gray varved SILT, and CLAY
END OF BORING 51ft
24 241 2 2 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-21-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 427+91/31' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829709
Easting: 1033022
Finish Date: 2-21-18 Bridge No.:
Hole No.: RW-1
NOTES: Pavement structure consists of 5" of bituminous concretepavement on 5" of Portland cement concrete pavement
Sheet2 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 42.2
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @13.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
PAVEMENTSTRUCTURE
SAND
SILTY SAND
SILTY CLAY
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray brown f SAND, some silt
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
17
12
16
15
17
10
16
17
16
18
17 11 14 13
9 14 15 16
14 17 17 18
9 9 8 13
19 19 18 20
12 12 12 13
3 2 1 3
4 4 3 4
2 2 4 8
4 3 3 4
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-9-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 106ft
Stat./Offset: 429+43/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829855
Easting: 1032975
Finish Date: 2-21-18 Bridge No.:
Hole No.: RW-2
NOTES: Pavement structure consists of 4.5" of bituminous concretepavement
Sheet1 of 3
No. ofSoil Samples: 21
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 41.0
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
40
35
30
25
20
15
10
5
0
-5
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19 after 24+ hours
S-11
UP-1
S-12
S-13
UP-2
S-14
UP-3
S-15
UP-4
S-16
UP-5
S-17
S-18
UP-6
S-19
SILTY CLAY(con't)
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
22
6
24
24
24
24
24
24
24
24
24
24
24
24
24
1 1 1 2
WOHWOHWOH 2
WORWORWOR 1
WORWORWORWOR
WORWORWORWOH
WOHWOHWOH 2
WOHWOHWOHWOH
WORWORWOR 3
WORWORWORWOR
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-9-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 106ft
Stat./Offset: 429+43/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829855
Easting: 1032975
Finish Date: 2-21-18 Bridge No.:
Hole No.: RW-2
NOTES: Pavement structure consists of 4.5" of bituminous concretepavement
Sheet2 of 3
No. ofSoil Samples: 21
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 41.0
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19 after 24+ hours
70
S-20
S-21
SILTY CLAY(con't)
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
END OF BORING 106ft
24
24
24
24
WORWORWOR 3
WORWORWOR 4
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-9-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 106ft
Stat./Offset: 429+43/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829855
Easting: 1032975
Finish Date: 2-21-18 Bridge No.:
Hole No.: RW-2
NOTES: Pavement structure consists of 4.5" of bituminous concretepavement
Sheet3 of 3
No. ofSoil Samples: 21
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 41.0
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
100
105
110
115
120
125
130
135
140
145
150
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-60
-65
-70
-75
-80
-85
-90
-95
-100
-105
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @19 after 24+ hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
PAVEMENTSTRUCTURE
SAND
SILTY SAND
SAND
SILTY CLAY
Red brown c-f SAND, trace silt
Red brown f-c SAND, trace silt
Red brown f-c SAND, trace silt
Brown f-c SAND, little silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
14
15
14
15
12
24
12
15
16
16
17 17 16 14
9 12 13 16
9 11 13 14
10 11 13 17
15 13 9 11
2 1 2 2
9 5 5 5
5 5 7 11
3 3 5 13
3 4 5 6
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-7-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 430+94/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829990
Easting: 1032911
Finish Date: 2-9-18 Bridge No.:
Hole No.: RW-3
NOTES: Pavement structure consists of 5.5" of bituminous concretepavement
Sheet1 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 38.8
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @13 after 0 hours
S-11 Gray varved SILT, and CLAY
END OF BORING 51ft
24 242 1 1 1
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-7-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 430+94/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 829990
Easting: 1032911
Finish Date: 2-9-18 Bridge No.:
Hole No.: RW-3
NOTES: Pavement structure consists of 5.5" of bituminous concretepavement
Sheet2 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 38.8
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-15
-20
-25
-30
-35
-40
-45
-50
-55
-60
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @13 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
PAVEMENTSTRUCTURE
GRAVELLYSAND
SILTY SAND
SAND
SILTY CLAY
Red brown c-f SAND, little m-f gravel, trace silt
Red brown f-c SAND, little silt
Red brown f-c SAND, little silt
Red brown f-c SAND, little silt
Red brown f-c SAND, little silt
Gray brown f-c SAND, little silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
15
18
15
18
19
16
15
20
17
22
17 20 15 17
11 16 18 20
18 18 20 25
12 19 25 24
17 19 19 19
3 2 3 2
10 10 10 14
6 9 8 11
2 3 3 4
2 2 3 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-6-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 76ft
Stat./Offset: 432.24/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 830101
Easting: 1032845
Finish Date: 2-7-18 Bridge No.:
Hole No.: RW-4
NOTES: Pavement structure consists of 5.5" of bituminous concretepavement
Sheet1 of 2
No. ofSoil Samples: 16
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 39.7
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
35
30
25
20
15
10
5
0
-5
-10
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @14 after 0 hours
S-11
S-12
S-13
S-14
S-15
S-16
SILTY CLAY(con't)
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
Gray varved SILT, and CLAY
END OF BORING 76ft
24
24
24
24
24
24
24
24
24
24
24
24
1 2 2 2
WOHWOHWOH 2
WOHWOHWOH 3
WOHWOHWOH 2
WORWOR 2 2
WORWORWOR 2
Core Barrel Type:
Driller: M. Childs
Engineer: R. Pion
Start Date: 2-6-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 76ft
Stat./Offset: 432.24/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 830101
Easting: 1032845
Finish Date: 2-7-18 Bridge No.:
Hole No.: RW-4
NOTES: Pavement structure consists of 5.5" of bituminous concretepavement
Sheet2 of 2
No. ofSoil Samples: 16
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 39.7
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-15
-20
-25
-30
-35
-40
-45
-50
-55
-60
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @14 after 0 hours
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
PAVEMENTSTRUCTURE
GRAVELLYSAND
SILTY SAND
SAND
SILTY SAND
SILTY CLAY
Brown f-c SAND, little f-m gravel, little silt
Brown f-c SAND, litte silt
Brown f-c SAND, litte silt
Brown f-c SAND, litte silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Brown c-f SAND, trace silt
Gray brown f-c SAND, some silt
Gray varved SILT, and CLAY
24
24
24
24
24
24
24
24
24
24
16
15
16
18
12
13
13
10
17
15
13 20 20 21
9 16 20 26
16 24 28 32
9 15 14 13
6 7 7 10
6 4 4 10
12 10 9 9
4 6 7 10
7 7 7 13
5 7 8 7
Core Barrel Type:
Driller: B. Perry/ M. Childs
Engineer: R. Pion
Start Date: 1-30-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 434+10/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 830246
Easting: 1032732
Finish Date: 2-6-18 Bridge No.:
Hole No.: RW-5
NOTES: Sheet1 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 44.3
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
0
5
10
15
20
25
30
35
40
45
50
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
40
35
30
25
20
15
10
5
0
-5
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @8 after 0 hours
S-11 Gray varved SILT, and CLAY
END OF BORING 51ft
24 222 3 3 3
Core Barrel Type:
Driller: B. Perry/ M. Childs
Engineer: R. Pion
Start Date: 1-30-18 Route No.: 2
Inspector: G. Arzt
Hammer Wt.:
Earth: 51ft
Stat./Offset: 434+10/15' LftTown: East Hartford, Connecticut
Project No.: 0042-0317 Northing: 830246
Easting: 1032732
Finish Date: 2-6-18 Bridge No.:
Hole No.: RW-5
NOTES: Sheet2 of 2
No. ofSoil Samples: 11
Rock: 0ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sa
mp
leT
yp
e/N
o.
Total Penetration in
Surface Elevation: 44.3
Fall: 30in.Fall: in.
Sampler Type/Size: SS 1 3/8" ID
Ge
ne
raliz
ed
Str
ata
De
scri
ptio
n
De
pth
(ft)
50
55
60
65
70
75
80
85
90
95
100
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pe
n. (i
n.)
Re
c. (i
n.)
Ele
va
tio
n (
ft)
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
Blows onSampler
per 6 inches
Project Description: Roadway Improvements
Groundwater Observations: @8 after 0 hours
Appendix D
Generalized Soil Profile
3-CABLE GUIDE RAIL
3-CABLE GUIDE RAIL
MBR
MBR
BCLC
BCLC
BCLC
BCLC
BM BM
"C"CB
BASECONC
DBL.HH
"C"CB
STREAM)TO DRAIN TO BOT HAS HOLE(NO PIPES-
C.L.F.
BASECONC
HH
POLECAM.
CB"C
"
FL=20.7
3
HH's
6"C
MP
"CL"CB
"CL"CB
"CL"
CB
15'' R
CP
15'' R
CP
BT=44.
15FL=TF=4
7.45
"CL"
CB
BT=37.26
FL=40.06SE
FL=39.56NE
TF=43.16
"CL"CB
BT=15.61TRUE IN CBBT=35.21@GRATETF=39.71"CL"CB
BT=33.30TF=38.45"C"CB
CP 5B-1
CP 1B
N/FCHD
100+00100+00100+00 101+00 102+00
103+00
104+00
105+00
8+009+00 10+00 11+00 12+00
13+00
14+00
15+00
16+00
627+00 628+00 629+00 630+00 631+00
632+00
633+00
634+00427+00 428+00 429+00 430+00 431+00
432+00
433+00
434+00
435+
00
02040
Elevation
-20-40-60-80
RW-1 RW-2RW-3 RW-4 RW-5
02040
Elevation
-20-40-60-80
13,13,13,1911,13,13,17
9,15,15,23
10,15,19,2112,17,25,3212,15,15,15
21,7,18,187,7,10,117,7,8,132,3,3,31,2,2,2
SILTY SANDSAND
SILTY CLAY
SAND
SILTY CLAY
SILTY SAND
SILTY CLAY
SAND
SILTY CLAY
SAND
SAND SILTY SAND
SAND
Silty Sand
RW-1
RW-4
Project Number 42-317
Route 2 Improvements City of East Hartford
Generalized Soil Profile at Proposed Retaining Wall
Plan View
Elevation View
Proposed Retaining Wall
Elev 32.5Elev 29.5
Elev 25.5Elev 28.5
ST
A 4
27+84
ST
A 4
28+14
ST
A 4
28+44
ST
A 4
28+74
ST
A 4
29+04
ST
A 4
29+10
ST
A 4
29+40
ST
A 4
29+70
ST
A 4
30+00
ST
A 4
30+24
ST
A 4
30+54
ST
A 4
30+84
ST
A 4
31+14
ST
A 4
31+44
ST
A 4
31+74
ST
A 4
32+04
ST
A 4
32+34
ST
A 4
32+64
ST
A 4
32+94
ST
A 4
33+24
ST
A 4
33+54
ST
A 4
33+84
ST
A 4
33+92
17,20,15,17
12,19,25,24
3,2,3,2
6,9,8,112,3,3,42,2,3,2
1,2,2,2
11,16,18,2018,18,20,25
17,19,19,19
10,10,10,14
WOH,WOH,WOH,2WOH,WOH,WOH,3WOH,WOH,WOH,2WOR,WOR,2,2
WOR,WOR,WOR,2
BRUSH
BRUSH
Pewterpot Brook Culvert
WOODS
WETLANDSAPPROX.LOC.
WETLANDSAPPROX.LOC.
WETLANDS
APPROX.LOC.
WETLANDS
APPROX.LOC.
BRUSHBRUSH
BRUSH
- location shown is the culvert section directly below face of proposed wall)Pewterpot Brook Twin 8' x 6' Concrete Box Culverts (note skewed culvert
RW-3
602
Silty Sand
17,11,14,139,14,15,16
14,17,17,189,9,8,13
19,19,18,2012,12,12,13
3,2,1,34,4,3,42,2,4,84,3,3,41,1,1,2
WOH,WOH,WOH,2
WOR,WOR,WOR,1
WOR,WOR,WOR,WORWOR,WOR,WOR,WOH
WOH,WOH,WOH,WOH,WOR,WOR,WOR,3
WOH,WOH,WOH,2
WOR,WOR,WOR,3WOR,WOR,WOR,WOR
WOR,WOR,WOR,4
RW-2
Note: The numbers are from SPT testing for each soil sample and represent the number of blows it took to drive the split spoon sampler each 6" interval
O/
H
SIG
N
602
13,20,20,21
9,16,20,26
16,24,28,32
9,15,14,136,7,7,710
6,4,4,1012,10,9,94,6,7,107,7,7,135,7,8,72,3,3,3
17,17,16,14
9,12,13,16
9,11,13,1410,11,13,1715,13,9,112,1,2,29,5,5,55,5,7,113,3,5,133,4,5,6
2,1,1,1
RW-5
602
12'' RCP
25+
00
BU
CK
EY
E
PIP
ELIN
EA
PP
RO
X.L
OC.G
AS
MAIN
MB
R
Proposed 36" Jacked Pipe483+
00
#2685
SN
ET
MB
R
Elevation Elevation
12'' RCP
DB
L.M
BR
18'' CMP
MH
SA
N24+
00
30 30
18'' CMP
WO
OD
ED
20
10
0
-10
-20
40
50
20
10
0
-10
-20
40
50
SA
N.M
H
W
G
682+
00
Gravelly SandGravelly Sand
HY
D
482+
00
18'' CMP
18'' C
MP
N/
FC
HD
and ClayVarved Silt
and ClayVarved Siltand Clay
Varved Siltand ClayVarved Silt
522.7
5'
N6°42'3
1"
W
Silty Sand LayersSand and
Sand SandSand
Project Number 42-317Generalized Soil Profile at
Proposed Pipe Jacking
Route 2 Improvements City of East Hartford
B-2
B-1 B-4
RTE 2 WB BRTE 2 EB B LL
+
+
+ ++
+
14,10,9,12
EXIS
TIN
G
R.O.W.
EXIS
TIN
G
R.O.W.
EXIS
TIN
G
R.O.W.
27,13,11,15
18,14,20,215,4,9,7
WOH,2,4,812,12,17,133,3,5,6 2,1,1,236" RCP36" RCP4,6,9,9 4,2,1,19,9,12,152,2,2,2
WOH,1,1,112,10,12,18WOH,WOH,1,2 WOH,WOH,WOH,24,5,4,10
WOH,WOH,WOH,2 WOH,WOH,1,2WOH,2,2,1WOR,WOH,WOH,WOH WOH,WOH,1,1WOH,1,1,1
WOR,WOH,WOH,2 WOH,WOH,1,2FULL SECTION 482+63WOR,WOR,WOH,WOH WOH,1,2,2
WOR,WOH,1,2 WOH,1,1,2WOR,WOR,2,3 WOH,1,2,2
B-2
4111404 ST33.28
411030433.51
410860133.96
410961334.59
B-4
410630434.71
410761335.26
4105
B-1
SIG
N
Appendix E
Laboratory Testing Data
Client: Connecticut Department of TransportationProject: Roadway Improvements Route 2Location: East Hartford, CT Project No: GTX-307811Boring ID: ---Sample ID: ---Depth : ---
Sample Type: ---Test Date: 03/27/18Test Id: 446133
Tested By: jbrChecked By: emm
Specific Gravity of Soils by ASTM D854
printed 4/3/2018 5:24:30 PM
Boring ID Sample ID Depth Visual Description SpecificGravity
Comment
RW-2
RW-2
RW-2
RW-2
UP- 3
UP- 4
UP- 5
UP- 6
61-63 ft
66-68 ft
71-73 ft
79-81 ft
Moist, dark gray clay
Moist, dark gray silt
Moist, dark gray clay
Moist, dark gray clay
2.88
2.92
2.95
2.92
Notes: Specific Gravity performed by using method B (oven dried specimens) of ASTM D854
Moisture Content determined by ASTM D2216.
Client: Connecticut Department of TransportationProject: Roadway Improvements Route 2Location: East Hartford, CT Project No: GTX-307811Boring ID: RW-2Sample ID: UP-3Depth : 61-63 ft
Sample Type: tubeTest Date: 03/22/18Test Id: 446126
Tested By: camChecked By: emm
Test Comment: ---Visual Description: Moist, dark gray claySample Comment: ---
Atterberg Limits - ASTM D4318
printed 4/3/2018 5:23:29 PM
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Pla
stic
ity In
dex
Liquid Limit
Plasticity Chart
ML or OLCL-ML
CL or OL
MH or OH
CH or OH
"A" Line
"U" Line
Symbol Sample ID Boring Depth NaturalMoisture
Content,%
LiquidLimit
PlasticLimit
PlasticityIndex
LiquidityIndex
Soil Classification
UP-3 RW-2 61-63 ft 48 45 26 19 1.2
Sample Prepared using the WET method
Dry Strength: VERY HIGH
Dilatancy: SLOW
Toughness: LOW
Client: Connecticut Department of TransportationProject: Roadway Improvements Route 2Location: East Hartford, CT Project No: GTX-307811Boring ID: RW-2Sample ID: UP-4Depth : 66-68 ft
Sample Type: tubeTest Date: 03/30/18Test Id: 446127
Tested By: camChecked By: emm
Test Comment: ---Visual Description: Moist, dark gray silt Sample Comment: ---
Atterberg Limits - ASTM D4318
printed 4/3/2018 5:23:30 PM
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Pla
stic
ity In
dex
Liquid Limit
Plasticity Chart
ML or OLCL-ML
CL or OL
MH or OH
CH or OH
"A" Line
"U" Line
Symbol Sample ID Boring Depth NaturalMoisture
Content,%
LiquidLimit
PlasticLimit
PlasticityIndex
LiquidityIndex
Soil Classification
UP-4 RW-2 66-68 ft 49 49 28 21 1
Sample Prepared using the WET method
Dry Strength: VERY HIGH
Dilatancy: SLOW
Toughness: LOW
Client: Connecticut Department of TransportationProject: Roadway Improvements Route 2Location: East Hartford, CT Project No: GTX-307811Boring ID: RW-2Sample ID: UP-5Depth : 71-73 ft
Sample Type: tubeTest Date: 03/30/18Test Id: 446128
Tested By: camChecked By: emm
Test Comment: ---Visual Description: Moist, dark gray clay Sample Comment: ---
Atterberg Limits - ASTM D4318
printed 4/3/2018 5:23:30 PM
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Pla
stic
ity In
dex
Liquid Limit
Plasticity Chart
ML or OLCL-ML
CL or OL
MH or OH
CH or OH
"A" Line
"U" Line
Symbol Sample ID Boring Depth NaturalMoisture
Content,%
LiquidLimit
PlasticLimit
PlasticityIndex
LiquidityIndex
Soil Classification
UP-5 RW-2 71-73 ft 54 58 27 31 0.9
Sample Prepared using the WET method
Dry Strength: VERY HIGH
Dilatancy: SLOW
Toughness: LOW
Client: Connecticut Department of TransportationProject: Roadway Improvements Route 2Location: East Hartford, CT Project No: GTX-307811Boring ID: RW-2Sample ID: UP-6Depth : 79-81 ft
Sample Type: tubeTest Date: 03/27/18Test Id: 446129
Tested By: camChecked By: emm
Test Comment: ---Visual Description: Moist, dark gray clay Sample Comment: ---
Atterberg Limits - ASTM D4318
printed 4/3/2018 5:23:30 PM
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Pla
stic
ity In
dex
Liquid Limit
Plasticity Chart
ML or OLCL-ML
CL or OL
MH or OH
CH or OH
"A" Line
"U" Line
Symbol Sample ID Boring Depth NaturalMoisture
Content,%
LiquidLimit
PlasticLimit
PlasticityIndex
LiquidityIndex
Soil Classification
UP-6 RW-2 79-81 ft 54 60 30 30 0.8
Sample Prepared using the WET method
Dry Strength: VERY HIGH
Dilatancy: SLOW
Toughness: LOW
1.0
Appendix F
USGS Mapping
I 91
Main
Silver
I 84
Wilbur Cross
State Hwy 2
Fo
rbe
s
Nott
US Hwy 44
Brewer
Burnside
State Hwy 15
US
Hw
y 5
Park
US Hwy 6
Naubuc
Hills
Roberts
Maple
Jordan
Pitkin
Willow
Sta
te H
wy
3
Griswold
Hartford
Brown
Forest
Hebron
Weth
ers
field
Otis
Pratt
River
Prosp
ect
Elliott
I 384
Maxim
Preston
Governor
Colt
Lo
cu
st
Win
dsor
Bond
Fra
nklin
Victoria
WellesChurch
Airport
Capitol
Sila
s D
eane
BrittCam
pfie
ld
Ho
use
Run
way
Barker
Albany
Gard
en
Court
Hig
h
Mather
Chester
Wawarme
State
Putnam
Long Hill
Sisson
BurkeOconnell
Elm
Gilman
Ma
rke
t
Murp
hy
Adelaide
Oa
k
Walnut
Bra
inard
Wa
shin
gto
n
Spring
Pearl
Hil ls
i de
HandelStandish
Wyllys
Oxford
Sheldon
Bro
ok
Sandra
Ledyard
Great Meadow
Larrabee
Woodmont
Jefferson
Douglas
Penney
Re
se
rve
McKee
Lancaster
Nutmeg
Plain
Central
Merc
er
Spruce
Bradley
May
Monro
e
Huyshope
Lin
dberg
h
Retreat
Hudson
Judd
Yale
Cherry
Naomi
Chipper
Trum
bull
Van Dyke
Risley
Rive
rside
New
London
Whiting
Meadow
Ridgewood
Glastonbury
Hanmer
Go
od
win
Pa
rk
Cromwell
SO Meadow
Hu
bba
rd
Crescent
Roosevelt
Short
Scotland
River Drive
Liebert
South
Robbins
Pleasant
Porter
Connector
Ner
Sterling
Bliss
Pent
Broad
Jerry
Exit 5
Wells
Stonington
Eaton
East
Ensign
Mill
East S
ervic
e
Jayce
Perim
ete
r
Great Hill
Olmsted
Center
Tolland
Hartland
Allyn
Willys
Ser
vice
Cambridge
Hillcrest
Garvan
King
Hart
Unnamed Street
Jay
New
Mahl
Holly
Ely
Benton
Lilac
Talcott
MorrisonD
arlin
Hillsdale
Rev
erend
Moo
dy
Shelly
Woo
ste
r
Nye
Myrtle
Evans
Marsh
Hollister
Folly Brook
Gold
State Hwy 94
Latim
er
Exit 86
Shadycrest
Be
llevu
e
Woodycrest
Ripley
Michael
Laure
l
Cedar
Grove
Alb
ert
Orchard
Landers
Driveway
Whitn
ey
Vill
age
Gle
nn
Belden
Elm
er
Suffolk
Westway
Eco
logy
Lincoln
Booth
Daniel
Wilcox
Rivermead
Phelp
s
Francis
Willia
m
Murray
Richard
Holland
Heath
er
Linwood
Carter
Exit 3
Bantle
Ramp
Blinn
Morris
Lexin
gto
n
Wildflower
Moore
Burb
ank
Brookside
Wro
bel
Sawka
Rankin
Parker
Riverview
Crosby
Greene
Old Roberts
Higbie
Winding Brook
Winding
Kinsley
Barbonsel
Terry
Front
Earl
Point
Sch
ool
Su
nse
t R
idg
e
Taylo
r
Warre
nLorraine
Lew
is
Willa
rd
Knoll
Trinity
Hendricxsen
Butternut
Nelson
Sq
uir
e
Gin
ger
Exit 5
B
Kelley
Donald
Willow Street
Exit 7
Greenwood
Exit 56
Howard
Wakefield
Exit 51
Salem
Exit 6
Gould
Uncas
Exit 2
9A
Balsam
Cumberland
Bre
wste
r
Jenrich
Exit 90
Un
nam
ed
Str
ee
t
Gro
veM
ain
Pratt
I 84
Main
South
I 91
Hartford
Trinity
Hillcrest
Driveway
Brown
Hig
h
Phelps
State Hwy 15
Park
Driveway
US
Hw
y 5
Garden
Ledyard
Wilbur Cross
Maple
Sta
te H
wy
3
Driveway
Elm
Driv
ew
ay
Fines
Till
Till
Sand overlying Fines
Fines
Water
Alluvium overlying Fines
Alluvium overlying Fines
Till
Sand
Till
Water
Till
Sand
Water
Till
Sand
Sand overlying Fines
Alluvium overlying Fines
Sand overlying FinesSand overlying Fines
Sand overlying Fines
Sand
Till
Water
Alluvium overlying Fines
Fines
Till
Fines
Till
Till
Water
Sand and Gravel
Sand overlying Fines
Fines
Water
Sand and Gravel
Sand overlying Fines
East Hartford
Hartford
Glastonbury
Wethersfield
Project No 42-317Route 2 Safety Improvements and Pavement Resurfacing
4
Surficial Soils Geology
0 6,400 12,8003,200Feet
Approximate Project Location
I 91
Main
Silver
I 84
Wilbur Cross
State Hwy 2
Fo
rbe
s
Nott
US Hwy 44
Brewer
Burnside
State Hwy 15
US
Hw
y 5
Park
US Hwy 6
Naubuc
Hills
Roberts
Maple
Jordan
Pitkin
Willow
Sta
te H
wy
3
Griswold
Hartford
Brown
Forest
Hebron
Weth
ers
field
Otis
Pratt
River
Prosp
ect
Elliott
I 384
Maxim
Preston
Governor
Colt
Lo
cu
st
Win
dsor
Bond
Fra
nklin
Victoria
WellesChurch
Airport
Capitol
Sila
s D
eane
BrittCam
pfie
ld
Ho
use
Run
way
Barker
Albany
Gard
en
Court
Hig
h
Mather
Chester
Wawarme
State
Putnam
Long Hill
Sisson
BurkeOconnell
Elm
Gilman
Ma
rke
t
Murp
hy
Adelaide
Oa
k
Walnut
Bra
inard
Wa
shin
gto
n
Spring
Pearl
Hil ls
i de
HandelStandish
Wyllys
Oxford
Sheldon
Bro
ok
Sandra
Ledyard
Great Meadow
Larrabee
Woodmont
Jefferson
Douglas
Penney
Re
se
rve
McKee
Lancaster
Nutmeg
Plain
Central
Merc
er
Spruce
Bradley
May
Monro
e
Huyshope
Lin
dberg
h
Retreat
Hudson
Judd
Yale
Cherry
Naomi
Chipper
Trum
bull
Van Dyke
Risley
Rive
rside
New
London
Whiting
Meadow
Ridgewood
Glastonbury
Hanmer
Go
od
win
Pa
rk
Cromwell
SO Meadow
Hu
bba
rd
Crescent
Roosevelt
Short
Scotland
River Drive
Liebert
South
Robbins
Pleasant
Porter
Connector
Ner
Sterling
Bliss
Pent
Broad
Jerry
Exit 5
Wells
Stonington
Eaton
East
Ensign
Mill
East S
ervic
e
Jayce
Perim
ete
r
Great Hill
Olmsted
Center
Tolland
Hartland
Allyn
Willys
Ser
vice
Cambridge
Hillcrest
Garvan
King
Hart
Unnamed Street
Jay
New
Mahl
Holly
Ely
Benton
Lilac
Talcott
MorrisonD
arlin
Hillsdale
Rev
erend
Moo
dy
Shelly
Woo
ste
r
Nye
Myrtle
Evans
Marsh
Hollister
Folly Brook
Gold
State Hwy 94
Latim
er
Exit 86
Shadycrest
Be
llevu
e
Woodycrest
Ripley
Michael
Laure
l
Cedar
Grove
Alb
ert
Orchard
Landers
Driveway
Whitn
ey
Vill
age
Gle
nn
Belden
Elm
er
Suffolk
Westway
Eco
logy
Lincoln
Booth
Daniel
Wilcox
Rivermead
Phelp
s
Francis
Willia
m
Murray
Richard
Holland
Heath
er
Linwood
Carter
Exit 3
Bantle
Ramp
Blinn
Morris
Lexin
gto
n
Wildflower
Moore
Burb
ank
Brookside
Wro
bel
Sawka
Rankin
Parker
Riverview
Crosby
Greene
Old Roberts
Higbie
Winding Brook
Winding
Kinsley
Barbonsel
Terry
Front
Earl
Point
Sch
ool
Su
nse
t R
idg
e
Taylo
r
Warre
nLorraine
Lew
is
Willa
rd
Knoll
Trinity
Hendricxsen
Butternut
Nelson
Sq
uir
e
Gin
ger
Exit 5
B
Kelley
Donald
Willow Street
Exit 7
Greenwood
Exit 56
Howard
Wakefield
Exit 51
Salem
Exit 6
Gould
Uncas
Exit 2
9A
Balsam
Cumberland
Bre
wste
r
Jenrich
Exit 90
Un
nam
ed
Str
ee
t
Gro
veM
ain
Pratt
I 84
Main
South
I 91
Hartford
Trinity
Hillcrest
Driveway
Brown
Hig
h
Phelps
State Hwy 15
Park
Driveway
US
Hw
y 5
Garden
Ledyard
Wilbur Cross
Maple
Sta
te H
wy
3
Driveway
Elm
Driv
ew
ay
Portland Arkose
East Hartford
Glastonbury
Hartford
Wethersfield
Project No 42-317Route 2 Safety Improvements and Pavement Resurfacing
4
Bedrock Geology
0 6,400 12,8003,200Feet
Approximate Project Location
Appendix G
Special Provisions
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
ITEM #0601651A - RETAINING WALL (SITE NO. 1)
ITEM #0601652A - RETAINING WALL (SITE NO. 2)
ITEM #0601653A - RETAINING WALL (SITE NO. 3)
ITEM #0601654A - RETAINING WALL (SITE NO. 4)
ITEM #0601655A - RETAINING WALL (SITE NO. 5)
ITEM #0601656A - RETAINING WALL (SITE NO. 6)
ITEM #0601657A - RETAINING WALL (SITE NO. 7)
ITEM #0601658A - RETAINING WALL (SITE NO. 8)
ITEM #0601659A - RETAINING WALL (SITE NO. 9)
ITEM #0601660A - RETAINING WALL (SITE NO. 10)
ITEM #0601661A - RETAINING WALL (SITE NO. 11)
ITEM #0601662A - RETAINING WALL (SITE NO. 12)
ITEM #0601663A - RETAINING WALL (SITE NO. 13)
ITEM #0601664A - RETAINING WALL (SITE NO. 14)
ITEM #0601665A - RETAINING WALL (SITE NO. 15)
ITEM #0601666A - RETAINING WALL (SITE NO. 16)
ITEM #0601667A - RETAINING WALL (SITE NO. 17)
ITEM #0601668A - RETAINING WALL (SITE NO. 18)
ITEM #0601669A - RETAINING WALL (SITE NO. 19)
ITEM #0601670A - RETAINING WALL (SITE NO. 20)
ITEM #0601671A - RETAINING WALL (SITE NO. 21)
ITEM #0601672A - RETAINING WALL (SITE NO. 22)
ITEM #0601673A - RETAINING WALL (SITE NO. 23)
ITEM #0601674A - RETAINING WALL (SITE NO. 24)
ITEM #0601675A - RETAINING WALL (SITE NO. 25)
ITEM #0601676A - RETAINING WALL (SITE NO. 26)
ITEM #0601677A - RETAINING WALL (SITE NO. 27)
ITEM #0601678A - RETAINING WALL (SITE NO. 28)
ITEM #0601679A - RETAINING WALL (SITE NO. 29)
ITEM #0601680A - RETAINING WALL (SITE NO. 30) Description: This item will consist of designing, furnishing and constructing a retaining wall in the location, grades, and to the dimensions and details shown on the contract drawings, and in accordance with these specifications. The retaining wall on this project shall be built with and backfilled using lightweight fill as described in this special provision. Retaining Wall Selection: The wall chosen shall be selected from the list shown on the contract drawings. The contract drawings may detail a cast-in-place reinforced concrete retaining wall. This type of retaining wall may also be used as an option. The Engineer will reject any proposed retaining wall that is not listed on the contract drawings.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
The list on the contract drawings is for all proprietary retaining walls that are appropriate for each site. This list does not warrant that the walls can be designed to meet either the dimensional, structural, or geotechnical constraints at each site. The following is a list of the Department's current approved proprietary retaining walls, no other proprietary retaining walls will be allowed:
NOTE: SEE THE CONTRACT DRAWINGS FOR THE SPECIFIC WALLS
THAT ARE ACCEPTABLE FOR EACH SITE.
Prefabricated Modular Walls 1. Doublewal-Standard Module Doublewal 173 Church Street Yalesville, CT 06492 (203) 269-3119
2. T-Wall Retaining Wall System The Neel Company 8328-D Traford Lane Springfield, VA 22152 (703) 913-7858
Mechanically Stabilized Earth (MSE) Walls
1. Reinforced Earth Walls The Reinforced Earth Company 133 Park Street North Reading, MA 01864 (978) 664-2830
2. Retained Earth The Reinforced Earth Company 1372 Oldbridge Road, Suite 101 Woodbridge, VA 22192 (703) 499-9818
Design: Design computations are not required for the cast-in-place wall detailed on the contract drawings except for any temporary earth retaining systems included in the lump sum item. The Contractor shall submit working drawings and design computations for temporary earth retaining systems in accordance with Article 7.14.03. 1 - Design Computations: If the Contractor chooses one of the proprietary wall options, he is fully responsible for the design, detailing and additional specifications required. The actual designer of the retaining wall shall be a qualified Professional Engineer licensed in the State of Connecticut. The designer must have designed at least three proprietary walls within the last three years.
2 - Designer's Liability Insurance: The Designer of the proprietary retaining wall shall secure and maintain at no direct cost to the Department, a Professional Liability Insurance Policy for errors and omissions in the minimum amount of One Million Dollars ($1,000,000). The Designer may, at his election, obtain a policy containing a maximum Two Hundred Fifty Thousand Dollars ($250,000) deductible clause, but if he should obtain a policy containing such
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
a clause, the Designer shall be liable to the extent of the deductible amount. The Designer shall obtain the appropriate and proper endorsement to its Professional Liability Policy to cover the indemnification clause in this contract as the same relates to negligent acts, errors or omissions in the work performed by the Designer. The Designer shall continue this liability insurance coverage for a period of three years from the date of the acceptance of the work by the agency head as evidenced by a certificate of acceptance issued to the contractor or for three years after the termination of the contract, whichever is earlier, subject to the continued commercial availability of such insurance. The Designer shall supply the certificate of this insurance to the Engineer prior to the start of construction of the wall. The designer’s insurance company shall be licensed in the State of Connecticut. 3 - Preliminary Submissions for Proprietary Retaining Walls: Prior to the start of fabrication or construction, the Contractor shall submit to the Engineer a design package, which shall include, but not be limited to the following: a. Detailed Plans:
• Plan sheets shall be approximately 24" x 36".
• Stamped by a licensed Professional Engineer (Connecticut).
• Full plan view of the wall drawn to scale. The plan view must reflect the horizontal alignment and offset from the horizontal control line to the face of the wall. Beginning and ending stations, all utilities, signs, lights, etc. that affect the construction along with all property lines and easement lines adjacent to the wall shall be shown.
• Full elevation view of the wall drawn to scale. Elevation views should indicate the elevation at the top and bottom of walls, horizontal and vertical break points, and the location of finished grade.
• Typical cross sections drawn to scale including all appurtenances. Detailed cross section should be provided at significant reinforcement transitions such as wall ends.
• Details of all wall components and their connections such as the length, size and type of reinforcement and where any changes occur; modular component and facing details including reinforcing steel and reinforcement connections; joint material including geotextile filter location and horizontal joint compression material, etc.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
• Drainage details for embankment backfill including attachment to outlets shown on contract drawings.
• Details of any roadway drainage pipe projecting through the wall, or any attachments to the wall. Details of the treatment of drainage swales or ditches shown on the contract drawings.
• Design parameters used along with AASHTO references.
• Material designations for all materials to be used.
• Detailed construction methods including a quality control plan. Construction quality control plans should include monitoring and testing frequencies (e,g, for setting batter and maintaining horizontal and vertical control). Construction restraints should also be listed in the details. Specific requirements for construction around obstructions should be included.
• Details of parapet attachments where required along with any lighting and/or signing requirements.
• Details of Architectural Treatment where required.
• Details of Temporary Earth Retaining Systems where required.
• Details of wall treatment where the wall abuts other structures.
• Treatment at underground utilities where required. b. Design Computations:
• Stamped by a licensed Professional Engineer (Connecticut).
• Computations shall clearly refer to the applicable AASHTO provisions as stated in the Notes on the Contract Drawings.
• Documentation of computer programs including all design parameters.
• The design shall conform to the criteria listed below. c. Construction Specifications:
• Construction methods specific to the proprietary retaining wall chosen. These specifications should include construction limitations including
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
vertical clearance, right-of-way limits, etc. Submittal requirements for materials such as certification, quality, and acceptance/rejection criteria should be included. Details on connection of modular units and connection of reinforcements such that assurance of uniform stress transfer should be included.
• Any requirements not stated herein. The submissions for proprietary retaining walls shall be treated as working drawings in accordance with Section 1.05 amended as follows: a. 6 sets of each submission shall be supplied to the Department b. The Contractor shall allow 21 days for the review of each submission. If subsequent submissions are required as a result of the review process, 21 days shall be allowed for review of each submission. No extensions in contract time will be allowed for the review of these submissions. 4 - Final Submissions for Proprietary Retaining Walls: Once a proprietary retaining wall design has been reviewed and accepted by the Department, the Contractor shall submit the final plans. The final submission shall include one set of full size (approximately 24" x 36") mylar sheets and five sets of full size blue line copies. The final submission shall be made within 14 days of acceptance by the Department. No work shall be performed on the retaining wall until the final submission has been received. Acceptance of the final design shall not relieve the Contractor of his responsibility under the contract for the successful completion of the work. The actual designer of the proprietary retaining wall is responsible for the review of any shop drawings prepared for the fabrication of the wall. One set of full size blue line copies of all approved shop drawings shall be submitted to the Department's permanent records. 5 – General Design Requirements a. All designs for proprietary walls and temporary earth retaining systems (if required) shall conform to the latest edition of the American Association of State Highway and Transportation Officials (AASHTO) Standard Specifications for Highway Bridges including the latest Interims published except as noted otherwise herein. b. The wall design shall follow the dimensions of the wall envelope shown in the contract drawings.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
For all proprietary walls, the top of the leveling pad or reinforced concrete toe footing shall be located at or below the bottom of the footing elevation shown on the contract drawings. If no footing elevation is shown, the minimum wall embedment shall be four feet as measured to the top of the leveling pad or toe footing.
If steps at the bottom of the wall are required, they shall be kept at or below the footing elevation shown on the contract drawings. Steps in addition to those shown on the contract drawings will be permitted at no additional cost to the Department. c. The wall shall be designed to be within all property lines and easement lines shown on the contract drawings. If additional work areas are necessary for the construction of the proprietary retaining wall, the Contractor shall be responsible for obtaining the rights from the affected property owners. Copies of these rights shall be forwarded to the Department. d. The top of the wall shall be at the top of the wall elevations shown on the contract drawings. Where coping or barrier is utilized, the wall face panel shall extend up into the coping or barrier a minimum of two inches. The top of the face panels may be level or sloped to meet the top of the wall line noted. e. Cast-in-place concrete will not be an acceptable replacement for areas noted by the wall envelope, except for minor grouting of pipe penetrations and leveling required for coping or traffic barrier. f. The wall shall be designed for a minimum live load surcharge equal to two feet of soil at a unit weight of 125 pounds per cubic foot. If there are specific live load surcharges acting on the wall, they shall also be accounted for. The minimum equivalent fluid pressure used to design the wall shall be 33 pounds per cubic foot per linear foot of wall. g. If stated on the contract drawings, the wall shall be designed for seismic forces according to the AASHTO Specifications. h. If the wall is detailed with a concrete parapet, the top two courses of prefabricated modular walls units shall be designed to support a transverse railing load of 10 kips. The 10 kip load may be distributed over the length of the parapet section between joints, but not exceeding 20 feet. Computations that verify the stability of the top two courses of the modular units shall be submitted to the Engineer. The detailing and reinforcement in the parapet section above the gutterline or finished grade, including any light standard attachments, shall be as shown on the contract drawings.
i. The wall shall be designed to accommodate all roadway drainage and drainage structures as shown on the contract drawings.
j. The maximum allowable bearing pressure of the soil shall be as shown on the contract
drawings. The bearing pressure stated assumes a uniform pressure distribution. If additional
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
soils information is required by the Contractor’s designer, it must be obtained by the Contractor and will not be reimbursed by the Department.
k. Parapet and Moment slab Design:
• General requirement for parapet and moment slab design:
The parapet and moment slab shall be designed in accordance the AASHTO Standard LRFD Bridge Design Specifications – 2007, including the latest interim specifications and errata, amended as follows:
The parapet shall be designed and constructed of precast or cast-in-place concrete. The moment slab shall be designed and constructed of cast-in-place reinforced concrete. Above the finished grade, the parapet dimensions, concrete and reinforcement shall conform to the Department’s retaining wall parapet details. Below the finished grade, the parapet shall be designed to resist the forces specified in Table A13.2-1 of the AASHTO LRFD Bridge Design Specifications for the parapet types indicated below:
Parapet Type AASHTO LRFD Test Level
42” High Standard Parapet TL-4
32” High Standard Parapet TL-3
Sidewalk Parapet TL-3
The moment slab and its connection to the parapet shall be designed to resist, at a minimum, a transverse load equal to 133% of Ft. The length of the structural connection between parapet and moment slab assumed to resist transverse force Ft
shall be the distance between parapet joints but not greater than 30 feet in any case. The length of the moment slab assumed to resist sliding and overturning may exceed parapet joint spacing but shall be no greater than 30 feet in any case. The moments shall be summed about the front face of the wall facing. All resistance factors shall be taken as 1.0. The internal angle of friction for the soil shall be assumed to be 34 degrees unless otherwise shown on the contract plans. Minimum concrete cover for reinforcing steel shall be 2 inches for top bars and 3 inches for bottom bars
• Precast Concrete Parapet Alternative:
Precast parapet sections shall be no less than 8 feet in length.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
Parapets shall include details for shear transfer between adjacent units by either concrete shear keys or steel dowels as follows:
o Shear keys when used shall be monolithically cast in each parapet section or joint location. Shear keys shall be located vertically within the top 32 inches of the parapet and shall be a minimum of 24 inches in length with a tapered width between 3 and 4 inches, and a minimum interlock depth of 2 inches.
o Steel dowels when used shall be a minimum of 3 in number, smooth,
14 inches long minimum, and 1 inch diameter at each parapet interface. Steel dowels shall be located in each parapet joint and spaced approximately 1 foot apart vertically. Steel dowels shall be positioned to project equally into each adjoining parapet sections and shall be detailed to avoid impeding shrinkage and thermal movements. Bond breakers may be used with steel dowels for that purpose. Alternatively, pockets may be cast to receive steel dowels in adjacent parapet units. Pocket widths shall not exceed steel dowel diameters by more than ½ inch.
Moment slabs for precast concrete parapets shall be structurally continuous throughout the overall wall length. Construction joints are permitted in moment slabs.
• Cast-in-Place Parapet Alternative:
The minimum distance between parapet joints shall be 20 feet. Expansion and contraction joints shall be placed in accordance with Section 11.6 of the AASHTO LRFD Bridge Design specifications. Expansion and contraction joints shall be located a minimum of 10 feet from the nearest edge of a catch basin. Expansion and contraction joints shall be located a minimum of 6 feet from the centerline of light standard anchorages and junction boxes. Preformed expansion joint filler, ½ inch thick, shall be installed at the expansion joints in the parapet. Parapets shall include details for shear transfer between sections by way of concrete shear keys or steel dowels as follows:
o Shear keys when used shall be monolithically cast in each parapet section or joint location. Shear keys shall be located vertically within the top 32 inches of the parapet and shall be a minimum of 24 inches in length with a tapered width between 3 and 4 inches, and a minimum interlock depth of 2 inches.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
o Steel dowels when used shall be a minimum of 3 in number, smooth, 14 inches long minimum, and 1 inch diameter at each parapet interface. Steel dowels shall be located in each parapet joint and spaced approximately 1 foot apart vertically. Steel dowels shall be positioned to project equally into each adjoining parapet sections and shall be detailed to avoid impeding shrinkage and thermal movements. A bond breaker shall be used with steel dowels for that purpose.
Moment slabs for cast-in-place parapets shall extend to the outside face of the retaining wall as shown on the plans. Moment slabs for cast-in-place parapets shall be structurally continuous throughout the overall wall length except at parapet contraction and expansion joint locations where longitudinal reinforcing within 2 feet of the wall face shall be discontinuous for the purpose of crack control. All remaining longitudinal reinforcing in moment slabs at parapet expansion and contraction joint locations shall be continuous. A vertical 1” deep chamfer on the exposed face of the moment should be provided in locations directly under parapet expansion and contraction joints. Construction joints are permitted in moment slabs for cast-in-place concrete.
6 - Design Requirements for Mechanically Stabilized Earth Walls: The design shall consider the internal stability of the wall mass as outlined below. The global stability of the structure, including slope stability, bearing capacity safety, and total and differential settlement is the responsibility of the Department. a. Hydrostatic Forces: Unless specified otherwise, when a design high water surface is shown on the contract drawings at the face of the wall, the design stresses calculated from that elevation to the bottom of wall must include a three foot minimum differential head of saturated backfill. In addition, the buoyant weight of saturated soil shall be used in the calculation of pullout resistance. b. Backfill: The friction angle of the backfill used in the reinforced fill zone for the internal stability design of the wall shall be assumed to be 34 degrees unless shown otherwise on the contract drawings. The friction angle of the in-situ soils shall be assumed to be a maximum of 30 degrees unless otherwise shown on the Contract drawings. The maximum assumed unit weight of lightweight fill material used to determine the factors of safety for sliding and overturning shall be 50 pounds per cubic foot. c. Soil Reinforcement: The soil reinforcement shall be the same length from the bottom to the top of each wall section. The reinforcement length defining the width of the entire reinforced soil mass may vary with wall height along the length of wall. The minimum length of the soil reinforcement shall be seventy percent of the wall height, H, or eight feet, whichever is greater.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
The soil reinforcement length shall be sufficient to satisfy the sliding, overturning and pullout factors of safety designated in AASHTO Specifications and the minimum lengths required for external stability as recommended by the Department. Calculation of stresses and pullout factors of safety shall be in accordance with the AASHTO Specifications for Highway Bridges. Calculations for stresses and factors of safety shall be based on assumed conditions at the end of the design life. The design life shall be 75 years unless otherwise indicated on the contract drawings. The design of soil reinforcements shall account for section loss as outlined in the AASHTO Specifications. All soil reinforcement shall be hot dipped galvanized. 7 - Design Requirements for Prefabricated Modular Walls: The general design of the wall shall be according to the AASHTO Specifications. The design shall consider the stability at each level of modules. The global stability of the structure, including slope stability, bearing capacity safety, and total and differential settlement is the responsibility of the Department. a. Hydrostatic Forces: Unless specified otherwise, when a design high water surface is shown on the contract drawings at the face of the wall, the design stresses calculated from that elevation to the bottom of wall must include a three foot minimum differential head of saturated backfill. In addition, the buoyant weight of saturated soil shall be used in the calculation of pullout resistance. b. Backfill: The friction angle of the backfill shall be assumed to be 34 degrees if sufficient amounts of pervious backfill are used. The friction angle of the in-situ soils shall be assumed to be a maximum of 30 degrees unless otherwise shown on the Contract drawings. c. Infill: The maximum assumed unit weight of infill material used for determining the factor of safety for overturning shall be 100 pounds per cubic foot. If Doublewal modules are to be filled with crushed stone, the maximum assumed unit weight of the infill shall be 80 pounds per cubic foot. d. Safety Factors: The minimum factors of safety shall be as specified in the AASHTO Specifications amended as follows. The factor of safety for T-Wall shall be 1.5 for pullout of the concrete stem. Shear keys are not to be included in these computations. Only resisting forces developed beyond the theoretical failure plane may be used in these computations.
Materials:
1 - Cast-in Place Concrete Walls: The materials furnished and used in the work shall be those prescribed within the Standard Specifications for Roads, Bridges and Incidental Construction, including supplemental specifications and applicable special provisions.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
2 - Prefabricated Modular and Mechanically Stabilized Earth Walls: Materials shall conform to the following requirements and those not listed below shall be as prescribed within the Standard Specifications for Roads, Bridges and Incidental Construction, including supplemental specifications and applicable special provisions. a. Concrete: The concrete shall conform to the requirements of Section M.03 and as follows: Concrete for all precast components shall be air-entrained composed of portland cement, fine and coarse aggregates, admixtures and water. The air-entraining feature may be obtained by the use of either air-entraining portland cement or an approved air-entraining admixture. The entrained-air content shall be not less than four percent or more than seven percent. The concrete utilized shall be a mix which will attain a minimum 28-day strength (f 'c ) of 4,500 pounds per square inch. The mix design shall be furnished to the Engineer. Concrete for footings or unreinforced leveling pads shall be conform to the requirements of Class "A" Concrete. Class "F" Concrete shall be used for cast-in-place concrete copings. Concrete Finish: Unless otherwise indicated on the contract drawings or elsewhere in the specifications, the concrete surface for the exposed face shall have an ordinary steel form finish. All non-exposed surfaces shall have a unformed finish which shall be free of open pockets of aggregate and surface distortions in excess of 1/4 inch. Acceptance Criteria for Precast Components: Precast components shall be accepted for use in wall construction provided the concrete strength meets or exceeds the minimum compressive strength requirement, the soil reinforcement connection devices and the panel or module dimensions are within the manufacture's allowable tolerances and any chipping, cracks, honeycomb or other defects are within acceptable standards for precast concrete or repaired as determined by the Engineer. It is recognized that certain cracks and surface defects are not detrimental to the structural integrity of the precast components if properly repaired. The Engineer shall determine the need for and proper method of such repair. All repairs shall be approved by the Engineer prior to acceptance of the precast component for use in wall construction. Marking: The date of manufacture, the production lot number, and the piece-mark shall be clearly marked on the side of each panel or module. b. Reinforcing Steel: Reinforcing steel shall conform to the requirements of ASTM A615, Grade 60. c. Attachment Devices for Prefabricated Modular Walls: All structural connectors shall be hot dipped galvanized according to the requirements of ASTM A123 (AASHTO M-111). The minimum thickness of the galvanizing shall be based on the service life requirements in the AASHTO Specifications.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
d. Soil Reinforcing and Attachment Devices for MSE Walls: Soil Reinforcement: All soil reinforcement and structural connectors shall be hot dipped galvanized according to the requirements of ASTM A123 (AASHTO M-111). The minimum thickness of the galvanizing shall be based on the service life requirements as previously stated. Steel strip reinforcement shall be hot rolled to the required shape and dimensions. The steel shall conform to AASHTO M223 (ASTM A572) Grade 65 unless otherwise specified. Welded wire fabric reinforcement shall be shop fabricated from cold-drawn wire of the sizes and spacings shown on the plans. The wire shall conform to the requirements of ASTM A82, fabricated fabric shall conform to the requirements of ASTM A185. Connection Hardware: Connection hardware shall conform to the details on the plans and the requirements in the special provisions or the plans. All fasteners shall be galvanized according to the requirements of ASTM A-153 (AASHTO M-232). The minimum thickness of the galvanizing shall be based on the service life requirements as previously stated. e. Joint Materials: All horizontal and vertical joints between panels shall be covered by a geotextile (separation-high survivability) conforming to the requirements of Article M.08.02-26. The minimum width and lap shall be twelve inches. Details of installation including connection of the geotextile to coping shall be provided. f. Backfill: Backfill shall be lightweight fill that conforms to the requirements below. In addition, the backfill for Mechanically Stabilized Earth Walls shall conform to all of the following requirements: Electrochemical Requirements: The backfill material shall conform to the following electrochemical requirements: Lightweight aggregate for geotechnical fill shall be expanded shale lightweight aggregate or approved equal meeting ASTM C 330. No by-product slags, cinders or by-products of coal combustion shall be permitted. Grading shall conform to ASTM C 330 – 3/4 inch x No. 4. Lightweight aggregate shall have proven record of durability as determined by ASTM C-88 and ASTM C-131. The Lightweight aggregate shall have the following properties:
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
Gradation
Sieve ASTM C 330 Requirement
1-inch 100
3/4 in 90-100
3/8 in 10-50
No. 4 0-15
Physical Properties
Property Test Method Requirement
Density Minimum ASTM D 4254
3
40 lb/ft
Maximum ASTM D 4253 3
60 lb/ft
Soundness (MgSO4- 5 cycles) ASTM C-88 < 30%
Abrasive Resistance ASTM C-131 40%
In-situ Phi (φ) Angle ASTM D-4030 40º
Electrochemical Properties
Property Test Method Requirement
Resistivity ASTM G187 > 3000 ohm-cm
pH ASTM D4972 5 - 10
Chloride Content ASTM D1411 < 100 mg/kg
Sulfate Content ASTM C1580 < 200 mg/kg
The following information shall be furnished by the Contractor prior to the start of construction:
1. Submit lightweight fill product data sheet and certification from the Manufacturer that the lightweight fill product supplied meets the requirements of this Section.
The materials for bagged stone shall conform to the following requirements: the crushed stone or gravel shall conform to the grading requirements of Article M.01.01 for No. 3 or No. 4 coarse aggregate or a mixture of both; the bag shall be of burlap and shall be large enough to contain one cubic foot of loosely packed granular material g. Smooth Steel dowels : Steel dowels used in parapets joints shall conform to the requirements of ASTM A36 and shall be galvanized in conformance with the requirements of ASTM A153.
Construction Methods:
1 - Cast-in-Place Concrete Walls: All construction methods for cast-in-place retaining
walls shall be in accordance with the detailed requirements prescribed for the construction the
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
appropriate items as specified in the Standard Specifications for Roads, Bridges, and Incidental Construction. 2 - Prefabricated Modular Walls: All construction methods for items not listed below shall be in accordance with the detailed requirements prescribed for the construction of the appropriate items as specified in the Standard Specifications for Roads, Bridges, and Incidental Construction. a. Special Surface Treatment: If a special surface finish is proposed for the wall, before proceeding with production, a model modular unit shall be provided by the fabricator for the Engineer's approval to establish a guide and standard for the type of finish to be furnished on the exposed face. This model shall be kept at the fabricator's plant to be used for comparison purposes during production. Formed surfaces other than the exposed face shall not require a special finish. b. Inspection and Rejection: The quality of materials, the process of manufacture, and the finished units shall be subject to inspection by the Engineer prior to shipment. Modular units which have imperfect molding, honeycomb, open texture concrete, or broken corners shall be repaired to the satisfaction of the Engineer or shall be rejected. Insufficient compressive strength shall also be cause for rejection. Modular units with special surface treatments shall be rejected if there are variations in the exposed face that deviate from the approved model as to color or texture in accordance with precast concrete industry standards. c. Marking: The date of manufacture shall be clearly scribed on an inside surface of each modular unit. d. On Site Representative: A qualified and experienced representative from the wall supplier shall be at the site at the initiation of the wall construction to assist the Contractor and the Engineer. If there is no more than one wall on a project then this criteria will apply to construction of the initial wall only. The representative shall also be available on as needed basis, as requested by the Engineer. e. Installation: The modular units shall be installed in accordance with manufacturer's recommendations. Special care shall be taken in setting the bottom course of units to true line and grade. The vertical joint opening on the front face of the wall shall not exceed 3/4 inch. Vertical tolerances and horizontal alignment tolerances measured from the face line shown on the contract drawings shall not exceed 3/4 inch when measured along an eight straightedge. The overall tolerance of the wall from top to bottom shall not exceed 1/2 inch per eight feet of wall height or one inch total, whichever is the lesser, measured from the face line shown on the contract drawings. A strip of geotextile shall be installed at all vertical joints.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
Assembly of the various components shall be performed in such a manner that no undue strain or stress is placed on any of the members that constitute the completed structure. f. Backfilling:
Doublewal:
Infill for modular units shall be placed, one course at a time, in lifts not exceeding two feet in thickness. The dry density of each lift of pervious structure backfill placed inside the modular units, after compaction, shall not be less than 90 percent of the dry density for that material when tested in accordance with AASHTO T-180, Method D. Each lift shall be thoroughly compacted with a vibratory tamping device. Placement of the pervious structure backfill behind the wall shall closely follow erection of successive courses of modular units. At no time shall the difference in backfill elevation between the interior and exterior of the wall exceed six feet. The units may be backfilled with crushed stone, provided that the design of the wall was based on a density of 80 pounds per cubic foot. All pervious structure backfill placed outside of the modular units shall be placed in accordance with the requirements of Article 2.16.03.
T-Wall:
Backfill placement shall closely follow erection of each course of modules. Backfill shall be placed in such a manner as to avoid any damage or disturbance to the wall materials or misalignment of the modules. Any wall materials which become damaged or disturbed during backfill placement shall be either removed and replaced at the Contractor's expense or corrected, as directed by the Engineer. Any backfill material placed within the wall envelope which does not meet the requirements of this specification shall be corrected or removed and replaced at the Contractor's expense. Backfill shall be compacted to 95 percent of the maximum density as determined by AASHTO T-99, Method C or D (with oversize correction, as outlined in Note 7). The moisture content of the backfill material prior to and during compaction shall be uniform throughout each layer. Backfill material shall have a placement moisture content less than or equal to the optimum moisture content. Backfill material with a placement moisture content in excess of the optimum moisture content shall be removed and reworked until the moisture content is uniform and acceptable throughout the entire lift. The optimum moisture content shall be determined in accordance with AASHTO T-99, Method C or D (with oversize correction, as outlined in Note 7).
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
If 30 percent or more of the backfill material is greater than 3/4 inch in size, AASHTO T-99 is not applicable. For such a material, the acceptance criterion for control of compaction shall be either a minimum of 70 percent of the relative density of the material as determined by a method specification provided by the wall supplier, based on a test compaction section, which defines the type of equipment, lift thickness, number of passes of the specified equipment, and placement moisture content. The maximum lift thickness after compaction shall not exceed ten inches. The Contractor shall decrease this lift thickness, if necessary, to obtain the specified density. Compaction within three feet of the face of the modules shall be achieved by at least three passes of a lightweight mechanical tamper, roller or vibratory system. The specified lift thickness shall be adjusted as warranted by the type of compaction equipment actually used. Care shall be exercised in the compaction process to avoid misalignment or damage to the module Heavy compaction equipment shall not be used to compact backfill within three feet of the wall face. At the end of each day's operation, the Contractor shall slope the last level of backfill away from the wall facing to direct runoff of rainwater away from the wall face. The Contractor shall control and divert runoff at the ends of the wall such that erosion or washout of the wall section does not occur. In addition, the Contractor shall not allow surface runoff from adjacent areas to enter the wall construction site. 3 - Mechanically Stabilized Earth Walls: All construction methods for items not listed below shall be in accordance with the detailed requirements prescribed for the construction of the appropriate items as specified in the Standard Specifications for Roads, Bridges, and Incidental Construction.
a. Special Surface Treatment: If a special surface finish is proposed for the wall, before proceeding with production, a model face panel shall be provided by the fabricator for the Engineer's approval to establish a guide and standard for the type of finish to be furnished on the exposed face. This model shall be kept at the fabricator's plant to be used for comparison purposes during production. Formed surfaces other than the exposed face shall not require a special finish. b. Foundation Preparation: The foundation for the structure shall be graded level for a width equal to or exceeding the length of the soil reinforcements, or as shown on the plans. Prior to wall construction, the foundation, if not in rock, shall be compacted. Any foundation soils found to be unsuitable shall be removed and replaced with granular fill. At each panel foundation level, an un-reinforced concrete leveling pad shall be provided as shown on the plans. The leveling pad shall be cast to the design elevations as shown on the plans.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
c. On Site Representative: A qualified and experienced representative from the wall supplier shall be at the site at the initiation of the wall construction to assist the Contractor and the Engineer. If there is no more than one wall on a project then this criteria will apply to construction of the initial wall only. The representative shall also be available on as needed basis, as requested by the Engineer. d. Wall Erection: Panels shall be placed in successive horizontal lifts in the sequence shown on the plans as backfill placement proceeds. As backfill material is placed behind the panels, the panels shall be maintained in a vertical position. Vertical tolerances (plumbness) and horizontal alignment tolerances shall not exceed 3/4 inch in eight feet. The allowable offset in any panel joint shall be 3/4 inch. The overall vertical tolerance of the wall (plumbness from top to bottom) shall not exceed 1/2 inch per eight feet, or one inch total, which ever is the lesser, measured from the face line shown on the plans. e. Placement of Reinforcements: Bending of reinforcements in the horizontal plane that results in a permanent deformation in their alignment shall not be allowed. Gradual bending in the vertical direction that does not result in permanent deformations is allowable. Connection of reinforcements to piles or bending of reinforcements around piles shall not be allowed. A structural connection (yoke) from the wall panel to the reinforcement shall be used whenever it is necessary to avoid cutting or excessive skewing of reinforcements due to pile or utility conflicts. Soil reinforcements shall be placed normal to the face of the wall, unless otherwise shown on the plans. f. Backfill Placement: Backfill placement shall closely follow erection of each course of panels. Backfill shall be placed in such a manner as to avoid any damage or disturbance to the wall materials or misalignment of the facing panels. Any wall materials which become damaged or disturbed during backfill placement shall be either removed and replaced at the Contractor's expense or corrected, as directed by the Engineer. Any backfill material placed within the reinforced soil mass which does not meet the requirements of this specification shall be corrected or removed and replaced at the Contractor's expense.
Lightweight aggregate shall be compacted in place during construction using smooth drum roller between 8 and 12 tons (static weight), sized to compact adequately without causing significant particle breakage. Place and compact the aggregate in 12-inch loose lifts with a minimum of 2, maximum of 4 orthogonal passes of compaction equipment, unless otherwise directed by the Engineer. Additional passes of compaction shall be performed, if required, until all measurable compaction has been achieved. The lightweight aggregate shall not be over- compacted. Construction equipment, other than for compaction shall not operate on the exposed fill.
Where weep holes are installed within the limits of the lightweight fill, bagged stone
shall be placed around the inlet end of each weep hole, to prevent movement of the
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
lightweight fill material into the weep hole. Approximately one cubic foot of crushed stone or gravel shall be enclosed in each of the burlap bags. All bags shall then be securely tied at the neck with cord or wire so that the enclosed material is contained loosely. The filled bags shall be stacked at the weep holes to the dimensions shown on the plans or as directed by the Engineer. The bags shall be unbroken at the time lightweight fill material is placed around them, and bags which are broken or burst prior to or during the placing of the lightweight fill material shall be replaced at the expense of the contractor.
When proposed atop virgin soil, the existing soil shall be excavated 12” below
existing grade prior to placing the lightweight fill. In this case, the vertical limit of lightweight fill shall be measured from 12” below existing grade.
Prior to placement of the soil reinforcements, the backfill elevation at the face shall be
level with the connection after compaction. From a point approximately three feet behind the back face of the panels to the free end of the soil reinforcements the backfill shall be two inches above the attachment device elevation unless otherwise shown on the plans. Compaction within three feet of the back face of the panels shall be achieved by at least three passes of a lightweight mechanical tamper, roller or vibratory system. The specified lift thickness shall be adjusted as warranted by the type of compaction equipment actually used. Care shall be exercised in the compaction process to avoid misalignment of the panels or damage to the attachment devices. Heavy compaction equipment shall not be used to compact backfill within three feet of the wall face. At the end of each day's operation, the Contractor shall slope the last level of backfill away from the wall facing to direct runoff of rainwater away from the wall face. The Contractor shall control and divert runoff at the ends of the wall such that erosion or washout of the wall section does not occur. In addition, the Contractor shall not allow surface runoff from adjacent areas to enter the wall construction site. Method of Measurement: This work will be paid for on a lump sum basis and will not be measured for payment. Basis of Payment: This work will be paid for at the contract lump sum for “RETAINING WALL (SITE NO. X)“, complete in place, which price shall include all work shown within the pay limits shown on the contract drawings for the retaining wall including but not limited to the following:
1. Design and construction of the proprietary retaining wall.
2. Excavation required for the construction of the retaining wall.
3. Design and construction of temporary earth retaining systems to retain the existing facilities during construction.
Rev. Date 11/6//2018
PROJECT NO. 42-317 ITEM #0601651A--#0601680
4. The furnishing, placing and compacting of lightweight fill within the payment lines.
5. The furnishing and placing of backfill drainage systems for the wall.
6. The furnishing and placing of rigid metal conduit, junction boxes, light standard anchorages, and other electrical appurtenances located within the wall proper.
7. Services of the On-Site Representative.
8. Any other work and materials shown on the plans for the retaining wall.
The price shall also include all materials, equipment, tools and labor incidental thereto. If bedrock or boulders in excess of one cubic yard are encountered in the excavation, it shall be paid for under the item "Structure Excavation - Rock".
Appendix H
Retaining Wall Typical
Bridge M
anual Section 3 V
8.dgn 3/4/2009 1:44:54 PM
LightweightFill