suddath project profile_intelsat
TRANSCRIPT
At Suddath,® NO JOB IS TOO BIG OR TIMEFRAME TOO SMALLOFFICE RELOCATION PROJECT DECOMMISSIONS 850,000 SQ FT AND MOVES 550 EMPLOYEES IN THREE WEEKS
Project PROFILE
World’s Largest Satellite Telecommunications Provider
Key Services•Office moving
•Surplus furniture and equipment disassembly and removal
•Furnitureliquidationandbrokerage
•Spacedecommission,cleaningandturnover assistance
LocationWashington,D.C.
the facts
35% Reductionin landfill usage anddisposal cost viarecycling serviceand liquidation
855 564 3939 | suddathworkplace.com
Client Testimonial“The Suddath team was a key component tothe success of the move. Suddath successfullymoved all of the staff and their equipment onschedule without any unforeseen delays,losses or damages.”
The ChallengeThe world’s leading provider of satellite services decided to expand andrelocateitsU.S.headquarterstoastateoftheart1.4millionsquarefootfacilityinWashington,D.C.SuddathWorkplaceSolutionsandcommercialrealestatemanagementfirm,CBRE,werethereeverystepofthewaytomanagethecomplexrelocation,surplusfurnitureremovalandspacedecommission.
Initiallytheofficemoveand850,000squarefootspacedecommissionwasplannedtooccuroverasixweek
period,howeverduetounforeseenchanges,thetimelinewasreducedtothreeweeks.Morethan550employees
wererelocatedand200truckloadsofsurplusfurnitureandequipmentwereremovedforliquidation,recycling
anddisposalduringthecompressedtimeline.SuddathandCBREwereabletocompletetheprojectontimeand
onbudget.
The SolutionSuddathWorkplaceSolutionsknowsthatattheendofmanybusinessrelocationstherecanbesignificantsurplus
furniture,technologyequipmentandmiscellaneousrefuse.Manytimescompaniesforgettoproactivelyplan
thisaspectoftheirrelocation.WithguidancefromSuddathandCBRE,thismassivespacedecommission,cleaning
andturnoverwaswellplannedandmanagedsmoothly.
the icing on the cakeByplanningearly,SuddathandCBREwereabletosavetheclientmoneyby
minimizingtheamountofgoodsdisposed.Infact,theclientwasableto
offset some of the removal labor with liquidation proceeds and recycle
refundswhichreducedlandfillusageby35percent.
©2014SuddathVanLines,Inc.U.S.DOTNo.29609Fla.IMNo.1411,SuddathOfficeSolutions,LLCU.S.DOTNo.2247935U.S.DOTNo.2503386
Project Goal: 550 EMPLOYEE RELOCATION, 850,000 SQUARE FOOT SPACE DECOMMISSION AND SURPLUS ASSET REMOVAL IN A THREE WEEK TIMEFRAME.
550 employees relocated
600 desktopcomputersdisconnected,relocated,reconnected andtested
200 truckloadsof surplus officefurniture andequipmentdisassembledand removed
200 workstationsbrokered,soldandrecycled; proceedscredited to offsetremoval cost
Setting the Standard for Moving the World ®