Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools. Track 6 conveners, presented by Helge Meinhard / CERN-IT 18 October 2013. Track 6 Conveners. Brian Bockelman Ian Collier Alessandro De Salvo Maria Girone Steven Goldfarb Burt Holzman - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/1.jpg)
Track 6 summary 1
Summary of Track 6Facilities, Production Infrastructures, Networking, Collaborative Tools
Track 6 conveners, presented byHelge Meinhard / CERN-IT
18 October 2013
![Page 2: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/2.jpg)
Track 6 summary 2
Track 6 Conveners• Brian Bockelman• Ian Collier• Alessandro De Salvo• Maria Girone• Steven Goldfarb• Burt Holzman• Helge Meinhard• Ray Pasetes• Wim Heubers (LOC)
![Page 3: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/3.jpg)
Track 6 summary 3
Usual disclaimer• Credit to presenters and session chairs• All errors, omissions, … are mine• Posters not covered – sorry
![Page 4: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/4.jpg)
Track 6 summary 4
Statistics• 83 abstracts; 81 accepted, 2 withdrawn• 28 oral presentations, 53 posters
Topic No contributionsFacilities 6
Production infrastructures 50
Networking 15
Collaborative tools 10
![Page 5: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/5.jpg)
Track 6 summary 5
Facilities
![Page 6: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/6.jpg)
Track 6 summary 6
Arduino and Nagios integration for monitoring (Victor Fernandez, U Santiago de Compostela)
• Aim: address monitoring needs of their compute farm
• Chose home-made integration of Arduino and Nagios for cost reasons
![Page 7: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/7.jpg)
Track 6 summary 7
Fernandez, U Santiago de Compostela
![Page 8: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/8.jpg)
Track 6 summary 8
SynapSense wireless environmental monitoring system of RACF at BNL (Alexandr Zaytsev, BNL)
• Environmental monitoring needed that is easy to install – no complex wiring
• SynapSense: wireless sensors
![Page 9: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/9.jpg)
Track 6 summary
Zaytsev, BNL
9
In the present configuration the system has 150+ base stations provided with 520+ low systematic temperature/humidity/pressure sensors reporting to the central servers every 5 minutes (0.27M readings per day)
The integral cost of the system is not exceeding the cost of 2 racks of equipment typical for RACF Linux farms
![Page 10: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/10.jpg)
Track 6 summary 10
Operating dedicated data centres – is it cost-effective? (Tony Wong, BNL)
• Cost comparison of BNL facilities with commercial cloud offerings (EC2, GCE)
![Page 11: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/11.jpg)
Track 6 summary 11
Wong, BNL
• Cost of computing/core at dedicated data centers compare favorably with cloud costs– $0.04/hr (RACF) vs. $0.12/hr (EC2)– Near-term trends
• Hardware• Infrastructure • Staff • Data duplication
• Data duplication requirements will raise costs and complexity – not a free ride
Includes 2009-2013 dataBNL-imposed overhead includedAmortize server and network over 4 or 6 (USATLAS/RHIC) years and use only physical coresRACF Compute Cluster staffed by 4 FTE ($200k/FTE)About 25-31% contribution from other-than-server
![Page 12: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/12.jpg)
Track 6 summary 12
Hardware at remote hosting centre (Olof Barring, CERN)
• Wigner research centre in Hungary won open call for tender for extending CERN’s computer centre capacity
• Issues around scalability and non-availability of physical access addressed
![Page 13: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/13.jpg)
Track 6 summary 13
Barring, CERN
![Page 14: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/14.jpg)
Track 6 summary 14
Barring, CERN
![Page 15: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/15.jpg)
Track 6 summary 15
Production Infrastructures
![Page 16: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/16.jpg)
Track 6 summary 16
ATLAS cloud computing R&D project (Randy Sobie, U Victoria)
• Private / academic clouds – HLT farm• Public / hybrid clouds: Amazon EC2, Google
compute engine• CloudScheduler as “middleware” between
HTCondor and cloud
![Page 17: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/17.jpg)
Track 6 summary 17
Sobie, U Victoria
![Page 18: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/18.jpg)
Track 6 summary 18
Fabric management (r)evolution at CERN (Gavin McCance, CERN)
• Agile Infrastructure project addressing- virtual server provisioning- configuration- monitoring
![Page 19: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/19.jpg)
Track 6 summary 19
McCance, CERN
![Page 20: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/20.jpg)
Track 6 summary 20
McCance, CERN
![Page 21: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/21.jpg)
Track 6 summary 21
McCance, CERN
![Page 22: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/22.jpg)
Track 6 summary 22
Production large-scale cloud infrastructure experience at CERN (Belmiro Moreira, CERN)
• Motivation: Improve- operational efficiency- resource efficiency- responsiveness
![Page 23: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/23.jpg)
Track 6 summary 23
Moreira, CERN
![Page 24: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/24.jpg)
Track 6 summary 24
Moreira, CERN
![Page 25: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/25.jpg)
Track 6 summary 25
Moreira, CERN
![Page 26: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/26.jpg)
Track 6 summary 26
Agile Infrastructure monitoring (Pedro Andrade, CERN)
• Motivation- Several independent monitoring activities in CERN IT- Combination of data from different groups necessary- Understanding performance became more important- Move to a virtualised dynamic infrastructure
• Challenges- Implement a shared architecture and common tool-
chain- Delivered under a common collaborative effort
![Page 27: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/27.jpg)
Track 6 summary 27
Andrade, CERN
![Page 28: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/28.jpg)
Track 6 summary 28
Andrade, CERN
![Page 29: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/29.jpg)
Track 6 summary 29
Andrade, CERN
![Page 30: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/30.jpg)
Track 6 summary 30
The CMS openstack, opportunate, overlay, online-cluster cloud (Jose Antonio Coarasa, CERN)
• Idea: Reuse CMS Data Acquistion System as an opportunistic Open-Stack based cloud.
• A cloud of opportunity - when CMS is not taking data, give computing power of HLT to Offline. Online must be able to "take back" computing resources quickly.
• Overlays on top of existing cluster; OpenStack must deal with existing complex network configuration.
• Cloud has been running since January 2013.• Has run up to 6,000 jobs at a time; a significant
resource in CMS Offline.
![Page 31: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/31.jpg)
Track 6 summary
High availability setup; complex networking due to required Online security!
![Page 32: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/32.jpg)
Track 6 summary
Opportunistic resource usage in CMS (Peter Kreuzer, RWTH Aachen)
• CMS has a relatively flat funding budget for hardware.
- CMS can keep its hardware fully occupied. Investment in people greater than investment in computing hardware. Must keep people productive!
- Goal: Allow people to dynamically integrate shared resources.
• Three types of resource access considered
• Non-CMS grid site, opportunistic or Allocation-based cluster (no grid interface), or Virtualization-based resources (OpenStack, EC2).
• Operational issues - how does CMS integrate temporary resources into a system designed for permanent resources?
- Either put all resources into a "fake" site or dedicated site for very large opportunistic resources.
- Testing already done at large-scale; sustainable operations is the current challenge.
![Page 33: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/33.jpg)
Track 6 summary 33
Operating the World-wide LHC computing grid (Andrea Sciaba, CERN)
• Dedicated effort as a follow-up from Technical Evolution groups in 2011/2012
• Activity resulted in a series of recommendations to be followed up by a new, dedicated coordination body
![Page 34: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/34.jpg)
Track 6 summary 34
Sciaba, CERN
![Page 35: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/35.jpg)
Track 6 summary 35
Sciaba, CERN
![Page 36: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/36.jpg)
Track 6 summary 36
Testing as a service with HammerCloud (Ramon Medrano Llamas, CERN)
• Large-scale flexible grid testing increasingly important and popular
• 50 M jobs / year• Requires flexible infrastructure for rapid
deployment
![Page 37: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/37.jpg)
Track 6 summary 37
Medrano Llamas, CERN
![Page 38: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/38.jpg)
Track 6 summary 38
Medrano Llamas, CERN
![Page 39: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/39.jpg)
Track 6 summary 39
Medrano Llamas, CERN
![Page 40: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/40.jpg)
Track 6 summary 40
Performance monitoring of ALICE DAQ system with Zabbix (Adriana Telesca, CERN)
• Growing DAQ farm requires more flexible, powerful system monitoring
• Comprehensive study of candidate systems has resulted in choosing Zabbix
![Page 41: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/41.jpg)
Track 6 summary 41
Telesca, CERN
![Page 42: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/42.jpg)
Track 6 summary 42
Telesca, CERN
![Page 43: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/43.jpg)
Track 6 summary 43
Telesca, CERN
![Page 44: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/44.jpg)
Track 6 summary 44
Beyond core count: new mainstream computing platforms for HEP workloads (Pawel Szostek, CERN)
• Improvements of performance and performance/watt by- Increasing core counts- Shrinking structure sizes- Introducing new microarchitectures
![Page 45: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/45.jpg)
Track 6 summary 45
Szostek, CERN
![Page 46: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/46.jpg)
Track 6 summary 46
Szostek, CERN
![Page 47: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/47.jpg)
Track 6 summary 47
The effect of flashcache and bcache on I/O performance (Jason Alexander Smith, BNL)
• Flashcache, bcache: Linux kernel modules for block caching of disk data on fast devices (such as SSDs)
• Flashcache- Developed by Facebook in 2010- Not included in Linux kernel
• Bcache: different approach with similar goals- In Linux kernel as of 3.10
• Result: good for small records/files
![Page 48: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/48.jpg)
Track 6 summary 48
Smith, BNL
![Page 49: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/49.jpg)
Track 6 summary 49
Smith, BNL
![Page 50: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/50.jpg)
Track 6 summary 50
Challenging data and workload management in CMS computing with network-aware systems (Tony Wildish, Princeton)
• PhEDEx controls bulk data-flows in CMS.
- Basic architecture is 10 years old. Retry algorithms are TCP-like (rapid backoff / gentle retries). No understanding of the underlying network activity.
- Complex transfer mesh -- since it no longer follows the MONARC model, we no longer have an analytic model of CMS transfers. Why are datasets moved? Which movements are correlated?
• Working on long-term use cases and models for integrating network knowledge:
- ANSE project working to integrate virtual network circuit control into PhEDEx. Explicitly control the networks.
- Hope is that this will reduce latencies in PhEDEx.
![Page 51: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/51.jpg)
Track 6 summary 51
Wildish, Princeton
Not currently bandwidth-limited, but preparing for
the future!
![Page 52: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/52.jpg)
Track 6 summary 52
Networking
![Page 53: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/53.jpg)
Track 6 summary 53
Deployment of PerfSONAR-PS networking monitoring in WLCG(Simone Campana, CERN)
• Introduction to PerfSONAR and PerfSONAR-PS
• Deployment plan for WLCG• Status
![Page 54: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/54.jpg)
Track 6 summary 54
Campana, CERN
![Page 55: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/55.jpg)
Track 6 summary 55
Campana, CERN
![Page 56: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/56.jpg)
Track 6 summary 56
Campana, CERN
![Page 57: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/57.jpg)
Track 6 summary 57
Big data over a 100G network at Fermilab (Gabriele Garzoglio, FNAL)
• One of our remote presentations• Goal: verify whole stack of software and
services end-to-end for effectiveness at 100G across participating labs
• Results on GridFTP/SRM/GlobusOnline, xrootd, squid/Frontier
![Page 58: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/58.jpg)
Track 6 summary 58
Garzoglio, FNAL
![Page 59: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/59.jpg)
Track 6 summary 59
Garzoglio, FNAL
![Page 60: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/60.jpg)
Track 6 summary 60
Garzoglio, FNAL
![Page 61: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/61.jpg)
Track 6 summary 61
Garzoglio, FNAL
![Page 62: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/62.jpg)
Track 6 summary 62
Network architecture and IPv6 deployment at CERN (David Gutierrez Rueda, CERN)
• Core network interconnecting all infrastructure, including Wigner, is IPv6 ready- Non-blocking 1 Tbps
![Page 63: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/63.jpg)
Track 6 summary 63
Gutierrez Rueda, CERN
![Page 64: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/64.jpg)
Track 6 summary 64
Gutierrez Rueda, CERN
![Page 65: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/65.jpg)
Track 6 summary 65
Gutierrez Rueda, CERN
![Page 66: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/66.jpg)
Track 6 summary 66
Application performance evaluation and recommendations for the DYNES instrument (Shawn McKee, U Michigan)
• DYNES is a “distributed instrument” in the US: has networking infrastructure at ~40 universities for creating virtual circuits.
• Solving a mystery: When creating circuits 1Gbps, they were getting 200Mbps performance.
- Traditional network debugging techniques yielded nothing.
- Solution: Using the Linux outgoing packet queue management layer to pace packets on the host at less than the circuit speed. Yielded >800 Mbps.
- Belief the issue is QoS in the internal implementation of one hop in the circuit is at fault.
• Lesson: Virtual circuits still depend heavily on the underlying hardware implementation. The “virtualization” is perhaps not a complete extraction. You must know your circuit!
![Page 67: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/67.jpg)
Track 6 summary 67
McKee, U Michigan
![Page 68: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/68.jpg)
Track 6 summary 68
WLCG security: a trust framework for security collaboration among infrastructures (David Kelsey, STFC-RAL)
• All about trust of infrastructures• Building on experience with
EDG/EGEE/EGI, OSG, WLCG
![Page 69: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/69.jpg)
Track 6 summary 69
Kelsey, STFC-RAL (1)
![Page 70: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/70.jpg)
Track 6 summary 70
GPU-based network traffic monitoring and analysis tools (Phil DeMar, FNAL)
• Another remote presentation• 10G common in servers, 40G and 100G
coming on backbones• Current flow- and traffic-based tools will
break down
![Page 71: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/71.jpg)
Track 6 summary 71
DeMar, FNAL (1)
![Page 72: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/72.jpg)
Track 6 summary 72
US LHC Tier-1 WAN data movement security architectures (Phil DeMar, FNAL)
• Remote again…• Both FNAL and BNL chose to separate
science data movements from general network traffic
![Page 73: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/73.jpg)
Track 6 summary 73
DeMar, FNAL (2)
![Page 74: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/74.jpg)
Track 6 summary 74
WLCG and IPv6: The HEPiX IPv6 working group (David Kelsey, STFC-RAL)
• IPv4 address depletion coming soon…• Network infrastructures increasingly ready
for IPv6• Many services not yet tested, much work to
be done still
![Page 75: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/75.jpg)
Track 6 summary 75
Kelsey, STFC-RAL (2)
![Page 76: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/76.jpg)
Track 6 summary 76
Collaborative Tools
![Page 77: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/77.jpg)
Track 6 summary 77
Indico 1.0+ (Jose Benito Gonzalez Lopez, CERN)
• Remarkable growth, very popular service• Added user dashboard, version optimised
for mobile devices, …• Coming: rich abstract editor, configurable
registration form, e-ticket, off-line web site
![Page 78: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/78.jpg)
Track 6 summary 78
Gonzalez Lopez, CERN
![Page 79: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/79.jpg)
Track 6 summary 79
Gonzalez Lopez, CERN
![Page 80: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/80.jpg)
Track 6 summary
Vidyo for the LHC (Thomas Baron, CERN)
• In production since December 2011• Strong points for CERN
- Multiplatform capabilities• Not only desktops but extension to mobiles and tablets
- Integration with H323/SIP protocols- Extensible (several hundreds in a single meeting)- Natural interactions
• very low latency and excellent lip sync - Good A/V quality and resilience/adaptability to poor
network conditions- Simple interface- Good integration possibilities
![Page 81: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/81.jpg)
Track 6 summary
Baron, CERN
![Page 82: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/82.jpg)
Track 6 summary
Scholarly literature and the press: scientific impact and social
perception of physics computing M. G. Pia1, T. Basaglia2, Z. W. Bell3, P. V. Dressendorfer4
IEEE NSS 2013Seoul, Korea
1INFN Genova, Genova, Italy2CERN, Geneva, Switzerland3ORNL, Oak Ridge, TN, USA4IEEE, Piscataway, NJ, USA
CHEP 2013Amsterdam
![Page 83: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/83.jpg)
Track 6 summary 83
Pia / INFN Genova
![Page 84: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/84.jpg)
Track 6 summary
Setting up collaborative tools for a 1000-member community (Dirk Hoffmann, CPPM)
• Cta: Collaboration without support of a strong institute
• Had to set up basic services themselve
84
![Page 85: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/85.jpg)
Track 6 summary 85
Hoffmann, CPPM
![Page 86: Summary of Track 6 Facilities, Production Infrastructures, Networking, Collaborative Tools](https://reader036.vdocuments.net/reader036/viewer/2022062323/56816047550346895dcf6c18/html5/thumbnails/86.jpg)
Track 6 summary 86
Final Words from Track 6THANK YOU
• to all speakers and poster presentersfor many interesting contributions
• to all attendees to the sessionsfor their interest and for lively discussions
• to my fellow convenersfor a smooth sailing of the track,and for their input to this summary
• to the organisersfor a great CHEP 2013!
SEE YOU IN …