P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359 MCA Architecture, Inc. Forensics Division Summary Progress Report No. 2 For Repairs for Yawl Building and Ketch Building South End Wall Tall Ships Condominium Project Salem, South Carolina MCA Architecture, Inc. Forensics Division March 10, 2015 MCA Project No. F11705.E

Upload: others

Post on 31-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    Summary Progress Report No. 2

    For

    Repairs for Yawl Building and

    Ketch Building South End Wall

    Tall Ships Condominium Project

    Salem, South Carolina

    MCA Architecture, Inc. Forensics Division March 10, 2015

    MCA Project No. F11705.E

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    2

    Table of Contents

    1. Summary Progress Report No. 2

    2. Supporting Photographs

    3. Application for Payment No. 3

    4. MCA Invoice No. 4

    Project Facts

    This repair project scope at the Yawl Building rear and end walls and the Ketch Building South End Wall includes the replacement of five bow window stacks of three each, end wall windows and the removal and replacement of adjacent EIFS (Synthetic Stucco) wall systems back to stud exposure.

    Framing is inspected for rot and replaced as needed.

    Gutters will be removed and eave fascia will be inspected and repaired.

    Fifteen Porch columns and five chimney stacks are also being inspected and repaired at the Yawl Building.

    Southeastern Wall Systems, Inc., of Lexington, South Carolina is the General Contractor for the project. Southeastern was awarded the Contract in November 2014 in the amount of $659,592.00.

    Mr. Jerry Bullard is the Owner and Project Manager. Mr. D.J. Whitus is the Project Superintendent.

    MCA Architecture, Inc., of Greenville, South Carolina is the Architect of Record and has prepared drawings with specifications indicating the scope of work and will provide inspection and coordination during the construction process.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    3

    Summary Progress Report

    Submittal data on the windows and stucco materials were submitted and approved before December 1, 2014.

    Scaffolding erection started December 15, 2014 and completed January 15, 2015. Demolition work began January 5, 2015. Windows were delivered to the site on February 4, 2015.

    The work has exposed multiple areas of moisture intrusion and wood rot.

    At the end walls, window and balcony header framing was found to be rotted. The north end of Yawl Building exhibited substantial framing rot at the ends and near windows.

    There was existing framing rot at many levels under the Bow Windows. Additional wall framing alignment discrepancies are continuing to be found at each of the Bow Window areas at all floors. The Contractor was instructed to rework the window framing to fit the templates of the new Andersen Windows and include the extra time and material in the rot allowance. This procedure has become proto-typical.

    At the end walls, new exterior plywood sheathing and repair framing work is complete.

    Waterproofing coating applied over sheathing is complete.

    Window installation at all end walls of Yawl Building is complete.

    At the porch column work the framing has been repaired. Some columns required major rot replacement. Others were not rotted.

    The demolition and repair work at the chimneys is complete.

    EIFS foam board has been applied at the Ketch Building end wall. Copper head flashing at end wall windows is complete.

    The rot replacement work through February 28, 2015 has expended all of the allowance funds for rot of $20,000.00. Additional funds will be expended at the bow windows. The T&M cost will be kept and documented.

    The Contractor continues to perform the work efficiently and with care.

    Photographic documentation follows.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    4

    Views taken early January & February, 2015 of repair work at north end wall of Yawl building.

    Major reframing took place at the north wall due to the existing rotted framing.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    5

    Views taken early January & February, 2015 of repair work at porch columns and windows of Yawl building.

    Major reframing took place at the porch corner framing due to the existing rotted framing to obtain structural support of the corner columns.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    6

    Views taken early January & February, 2015 of repair work at roof chimneys of Yawl building.

    Damage sheathing replaced at bottom of chimneys. Metal flashing added at critical intersections and bottom of chimney wall.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    7

    Views taken early February, 2015 of repair work at bow window framing of Yawl building units 140 and 240.

    Bow window framing will be completely replaced to eliminate deteriorated framing and to correct alignment and bracing.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    8

    Views taken February 10, 2015 of south end wall window installation and application of yellow water resistant coating over plywood sheathing of Yawl building.

    New window installation in progress showing screw attachments, copper flashing and temporary protection.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    9

    Views taken March 4, 2015 of south end wall, Ketch Building, EIFS foam board, window installation and application of yellow water resistant coating over plywood sheathing.

    New foam board installed at chimneys over new sheathing stripes.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    10

    Views taken March 4, 2015 of interior bathroom at end walls at Ketch Building and Yawl Building. New windows are installed and trim is complete. Walls are being prepared for painting.

    Unit 135 at Ketch Building has severe interior wall damage from water intrusion.

  • Tall Ships Condominium Association Yawl Building and Ketch South End Wall Salem, South Carolina

    Summary Progress Report No. 2 MCA Forensics Project No. F11705.E

    March 10, 2015 Page

    P.O. Box 6537, Greenville, SC 29606 Tel. 864.232.8204 Fax 864.370.9359

    MCA Architecture, Inc. Forensics Division

    11

    Views taken March 4, 2015 of interior new end wall bedroom windows and existing bow windows ready to be removed at Ketch Building and Yawl Building.

    New windows at end wall are installed and trim is complete. Walls are being painted..