superjanet4 update roland trice, ulcc superjanet4 rollout manager
Post on 22-Dec-2015
233 views
TRANSCRIPT
SuperJANET4 Update
Roland Trice, ULCCSuperJANET4 Rollout Manager
31 January 2001 SERJUG 2
Agenda
•SuperJANET4 – Project Background
•SuperJANET4 – Implementation
SuperJANET4 Project Background
31 January 2001 SERJUG 4
Project Background
•SJ III contract ends March 2001
Since December 1999, UKERNA has been engaged in the procurement process for the backbone network for SuperJANET4.
The contract for the backbone and the regional network access links was signed on 16 June with WorldCom. These links will be provided by 31 October. We will then install the switching equipment on the backbone and test it. During December 2000 to March 2001 we will move the regional network connections from.
31 January 2001 SERJUG 5
Project Background
•SJ III contract ends March 2001
•SJ III is running hot
31 January 2001 SERJUG 6
SJ III
31 January 2001 SERJUG 7
Project Background
•SJ III contract ends March 2001
•SJ III is running hot
•CSR 1 money available
31 January 2001 SERJUG 8
Project Background
•SJ III contract ends March 2001
•SJ III is running hot
•CSR 1 money available
•Telecoms industry changing•Fibre installation over the UK
•Increasing bandwidth on fibre
31 January 2001 SERJUG 9
Project Background - Drivers
•Re-create a world class network
•Regional agenda
•Broaden user base•260 sites moving to over 700
•Reliability - operational network
•Research capability
•Extend the reach of SuperJANET
31 January 2001 SERJUG 10
Project Timescales
1999 2000 2001
Requirements Analysis
Backbone Procurement
Risk Reduction
Router Procurement
Roll Out
MAN Management and Contracts
Architecture
31 January 2001 SERJUG 11
Wanted Overall...
•National reach, high capacity, resilient, affordable bandwidth.
•High quality co-location sites in the core of the network.
•Better relationships with MANs.
•Broaden access.
•Research capability.
SuperJANET4 Implementation
31 January 2001 SERJUG 13
KentishMAN
Northern Ireland
TVN
South Wales MAN
SWAN & BWEMAN
NorMAN
MidMAN
EastNet
External Links
LMN
YHMAN
Scotland via
Edinburgh
Scotland via
Glasgow
NNW
LeNSE
EMMAN
WorldCom Glasgow
WorldComEdinburgh
WorldComLeeds
WorldComWarrington
WorldComLondon
WorldComReading
WorldComPortsmout
h
WorldCom
Bristol
SJ4 March 2001 155Mbps
622Mbps2.5Gbps
31 January 2001 SERJUG 14
Northern Ireland
TVN
South Wales MAN
SWAN & BWEMAN
NorMAN
MidMAN EastNet
External Links
LMN
YHMAN
Scotland via
Edinburgh
Scotland via
Glasgow
NNW
LeNSE
EMMAN
WorldCom Glasgow
WorldComEdinburgh
WorldComLeeds
WorldComWarrington
WorldComLondon
WorldComReading
WorldComPortsmout
h
WorldCom
Bristol
SJ4 December 2001 155Mbps
+
622Mbps2.5Gbps10Gbps
KentishMAN
C&NL
North Wales MAN
31 January 2001 SERJUG 15
Northern Ireland
TVN
South Wales MAN
SWAN & BWEMAN
NorMAN
External Links
LMN
MidMAN EastNet
YHMAN
Scotland via
Edinburgh
Scotland via
Glasgow
NNW
LeNSE
EMMAN
WorldCom Glasgow
WorldComEdinburgh
WorldComLeeds
WorldComWarrington
WorldComLondon
WorldComReading
WorldComPortsmout
h
WorldCom
Bristol
SJ4 June 2002 155Mbps+
622Mbps2.5Gbps10Gbps20Gbps
KentishMAN
C&NL
North Wales MAN
31 January 2001 SERJUG 16
Backbone Bandwidth
02468
101214161820
SJI I I SJ41Q2001
SJ44Q2001
SJ42Q2002
Gb
ps
x16
x64
x128
31 January 2001 SERJUG 17
Other options in the future.
•Further access link increases (e.g. 100Gpbs to London) by Jan 2004.
•Backbone up to 80Gbps.
Both of these depend on UKERNA and WorldCom agreeing the price.
31 January 2001 SERJUG 18
Co-Location Sites (C-PoPs)
•24 hour security.
•Access to personnel authorized by UKERNA.
•3rd party telecomms access.
•Racks for UKERNA’s equipment.
Rollout
31 January 2001 SERJUG 20
Rollout history
•November 2000•Router acceptance tests
•Backbone deployed
•Backbone routers delivered & commissioned
•Backbone acceptance tests
31 January 2001 SERJUG 21
31 January 2001 SERJUG 22
31 January 2001 SERJUG 23
Rollout history
•December 2000•Bars delivered and commissioned•ULCC and Manchester connected
•12th December
•Belfast connected•14th December
•A week late, but still on schedule
31 January 2001 SERJUG 24
Delays with circuit provision
•Bad weather
•River crossings
•Road works
•Estates departments
31 January 2001 SERJUG 25
31 January 2001 SERJUG 26
31 January 2001 SERJUG 27
31 January 2001 SERJUG 28
Scope of changes
• LeNSE transition moved• Thursday 22nd March
• Oxford & RAL postponed•Dates to be confirmed
• MidMAN •Delayed until 27th February
• Thursday slots activated from mid February
• Attempting to complete the transition before the last week of March
31 January 2001 SERJUG 29
SJ4 Transition Timetable
• Nottingham/ Newcastle
• Edinburgh/Glasgow
• Cambridge
• Cardiff/Leeds
• Reading
• 2 Contingency slots
• Exeter
• 2 Contingency slots
• Birmingham/Contingency slot
• 2 Contingency slots
• 16th January
• 23rd January
• 30th January
• 6th February
• 13th February
• 15th February
• 20th February
• 22nd February
• 27th February
• 29th February
31 January 2001 SERJUG 30
SJ4 Transition Timetable
• Chatham• 2 Contingency slots• UFI/Oxford (?)• 2 Contingency slots• C&NL MAN/Rutherford (?)• LeNSE/Contingency slot• 2 Contingency slots• 2 Contingency slots• SJ III Dies
• 6th March• 8th March• 13th March• 15th March• 20th March• 22nd March• 27th March• 29th March• 31st March
31 January 2001 SERJUG 31
The good news is…..
•Rollout is on schedule
•No major problems to-date
Questions?