Detailed Design ReviewP16241 – AUTONOMOUS PEOPLE MOVER PHASE I I I
Team
2
Agenda•Problem Definition Review• Background• Problem Statement• Project Scope• Customer Requirements• Engineering Requirements
• Detailed Design• Mounting• LiDAR• Ultrasonics
• Emergency Stop• Throttle Stock Mode Override• Steering Control/Improvements• Input/Output Layout• Vehicle Simulation• High-Level Software Block Diagram• Mode Control Diagram• Purchasing Plan• Risk Assessment• MSD II Preliminary Schedule
3
BackgroundRochester Institute of Technology is re-entering the field of autonomous vehicle research.
Research and development of autonomous vehicles are becoming more and more popular in the automotive industry. It is believed that autonomous vehicles are the future for easy and efficient transportation that will make for safer, less congested roadways.
Our project will follow the work completed by the Phase I and II teams.
4
Problem Statement•Current State• There have been two phases of this project so far. The first phase focused on modifying a golf
cart into a remote controlled vehicle. The second phase is working on adding autonomous functionality to the APM in highly restricted settings
•Desired State• APM is capable of localization, path planning, path following, and object avoidance. APM
provides a simple human-machine interface which displays diagnostic information. Passengers have the ability to take control of the vehicle whether it is moving or stationary
•Project Goals• APM can drive autonomously on a closed course while avoiding static and moving obstacles,
staying on the designated path, and maintaining the safety of passengers and bystanders
•Constraints• Phase II & CE Team accomplishments; budget; time for research; course characteristics
5
Project ScopePhase I Phase II & CE Team Phase III
• Remote control
• Manual override
• Remote subsystem
functionality
• Basic path following
(GMAP/SLAM)
• Electronics enclosure
• Touch screen mounting/basic
GUI
• Mounting of LiDAR & sensors
• Object detection
• Algorithms to utilize LiDAR &
ultrasonics
• Fully waterproofing electronics
• Path planning
• Basic user interface
• Emergency stop
• Redesign of main PCB
6
Customer Requirements
7
9
3
1
Required functionality for completion
Highly recommended functionality
Preferred functionality
Key
Customer
Rqmt. #Importance Description
CR1 9 APM must, at a minimum, be able to operate within a closed course in autonomous mode
CR2 9 APM must move forwards in autonomous mode
CR3 9 APM must have intelligent vehicle control: driving
CR4 9 APM must have intelligent vehicle control: steering
CR5 9 APM must have intelligent vehicle control: braking
CR6 3 APM must re-route path to avoid obstacle
CR7 9 APM must be able to detect obstacles and brake
CR8 3 APM must exhibit localization
CR9 3 APM must have diagnostic data logging capability
CR10 1 APM will have a display which will show it's location on a map, as well as diagnostic information
CR11 9 APM destination must be input via Secure Shell Protocol (SSH) or remote desktop to the onboard PC
CR12 9
APM must perform an emergency stop when a passenger hits the emergency stop button, or when the remote
control device activates the emergency stop
CR13 9 APM must have a way to switch between manual, remote, and autonomous modes
CR14 9 APM must have a waterproof enclosure to protect computer and other electronics
CR15 9 APM must have clear and accurate documentation on all aspects of cart along with their theoretical operations
CR16 9 APM must have videos consisting of explanations of various subsystems
CR17 9 APM must have schematics and wiring diagrams for all electrical modifications made to cart
CR18 9 APM must have drawings of all mechanical modifications made to cart over the different phases
Engineering Requirements
8
Rqmt. #
F
u
n
Engr. Requirement (metric)Unit of
Measure
Minimum
Value
Target
Value
Customer
RequirementComments/Status
S1 Driving Modes (Manual, RC, Autonomous) Pass / Fail 1, 2, 13
S2 Steering Control Precision Degrees ± 2 ± 1 1, 3, 4
S3 Steering Position Encoding Degrees ± 2 ± 1 1, 3, 4, 7, 8 Governs steering accuracy through feedback
S4 Speed Control Precision MPH ± 1 ± 0.5 1, 2, 3, 4, 5, 6, 7, 12
S5 Speed Encoding MPH ± 1 ± 0.5 1, 3, 4, 5, 6, 7, 12 Governs speed accuracy through feedback
S6 Maximum Speed MPH 3 5 2, 3
S7 GPS Positioning Meters ± 5 ± 0.25 1, 6, 8, 10 Governs deviation between planned and actual course
S8 Course: Arrive at planned destination Meters ± 5 ± 2.5 1, 2, 3, 4, 5, 8 Cart will stop within stated radius from destination
S9 Course: Stop when moving obstacle moves in way Pass / Fail 1, 2, 5, 6, 7 More research needed to get more specific about size, speed, and distance
S10 Detection of Light Reflecting 10" x 10" Objects Within 3 Meters Percentage ± 1 100 1, 6, 7 180 degrees in front of car, 15 degrees vertical
S11 Detection of Sound Reflecting 1' x 1' Objects Within 1 Meter Percentage ± 1 100 1, 6, 7 180 degrees in front of car, 15 degrees vertical
S12 Minimum Stopping Distance (from top speed without hitting obstacle) Meters 5 3 1, 3, 5, 7 2.9 m/s^2 (0.30 G) & 4.8m/s^2 (0.49 G) average acceleration, respectively
S13 SSH Interface with onboard PC Pass / Fail 9, 11
S14 Waterproof Enclosure for Electronics IPX- IPX3 IPX4 14 Will protect from splashing water from any direction
S15
Subsystem videos must be short and informative on how each subsytem
works Minutes 3 5 16
S16
Mechanical drawings must be able to be given to machinists with the
ability to reproduce the part with nothing other than the drawing Pass / Fail 18
Machine shop employees should be able to reproduce the part without any
questions asked
Solid Models•LiDAR Mounting
•Ultrasonics Study & Mounting
9
LiDAR Mount Design• Inclination angle adjustable in 5 degree increments
• Aluminum construction
• LiDAR removable without tools
• Options to add lock and shroud for sensor
• Estimated Cost: $49.02 excluding nuts and screws
• See drawing for detailed information
10
Ultrasonics Mounting Study
11
Ultrasonics Mounting• 5 sonar sensors
• 2-3 existing MB7001’s
• 3-2 new MB7040’s
•Maxbotix MB7040: $99.95 each
• PVC Needed:
• 3’ x ¾” SCH40 Pipe
• 5 x Tee fittings
• 2 x 90” Elbows
• 2 x 22.5” Elbows
• Estimated Cost: $10.05
• See drawings for detailed information
12
Ultrasonics Mounting Summary• 5 sonar sensors
• Possible addition of shorter range sensors
• Adjustable LiDAR mount
•Total Cost: $358.92 (3 new sonars and mounts)
13
Future Mounting Tasks• Stereo cameras
• Re-mounting of brake actuator to resolve interference
• Fully securing electronics enclosure
•Weatherproofing
14
Emergency Stop: Electrical
15
Emergency Stop: Electrical
16
Throttle Stock Mode Override
17
Steering Control• Steering System Issues• Requires 5V signal
• High pitch whining if driven by PWM
• Current design uses 2 DAC’s for different steering signal
• Current design uses additional DAC for a reference voltage
• There are only 2 DACs per Arduino Due
•Possible Solutions• Switch to Arduino Megas
• Improve level shifting circuit
•Benefits of improving the leveling shifting circuit• Uses a DAC and not PWM
• Requires a single DAC instead of 3
• Requires 1 Arduino instead of 2
• PCB needs to be improved anyways
18
Proposed Steering Control Improvement• Split output and use Op Amps to scale voltages
• Voltage subtractor and non-inverting configurations
• Converts a single output from 0-3.3 V to a differential output from 0-5 V
19
One Arduino Layout: Inputs/Outputs
20
Vehicle Simulation Update• Algorithm proceeds to next waypoint once cart location is within a specified proximity of current waypoint
21
High-Level Software Block Diagram
22
23
Mode Control Diagram
24
Purchasing Plan
25
Starting Budget $500.00
Budget Remaining $227.87
Vendor Description APM Relationship Part No Quantity
Date
Purchased Date Recieved Amount
Amazon GPS module GPS 1 22-Oct 28-Oct $35.00
Amazon GPS antenna GPS 1 22-Oct 28-Oct $9.50
OSH Park GPS PCB GPS 3 30-Nov $11.90
Automation Direct
PWR RELAY 40A DPDT 12VDC
COIL OPEN STYLE PANEL
MOUNT Emergency Stop
AD-PR40-2C-
12D 1 $19.25
McMaster Carr
Plate / 5" Sqaure x 3/16" Thk. x
1/2" Tube LiDAR Mount 1 $21.30
N/A Vertical / Scrap (from Plate) LiDAR Mount 2 $0.00
N/A Bracket / Scrap (from Plate) LiDAR Mount 2 $0.00
McMaster Carr
5/32" Pins / 5/32" x 1/2" 316 SS
Dowel Pins (Pack of 5) LiDAR Mount 2 $8.00
McMaster Carr
Thumb Screw / 1/4-20 x 3/8"
Plastic Rosette Head Thumb
Screws (Pk of 10) LiDAR Mount 1 $10.38
Ultrasonics PVC piping and
joints Ultrasonics Mount $10.04
Maxbotix MB7040 Ultrasonics 2 - 3 $299.85
MSD Phase II's Remaining Budget ----- ----- ----- 1/25/2016 $153.09
Purchasing Plan
Risk Assessment
26
1-3
4-26
27-81
Key
Low Ranked Risks
Medium Ranked Risks
High Ranked Risks
ID Category Risk Item Likelihood Severity Importance
1 Not enough bandwidth to send all sensor information 1 3 3
2 Control code error 1 9 9
3 Not high enough resolution from sensors 1 3 3
4 Unable to determine current location 3 1 3
5 Sensor failure 1 9 9
6 Sensor false reading 3 9 27
7 Mechanical failure 1 9 9
8 Electrical failure 1 9 9
9 Power loss 1 9 9
10 Integration trouble with steering and obstacle avoidance 1 3 3
11 LiDAR does not integrate well with other systems 1 1 1
12 PCB shorts out 1 9 9
13 Touch screen loses input 1 3 3
14 Touch screen stops displaying information 1 3 3
15 GPS getting incorrect signal 1 9 9
16 Erradict object can't be identified 1 9 9
17 Control electronics overheat 3 9 27
18 One of the three ultrasonics is unusable 9 3 27
19 One of the arduinos blows while testing 3 3 9
20 Not enough waypoints to reach user destination 3 1 3
21 Need to buy additional sensors for all automation tasks 3 1 3
22 Phase 2 does not meet all of their requirements 3 9 27
23 Space for testing on campus is not available 3 3 9
24 Not having enough time to learn from Phase II 3 3 9
25 Team loses a CE/programmer 1 9 9
26 Team does not have enough budget to purchase a new GPS 1 3 3
27 Team does not have enough resources to complete all software aspects 3 9 27
28 Don't get redesigned main PCB back from D3 by set date 9 3 27
29 Phase 2 does not complete all schematics for APM 9 1 9
30 Enclosure costs more than budget 3 3 9
Technical
Resource
MSD II Preliminary Schedule
27
MSD II Preliminary Schedule
28
MSD II Preliminary Schedule
29
VCV
VCVVCV
VCVVCV
VCV
VCV
VCV
VCV
VCV
VCV
VCV
MSD II Preliminary Schedule
30
Questions & Feedback