tadbiromran jam (toj) co.€¦ · tadbiromran jam (toj) co. 1- main expertise 2-2- railways ......

25

Upload: others

Post on 09-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Introduction

Through long term experience in the fields of intercity and urban railways’ track design

and construction, we have virtually conquered all local track-related projects in Iran. From track

laying in ballasted intercity railways in Iran (more than 2000 km.) we have extended our services in

railway track engineering consulting and EPC projects. We have our footprints in Tehran, Mashhad

and Isfahan Urban Railways.

Our key personnel include best governmental supreme managers to well-educated

professional private engineers whom all have devoted themselves to development and

improvement of railway track engineering construction and engineering services.

We follow the best procedures world-wide and are keen in newly developed technologies

in railway track and signaling systems. Also due to very good binding with domestic track

elements’ manufacturers our prices are very competitive.

T.O.J. Co. Main fields of

expertise

Railways (Intercity Railway)

Urban Traffic Heavy Haul

Traffic

Ballasted Track

Consulting services

Project Management

Construction and

Supervision

Slab Track

Track Services

Communication Signaling

TadbirOmranJam (TOJ) Co.

Railway Superstructure and Track Laying Company

Brief Introduction

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

1- Main Expertise

2-2- Railways (Intercity Railway)

The proper choice of a track system depends on many factors. Each project, after all,

places different challenges. Which system is the best for a certain application? Is a ballasted or a

non-ballasted solution advisable? Sometimes a simple solution will lead faster to your goal – and

sometimes a sophisticated system is the better solution over the long run. In any case, T.O.J. Co.

can offer the appropriate solution: We help you to find the right way.

A track system by T.O.J. Co. is always a tailored solution, in which systems are adapted to

special requirements. Curves, bridges, fill sections, tunnels, and turnouts place the strictest of

requirements on the route. Foundation-soil characteristics have crucial consequences for planning.

What physical forces and environmental influences can be expected? How will the soil react to

operational loads over the long run? And: What logistics requirements must be considered during

construction? After all: optimization of the process chain is our primary goal, and this includes

construction-site access, transport paths, and material supply.

2-3- Urban Traffic

Innovative concepts in urban traffic make our cities more worthwhile to live in. But

nowadays, foresight is more important here than ever: the coexistence of people, means of

transport, and other machines in crowded spaces demands intelligent and ecologically harmonious

solutions – not only in planning and logistics, but likewise during construction phases and during

transport operation. T.O.J. Co. offers innovative system solutions for all requirements of mass

rapid transit. And since each track system should be optimized for its special area of application,

T.O.J. Co. places special emphasis on close collaboration with our customers and business

partners.

Any public transport project in urban zones is just as individual as the city in which it is

implemented. Continuously new requirements challenge engineers and planners: urban

architecture, bridges, overpasses and tunnels, impressive squares, train stations, and malls and

shopping centers exert critical influence on the selection of systems. How do structures near a rail

line react over the long term to rail operating loads, and how should we protect them? In downtown

and residential areas, the public increasingly voices greater expectations for aesthetic criteria.

2-4- Heavy-Haul Railways

Due to heavy axle loads and special operating conditions these railways require special

attention in track design. Although the applied track system in most of these railways is ballasted

track but special attention should be given to track elements such as rail grade and dimension,

sleeper type and spacing and high-duty fastening systems.

T.O.J. Co. has long experience in freight and mixed railways lines across Iran and is

willing to submit all valuable experience to its oversea client. Main track design criteria for us in

this field are availability, punctuality and safety.

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

2-5- Track Engineering Services

As an EPC contractor we have equipped ourselves with best track engineers and now we

are engaged in all track related project in all phases including feasibility studies, preliminary

design, basic design and detail design. Also our services are extended to track construction

management and supervision.

Our engineers have a long-term experience in Tehran, Mashhad, Shiraz, Isfahan and Ahvaz

urban railways and currently are supervising the track construction in Shiraz and Isfahan.

Following pictures shows are sample sheets which were presented to our Clients for previous track

design projects.

2- Key personnel

Responsibility

in T.O.J. Co. Main Previous responsibilities

Years of professional

experience

ValyAhmadiZadsaraee board of

directors

Consultant for Iranian Railway of Iran

Deputy of Railway general manager

General Manager of state-owned track

Construction Company

Deputy of railway infrastructure

department

30

Hassan Rasooli Board of

Directors

Mayor of Kashmar,

Governor of Zahedan

Deputy of Iranian railway planning

organization,

Member of board of directors of

Iranian railway,

30

Hassan Mosavinejad Board of

Directors

Deputy of railway general manager of

general manager of railway planning and

budget department,

Transport ministry consultant,

Deputy of railway planning office,

Member of railway boards of director,

30

Mahan Yoldashkhan Technical

Deputy and

ProjectManager

Track expert in design office of

ministry of roads and transportation,

Track engineer in Shiraz urban

railway design project,

Track engineer in Isfehan urban

railway design project,

Superior transport researcher of

ministry of roads and transportation in 2008,

Translator and author of several

track-related books in Iran,

13

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Beside the current activities and engineering services, this company always emphasize on

having up to date standards and publication, translation of the latest technical books and publishing

scientific articles by its experts.

Here are some of the scientific activities, done by TOJ experts:

1- Application of Cellular Polyurethane (PU) Materials for Increasing Track Elasticity and

Vibration Mitigation in Railway Track System, Mahan Yoldashkhan, 8th Railway

Transportation Conference

2- Development of a Light Mass-Spring System for Ground- Borne Vibration Mitigation

in Shiraz LRT Line, Mahan Yoldashkhan, 1st International Congress on Earthquake

and Lightweight Construction

3- Reliability Analysis of Rheda Slab Track System under Traffic Loads, Negin Tayebi,

Journal of Transportation Engineering

4- Practical Guide to Railway Engineering, Translated by Mahan Yoldashkhan

5- Railway Traffic and Timetable, Translated by Mahan Yldashkhan

6- Modern Accounting, Written by Mahmood Heydari

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

4-1 Main Project:

Project Progress

Estimated

Cost

(Billion

Rials)

Description

Construction of Tehran metro Line 4 Depot

Superstructure and Track Laying 100% 30

Including Link

Tunnel and Depot

Super structure

Construction of Tehran Metro Line 4 Underground

Parking (Ekbatan) Structure 100% 300

Construction of Tehran Metro Line 4 Parking (Ekbatan)

Superstructure and Track Laying 100% 20

Superstructure

construction for

Underground

Metro Parking

Superstructure Construction and Track Laying for

Phase 5 of Tehran Metro Line 4 100% 79

Connection of

Azadi St to Eram

e Sabz St

Construction of Negin Floor Parking with 6500 m2 Area 100% 120

Superstructure Construction and Track Laying of

Tehran Metro Line 3 Phase1 Including 5 Km double

Track Tunnel 100% 80

Vali e Asr

Intersection St to

Sohrevardi St

Superstructure and Track Laying of Tehran Metro Line

3 Phase 2 (Vali e AsrIntersection St to Azadegan Depot) 100% 220

Vali e Asr

Intersection St to

Azadegan Depot

Enterance

Superstructure Construction and Track Laying of

Tehran-Tabriz Substituting Underground Route

Including 32 Km Slab Track and 7 Km Ballasted Track 100% 315

Thr Project

Carried Out in

municipality Area

No 17 & 18-

Employer: Rahab Construction of Jamedat Building for Alhavi Pharmacy

Factory 100% 50

Over 7000 m2 Building Contract management 80% 20

Contractor of 2000m2 Buildings 8% 10 Supervision for Iran South Railway Corridor

Implementation of Signaling and Telecommunication 60% 12

Infrastructure Maintenance of Tehran Metro Line 1 and

2 100% 20

Superstructure and Track Laying of North part of

Tehran Metro Line 3 (Vali e AsrIntersection St to

Beheshti)

100% 240

Superstructure and Track Laying of North part of

Metro Line 1(Tajrish Station) 100% 30

Superstructure and Track Laying of Tehran Kolahdooz

Depot of Metro Line 4 100% 40

Superstructure and Track Laying of Shiraz Metro Line 1 90% 200

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

4-2- A Brief Description of the Company Main Project

Superstructure and Track Laying of Tehran Metro Line 3:

This project includesthe following main scope of works by which is left to the company:

Procurement of required rail to fulfill the project needs(TadbirOmran e Jam is

responsible for Procurement of 5000 tons of UIC 54E-1 rails.)

Procurement of fastener parts (including steel rail seats, large pad, small pad,

springs, different types of screws, welding materials and etc.)

Providing human source and required machinery.

Production of prefabricated ducts for tunnel facilities as well as transportation and

implementation beside of track superstructure.

Rail joints welding by thermit process.

Receiving of turnout and crossovers from TUSRC and implementation in slab track.

The main characteristics of this project are as follows:

No Project Part Contractor Scope of Works Length(Km)

1 Middle Part of Tehran

Metro Line 3 TadbirOmran e

Jam

Procurement of rails and

fasteners

Complete Superstructure

Construction

5

2 Southern Part of

Tehran Metro Line 3

(Bored Tunnel)

TadbirOmran e

Jam

Procurement of rails and

fasteners

Complete Superstructure

Construction

5.5

3 Southern Part of

Tehran Metro Line 3

(Cut & Cover Tunnel)

TadbirOmran e

Jam

Procurement of rails and

fasteners

Complete Superstructure

Construction

6.5

4 North Part of Tehran

Metro Line 3

TadbirOmran e

Jam

Procurement of rails and

fasteners

Complete Superstructure

Construction

17

Total(Km) 34

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

The following figures show construction method for Middle Part of Tehran Metro Line 3.

Surveying and implementation of basic marks in vicinity of assembled track in tunnel.

Assembling and adjustment of a crossover in tunnel

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Concrete pouring by rail truck for construction of Tehran metro line 3 to line 4 link turnout

Assembled Track

Finished Track (after curing)

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Superstructure and Track Laying of North part of Tehran Metro Line 1(Tajrish Station) is

one of the challenging superstructure projects and We’ve used a 80 meter height shaft to access tunnel for

concreting slab.

Crane used for transferring concrete to tunnel

Clip screw fixing

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Superstructure construction and track laying of KollahDouzDepot(Tehran Metro Line 4 Depot)

KollahDouz Depot supposed to be the end depot of Tehran metro Line 4 in which all levels of

line 4 rolling stock maintenance are performed. Procurement of all track parts (including sleepers,

fasteners, ballast, welding and etc) as well as providing human resource, construction machinery,

track laying and construction of all tracks in depot area are left to TadbirOmran e Jam Company.

General Plan of KollahDouz Depot Track Layout (App 10 km length).

Poured concrete for KollahDouz Depot Link Tunnel which was curing by wet textiles

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Superstructure construction and track laying of Tehran-Tabriz underground tunnel

By this contract Iran railways examined the first slab track in their underground tunnels.

The main scopes of works are as follows:

1- Procurement of 4000 tons of E60 rails.

2- Production of di-block sleepers.

3- Procurement of fastener parts.

4- Construction of slab tracks and ballasted tracks.

5- Welding process and other complementary works.

Rail unloading from flat rail truck to road truck

Ballasted track

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Arranging of di-block prefabricated sleepers and assembling them to build track panels and initiating of track adjustment.

Prepared track Panel ready to track laying and track adjustment procedure

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Pouring concrete of slabs

Sleepers which are used in this project, are double block sleepers and Tadbir Omran Jam

has produced over 50000 sleepers.

Preparing sleeper frames

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Preparing sleeper frame

Sleepers truss bars

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Sleeper production

\

Batching Plant

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

1Metro Line Shiraz of uperstructure and Track LayingS

In this project, Tadbir Omran Jam is in charge of superstructure and track laying of over 8

kilometers of single track tunnel and also about 2 kilometers of open track.

Assembled track in single track tunnel

Sleeper laying in U-Wall area

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Superstructure in U-wall area

Superstructure in single track tunnel

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Infrastructure maintenanceof Tehran metro Line 1 and 2

By this contract, tadbirOmran e Jam is responsible for all maintenance activities for tracks and

structures of Tehran metro line 1 and 2.

Preperation of

maintenance Plan

•Preperation of general maintenace plan for tracks and superstructure

•Preperation of general maintenace plan for turnouts and crossovers.

•Preperation of general maintenace plan for track srtuctures.

•Receive monthly orders from employer

Track Maintena

nce

•Control and adjustment of track gauge.

•Grinding of rails

•Checking of fastener parts and replacement of faulty parts.

•Checking of welding and rail joints and required geometrical and mechanical corrections

•Checking and adjustment of rubber pads under rails and under rail seats

Maintenance of

Switches and

Crossovers

• Weekly services of turnouts and crossovers including lubricating and cleaning of sliding plate, blades and enterance.

• Full control of joints and wrenching of screws.

• Geometrical control of frog and performoing reqired correctional actions.

• Checking of sealed joints at start and end of turnouts.

• Check and correction of geometrical plan of turnouts and crossovers in slab tracks and ballsted tracks.

Ballast bed

Maintenance

• Geometrical control of ballasted tracks and preparing of track geometrical adjustment in horizontal and spiral curves.

• Adjustment of track, turnouts and crossover geometrical parameters if required.

• Subgrade leveling.

• Checking of subgrade fouling, water drainage and fouled ballast replacment, if required.

• New Ballast tamping or parts of routes which is required.

• Control of rail joints in ballasted tracks and geometrical adjustment, weld and joints corrections.

Infrastructure

Maintenance

• Inspection of all utilities ducts(57 and 72 cm)

• Inspection of all track drainage, sides and mid canals, outlets and remove faults.

•Correction of slab tracks concrete

•Repair of duct plug.

•Removal of weeds in depot

• In depots some of actions related to utilities are performed by structure team.

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Machineries

We own a wide range of machineries for track superstructure construction and

maintenance. Our machineries cover both ballasted and ballastless track structures. In the following

we intend to depict some of our machineries’ potentials.

Light Track Machineries

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

List of Light Machineries

EQUIPEMENTS for ALUMINOTHERMIC WELDING

Rail shearing machine

Turbine Preheating unit

Cutting blades

Rail stressor

Rail thermometer

TRACK MACHINERIES

Sleeper drilling machine

Light Grinding unit

Abrasive disc saw

Impact wrench

Grinding unit on trolley

Profile grinding machine

Rail cleaner

Rail drilling machine

Profile grinding machine

Sleeper drilling machine

Coachscrewing machine

CONTROLLING DEVICES

Track & switch measuring devices

Platform gauge

Versine measurement set

Data-logging trolley

Ultra sonic flaw detector trolley

Electronic gauge for straightness

Ultra sonic flaw detector

Hardness tester

Track & switch measuring devices

Hardness tester

LIFTING or HANDLING EQUIPMENTS

Motorised Trolley

Light weight trolley

Welders trolley

Mechanical jack

Hydraulic jack

TRACK TOOLS

Forks & Ploughs TOM1 BALLAST REMOVAL

Tongs RAIL & SLEEPERS HANDLING

Mechanical spanners

Bars

Shovels, picks, adzing howels

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Hammers & mallets

RAILS and FISHPLATING

C Clamp FISHPLATING

Insulated rail joint

HeavyTrack Machineries

Sleeper Replacement Machine

Multi-Function Light Loader

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Multi-Function Light Loader (In practice)

Rail-Based Crane and Transport Unit

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Track mixer (used both on railway track and road)

Also we are able to provide following special track machineries for

high-duty applications:

1- Tamping Machine 09-32,

2- Ballast Regulators,

3- Ballast Cleaning Machines,

4- Track Stabilizers,

5- Mobile flash-butt welding units,

6- Track laying cranes,

7- Track recording cars.

Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.

Other Civil Machineries

Following table shows a complete list of our machineries (except

special track machines).

Item Vehicle Type Number Comments

1 Loader 1 Heavy duty

2 Transport vehicle 5 Benz and Amico

3 Mobile Water Tank 2

4 Trailer 1

5 Heavy Duty Concrete Mixer

Vehicle

4 Benz

6 Cranes 2 35 Tones

7 Concrete Batching Plant 2

8 Concrete Pumps 2

9 Stationary water tanks 3 60000, 5000 and 3000 liters