technical solutions for gas insulated switchgear
Embed Size (px)
TRANSCRIPT
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
1/34
1
Solution against Various Substation Requirementolution against Various Substation Requirement
with as Insulation Technologies
ith as Insulation Technologies
(Tokyo, Japan)(Tokyo, Japan)
CIGRE Romania, CIGRE Study CommitteeCIGRE Romania, CIGRE Study Committee B3:B3:
SubstationsSubstations
RomaniaRomania
April, 2008April, 2008
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
2/34
2
1. Solution for Substation Application1. Solution for Substation Application
2. Solution for Substation in Urban Area2. Solution for Substation in Urban Area
3. Substation Refurbishment3. Substation Refurbishment
4. Latest Achievement4. Latest Achievement
CONTENTSCONTENTS
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
3/34
3
1. Solution for Substation Application1. Solution for Substation Application
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
4/34
4
1)Economical1)Economical
Expensive LandExpensive Land
2)Physical2)Physical
(Geographical)(Geographical)
Congested AreaCongested Area
Mountain AreaMountain Area
Coastal / RiversideCoastal / Riverside
MuddyMuddy
1.Combine with1.Combine with
building, parking,building, parking,public spaces etcpublic spaces etc
2.Combine with2.Combine with
TransmissionTransmission
TowerTower
1)Mobile1)Mobile
2)Combine2)Combine
Substation Space
a) No Space
Available
b) Limited Space
c) Enough Space
Available
Requirement
a) New
b) Refurbish/Replace
c) Extension/Uprating
Solution for Substation ApplicationSolution for Substation Application
1.Digging2.In/On/Under
Building
3.Reclamation
4.Floating
1)Gas Insulated1)Gas Insulated
2)Air Insulated2)Air Insulated
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
5/34
5
1)Indoor1)Indoor
2)Outdoor2)Outdoor
Surroundings
a) Climate
Dry / Wet (Humid)
Polluted / Coastalb) Ambient Temperature
Nominal
Extremely Hot (i.e > 40deg)
Extremely Cold (i.e
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
6/34
6
Substation in Urban Area
1)Economical1)EconomicalExpensive LandExpensive Land
2)Physical2)Physical
(Geographical)(Geographical)
Congested AreaCongested Area
Mountain AreaMountain AreaCoastal / RiversideCoastal / Riverside
MuddyMuddy
1)Mobile1)Mobile
2)Combine2)Combine
1.Digging
2.In/On/Under
Building3.Reclaiming
4.Floating
1)Gas Insulated1)Gas Insulated
2)Air Insulated2)Air Insulated
1)Indoor1)Indoor
2)Outdoor2)Outdoor
1.Combine with1.Combine with
building, parking,building, parking,
public spaces etcpublic spaces etc
2.Combine with2.Combine withTransmission TowerTransmission Tower
Mobile SS (PreMobile SS (Pre-- Fabricated)Fabricated)On TrailerOn Trailer
On Ship / VergeOn Ship / Verge
On Rig (i.e. oil / naturalOn Rig (i.e. oil / natural
gas plant on the sea)gas plant on the sea)
Compact SSCompact SS
Underground SSUnderground SS
Complex Building SSComplex Building SS
SS under TransmissionSS under Transmission
TowerTower
Indoor AIS SSIndoor AIS SS
Outdoor AIS SSOutdoor AIS SS
Indoor GIS SSIndoor GIS SS
Outdoor GIS SSOutdoor GIS SS
Solution for Substation ApplicationSolution for Substation Application
Hybrid SSHybrid SS
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
7/34
7
Type of Switchgears (AIS / Hybrid / GIS) ~ 1Type of Switchgears (AIS / Hybrid / GIS) ~ 1
Conventional AISConventional AIS Hybrid GISHybrid GIS GISGISIn airIn air In airIn air In SF6 gasIn SF6 gasMain BusMain Bus
DistributedDistributed Highly integratedHighly integratedArrangement ofArrangement of
EquipmentEquipment
ExposedExposed Fully enclosedFully enclosed
Exposure of LiveExposure of Live
PartsParts
LargeLarge SmallSmallOverall Land AreaOverall Land Area
Less than GISLess than GIS --Equipment CostEquipment Cost
Outline of mainOutline of main
componentcomponent
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
8/34
8
Type of Switchgears (AIS / Hybrid / GIS) ~ 2Type of Switchgears (AIS / Hybrid / GIS) ~ 2
Conventional AISConventional AIS
Hybrid GISHybrid GIS
Full GISFull GIS
Area (mArea (m22))
AISAIS HH--GISGIS GISGIS
5,6965,696
(100%)(100%)3,7763,776
(66%)(66%)882882
(15%)(15%)
Volume (mVolume (m22))227,840227,840
(100%)(100%)151,040151,040
(66%)(66%)12,34812,348
(5%)(5%)
(550kV SS, 1(550kV SS, 1--1/2CB system)1/2CB system)
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
9/34
9
GISAIS
Live
Livetank
Dead
tank
GCB +
Physical Integration
GCB+DS/ES GCB+DS/ES+BusAir insulation
Scope of SF6 Gas Insulation
Hybrid Switchgear
OCBABB
Hybrid Breaker Technical ClassificationHybrid BreakerHybrid BreakerTechnical ClassificationTechnical Classification
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
10/34
10
400kV Hybrid GIS (60Hz)400kV Hybrid GIS (60Hz)
CustomerCustomer
CountryCountry
Installed atInstalled at
Installed inInstalled in
: SEC: SEC--ERBERB
: Saudi Arabia: Saudi Arabia
:: HawiyahHawiyah SSSS
: 2001: 2001
Rated VoltageRated Voltage
Rated CurrentRated Current
Rated Breaking CurrentRated Breaking Current
: 380kV: 380kV
: 3150A: 3150A
: 50kA: 50kA
ESES
GCB DSDSBgBg
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
11/34
11
2.Solution for Substation in Urban Area2.Solution for Substation in Urban Area
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
12/34
12
Solution for Substation in Urban AreaSolution for Substation in Urban Area
Space LimitationSpace Limitation
--
under building, parking, public spaces, etc.under building, parking, public spaces, etc.
SafetySafety-- NonNon--flammability and nonflammability and non--explosive featuresexplosive features
Environmental ConformityEnvironmental Conformity-- OilOil--free & lessfree & less--pollution, minimum visual impact, Lowpollution, minimum visual impact, Low--noise, etc.noise, etc.
Economical SolutionEconomical Solution-- Less construction costs, less maintenance & operation costs, etLess construction costs, less maintenance & operation costs, etc.c.
Requirement for Substation in Urban Area
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
13/34
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
14/34
14
Underground SubstationUnderground Substation-- Substation under office building, historical architects in theSubstation under office building, historical architects in the limited spacelimited space
Compact Substation with GIS and GITCompact Substation with GIS and GIT--Compact and nonCompact and non--flammable substation with GIS and GITflammable substation with GIS and GIT
(Gas Insulated Transformers)(Gas Insulated Transformers)
Environmental Consideration TechnologyEnvironmental Consideration Technology-- Minimum visual impact, LowMinimum visual impact, Low--noise, etc.noise, etc.
ToshibaToshibas Solution for Substation in Urban Areas Solution for Substation in Urban Area
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
15/34
15
Compact Substation with GIS & GITCompact Substation with GIS & GIT
150MVA150MVA--275kV275kV
Shunt ReactorShunt Reactor
300MVA300MVA--275kV GIT275kV GIT GISGIS
GITGIT
GIBGIB
Underground SubstationUnderground Substation
GIS RoomGIS Room
TransformerTransformer
RoomRoomOil TransformerOil Transformer
ConservatorConservator
PressurePressure
ReliefRelief
DeviceDevice
Oil PitOil Pit
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
16/34
16
20MVA20MVA--66kV GIT66kV GIT
entilation duct
Low pressure, Indoor type,
Direct GIS connection
MODEL OF GIS & GIT SUBSTATIONMODEL OF GIS & GIT SUBSTATION
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
17/34
17
OIT(Oil Immersed
Transformer)GIT(Gas Insulated
Transformer)
COMPARISON BETWEEN OIT AND GITCOMPARISON BETWEEN OIT AND GIT
Construction of OIT and GIT
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
18/34
18
COMPARISON BETWEEN OIT AND GIT SUBSTATIONCOMPARISON BETWEEN OIT AND GIT SUBSTATION
Fire fighting and alarm systemSubstation with GIS and OIT
High Ceiling
Gravel Filling / Oil Catch Pit
Underground Oil Storage Tank
Underground Water Tank
Fire Wall
Substation with GIT and GIT
REDUCTION OF
TOTAL VOLUME
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
19/34
19
0
20
40
60
80
100
0 0.2 0.4 0.6 0.8 1
Faul t Time [sec]
PressureRise[%]
Tank Strength
Oil-Immersed Transformer
Gas Insulated Transformer
Safety ~ NonSafety ~ Non--Flammable & ExplosivenessFlammable & Explosiveness
SF6 GasSF6 Gas Slow Pressure RiseSlow Pressure Rise NonNon--ExplosivenessExplosiveness
Non Flammable GasNon Flammable Gas NonNon--FlammableFlammable
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
20/34
20
275kV Underground Substation under Temple275kV Underground Substation under Temple
275/66kV GIS275/66kV GIS TransformersTransformers
Buddhist TempleBuddhist Temple
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
21/34
21
275kV Underground Substation under275kV Underground Substation under OffceOffce BuildingBuilding
300MVA300MVA--275kV275kV
Gas Insulated Transformer (GIT)Gas Insulated Transformer (GIT)
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
22/34
22
500kV Underground Substation in Central Tokyo500kV Underground Substation in Central Tokyo
Office buildingOffice building
Underground SubstationUnderground Substation
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
23/34
23
3. Substation Refurbishment3. Substation Refurbishment
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
24/34
24
Old AIS Installation AreaOld AIS Installation Area
(400/220kV)(400/220kV)After Installation of GISAfter Installation of GIS
(400/220kV)(400/220kV)
AISAIS37,000m37,000m22
(100%)(100%)
GISGIS15,000m15,000m22
(40%)(40%)
Substation Replacement in RomaniaSubstation Replacement in Romania
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
25/34
25
Old AISOld AIS
ExposureExposure of l ive partsof l ive parts
LiveLive tank enclosurestank enclosures
GISGIS
No exposureNo exposure of l ive partsof live parts
DeadDead tank enclosurestank enclosures
Substation Replacement in RomaniaSubstation Replacement in Romania
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
26/34
26
Refurbishment from AIS SS to GIS SSRefurbishment from AIS SS to GIS SS
Before Replacement : Air Insulated Substation (72kV)
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
27/34
27
Empty Space
Refurbishment from AIS SS to GIS SSRefurbishment from AIS SS to GIS SS
Before Replacement : Air Insulated Substation (72kV)
Conforming to Kyoto Protocol & subsequent agreementsupported world widely regarding CO2 reduction wil l require
environmental-friendly solution more strictly. This solution will
contribute to fulfill such requirement even in the T&D area.
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
28/34
28
4. Latest Achievement4. Latest Achievement
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
29/34
29
Barron Gorge Hydro PSBarron Gorge Hydro PSGIT ApplicationGIT Application
Old OITOld OIT
New 39MVANew 39MVA--132kV GIT132kV GIT
ReplacementReplacement
Hydro PS in World Heritage AreaHydro PS in World Heritage Area
Prevention from Oil Influx into RiversPrevention from Oil Influx into Rivers
Application of GITApplication of GIT
Barron Gorge Hydro PSBarron Gorge Hydro PS(STANWELL, Australia)(STANWELL, Australia)
In 2005In 2005
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
30/34
30
Environmental Conformity of Gas Insulated TransformersEnvironmental Conformity of Gas Insulated Transformers
(from local newspaper, in 2005)(from local newspaper, in 2005)
Environmental conformity of Barron Hydro Power Station was improEnvironmental conformity of Barron Hydro Power Station was improvedved
by 39MVA Gas Insulated Transformer.by 39MVA Gas Insulated Transformer.
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
31/34
31
Conceptual view of Haymarket 330/132kV substationConceptual view of Haymarket 330/132kV substation(at Sydney Australia by(at Sydney Australia by TransgridTransgrid ))
World Largest GIT SubstationWorld Largest GIT Substation
Office building is constructed above SS.
Inlets & Outlets of Tr air cooling system are on the roof floor.
Office building is constructed above SS.
Inlets & Outlets of Tr air cooling system are on the roof floor.
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
32/34
32
Picture after completionPicture after completion
New SubstationNew Substation
Haymarket Substation, AustraliaHaymarket Substation, Australia
SH k S b i A li
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
33/34
33
400MVA400MVA--330kV330kV
Gas InsulatedGas Insulated
TransformerTransformer
(World(World
s Largest GIT)s Largest GIT)
Customer :Customer : TransGridTransGrid (Australia)(Australia)
Substation : Haymarket SSSubstation : Haymarket SS
No. of units : 3No. of units : 3
Year of manufacture : in 2002Year of manufacture : in 2002
Haymarket Substation, AustraliaHaymarket Substation, Australia
C l i S l i f V i S b iC l i S l ti f V i S b t ti
-
8/10/2019 Technical Solutions for Gas Insulated Switchgear
34/34
34
Conclusion ~ Solutions for Various SubstationsConclusion ~ Solutions for Various Substations
Limited SpaceLimited Space Higher SafetyHigher Safety EnvironmentEnvironment CostCost--SavingSaving
Solutions with Gas Insulation TechnologiesSolutions with Gas Insulation Technologies
DemandsDemands
Gas Insulated Transformers (GIT)Gas Insulated Transformers (GIT) Gas Insulated Switchgears (GIS)Gas Insulated Switchgears (GIS)
Compact SolutionCompact Solution
Substation in Urban AreaSubstation in Urban Area
Substation RefurbishmentSubstation Refurbishment
FailFail--Safe SolutionSafe Solution
NonNon--flammabilityflammability
NonNon--explosivenessexplosiveness
Economical SolutionEconomical Solution
Easier installationEasier installation
Easier maintenanceEasier maintenance
FeaturesFeatures