technology & standards update - swinog
TRANSCRIPT
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Swinog #33, 24 05. 2018
Technology & Standards UpdateOverview
Christian Kuster
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Industry Hardware Design Evolution overview
2016~2018 2019~2020 2022+
100GQSFP28
100G CFP2
ChipsCrafts
Interface
Inter-Connection
PowerConsumption
Large Capacity
1KW/SlotAir Cooling
Ready
2T/Slot
25G NRZ PCB
400GCFP8
50GQSFP28
400GQSFP DD
1.5KW/SlotAir Cooling
4T/Slot
28G NRZ Cable
Expected
8T/Slot
1.8KW/SlotAir Cooling
56G PAM4Cable
>2KW/Slot Liquid Cooling
Future
112G PAM4Cable/Optical
16T+/Slot
1T+
16nm 7nm 5nm
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Interface: Cost effective 50GE
0- 5 5 - - 1 - 52 15
reduces CAPEX of Per Bit by 30%
50GE smooth evolution to 100GE
Evolution Path 1:
Replacing 50GE optical
module with 100GE
Optical module
Evolution Path 2:
Binding two 50GE into
100GE through FlexE
* * * *22 * -1 0 0 4 8224 4 55 151 10 4
* 1 1 0*14 1 1 08 1 5 10
-
Long-distance
40KM
Protection
<50ms
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Interface: 400 Gigabit Ethernet on the horizon
Traffic is growing and standards are
mature. 400GE is on the horizon.
Joint Test Network
In joint testing, the commercial
capabilities of 400GE were proven.
Industry's First E2E 400GE Solution
Bandwidth is increased 4-fold with
topology and configurations simplified.
400GE port,
10 km, CFP8
400GE, gray, 10 km
2*200G, 2000 km
Tester TesterRouter Router400G Link 100G Link400GE Port
• 400GE line-rate forwarding achieved
2*200G
>2000 kmRouter WDM Router
400GE10 km
400GE10 km
WDM
IP
Optical
2014•Initiated 400GE standard
2017•Released 400GE standard
2012•Released 100GE standard
2015• OIF
released 400G white paper
2013• ITU-T
initiated 400G mapping standard
2016• ITU-T
released 400G mapping standard
• IEEE, ITU-T, OIF have released 400G standards.
• Huawei chairs the 400GE Ethernet Alliance & leads the development of 400G standard
400GE: Next-Generation Ports
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Innovative Cable-based Backplane -Resolve System Capacity Bottleneck with 400GE
SERDES BUS
SINGNAL LOSS
PCB LAYER
SIZE
<25Gbps 28G/56Gbps
¼ Loss of PCB
About 50 No Limit
1.2m No Limit
PCB V.S. CABLE
• Up to 160T per Chassis
Multiple shield protection
Rx and Tx separation
Precision copper wire High-performance dielectric material
Dense shield Multiple corrosion protection layerHigh-strength wire
unstable
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
Protocol Simplification Trend mature unMature
NetConf YANG
BIER
BIER BASE BIER OAMBIER
OVERLAYBIER
INTERWBIER Central
control
Segment Routing
SR MPLS SR IPV6 SR OAM Inter-ASLabel
Distribution
E-TREE
(P2MP L2VPN)
EVPN
EVPN
CLI MIB
Configuration
MIB
Monitor
MIB
Performance
TRAP
Alarm Event
Notification
NetCONF YANG
Telemetry (gPRC)NETCONF
OAM
IP OAMMPLS-TP
OAM
Overlay OAM/Telemetry
MPLS OAM …
Inter-layer OAM/LIME
Unified OAM
E-LAN
(MP2MP L2VPN)
E-LINE
(P2P L2VPN)
(PBB-)EVPN
EVPNETREE
EVPNVPWS
WANIRB
(L2/L3)
DCI
(Inter DC)
IP-VPN
(L3 VPN)
EVPNIRB
EVPNIRB Ex
EVPNDCI
DCI
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial
and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you0
50
100
cisco
huawei
juniper
Ericsson
Ciena
NokiaZTEIntel
Infinera
Metaswitch
Broadcad
Yuma
Tail-F
IETF drafts with YANG modules
Huawei & Cisco submitted each around >70 YANG model drafts
Variety of YANG Model Docking Solutions
Source�IETF
Private YANG Docking
Private YANG
IETF YANG
Mediator
Private YANG Private YANG
IETF YANG maps toprivate YANG
3rd YANG External Mediator Docking
Informal models
Service Specific code
Orchestrator
Vendor A
Device Adaptors
Vendor B
Vendor C
Informal models
Orchestrator
Netconf/YANGPlug & Play
Formal Date-Model
Traditional YANG Based
Model-driven cross-domain/multi-vendor managementreduces effort and shortens deployment time
YANG Model CFG Management shortens TTM, Huawei Actively Promotes Standardization of Public Parts
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financialand operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results anddevelopments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided forreference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank youThank You!