The essence of time in policy

and design Radioactive waste management strategy in The Netherlands

Jan Boelen

COVRA NV

IAEA, Vienna

23 November 2016

Page 2: The essence of time in policy and design

CONTENTS

• The Netherlands

• Governance / Policy

• COVRA Pragmatic solutions

2

Page 3: The essence of time in policy and design

3

Page 4: The essence of time in policy and design

4 4

SOLUTIONS FOR THE NETHERLANDS

• small amount of waste

• high ground water table

• high population density

• high environmental

awareness

• advanced spatial planning

17 million people

Page 5: The essence of time in policy and design

5

RADIOACTIVE WASTE

• 2 nuclear power plants

1 operating (500 MWE)

1 shut down(GKN 1997)

• 2 research reactors

• industry

• medicine

• research

• U-enrichment plant

Waste inventory (1982-2015)

HLW: 100 m3

LILW: 11.000 m3

NORM: 17.000 m3

Page 6: The essence of time in policy and design

PRAGMATIC DISPOSAL SOLUTIONS

6

Page 7: The essence of time in policy and design

7 7

Page 8: The essence of time in policy and design

8

Page 9: The essence of time in policy and design

9

CLASSICAL TRIANGLE

Page 10: The essence of time in policy and design

IMC APPROACH

10

Page 11: The essence of time in policy and design

11 11

RWM POLICY THE NETHERLANDS

• polluter pays

• One central radioactive waste management organisation

• all waste managed and owned by COVRA

• capital growth fund within COVRA

• all waste managed at one industrial site

• at least 100 years storage, in buildings

• deep disposal after 100 years stable policy since 1984!

Page 12: The essence of time in policy and design

INTEGRATED WASTE MANAGEMENT

12

Page 13: The essence of time in policy and design

IMAGE OF THE FUTURE

13

Page 14: The essence of time in policy and design

14

Store for 100 years

Page 15: The essence of time in policy and design

REQUIREMENT MANAGEMENT SYSTEM

15

Page 16: The essence of time in policy and design

FINDING A SITE

16

Please, mister can we have our ball?

Page 17: The essence of time in policy and design

SITING CRITERIA

• Normal industrial activity

• Risk perception: not close to

living areas

• Long term acces to skill pool:

industrial area

• Good accessability; road ,

train, water

• Access to water for cooling

17

20

12

2

Final selection based on:

public acceptance

Page 18: The essence of time in policy and design

18

Page 19: The essence of time in policy and design

19

TRANSPARANCY IN DESIGN

LLW treatment building

Page 20: The essence of time in policy and design

20

TRANSPARACY IN OPERATIONS

- EVERYBODY WELCOME

Page 21: The essence of time in policy and design

21

SAFE = BEAUTIFUL

Page 22: The essence of time in policy and design

22 22

METAMORPHOSIS

0

200

400

600

800

1000

1200

1400

1600

1800

2000

1 10 100 1000 10000

Watt

Time (years)

Page 23: The essence of time in policy and design

23

2003

Page 24: The essence of time in policy and design

24

2023

Page 25: The essence of time in policy and design

25

2043

Page 26: The essence of time in policy and design

26

2063

Page 27: The essence of time in policy and design

27

2083

Page 28: The essence of time in policy and design

28

2103

Page 29: The essence of time in policy and design

EXTENSION OF METAMORPHOSIS

29

Page 30: The essence of time in policy and design

EXTENSION OF METAMORPHOSIS

30

Page 31: The essence of time in policy and design

31

A SPECIAL EFFECT: TWICE A YEAR

Page 32: The essence of time in policy and design

NEW DEPLETED-U STORAGE

32

Page 33: The essence of time in policy and design

THE ESSENCE OF TIME

Stable long term policy

Not in a remote site

Active knowledge management

Manageable

Openness