The Futran System: a new technology

innovation for improved performance in coal

transportation

Presented by: Andries Louw

May 2015

The Futran system is a revolutionary new transportation

system that can be applied to transform various industries

Conveyor belts (25%-50% savings)

Factory / warehouse transformation

Urban Public transportation (70%-90% savings)

Open pit mining (25% - 50% savings)

Underground mining (30% - 60% savings)

1. M

inin

g

Heavy haul rail (40% - 60% savings)

Dry bulk ship loading (60%-80% savings) 3

. In

do

ors

2. B

ulk

an

d f

reig

ht

4. P

ub

lic T

ran

sit

The Futran System can be used to transport a range of loads of

different sizes and weights, using small, powerful electric motors

Electric motor unit Non-motorised bogies

The track has a very small footprint on the ground

The system is a low cost, low maintenance, high capacity bulk transit

system that can be assembled quickly and easily

Design specifications of the Futran System • A Low cost, greatly simplified design using off-the-shelf components

• Multi purpose system for moving a great range of objects

• Uses a light weight suspended track with no moving parts

• Can easily be maintained in far off regions and locations

• Aimed at the sub 100km/h market

• Uses very little energy per ton

• Is Completely automated

• Can be suspended above existing right of way

• Low cost / high capacity

• High availability design

• Can be built and constructed locally

The Futran system design was completed by Milotek and

patented in April 2014

Milotek Pty Ltd is the South African based company that owns the rights to the Futran system in Africa and South America. Imperial Holdings Pty Ltd is the majority shareholder in Milotek with 65% of the shares. Futran Limited owns the rights to the IP in the rest of the world.

The Futran motorised bogie is incredibly light weight and

robust while yielding significant power

Standard motor Power: 100 kW Torque: 2000 Nm

Range of motors Power: 10 to 200kW Torque: 500 to 5000Nm

The track is pre-manufactured and assembled on site

By using Advanced High Strength steel, we managed to

drastically reduce the track weight and cost

Salient features Track weight: <kg per meter Steel sheet cut-offs: <2% Section carrying capacity: >1 ton per meter Bulk carrying capacity: >50 000 tons per hour Track Maintenance cost: <2% of Capex per annum (est.)

The unique track design enables us to make it very light

weight and modular, easy to assemble anywhere

In July 2014 the first prototype test track was completely

assembled and electrified

The motorised bogie was mounted on the track and tested

manually first

Both a grid powered and a battery powered test unit was

successfully commissioned and have been tested

Battery powered unit

Grid powered unit

Mini train being pulled

The first test unit has been running since June 2014 under

controlled conditions

We are finishing off testing the third version of the bogie on a

new track and the fourth is being constructed at present

Bogie number 3

Bogie number 1

Bogie number 2

Bogie number 4

The completed motorised bogie has a protective cover to

limit dust and moisture exposure

An external test track of 1 km is being constructed at present

and will go live in June 2015

A multitude of bucket or skip types can be pulled behind the

motorised bogies

A range of loading systems are being developed for different

uses

Continuous in-line loading

Run-of-mine standstill loading

OB standstill loading

Superstructures for both single, double and triple lanes have

been developed

When the System runs horizontally (up to 5 degrees), it can cost

effectively run as long as a railway line or as short as a conveyor belt

A narrow counter-balance bogie can be used (narrow track), resulting in a low

cost track structure

Light weight containers moving in mini-trains of 20 to 30 tons can be pulled by a

single motorised unit, lowering cost

Many low support pillars can be used to lower cost further

Carrying capacity of track: > 40 000 tons per hour

Costs less than a conveyor belt for a system that requires much less

maintenance, has 99.9% availability, can cater for much higher capacity and runs

at less than half the operating cost

The Futran System can move loads from horizontally to vertically and

anything in between

Bogie cannot move out of channel track

When the Futran System runs up steep slopes, like a mountain, an

open pit mine or an incline shaft (>16 degrees), it shifts paradigms

A narrow counter-balance bogie can be used (narrow track), resulting in a low

cost track structure

Light weight containers moving in mini-trains of 4 to 20 tons can be pulled by a single motorised unit straight up steep slopes of a mine

Small support pillars can be used

Operating cost: • Virtually maintenance free system • Running less distance than a truck or train… • Has a weight to load ratio of less than 10%, or half

that of a truck or a train

As a result the system overcomes the gradient and cost and

distance limitations of conveyor belts

Problems associated with conveyor belts 1. Open system (dust) 2. Maintenance intensive 3. Low reliability 4. Lots of moving parts 5. Expensive 6. Gradient limitations 7. Distance limitations

THE FUTRAN SYSTEM 1. Closed System 2. Low maintenance 3. 99.9% availability 4. Few moving parts 5. Very cost effective 6. No Gradient limitations 7. No Distance limitations

When used to haul ore, coal or overburden out of an open pit mine, the

Futran system is much, much more cost effective than current modes

Diesel, Drivers, Tyres, Breakdowns, Roads, Dust, Internal Combustion

Engines, High TCO Payload / Operating Weight ratio: <55%

Electricity, EV Motors, No roads, No dust, automated, low maintenance, low

TCO per ton Payload / Operating Weight ratio: >80%

A typical Futran open pit mine process enables automated

haulage of RoM, OB, Waste and coal

WS 1

WS 3 WS 4

WS 2

WS 5

WS 6

WS 7 W

S 8

W

S 9

WS 9

WS 9

WS

9 Work Stations

WS 1: RoM Loading bay WS 2: RoM buffer bogies WS 3: OB Loading Area WS 4: OB buffer bogies WS 5: Workshop WS 6: RoM buffer WS 7: RoM crusher WS 8: OB Dump WS 9: Emergency waiting area

By spreading the load across multiple bogies, the system can also be

used to transport larger loads, such as containers

Containers and dry bulk

can be transported

using the same track

The same system can therefore be used for Long distance bulk,

freight and containerised transit

Problems associated with Dry Bulk, freight and containerised transit 1. Expensive 2. Dangerous on roads 3. Track volume limitations 4. Critical mass required 5. Right of way issues 6. Labour intensive 7. Environmental contamination

(dry bulk specifically) 8. Prone to people error

The Futran system has almost no competition when distance is

too long for conveyor belts and too short for trains or trucks

When compared against long distance rail, a well designed

Futran system can run at half the cost of a rail line

Given enough volume, cost per ton km can drop below 1 US cent, even for a fully outsourced solution running at profit for the operators. Maximum system capacity exceeds 300 million tons per annum

Rail benchmark

Rail Maximum capacity

Futran maximum capacity

At Coal and Iron Ore terminals the Futran system can further be

used to do ship loading, even from outside the terminal

1 – 50 km

1 – 50 km Sh

ip lo

adin

g chu

te

Bulk stockpile

Bulk stockpile

Ship

It is theoretically possible to achieve a rate of 40 000 tons per hour

using 2 berths only (handymax or bigger)

200 meters 200 meters

Feeding speed 1 ton per meter

at 40km/h

Each ore ship loading chute is fed by up to 7 tracks that can each take 20 containers of 2 tons each. These open in sequence to ensure a constant flow. All chutes can be

operated simultaneously.

In the Walvisbay North Port in Namibia, for instance, we can lower

cost and increase volumes dramatically

The main buffer stockpile will be outside the harbour so no need to increase harbour based stockpiling

Where the sea bed is shallow, the Futran system can be used as

a direct ship loader or a barge loader

Ideally, the environment will allow us to run the Futran track far enough into the sea to do direct ship loading from the coast

If such a long track is not feasible, we will do barge loading closer to the coast and then tranship in deeper waters

In Mozambique we can link Tete to Nacala via Macuze,

enabling vastly increased capacity at much reduced cost

Total Distance: 1055km Total construction cost: +- 2.5 billion US$ Line capacity: > 200 million tons per annum Project timelines: Can be Ready by 2018

Angoche

Nacala

It can now become feasible to ship landlocked resources to

ports in Southern Africa

35

Key Routes

Large Coal deposit

Large Iron Ore deposit

Dry Bulk harbour

Southern Africa is richly endowed with mineral riches, but the vast deposits of coal and iron ore are difficult to exploit due to the lack of transit and port infrastructure, combined with the large overland distances, often across multiple countries.

Together, these known reserves are so vast they can be

mined on a large scale for hundreds of years

36

TOTAL KNOWN EXPORT QUALITY COAL:

>80 billion tons 5 countries and 17+ suppliers Mixture of coking and various

thermal grades

TOTAL KNOWN EXPORT GRADE IRON:

>50 billion tons 5 countries and 9+ supplies

Using the Futran system, we are now discussing the creation

of The Southern African Ecolink with governments and mines

37

Nacala

Quelimane

Angoche

Key Routes

Large Coal deposit

Large Iron Ore deposit

Dry Bulk harbour

Zim link route

By linking all these deposits together with a low cost, high capacity, multi-modal transit system, the economic destiny of the region can be transformed while mines and investors are safeguarded from catastrophic events (go the other way) and political turmoil (go the other way).

Beira is too shallow and has too little capacity to be included in the route

At high volumes the Futran based Southern African Ecolink

will have a much lower total cost of ownership than rail

38

Expected rail cost per ton • Moatize to Nacala 42$ • Sishen to Walvisbay 35$ • Lephalale to Walvisbay 47$ • Zimbabwe to Nacala 45$

Expected Futran cost per ton • Moatize to Nacala 14$ • Sishen to Walvisbay 12$ • Lephalale to Walvisbay 17$ • Zimbabwe to Nacala 17$

By linking multiple resources together in a seamless chain

the Ecolink Value Chain unlocks much more value

ADD MULTIPLE INGREDIENTS

• Iron Ore

• Low grade Thermal coal

• High grade Thermal coal

• Coking coal

• Water

• Low cost, seamless haulage

• Multiple dry bulk Port terminals

39

GET A RANGE OF OUTPUTS

• Electricity

• Diesel

• Fertilizer

• Chemicals

• Plastics

• Pig iron

• Steel

• Thermal Coal

• Coking coal

• Iron ore

South Africa: The market for the Futran system is significant

Addressable market: The short, medium, long distance dry bulk transportation industry in South Africa is currently serviced by trucks, conveyor belts, trains and slurry pipes.

Our competitive advantage relative to conventional modes of transportation is significant: • Automated (lower people cost)

• Lower Total Cost of Ownership

• Use less energy

• Safer for operators and miners

• Easier to construct

• More flexible

• More reliable

• Greener

• More scalable

• More attractive business models for clients

• Etc.

Coal accounted for approximately 26% of South African

mining revenue earned in 2013

Mineral Group

% of total

sales (2013)

Coal 26%

Gold 21%

Platinum Group Metals 21%

Iron Ore 14%

Other minerals 5%

Manganese Ore 3%

Other minerals 3%

Chromium ore 2%

Nickel 2%

Building materials 2%

Copper 1%

100%

The coal volumes in South Africa are so abundant that we have to service this market as soon as possible

Coal production in South Africa is expected to exceed 300

million tons per annum from 2016 onwards

Open-pit mining account for roughly half of South African coal mining

operations, the other half being sub-surface

Milotek will construct and own the entire system at client

sites and charge the client on a per ton delivered basis

Milotek will design, finance, construct, deploy, operate, and maintain Futran systems at client sites and then charge the client

on a per ton delivered basis only

FOR EXAMPLE

Our system pricing per ton/km improves with: 1) Distance 2) Volume 3) Contract period

Total transportation distance

Total committed tpons per annum 5 Mil 10 Mil 5 Mil 10 Mil

Truck cost per ton delivered R 15 R 15 R 24 R 24

Futran cost (over 8 years) R 14 R 13 R 21 R 20

Futran cost (over 12 years) R 12 R 11 R 18 R 17

Futran cost (over 20 years) R 10 R 9 R 15 R 14

10kms 20kms

Client Price

Although suitable for medium and long distance bulk transit,

Milotek will target shorter, on-site mining operations first

Although we are more suited for longer distances and high

volumes, there is a great need for the Futran system at

operating mines who have to cut their costs while increasing

their productivity.

We will target:

• Pit or shaft to washing plant (or beneficiation plant)

• Pit to overburden dump

• Washing plant to waste dump

• Washing plant to stockpile

• Washing plant to rail sidings

• Washing plant to end customers (such as Eskom)