the sizewell c project · chapter 10 transport figures 10.11 - 10.23. aldeburgh leiston saxmundham...

14
May 2020 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 The Sizewell C Project 6.3 Revision: 1.0 Applicable Regulation: Regulation 5(2)(a) PINS Reference Number: EN010012 Volume 2 Main Development Site Chapter 10 Transport Figures 10.11 - 10.23

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

May 2020

Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

The Sizewell C Project

6.3

Revision: 1.0

Applicable Regulation: Regulation 5(2)(a)

PINS Reference Number: EN010012

Volume 2 Main Development Site Chapter 10 TransportFigures 10.11 - 10.23

Page 2: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

ALDEBURGH

LEISTONSAXMUNDHAMFRAMLINGHAM

WICKHAMMARKET

SOUTHWOLD

HALESWORTH

WOODBRIDGE

HARLESTON

BUNGAY

MAIN SITEACCESS

NORTHERNPARK AND RIDE

SOUTHERNPARK AND RIDE

A1145

A12

A14A12

A12

A11

A146

A140

A12

A12

A143

A1120

A1120 A1094B1122

B1125

B1069

B1078

B1078

B1077

B1077

B1118B1116

B1116

A144A145

B1127

B1062

B1527

B1117

B1117

B1123

A1156

B1456A12

B1083IPSWICH

DISS

BECCLES

LOWESTOFT

0 1,750 3,500 5,250 7,000 8,750M

DOCUMENT:

SCALE BAR

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W. 1:180,000 @A3

KEYBus Routes

IpswichLowestoftNorthern Parkand RideSouthern Parkand RideLeiston /KnodishallSaxmundhamLEEIE

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:PROPOSED SIZEWELL C BUS ROUTES - PEAK CONSTRUCTION

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

FIGURE 10.11

Page 3: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.12DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING EARLY YEARS - SUB AREA A SIZEWELL C

ENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 4: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.12DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING EARLY YEARS - SUB AREA A SIZEWELL C

ENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 5: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.14

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING EARLY YEARS - SUB-AREA C

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 6: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.15

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING EARLY YEARS - SUB-AREA D

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 7: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.16DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING PEAK CONSTRUCTION- SUB-AREA A SIZEWELL C

ENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 8: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.17DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING PEAK CONSTRUCTION- SUB-AREA B SIZEWELL C

ENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 9: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.18

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING PEAK CONSTRUCTION - SUB-AREA C

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 10: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.19

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING PEAK CONSTRUCTION - SUB-AREA D

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 11: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.20DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING SCREENING OPERATIONAL PHASE -SUB-AREA A

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 12: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

DOCUMENT:

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

FIGURE 10.21DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH Not to scale

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

COPYRIGHT DRAWING TITLE:SCREENING SCREENING OPERATIONAL PHASE SUB-AREA B

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

NOT PROTECTIVELY MARKED

Page 13: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.22

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING OPERATIONAL PHASE - SUB-AREA C

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 14: The Sizewell C Project · Chapter 10 Transport Figures 10.11 - 10.23. ALDEBURGH LEISTON SAXMUNDHAM FRAMLINGHAM WICKHAM MARKET SOUTHWOLD HALESWORTH WOODBRIDGE HARLESTON BUNGAY MAIN

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 10TRANSPORT

FIGURE 10.23

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :MAR 2020 LH

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

Not to Scale

SCREENING OPERATIONAL PHASE - SUB-AREA D

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED