    Airport Layout and DesignTrent Baldwin & Jim Clague of PBS&J

    775-828-1622

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    2/50

    Learning Objectives

    Part 1 Background of the Industry

    US Airport System Airport Capitol Improvement Funding Part 2 Airport Planning

    Airport Master Plan Airport Layout Plan Wind Rose Analysis Runway Designation (Homework Problem)

    Part 3 Design Guides Advisory Circular 150/5300-13 Federal Aviation Regulations Part 77

    Part 4 Construction

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    3/50

    Part 1 Background of the Industry

    US Airport System

    Airport Improvement Funding

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    4/50

    US Airport system

    Commercial Airports are used for Travel for Business and Travel Cargo

    Some Private Pilots General Aviation Airports are used for

    Emergency Services Connect rural communities Used mostly by Private pilot Recreation use

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    5/50

    30 Hub Airports

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    6/50

    550 Commercial Airports

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    7/50

    5,300 Public Use Airports

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    8/50

    Growth of Passenger Air Travel

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    9/50

    Global growth projection in passenger travel

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    10/50

    Greater delays as a result of growth

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    11/50

    Growth of Private Business Jets

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    1 9 7 4

    1 9 7 6

    1 9 7 8

    1 9 8 0

    1 9 8 2

    1 9 8 4

    1 9 8 6

    1 9 8 8

    1 9 9 0

    1 9 9 2

    1 9 9 4

    1 9 9 6

    1 9 9 8

    2 0 0 0

    2 0 0 2

    Fixed Wing Aircraft Flight Departments Fractional Shares Fractional Aircraft

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    12/50

    Funding of Airport Projects

    Funding Stakeholders include Federal Government FAA State Government

    Local Government County and City The Airport

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    13/50

    FAA Funding

    FAA currently funds up to 95% of Airport Capital improvements forGeneral Aviation (GA) airports and

    93.75% for international airports Runway, Taxiway and Aprons NavAids Limited funding for revenue sources.

    Terminals, Fueling Stations, Hangars.

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    14/50

    Other Funding

    2004 Nevada Aviation Trust Fund Intended to match FAA Funding Used for General Aviation Airports only

    Local funding Airport Funding

    Passenger and Facility Fees, Cargo Taxes,Fuel Taxes

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    15/50

    Airport Improvement Program (AIP)

    Airport Capital Improvement Program(ACIP)

    FAA Grants

    Design Construction

    E l f Eli ibl I li ibl AIP P j

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    16/50

    Examples of Eligible vs Ineligible AIP Projects

    Eligible Projects Ineligible Projects

    Runway construction/rehabilitation Taxiway construction/rehabilitation Apron construction/rehabilitation Airfield lighting Airfield signage Airfield drainage Land acquisition Weather observation stations (AWOS)NAVAIDs such as REILs & PAPIs Planning studies Environmental studies Safety Area improvements Airport Layout Plans (ALPs)Access roads only located on airport property Removing, lowering, moving, marking, and

    lighting hazards

    Maintenance equipment and vehicles Office and office equipment Fuel farms Landscaping Artworks Aircraft hangars Industrial park development Marketing plans Training Improvements for commercial enterprises General Aviation Terminal Buildings Automobile parking lots Maintenance or repairs of buildings

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    17/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    18/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    19/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    20/50

    Part 2 Airport Planning

    Airport Master Plan Airport Layout Plan Wind Rose Analysis

    Runway Designation (Homework)

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    21/50

    Elements of an Airport Master Plan

    Airport Master Plan

    Environmental Considerations Existing Conditions

    Aviation Forecast* Facility Requirements Alternatives Development and Evaluation Airport Layout Plans* Facilities Implementation Plan

    Financial Feasibility Analysis*Approved by the FAA

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    22/50

    Airport Layout Plans Drawing Set

    1) Airport Layout Plan*

    2) Data Sheet3) Terminal Area Plan (s)

    4) Airport Airspace Drawing (FAR Part 77)5) Inner Portion of the Approach Surface

    Drawing6) Airport Land Use Drawing7) Airport Property Map

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    23/50

    Wind Rose Analysis

    Used to determine optimal placement

    of runways If wind coverage of 95% for 10.5 knot

    wind can be achieved no cross windrunway is needed. Indicates probability of safe landings.

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    24/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    25/50

    Runway Designation

    Runway Placement

    Constrained By Land and Wind 1 st Convert to Degrees 2 nd Adjust for Magnetic Variance 3 rd Divide the bearing by 10 4 th Round to the nearest whole number (if

    the answer is 0 use 36) If there are multiple runways designate

    Right or Left

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    26/50

    Angle Conversion

    The runway bearing is typically

    reported as a Bearing Angle Runway Designation uses the AzimuthAngle

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    27/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    28/50

    Runway Designation Example

    Problem A proposed runway is determined to be

    N54 o30W, With a magnetic variance of 14 o45 West and an annual rate of changeof 10 East.

    Solve What should the runway designation be?

    l

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    29/50

    Solution

    1. N54 o30W Bearing Angle =>

    305.50o

    Azimuth Angle2. -14.75 Magnetic Variance

    305.50 o - 14.75 o = 290.75 o

    3. Divide the Bearing by 10290.75 o / 10 = 29.075

    4. Round to the nearest whole number29.075 => 29

    5. Runway designation 11-29

    P 3 D i G id

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    30/50

    Part 3 Design Guides

    Advisory Circular 150/5300-13

    Federal Aviation Regulation Part 77

    T f D i S d d

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    31/50

    Types of Design Standards

    Federal Aviation Regulations

    (FARs) are organized by parts andare federal laws under chapter 14 of the Code of Federal Regulations(CFRs)

    Advisory Circulars (AC) are asystematic means of providing non-regulatory information in a variety of subjects areas cataloged by number.

    FAA D i G id

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    32/50

    FAA Design Guides

    Found on FAA website http://www.faa.gov/arp/engineering/

    AC 150/5300-13 Airport Design AC 150/5320-6D Airport Pavement Design

    and Evaluation AC 150/5340-1H Airport Markings FAR Part 77

    Ai t L t A d D i

    http://www.faa.gov/arp/engineering/http://www.faa.gov/arp/engineering/
  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    33/50

    Airport Layout And Design

    Design Reference Code

    Wing span of Design Aircraft A through E (A is small, E is large)

    Approach speed of Design Aircraft I through VI (I is slow, VI is fast)

    Example

    Reno Runway 34L-16R, D-IV Stead 826, C-II Carson 9-27 B-II

    Ai t L t A d D i

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    34/50

    Airport Layout And Design

    Runway Design Runway Length and Width Runway Shoulders

    Safety areas Taxiway Design

    Taxiway Width Shoulders Wing Tip Clearance / Safety Areas

    Location of Hold Bars

    Ai t L t A d D ig

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    35/50

    Airport Layout And Design

    Safety Areas Runway Safety Area (RSA) Taxiway Safety Area (TSA)

    Object Free Zone (OFZ) Object Free Area (OFA) Runway Protection Zone (RPZ) Visual Restriction Line (VRL) Building Restriction Line (BRL)

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    36/50

    Runway Striping

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    37/50

    Runway Striping

    Striping

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    38/50

    Striping

    Hold Sign Striping

    Runway Closed Striping (Permanent)

    Signing

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    39/50

    Signing

    Runway or Taxiway designation sign

    Hold Sign Directional Signs

    Signing

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    40/50

    Signing

    Runway Holding Position Sign

    Direction Sign For Runway Exit

    FAR Part 77

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    41/50

    FAR Part 77

    The Definition of Controlled Airspace

    Around an Airport Any Object located inside the Defined

    Surfaces is considered an obstruction

    http://www.ngs.noaa.gov/AERO/oisspec.html

    FAR Part 77

    http://www.ngs.noaa.gov/AERO/oisspec.htmlhttp://www.ngs.noaa.gov/AERO/oisspec.htmlhttp://www.ngs.noaa.gov/AERO/oisspec.htmlhttp://www.ngs.noaa.gov/AERO/oisspec.html
  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    42/50

    FAR Part 77

    3-D Drawing

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    43/50

    3-D Drawing

    Surface Dimension Table

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    44/50

    Surface Dimension Table

    Part 4 Construction

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    45/50

    Part 4 Construction

    Construction Management

    Construction Safety

    Construction Management

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    46/50

    Construction Management

    Preconstruction meeting

    Material submittals Weekly construction meetings

    Construction reports Construction issues Pay requests Change orders Construction Inspection Materials Testing

    Construction Safety

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    47/50

    Construction Safety

    NOTAMS Notice to Airmen

    Used to close the portions of the airfieldunder construction Temporarily Close Runways and/or

    Taxiways Commercial Airports Require Security

    Badging for all personnel on theairfield. Vehicular Traffic

    Checkered Flags, Amber Lights, Radios

    Aviation Lingo

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    48/50

    Aviation Lingo

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    49/50

  • 8/6/2019 Topic 5 - Airport Layout and Design Final

    50/50

    Thank YouTrent Baldwin & Jim Clague of PBS&J

    775-828-1622