total depth: 15.60 m, date: 04/11/2016 project: fa.ta ... · cpet-it v.1.7.6.42 - cptu data...

19
Project: FA.TA. RICAMBI S.P.A. GEOTEA S.R.L. Via della Tecnica 57/A4 40068 - San Lazzaro di Savena (BO) +39.051.6255377 Total depth: 15.60 m, Date: 04/11/2016 VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA Cone Type: Tecnopenta Cone Operator: ZANNA - CINTI CPT: 16.228_CPTU1 Location: CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Upload: others

Post on 20-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 2: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.52.12 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 3: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.52.40 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 4: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

CPTUBorehole

Depth(m) (t50)0.50 t50

(s)t50

(years) G/Such

(m2/s)ch

(m2/year)

T a b u l a r r e s u l t s

Dissipation Tests Results

Dissipation tests consists of stopping the piezocone penetration and observing porepressures (u) with elapsed time (t).The data are automatic recorded by the field computer and should take place until a minimum of 50% dissipation. The porepressures are plotted as a function of square root of (t). The graphical technique suggested by Robertson andCampanella (1989), yields a value for t50, which corresponds to the time for 50% consolidation. The value of the coefficient of consolidation in the radial or horizontal direction ch was then calculated by Houlsby andTeh's (1988) theory using the following equation:

50

5.0r

2

h tIrT

c

where: T: time factor given by Houlsby and Teh's (1988) theory corresponding to the porepressure positionr: piezocone radiusIr: stiffness index, equal to shear modulus G divided by the undrained strength of clay (Su).t50: time corresponding to 50% consolidation

Dissipation tests

Permeability estimates based on dissipation testThe dissipation of pore pressures during a CPTu dissipation test is controlled by the coefficient of consolidation in thehorizontal direction (ch) which is influenced by a combination of the soil permeability (kh) and compressibility (M), asdefined by the following:

/Mγck whh

where: M is the 1-D constrained modulus and γw is the unit weight of water, in compatible units.

M(MPa)

kh

(m/s)

16.228_CPTU1 3.00 20.3 412 1.31E-005 100.00 1.88E-006 59 5.45 3.39E-009

Page 5: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

This software is licensed to: GEOTEA S.R.L. CPT name: 16.228_CPTU1

Piezocone Dissipation Test: 16.228_CPTU1Depth: 3.00 (m)

t^0.50 (s^0.50)302826242220181614121086420

Pore

pres

sure

u2

(kPa

)

150

145

140

135

130

125

120

115

110

105

100

95

90

85

80

75

70

65

60

55

5020.294

Piezocone Dissipation Test: 16.228_CPTU1Depth: 3.00 (m)

u0 = 11.77 (kPa)

u initial dissipation

assumed initial pore pressure, ui

Pore pressure

Legend

u2 penetrationInitial dissipationEnd of dissipation (extrapolated)Initial estimated at t=0

Pressure (kPa)200150100500

Depth

(m

)15 .5

15

14.5

14

13.5

13

12.5

12

11.5

11

10.5

10

9.5

9

8.5

8

7.5

7

6.5

6

5.5

5

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0Pore pressure

Page 6: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.48 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU2

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.53.23 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 7: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.48 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU2

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.53.51 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 8: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.48 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU2

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.54.14 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 9: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.54.43 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 10: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.55.09 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 11: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.

Via della Tecnica 57/A4

40068 - San Lazzaro di Savena (BO)

+39.051.6255377Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIA

Cone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.55.28 0Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 12: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

CPTUBorehole

Depth(m) (t50)0.50 t50

(s)t50

(years) G/Such

(m2/s)ch

(m2/year)

T a b u l a r r e s u l t s

Dissipation Tests Results

Dissipation tests consists of stopping the piezocone penetration and observing porepressures (u) with elapsed time (t).The data are automatic recorded by the field computer and should take place until a minimum of 50% dissipation. The porepressures are plotted as a function of square root of (t). The graphical technique suggested by Robertson andCampanella (1989), yields a value for t50, which corresponds to the time for 50% consolidation. The value of the coefficient of consolidation in the radial or horizontal direction ch was then calculated by Houlsby andTeh's (1988) theory using the following equation:

50

5.0r

2

h tIrT

c

where: T: time factor given by Houlsby and Teh's (1988) theory corresponding to the porepressure positionr: piezocone radiusIr: stiffness index, equal to shear modulus G divided by the undrained strength of clay (Su).t50: time corresponding to 50% consolidation

Dissipation tests

Permeability estimates based on dissipation testThe dissipation of pore pressures during a CPTu dissipation test is controlled by the coefficient of consolidation in thehorizontal direction (ch) which is influenced by a combination of the soil permeability (kh) and compressibility (M), asdefined by the following:

/Mγck whh

where: M is the 1-D constrained modulus and γw is the unit weight of water, in compatible units.

M(MPa)

kh

(m/s)

16.228_CPTU3 6.50 11.4 129 4.09E-006 345.18 1.12E-005 353 18.92 5.80E-009

Page 13: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

This software is licensed to: GEOTEA S.R.L. CPT name: 16.228_CPTU3

Piezocone Dissipation Test: 16.228_CPTU3Depth: 6.50 (m)

t^0.50 (s^0.50)302826242220181614121086420

Pore

pres

sure

u2

(kPa

)

150

145

140

135

130

125

120

115

110

105

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

2011.354

Piezocone Dissipation Test: 16.228_CPTU3Depth: 6.50 (m)

u0 = 36.22 (kPa)

u initial dissipation

assumed initial pore pressure, ui

Pore pressure

Legend

u2 penetrationInitial dissipationEnd of dissipation (extrapolated)Initial estimated at t=0

Pressure (kPa)200150100500

Depth

(m

)15

14 .5

14

13.5

13

12.5

12

11.5

11

10.5

10

9.5

9

8.5

8

7.5

7

6.5

6

5.5

5

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0Pore pressure

Page 14: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

Tip resistance (MPa)21.510.5

15.5

15

14.5

14

13.5

13

12.5

12

11.5

11

10.5

10

9.5

9

8.5

8

7.5

7

6.5

6

5.5

5

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0

Ic4321

Depth (m) Elev ation: 0.00 (m)

0.66 C lay & silty clay 1.3 5.19E-7 4.7 23.5 - - 18.1 26.0 92.2 4.3 32.5 17.4

1.28 C lay 1.7 7.11E-8 6.8 30.8 - - 22.8 43.0 101.7 3.7 24.5 18.5

2.18 C lay & silty clay 1.7 1.09E-7 6.9 30.9 - - 22.1 41.6 109.8 2.1 13.7 17.7

7.28 C lay 1.1 2.14E-8 5.3 - - - 13.1 33.9 74.1 0.9 5.6 16.87.60 C lay & silty clay 1.0 2.40E-8 4.8 - - - 10.1 28.5 72.6 0.8 5.2 16.1

8.28 C lay 1.0 9.42E-9 5.1 - - - 8.8 32.9 63.4 0.7 3.9 16.5

10.08 C lay & silty clay 1.0 1.83E-8 4.9 - - - 7.6 28.6 71.9 0.6 4.1 15.910.48 C lay 1.3 5.79E-9 6.8 - - - 10.4 45.8 74.7 0.7 3.4 17.1

qt (MPa) Ksbt (m/s) N60 Es (MPa) Dr Phi (°) M (MPa) Go (MPa) Su (kPa) Su ratio O C R Gamma(kN/m³)

Description

1.80

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.56.00Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 15: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.60 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU1

Location:

From depthTo depth

(m)

Thickness(m)

Permeability(m/s)

SPTN60

(blows/30cm)Es

(MPa)Dr Friction

angleConstrainedmodulus, M

(MPa)

Shearmodulus, GO

(MPa)

Undrainedstrength, SU

(kPa)

Undrainedstrength

ratio

OCR Unit weight(kN/m³)

Summary table of mean values

0.66

1.280.62

5.19E-07 4.7 0.023.5 0.0 18.1 26.0 92.2 4.3 32.5 17.4

(±5.03E-07) (±1.0) (±3.8) (±0.0) (±0.0) (±2.7) (±6.9) (±6.7) (±0.2) (±1.7) (±0.7)

1.28

2.180.90

7.11E-08 6.8 0.030.8 0.0 22.8 43.0 101.7 3.7 24.5 18.5

(±1.97E-08) (±0.4) (±0.4) (±0.0) (±0.0) (±1.4) (±1.9) (±6.5) (±0.5) (±4.2) (±0.1)

2.18

7.285.10

1.09E-07 6.9 0.030.9 0.0 22.1 41.6 109.8 2.1 13.7 17.7

(±1.44E-07) (±1.2) (±6.7) (±0.0) (±0.0) (±4.5) (±7.9) (±20.3) (±0.7) (±4.8) (±0.7)

7.28

7.600.32

2.14E-08 5.3 0.00.0 0.0 13.1 33.9 74.1 0.9 5.6 16.8

(±1.62E-08) (±0.5) (±0.0) (±0.0) (±0.0) (±1.9) (±2.8) (±11.4) (±0.1) (±1.0) (±0.3)

7.60

8.280.68

2.40E-08 4.8 0.00.0 0.0 10.1 28.5 72.6 0.8 5.2 16.1

(±6.46E-09) (±0.4) (±0.0) (±0.0) (±0.0) (±1.4) (±1.4) (±5.7) (±0.1) (±0.5) (±0.2)

8.28

10.081.80

9.42E-09 5.1 0.00.0 0.0 8.8 32.9 63.4 0.7 3.9 16.5

(±4.97E-09) (±0.6) (±0.0) (±0.0) (±0.0) (±3.0) (±4.5) (±9.1) (±0.1) (±0.8) (±0.5)

10.08

10.480.40

1.83E-08 4.9 0.00.0 0.0 7.6 28.6 71.9 0.6 4.1 15.9

(±9.78E-09) (±0.3) (±0.0) (±0.0) (±0.0) (±1.6) (±1.5) (±9.9) (±0.1) (±0.7) (±0.2)

10.48

15.605.12

5.79E-09 6.8 0.00.0 0.0 10.4 45.8 74.7 0.7 3.4 17.1

(±3.73E-09) (±1.7) (±0.0) (±0.0) (±0.0) (±5.1) (±13.4) (±16.1) (±0.1) (±0.7) (±0.8)

Depth values presented in this table are measured from free ground surface

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.56.00 5Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 16: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.48 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU2

Location:

Tip resistance (MPa)2.521.510.5

15

14.5

14

13.5

13

12.5

12

11.5

11

10.5

10

9.5

9

8.5

8

7.5

7

6.5

6

5.5

5

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0

Ic4321

Depth (m) Elev ation: 0.00 (m)

0.78 C lay & silty clay 1.4 1.42E-7 5.5 24.1 - - 19.1 34.3 89.5 3.6 24.1 18.0

1.72 C lay 1.0 5.09E-8 4.5 19.9 - - 13.6 28.8 65.4 1.9 11.5 17.2

2.36 C lay & silty clay 1.6 7.68E-8 6.6 28.6 - - 21.5 41.8 101.9 2.5 16.1 18.0

3.18 C lay 1.6 4.28E-8 6.8 32.4 - - 20.8 43.9 98.5 2.0 12.6 18.0

4.66 C lay & silty clay 1.7 4.78E-8 7.2 - - - 22.1 44.9 108.5 1.9 11.9 17.95.06 C lay 1.6 3.28E-8 7.0 - - - 20.5 45.2 99.1 1.7 10.1 17.95.46 C lay & silty clay 1.4 7.94E-8 5.8 30.0 - - 18.0 35.8 91.8 1.3 8.2 17.0

6.64 C lay 0.9 9.48E-9 5.0 27.6 - - 8.4 32.6 58.2 0.7 3.8 16.6

9.68 C lay & silty clay 1.3 1.01E-7 5.9 37.0 - - 12.9 33.9 71.8 0.7 4.1 16.4

10.52 C lay 1.2 2.80E-9 6.7 - - - 8.3 46.9 62.4 0.6 2.7 17.3

qt (MPa) Ksbt (m/s) N60 Es (MPa) Dr Phi (°) M (MPa) Go (MPa) Su (kPa) Su ratio O C R Gamma(kN/m³)

Description

1.80

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.57.39Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 17: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.48 m, Date: 04/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: ZANNA - CINTI

CPT: 16.228_CPTU2

Location:

From depthTo depth

(m)

Thickness(m)

Permeability(m/s)

SPTN60

(blows/30cm)Es

(MPa)Dr Friction

angleConstrainedmodulus, M

(MPa)

Shearmodulus, GO

(MPa)

Undrainedstrength, SU

(kPa)

Undrainedstrength

ratio

OCR Unit weight(kN/m³)

Summary table of mean values

0.78

1.720.94

1.42E-07 5.5 0.024.1 0.0 19.1 34.3 89.5 3.6 24.1 18.0

(±1.36E-07) (±0.8) (±2.2) (±0.0) (±0.0) (±1.9) (±6.6) (±4.6) (±0.4) (±4.2) (±0.5)

1.72

2.360.64

5.09E-08 4.5 0.019.9 0.0 13.6 28.8 65.4 1.9 11.5 17.2

(±5.35E-08) (±0.6) (±0.9) (±0.0) (±0.0) (±2.0) (±5.1) (±8.7) (±0.3) (±1.8) (±0.6)

2.36

3.180.82

7.68E-08 6.6 0.028.6 0.0 21.5 41.8 101.9 2.5 16.1 18.0

(±6.43E-08) (±0.5) (±1.7) (±0.0) (±0.0) (±1.7) (±4.7) (±10.4) (±0.2) (±1.8) (±0.4)

3.18

4.661.48

4.28E-08 6.8 0.032.4 0.0 20.8 43.9 98.5 2.0 12.6 18.0

(±2.52E-08) (±0.6) (±32.4) (±0.0) (±0.0) (±2.0) (±3.7) (±12.7) (±0.2) (±1.6) (±0.2)

4.66

5.060.40

4.78E-08 7.2 0.00.0 0.0 22.1 44.9 108.5 1.9 11.9 17.9

(±1.26E-08) (±0.4) (±0.0) (±0.0) (±0.0) (±0.9) (±2.3) (±6.2) (±0.1) (±0.8) (±0.1)

5.06

5.460.40

3.28E-08 7.0 0.00.0 0.0 20.5 45.2 99.1 1.7 10.1 17.9

(±1.61E-08) (±0.0) (±0.0) (±0.0) (±0.0) (±1.1) (±2.0) (±9.6) (±0.1) (±1.0) (±0.2)

5.46

6.641.18

7.94E-08 5.8 0.030.0 0.0 18.0 35.8 91.8 1.3 8.2 17.0

(±8.77E-08) (±0.8) (±1.5) (±0.0) (±0.0) (±3.8) (±3.7) (±19.4) (±0.2) (±1.9) (±0.4)

6.64

9.683.04

9.48E-09 5.0 0.027.6 0.0 8.4 32.6 58.2 0.7 3.8 16.6

(±1.45E-08) (±0.6) (±0.6) (±0.0) (±0.0) (±3.7) (±4.0) (±13.5) (±0.2) (±1.4) (±0.5)

9.68

10.520.84

1.01E-07 5.9 0.037.0 0.0 12.9 33.9 71.8 0.7 4.1 16.4

(±2.04E-07) (±1.6) (±37.0) (±0.0) (±0.0) (±10.6) (±6.2) (±30.5) (±0.2) (±2.2) (±0.4)

10.52

15.484.96

2.80E-09 6.7 0.00.0 0.0 8.3 46.9 62.4 0.6 2.7 17.3

(±4.36E-09) (±1.7) (±0.0) (±0.0) (±0.0) (±5.6) (±12.7) (±21.1) (±0.2) (±1.0) (±0.7)

Depth values presented in this table are measured from free ground surface

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.57.57 6Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 18: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

Tip resistance (MPa)2.521.510.5

15

14.5

14

13.5

13

12.5

12

11.5

11

10.5

10

9.5

9

8.5

8

7.5

7

6.5

6

5.5

5

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0

Ic4321

Depth (m) Elev ation: 0.00 (m)

0.66 C lay & silty clay 1.4 1.70E-7 5.4 25.6 - - 18.6 31.9 97.8 3.7 17.0 17.8

2.34 Silty sand & sandy silt 1.5 4.04E-7 5.2 22.0 32.4 34.8 20.1 27.8 - - - 16.92.70 C lay & silty clay 1.6 1.03E-7 6.6 33.1 - - 20.0 38.4 101.9 1.6 7.3 17.1

12.62 C lay 1.7 1.03E-8 8.6 - - - 18.1 55.4 103.8 0.9 4.2 17.7

qt (MPa) Ksbt (m/s) N60 Es (MPa) Dr Phi (°) M (MPa) Go (MPa) Su (kPa) Su ratio O C R Gamma(kN/m³)

Description

1.30

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.58.28Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt

Page 19: Total depth: 15.60 m, Date: 04/11/2016 Project: FA.TA ... · CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.51.03 0 Project

Project: FA.TA. RICAMBI S.P.A.

GEOTEA S.R.L.Via della Tecnica 57/A440068 - San Lazzaro di Savena (BO)+39.051.6255377 Total depth: 15.20 m, Date: 09/11/2016

VALSAMOGGIA (BO) - CRESPELLANO - LOC. CHIESACCIACone Type: Tecnopenta

Cone Operator: Zanna - Cinti

CPT: 16.228_CPTU3

Location:

From depthTo depth

(m)

Thickness(m)

Permeability(m/s)

SPTN60

(blows/30cm)Es

(MPa)Dr Friction

angleConstrainedmodulus, M

(MPa)

Shearmodulus, GO

(MPa)

Undrainedstrength, SU

(kPa)

Undrainedstrength

ratio

OCR Unit weight(kN/m³)

Summary table of mean values

0.66

2.341.68

1.70E-07 5.4 0.025.6 0.0 18.6 31.9 97.8 3.7 17.0 17.8

(±1.77E-07) (±1.2) (±5.3) (±0.0) (±0.0) (±3.8) (±7.7) (±17.5) (±0.7) (±3.4) (±0.7)

2.34

2.700.36

4.04E-07 5.2 32.422.0 34.8 20.1 27.8 0.0 0.0 0.0 16.9

(±1.34E-07) (±0.4) (±1.2) (±0.8) (±0.2) (±1.2) (±1.4) (±0.0) (±0.0) (±0.0) (±0.2)

2.70

12.629.92

1.03E-07 6.6 0.033.1 0.0 20.0 38.4 101.9 1.6 7.3 17.1

(±1.08E-07) (±1.0) (±3.7) (±0.0) (±0.0) (±5.5) (±5.3) (±23.5) (±0.8) (±3.8) (±0.6)

12.62

15.202.58

1.03E-08 8.6 0.00.0 0.0 18.1 55.4 103.8 0.9 4.2 17.7

(±6.56E-09) (±1.2) (±0.0) (±0.0) (±0.0) (±5.8) (±8.6) (±21.3) (±0.2) (±0.8) (±0.4)

Depth values presented in this table are measured from free ground surface

CPeT-IT v.1.7.6.42 - CPTU data presentation & interpretation software - Report created on: 05/12/2016, 11.58.28 4Project file: \\Server\server\GEOTEA\LAVORI\2016\16.228_FA.TA. RICAMBI S.P.A\Prove in sito\CPT\16.228_CPTU.cpt