total solution provider

10
www.poscoenc.com Total Solution Provider Plant Engineering & Construction Division

Upload: nguyennhan

Post on 14-Dec-2016

240 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Total Solution Provider

www.poscoenc.com

Total Solution Provider

Plant Engineering & Construction Division

Page 2: Total Solution Provider

1

Plant Engineering & Construction division

We strive to work with customers around the world to meet all of their requirements with total solution.

Based on the technologies and experiences obtained from integrated Steel

Mill projects in Pohang and Gwangyang Works of POSCO, POSCO E&C is now

expanding its business domain to the world market. We have the advantage

of accomplishing numerous projects successfully on time by providing

“Total Engineering Solution” throughout 45 years of accumulated

commissioning know-how, systematic technology development, strategic

collaboration with suppliers. POSCO E&C enjoys high company credit ratings

by adhering to ethical management.

MajOr STE E l PrOj ECTS

PrOFi lE

• ESCO Blast Furnace &

Sinter Plant, Iran

• POSCO ASSAN TST, Turkey

• ARCO Special Steel, Egypt

• HADEED CCL, KSA

• POSCO-Maharashtra

CRM&CGL, India

• IISCO Blast Furnace, India

• POSCO-VIETNAM CRM, Vietnam

• Formosa RMH + HSM, Vietnam

• PT.KP Integrated Steel Works,

Indonesia

• Shunpo ACL, China

• ZPSS STS Complex, China

• PTEC PGL, CCL, Taiwan

• Asia Special Steel, Japan

• BSL Sinter Plant, Australia

• POSCO-MEXICO No.1 & 2

CGL, Mexico

• POSVEN HBI Plant, Venezuela

• CSP Integrated Steel Works, Brazil

• KOBRASCO Palletizing, Brazil

Ongoing Completed

Or dE rS & r EvE n u EOrder Total revenue

POSTECH: 2.36%Employee Stock Ownership: 3.83%

Other: 4.28%

Shareholder Status

89.53%POSCO

Capital Stock158.6 million

F i nanCE

Human resourceas of July 2013 (unit: Person)

as of Dec 2013 (unit: Billion Dollars)(unit: Million Dollars)

4,184 3,742Total engineer

management 442

1.8

BBB–Standard & Poor’s Baa3Moody’s

a1

Credit rating

The highest credit rating in the Korean construction industry

Commercial paper

Cr E diT raTi nGas of July 2013

aa–Corporate bonds

Steel Plant Business

Overseas Domestic

10,264.35,844.2

9,930.66,265.8

2010

2011

2012

8,660.9 6,620.8

13,000.45,696.7

2009

4,420.1

3,664.8

2,031.1

7,303.7

7.7

11,3915,582.1

20135,809

Page 3: Total Solution Provider

2

Competence of POSCO E&CExceeding expectation through World Class Engineering Capabilities

POSCO E&C has demonstrated its own ability to provide all kinds of steel plants for more than four

decades. as per clients’ demand, POSCO E&C has provided Project planning, Engineering, Procurement,

Construction and Operation and Maintenance services within schedule and budget. With its enriched

background rooted from numerous projects managed both in and outside of Korea and its extensive

expertise in providing and modernizing steel plants and ensuring lifelong competitiveness. POSCO E&C

is the best partner for your global steel plant projects, which you can rely on.

The key to POSCO E&C’s remarkable trackrecord is its engineers equipped with full-spectrum of EPC capabilities. Plant Engineering & Construction Division secures more than a thousand of engineers in steel business. Approximately 50 percent of engineers have fully serviced to POSCO E&C for over 20 years.

ISO 9001 [LRqa]

ISO 14001 [LRqa]

OHSaS 18001 [LRqa]KOSHa 18001 [KOSHa]

Cost Managementquality Management Overall Progress ControlRisk & Interface Management

Management

Civil & architectureSteel StructureEquipment InstallationElectric / InstrumentationSupervision

Construction

feasibility StudyBasic & Detail EngineeringProcess Design

Engineering & designPurchasingExpeditingInspectionTraffic Control

Procurement

TOTal ManaGEMEnT OF PrOjECT

STEEl BuSinESS OriEnTEd EnGinEErS

GlOBal STandard FOr Q&HSE

15yrs

20yrs

5yrs

10yrs

210

478 75

246

Quality

Environment

Safety

TECHnOlOGY EXPErTiSE

POSCO E&C’s competence in basic engineering has evolved based on its rich experience developed from manufacturing, installation and commissioning tasks conducted in both domestic and overseas sites. Combined with advantages in operation records of POSCO, these form POSCO E&C’s key competitiveness.

Supervising on Construction & Commissioning

Manufacturing & Shop Test

Basic & detailed Engineering

Operational records of POSCO

Man-Power of Eng.

Operation &Maintenance Service

3

Page 4: Total Solution Provider

4 5

P E P C O M S T r a T E G Y

Early Production Stabilization

• Over 20 years of experienced Manpower in POSCO • On & Off Job Training • Early Involvement of Experts from Commissioning stage• Supply of Operation & Maintenance Manual

On Demand, On Schedule, On Budget with the finest technology

• Innovative Engineering and State-of-the Art Equipment • Steel Business-oriented Engineers• Competitive Procurement through Global Networks of POSCO Group• On-time Project Completion• Effective Cost Control• Global Standard For Quality & HSE (Health, Safety & Environment)• Single Accountability for EPC Project

Optimized Project Planning

• Provide customized proposal• Assist in Client’s Feasibility Study as Technology Provider

Endeavouring to become a global Total Solution Provider that carries out projects in a comprehensive

manner, POSCO E&C has established the Project Planning, Engineering, Procurement, Construction, and

Operation & Maintenance (PEPCOM) system. It also continues to secure essential capabilities for each

process, including the development of independent designing ability. in addition, it will provide greater

satisfaction and services to its customers around the world by further strengthening its core technologies

and expertise.

Total Solution Provider for Steel Business

PEPCOM strategy of POSCO Group

Planning, Development

Engineering

Procurement

Construction

Operation &

Maintenance

B u S i n E S S O v E r v i E W

Steel Makingp.7

Cold rolling & Process line p.10

Continuous Castingp.7

Hot rollingp.8

long Products Plant p.11

industrial Process Plantp.13

iron Makingp.6

new Technologiesp.12

Page 5: Total Solution Provider

6 7

iron Making POSCO E&C has been stepping forward to be one of the world’s leading companies in the area of iron making technology based on its own engineering and know-how.

Blast Furnace & Sinter Plant

Effect of lBr & Off line methodology

raw Material Handling FacilitiesSpecialized in technology of large-scale Blast Furnace & Sinter Plant, which provides high productivity & availability with low operating cost to the clients.

One million dollars can be saved by reducing the construction period for one day by using LBR(Large Block Ring) & Off Line(Skid way system) methodology.

POSCO E&C possesses world-class technology which is represented by its accuracy, cost efficiency and fast-paced completion.

Raw material handling facilities including Ore handling and Coal handling with material treatment capacity of 68 and 35 million tons respectively are in operation in POSCO steel works . Recently, POSCO E&C has supplied 15 silos, each of 50 thousand tons of capacity in Gwangyang additionally.

Gwangyang works

No.1 Blast furnaceThe World’s largest Blast Furnace 6,000m3

No.5 Sinter PlantThe World’s largest Sinter Plant 600m2

96% 98%+1.6%

availability

Others POSCO

2.5%

POSCO

2%

+24%

Productivity

Others

Cost

100%

75%

-25%

Scrap POSCO

VALU E I M PROVE M E NT BY POSCO E&C’S TECH NOLOG I E S

Strand Jack

Transfer CarHydraulic Jack

Above all, POSCO E&C has developed unique model of RH facility - Duplex-RH. This facility is supplied to various sites including steel making plants of POSCO in Korea and Integrated Steel Mills in Indonesia and Brazil.

Steel Making POSCO E&C has considerable experiences in EPC turn-key projects for new steel making plants and has been expanding Steel making business to overseas markets based on the project executed in Pohang and Gwangyang.

Continuous Casting

POSCO E&C recently designed no.4 Continuous Casting in Gwangyang steel works with its accumulated know-how and technology inherited from POSCO. This, as a result, reduced costs and enabled POSCO E&C to successfully enter into the Continuous Casting Market.

Whether it is BOf or Eaf process, POSCO E&C will provide the clients with cost-effective solution as per their needs.

– Low Project Cost – Easy Maintenance– Standardized Operation

• 3D Simulation Engineering• Anti Deflagration Design for off gas system• CO2 Breakthrough technology development

virtual training system for Converter operation

– Eco-friendly operation & Flexible operation

• Virtual operation with 3D modeling “VR(Virtual Reality) Simulator”• Virtual system, HMI, panel, controller

• High Productivity – High Speed Casting – Optimized Roll Geometry

• CAE Simulation Engineering – Heat transfer analysis – Structural analysis

T E C H N O LO GY

• High Quality – High Manganese Steel – advanced High Strength Steel

EAF(Electric Arc Furnace)BOF(Basic Oxygen Furnace)

Page 6: Total Solution Provider

8 9

INTRODUCTION : NO. 4 HOT ROLLING MILL EXPANSION PROJECT, KWANGYANG WORKS OF POSCO

Converter and Tilting device • Converter profile design • Technology to prolong a converter long lifetime • Converter titling device (Outsourcing)

Off gas cooling system • Calculation of Heat surface and cooling capacity • Basic design for Hood and Radiation part• Boiler system using circulation water

Oxygen supply system• Main Lance Design• O2 blowing pattern including height• Main lance tip(Laval nozzle) for de-C and de-P operation

Off gas cleaning system • Evaporation cooler Design• Anti deflagration system in off gas duct• ESP Design

Converter Process design• Analysis of the reaction in converter • Off gas control system• Static, Dynamic control model

Key Technologies

Steel Making Continuous Casting

Lf 1set

RH 2set

Slab 2setKR 2set BOf 2set

POSCO E&C demonstrates its own technology by performing No.4 Hot Rolling Mill project with capacity of 3.3 million tons per annum in Gwangyang steel works including Roughing Mill and 4Hi-7stands work roll shifting type finishing Mill. furthermore, POSCO E&C has reduced construction and operating cost by applying new technologies such as Evaporation Cooling system of Reheating furnace and Coil Pallet conveyor.

Hot rolling

Hot rolled Coil

roughing Mill / Edger• Mill Stand Design• Sizing Press • Control System

reheating Furnace• Process Flow • In / Out Design• Control System

Finishing Mill • Mill Stand / Looper • Shape Control / Crop Shear• Control System

down Coiler • Pinch Roll Stand • Down Coiler • Control System

Process Engineering• Process Flow and Basic Concept• Pass Schedule• Production Simulation

Hot rolling Mill

Crop Shear

Edge Heater

Laminar flow

accelerated cooling and heat treatment are core technologies applied to the plate mills engineered by POSCO E&C. This will guarantee high-quality steel plate from Shipbuilding to aPI.

Steel Plate

Page 7: Total Solution Provider

10 11

Cold rolling & Process line

Successful experience from Cold rolling Mill complex project in Korea as well as vietnam and india has enhanced the reliability of its stable operation through POSCO E&C’s optimized layout engineering, high speed jet pickling technology reaching 260mpm, state-of-the art mill technologies.

T E C H N O LO GY

Continuous annealing line

• POSRO-Furnace Engineering Software for Heat Balance & Speed Map

High Speed jet Pickling

• Process speed up to 260 mpm• Shallow high turbulent type• High Automation

Cold rolling Mill

• Rolling Process & Pass Schedule Program • 3D Modeling• Control Function & Interfacing aGC• Design Standard & formula

CGlAir Wiping System

• Air Knife• Baffle Unit• Auto Lip Cleaner• Blower System• Positioner• HMI & Local Control• Electro

CCl Roll coater

• Automatic roll gap control and nip pressure control• Stable coating thickness control• Increased productivity by eliminating time loss• Reduction of paint consumption• Easy operation and maintenance

long Products Plant

Keeping in mind the ever increasing demand of long products in the construction and infrastructure industries, POSCO E&C has carved a niche for themselves in the long product category. Customized EPC management services as per the client’s requirement along with the tailored made planning & execution; makes POSCO E&C one of the most capable, efficient and economic contractor globally. POSCO E&C offers a single window solution from planning, engineering, procurement, construction, operation & maintenance of Mini-Mill process consisting of EaF, casting machine and rolling mills keeping the project cost under budget while fulfilling the objectives of the project under secured and environment friendly surroundings.

With our extensive experience and know how in the bar mill area, we can provide you with total solutions from reinforced bars to customized special round bars to suit your every need.

round Bar Mills

Our section mills have been proven to offer high quality and high performance at optimal costs. We bring you the customized combination of technology and operational costs to provide you with a competitive edge over your competitors.

Section Mills

Equipped with the high quality wire rod mill solution, we are ready to provide from conceptual engineering to final installation and commissioning. We are there to assist you with every step to finally achieve your goals.

Wire rod Mills

T E C H N O LO GY

Lf

or

EafScrap Preparation CCM

Reheating furnace

Rolling Mill

Block Mill

Section bar

Laying

Re-bar

Wire Rod

Page 8: Total Solution Provider

13

In pursuit of eco-friendly and slim steelworks, POSCO has developed CEM (Compact Endless cast - rolling Mill) process, a new downstream in the plant following successful development of FINEX, an innovative iron-making process replacing conventional heavy mills. Large portion among CR products can be replaced by thin HR products utilizing the benefits of CEM coming from the direct linking of the caster to the rolling mill. Operational records of CEM will demonstrate the superiority to conventional processes.

• High speed casting • Endless rolling • Lowered OPEX & CAPEX

new Technologies

FINEX, one of the most successful alternative iron-making technologies jointly developed with Siemens-VAI, is based on the direct use of ore fines and non-coking coal. The key technologies of FINEX are fluidized bed reduction of ore fines, hot DRI fines compaction to HCI (Hot Compacted Iron), briquetting of coal fines, and melting of HCI into hot metal. POSCO has been operating the world’s first commercial FINEX plant, with 1.5 Mt of annual capacity, since April 2007 and has added up a new 2.0 million tons per annual capacity in January 2014. It is truly remarkable that a plant produces 2.0 million tons of hot metal by smelting reduction processes since other similar technologies have never achieved this capacity level other than blast furnace process before.

Open a new era of iron-making technology

No.2 FINEX, Pohang Works

Fluidizing Bed Reactor

fine OreNon-coking Coal

Molten Iron

Coal Briquette

HCI

Melting furnace

FINEX(Fine Ore Reduction Process)

CEM(Compact Endless casting and rolling Mill)

12

induSTrial PrOCESS PlanT

13

Cement Plants

With the recent win of a cement project in East Timor, POSCO E&C has not only stepped in the cement plant projects but has also proved its metal among global contractors. The East Timor’s TL Cement (Timor-Leste Cement is a special purpose corporation wholly owned by BGC the largest construction company in Western australia) project worth 350 million dollars for the construction of cement plant with the annual capacity of 1.5 million tons in Baucau. In addition to the precise planning based on the client’s requirement what most worked in POSCO E&C’s favor was the trust that the company has created with the client.

Mining Plants

Further expanding its shores of industrial plant projects; POSCO E&C offers EPC services for the Iron ore, copper & coal mining projects. Innovative engineering in addition to the highly experienced mining and metals professionals has the capabilities to make every job doable irrespective of challenges. The synergy among other affiliates of POSCO Group and strategic alliance with advanced technological providers always serve as our competitive advantages because it makes our jobs more efficient and productive by combining capacities of them.

Cement Mill

Clinker / Gypsum feed Bin

Blending Silo Preheater

Rotary Kiln

Stockyard

Crusher

quarry

Pre Blending

Raw Mill

Raw feed BinClinker Cooler

Clinker Silo

Dispatch

With the expertise in Steel Plants, POSCO E&C has diversified its approach towards industrial

plants catering to the Cement industry, Oil & Gas plants as well as natural resources projects

in order to offer a well-packaged engineering and construction solution to the wide range of

customers benefitting from its capabilities and value engineering solutions.

Oil & Gas

Energy requirement is growing all over the world and so does the requirement of Oil & Gas Projects for which POSCO E&C has developed in-house capabilities to handle EPC projects. Expertise in process engineering and project management capabilities gained from other EPC projects handled over several decades enables POSCO E&C to take up new challenges and overcoming them through continued innovation, engineering flexibility and ingenuity.

Page 9: Total Solution Provider

POSCO E&C is currently building Integrated Steel Mill with a capacity of 3 million tons per annum

in Cilegon, Indonesia. More than ten thousand people are involved in its construction and our first

overseas Integrated Steel Mill project scheduled to be completed by the end of 2013. This project

has made a great contribution to the development of related industries.

In addition, Integrated Steel Mill with a capacity of 3 million tons per annum is currently

under construction in Brazil by POSCO E&C. This is the biggest single EPC contract since

the foundation of the company which amounts to approximately 4.4 billion US dollars.

POSCO E&C is the only company in the world capable of constructing

two Integrated Steel Mills at the same time providing Total Solution from feasibility

Study to Operation & Maintenance of the plant.

EPC ManaGEMEnT CaPaBiliTiES

Engineering, Procurement & Construction

PT.KP integrated Steelworks in indonesia

Capacity : 3,000,000 ton/yr

Product : Slab and Plate (6 ~ 100 mmt × 4,500mmW)

Period : Jul. 2011 ~ Dec. 2013

CSP integrated Steelworks in Brazil

Capacity : 3,000,000 ton/yr

Product : Slab

Period : Nov. 2011 ~ Aug. 2015

14 15

Project Lists

Iron Making

Steel Making & Continuous Casting

Hot Rolling

POSCO Gwangyang , Korea No. 1 Blast furnace (Revamping)

IISCO,Sail Burnpur , India Blast furnace

ESCO Esfahan, Iran No. 3 Blast furnace

POSCO Pohang, Korea FINEX

POSCO Pohang, Korea Cell Silo for Sub-material Storage

POSCO Gwangyang, Korea Silo Receiving/Discharging Belt Conveyor

ZPSS Zhangjiagang , China STS Slag Handling Facility

ESCO Esfahan, Iran No.4 Sinter Plant

POSCO Gwangyang, Korea No.5 Sinter Plant

BSL Port Kembla, australia Sinter Plant

POSCO Gwangyang, Korea New Steel Making (2 x Converter)

aSSI Hibikinada, Japan Steel Making (Ingot)

POSCO Gwangyang , Korea No.2,3 CCM

POSCO Pohang, Korea Postrip Demo Plant

POSCO Gwangyang, Korea No.1 Mini Mill

POSCO Gwangyang , Korea No.1 Plate Mill

POSCO Gwangyang , Korea No.4 HRM

ZPSS Zhangjiagang, China Stainless Steckel Mill

aRaB Special Steel Sadat, Egypt Bar & Wire-Rod Mill

VPS Haiphong, Vietnam Bar & Wire-Rod Mill

POSCO-Vietnam Vungtao, Vietnam No.1 Continuous Annealing Line

qPSS qingdao, China Stainless CR Plant

Shunpo Shunde, China Electrical Steel Line

POSCO-MEXICO Altamira, Mexico No.1&2 CGL

POSCO-Maharashtra Maharashtra, India CGL

union Steel Busan, Korea No.5 CGL

Assan Galvaniz Istanbul, Turkey CCL

HaDEED Jubail, Saudi arabia CCL

Haier Hefei, China CCL

CHS Kaohsiung, Taiwan No.2 RCL

Cold Rolling & Process Line

Page 10: Total Solution Provider

16

Global Network

China(Beijing)

China (Hunchun)

Vietnam(Hanoi)

Vietnam(Hochiminh)India

Cambodia

Saudi arabia u.a.E.

Peru

Chile

Venezuela

Korea

Branch

Subsidiary / Branch

Subsidiary

Kazakhstan

Headquarters568-1, Goedong-dong, Nam-gu, Pohang, Gyeongsangbuk-do, KoreaPohang P.O. Box 100 T. 82–54–223–6114~5

Engineering Center67-2, Jukdo 2-dong, Buk-gu, Pohang, Gyeongsangbuk-do, Korea

Songdo Office36 Songdo-dong, Yeonsu-gu, Incheon, Korea POSCO E&C Tower 1T. 82–32–748–2114

r&d Center180-1 Songdo-dong, Yeonsu-gu, Incheon, KoreaPOSCO Global R&D CenterT. 82–32–748–2114

POSCO E&C (China) Co., Ltd.19th Floor, Recreo international Centre, 8 Wangjing East Road, Chaoyang District, Beijing, ChinaPost Code: 100102 T. 86–10–8473–0911 F. 86–10–8473–0778

Hunchun POSCO Hyundai international logistics Complex development Co.,ltd. 3rd Floor Hangwu Building, No.1294, Xin An road, Jing He str.Hun Chun City, Jilin pro, CHINAT. 86–433–509–8880 F. 86–433–509–8883

POSCO E&C vietnam Co., ltd.Plant Nhon Tach industrial Zone 1, Dong Nai Province, Vietnam T. 84–61–356–0850 F. 84–61–365–0852Office #708, 7th Floor, Diamond Plaza Building, 34 Le Duan St. Dist.1, HCMC, Vietnam T. 84–8–3822–0990F. 84–8–3822–0991

international Business Center CorporationDiamond Plaza Building, 5th Floor, 512, 34 Le Duan St, Dist.1, HCMC, Vietnam T. 84–8–3827–4292 F. 84–8–822–8562

an Khanh new City development joint venture Co., ltd.Km 10 + 600, Thang Long Avenue, An Khanh Commune, Hoai Duc District, Hanoi, VietnamT. 84–93–433–7438F. 84–4–3755–6546

CaMBOdia CO.,lTd. No.4 Sothearos Blvd. Sangkat Tonle Bassac, Khan Chamkamon, Phnom Penh, Cambodia

POSCO Engineering & Construction india Private ltd.6th Floor Park Centra Building Tower B, 32nd Milestone, NH–8, Sector–30, Gurgaon–122001, Haryana State, India T. 91–99–7139–8501 F. 91–124–331–5111

POSCO E&C venezulea C.a.Centro San Ignacio, Torre Copérnico, 8th Floor, Av. Blandín, Urbanización La Castellana, Caracas, Venezuela T. 58–412–369–1593

PT. POSCO E&C indonesiaIndonesia Stock Exchange Building Tower 2, 19th floor, Suite 1902 JI. Jend. Sudirman Kav. 52–53 Jakarta 12190 T. 62–812–10–22869 F. 62–21–515–5715

Posco E&C Smart S de rl de Cv Boulevard de los rios s/n col. puerto industrial Altamira, Tamaulipas C.P 89603 T. 52–833–162–3092

POSCO EnGEnHaria E COnSTruCaO dO BraSil lTda. Etevaldo Nogueira Business 17º Pavmento, Av. Dom Luis, 807 Meireles, cidade de Fortaleza, Estado do Ceara, Brasil T. 55–85–3031–1900

POSCO E&C australia Pty ltd. Level 3 Adelaide House, 200 Adelaide Terrace, East Perth, WA 6004, Australia T. 61–8–9466–7800F. 61–8–9466–7878

POSEC-Hawaii inc.1240 Ala Moana Blvd. Suite 450, Honolulu, Hawaii 96814, USA

Santos CMi Av. Eloy Alfaro N30–341 Av. Amazona Piso 3, Quito, Ecuador T. 593–2–397–9600 F. 593–2–290–4602

POSCO E&C Hanoi representative Office Room A310, The Manor, My Dinh, Me Tri, Tu Riem, Ha Noi, Vietnam T. 84–4–3936–4950~4 F. 84–4–3936–4955

POSCO E&C Houston Office 12600 Northborough Drive Suite 200 Houston, TX 77067, U.S.AT. 1–713–273–4140 F. 1–713–588–2691

POSCO E&C Cambodia Branch Office IOC Center F3–R04, No. 254, Monivong Blvd, Phnom Penh, Cambodia T. 855–2–322–4511F. 855–1–238–9234

POSCO Engineering & Construction Co., ltd., Kazakhstan Branch OfficeRm. 125, 4th Fl. Block 5A Nurly Tau “Business Center”, 7 Al–Farabi Ave., Almaty, KazakhstanT. 7–701–996–0038 F. 7–727–311–5246

POSCO E&C u.a.E Branch Office P.O. Box 94270, Villa No. A6–4884(21 Villa), Khalidiya, Abu Dhabi, U.A.E.T. 971–2–676–2080F. 971–2–676–0208

POSCO E&C Saudi arabian Branch OfficeP.O.Box 5902, #504 Al–Akariya Building 3,Olaya Main Street, Riyadh 11432, KSA T. 966–1–215–1705 F. 966–1–215–1704

POSCO E&C Sucursal del Peru Amador Merino Reyna 307, Of.804 San Isidro, Lima, Peru T. 51–1–422–2567F. 51–1–422–0648

Posco E&C Chille Branch OfficeAV. VITACURA 2939, OF. 1901, LAS CONDES, SANTIAGO, CHILE (POSCO E&C AGENCIA DE CHILE)T. 56–2–435–1404 F. 56–2–435–1407

POSCO E&C Sucursal El Salvador Branch Office67 Av.Sur, Pasaje 2 # 26, San Salvador, El Salvador T. 503–2298–3900 F. 503–2298–3939

Brazil

El Salvador

EquadorIndonesia

australia

Headquarters and Domestic Branches

Overseas Subsidiaries and Branches

Gwangyang Office623 Geumho-dong, Gwangyang, Jeollanam-do, KoreaT. 82–61–798–5200

Busan Office1406 U-dong, Haeundae-gu, Busan, Korea 4th Floor, Woori Bank Suyeongman BranchT. 81–51–749–0500

HawaiiMexico

Pub

lishe

d by

PO

SC

O E

ngin

eeri

ng &

Con

stru

ctio

n

www.poscoenc.com

H E a D q ua R T E R S

180, Daesong-ro, Nam-gu, Pohang, GyeongBuk, 790-704, KoreaT. 82–54–223–6114~5

S O N G D O O f f I C E

POSCO E&C Tower 1, 241, Incheon tower-daero, Yeonsu-Gu, Incheon, 406-732, KoreaT. 82–32–748–2114