Page 1: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Promoting clean public transport

map by © (2010) data2map.at

Szeged, January 2013

TROLLEY – What was achieved by Szeged Transport Company

Dr. István Tibor TÓTH managing director

Szeged Transport Company

TROLLEY Final Conference

Page 2: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Starting point

▌2

►Szeged Transport Company's ►predecessor was formed in 1884

►First tram: 1908

►First trolleybus: 1979

Page 3: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Starting point

▌3

Why did we choose to participate in ?

To share: - our experiences in infrastructure development; - our knowledge of trolleybus reconstructions, diesel-bus conversions; - our know-how of tram-trolleybus common operation.

To gain: - execution plans to further improve our trolleybus network; - reconstruction one of our junction in the city center; - knowledge about on-board and off-board energy storage systems; - best practices in different fields of trolleybus operation.

Page 4: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Trolleybus corridor: pilot overhead reconstruction

▌4

Reconstruction of the catenary at Híd utca junction

Before:

Page 5: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Trolleybus corridor: pilot overhead reconstruction

▌5

With modern trolleybus overhead elements it is possible to - increase the speed of the vehicles;

- decrease the number of dewirings. WP 4.1.6. Report on the reconstruction of trolleybus junction and stop:

A comprehensive review of the method of construction with problems, solutions, best practices. Downloadable at the trolley website After:

Page 6: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Trolleybus corridor: pilot accessible stops

▌6

Reconstruction of the Híd utca trolleybus stop

Introducing low-floor accessibility kerb elements. The first in Szeged in our region.

•Before: After:

Page 7: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

What has changed in Szeged through TROLLEY

▌7

►The projekt increased awareness in Szeged:

More opened to the idea of battery traction in Szeged – towards full electromobility

First trolleybus with auxilliary battery in Szeged

Page 8: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

Dissemination

▌8

►Dissemination actions of in Szeged:

►Conferences

►Image campaing

►European trolleybus days

►Open days in depot

Page 9: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013

What is the way forward after TROLLEY in Szeged

▌9

►After the trolley project:

New trolleybuses with traction batteries.

Consideration of hybrid operation (leaving the catenary).

Planning of the extension of the SZKT-s network

Re-establishing the bus network in Szeged

Page 10: TROLLEY What was achieved by Szeged Transport Company · Szeged, January 2013 What is the way forward after TROLLEY in Szeged 9 After the trolley project: New trolleybuses with traction

Szeged, January 2013 ▌10

Thank you for your attention!