tunnelling tips! drilling and blasting in dense urban areas

27
Tunnelling Tips! Drilling and blasting in dense urban areas THINKING

Upload: aurecon

Post on 13-Jul-2015

1.450 views

Category:

Engineering


4 download

TRANSCRIPT

Tunnelling Tips! Drilling and blasting in dense urban areas

THINKING

It’s a common practice Drilling & blasting is common practice in cities such as Hong Kong due to the large volume of tunnelling work.

THINKING

Is it really better to blast?

Blasting methods are proven to be more effective at removing hard rock than mechanical excavation.

THINKING

Think before you drill… There are many considerations & hazards that you must be aware of when using this method in highly dense areas.

THINKING

Know what you’re up against.

Know your challenges

THINKING

• Proximity - close to many sensitive receivers

• Potential impacts on the community

• Possible constraints on contractors

Know your challenges

• Higher level of confidence required for approval authorities

• Needs of the community vs rising construction costs

THINKING

Be a step ahead know your hazards

THINKING

• Ground-borne vibrations • Fly rock • Dust and fumes • Air overpressure • Explosives handling

Are you aware of the Sensitive receivers?

THINKING

• Temporary excavation support • Public utilities • Retaining walls and cut slopes • Natural terrains • Existing building structures • Piled Foundations • Historic buildings

Prepare before you blast

Prepare before you blast

THINKING

Address your hazards & sensitive receivers by making the appropriate considerations…

Take action

Prepare before you blast

THINKING

Ensure monitoring and control measures are in place before you drill & blast

THINKING

Vibration monitoring procedures and inspections are to be put in place

Reduction of air overpressure needs to be considered

Physical protection measures are essential

Prepare before you blast

Take action

• Explosives delivery and handling procedures

are to be drawn up

• Public notification and traffic management needs to be appropriately planned

• Site supervision must be arranged

• Blasting Assessment Report (BAR) needs to be written

THINKING

Take action

Prepare before you blast

THINKING

Prepare before you blast Ensure Vibration Prediction work and Monitoring procedures are ready to go

This validates design predictions & ensures PPV limits are not exceeded

This involves… • Setting vibration limits

• Predicting vibrations acting at sensitive receivers

• Limiting explosive charge weight

• Measuring and recording vibrations

THINKING

Prepare before you blast

Take action

THINKING

Prepare before you blast

Know your limits

THINKING

Prepare before you blast

The vibration equation?

Write it up

Write it up Contractor’s Blasting Assessment Report

This report demonstrates that the blasting works are feasible without exceeding the impact criteria of nearby sensitive receivers. In this report, you will:

• Identify the location and condition of sensitive receivers

• Propose allowable vibration limits • Estimate allowable charge weights • Examine possible hazards and adverse

consequences • Propose protection measures and safety

procedures to ensure that the hazards are controlled

THINKING

Write it up Blasting Method Statement (BMS)

THINKING

The contractor will also need to prepare a Blasting Method Statement (BMS) with specific detail of work sequence, blast design, protective measures, monitoring and contingency plans.

Blasting Assessment Report (BAR) needs to be approved by the Mines Division of the Civil Engineering and Development Department (CEDD) before going ahead.

Get it approved

THINKING

Measure up

Measuring the vibrations

You need a minimum of monitoring stations for each blast (MTR projects)

6

What you need

THINKING

Measuring the vibrations What you need

THINKING

Use a Vibrograph (velocity seismograph) to measure and record PPV and amplitude of ground motion

AAA trigger system

Measuring the vibrations What you need

THINKING

• Alert • Action • Alarm

Contact: Jack Muir Associate – Transport [email protected] Nick Bedford Senior Civil Engineer – Transport [email protected]

Read more on our website!