Tustin Estate:
Feasibility and
Master-planning
Tender Brief
Version Date Author Issued to
Original draft 12 June Sophie Hall-Thompson Catherine Bates
Draft V1 2 July Catherine Bates Project Group; Neal Purvis
Draft V2 26 July Catherine Bates & Sophie Hall-Thompson
Project Group; Neal Purvis
Draft V3 12th
August Sophie Hall-Thompson Project Group; Neal Purvis
Final V4 14th
August Sophie Hall-Thompson Architectural Practices
2
Contents Page
Contents Page ................................................................................................................2
1.0 Introduction .........................................................................................................3
2.0 Background .........................................................................................................5
2.1 Council Programmes..........................................................................................5
2.2 Resident engagement.........................................................................................6
2.3 Planning Policy Context.....................................................................................9
2.4 The Site ..............................................................................................................10
3.0 The Design Brief ...............................................................................................14
3.1 Programme of Work..........................................................................................14
3.2 Scope of services .............................................................................................14
3.3 Service Outputs ................................................................................................16
Community Engagement ............................................................................................16
Site Analysis .................................................................................................................17
Feasibility Study options ............................................................................................17
Master-plan ...................................................................................................................20
3.4 Design Requirements .......................................................................................21
4.0 Tender Process .................................................................................................28
4.1 Eligibility ............................................................................................................28
4.2 Submissions ......................................................................................................28
4.3 Evaluation ..........................................................................................................29
4.4 Indicative Tendering & Evaluation Timescales .............................................31
4.5 Appendices ........................................................................................................31
4.6 Supplementary information .............................................................................32
4.7 Other supporting information to follow .........................................................32
3
1.0 Introduction
1.1.1 The London Borough of Southwark is inviting multi-disciplinary architectural
practices to tender for services to develop an improvement and/ or rebuild
scheme for Tustin Estate, SE15. The scope of services relate to the whole
estate with the exception of the three towers (which are currently undergoing a
major works programme).
1.1.2 The purpose of this work is to improve the quality of life of the existing
residents on the estate and to explore the possibility of providing additional
council homes for Southwark residents.
1.1.3 The scope of services will be commissioned and managed by the Council and
will be developed with input from a project group of stakeholders, comprising
of residents, representatives from onsite businesses and Pilgrims ’ Way
Primary School.
1.1.4 All residents of the estate and stakeholders will be invited to fully participate in
each stage of the scope of services.
1.1.5 The scope of services consists of four elements: 1. Community engagement 2.
Site analysis 3.Feasibility and options development 4. Master-plan design.
1.1.6 The scope of services seek to identify a preferred option for Tustin Estate that
residents and businesses of the Estate can support alongside representatives
of Pilgrims’ Way Primary School and the council.
1.1.7 The scope of services may also be used to inform updates to the Old Kent
Road Area Action Plan (OKR AAP) where this is deemed appropriate.
4
1.1.8 It is anticipated that the successful practice will have considerable experience
of working on large inner London housing estates and be able to demonstrate:
an innovative and proven track record of inclusive and meaningful community
engagement; successful collaborative working practices bringing together
people and expertise from across disciplines; and high quality master-planning
and design solutions, bringing together residential, education, commercial and
public open space. We welcome consortium based submissions that included
local practices and bring wider social value.
1.1.9 The successful practice will be expected to interface and incorporate a range
of services and surveys directly appointed by the council. These will feed in
and inform each stage of the design development.
1.1.10 Consultants will be required to work closely with the Council on matters related
to communications, consultation and commercial sensitivities.
5
2.0 Background
2.1 Council Programmes
2.1.1 Southwark Council is the biggest social landlord in London and we are
committed to delivering and managing good quality council homes for all our
residents. We have programmes to improve council homes and build more
council homes. The Council Plan commits to delivering a target of 11,000 new
council homes for social rent by 2043.
2.1.2 The Council has also launched a Great Estates programme, with the aim of
guaranteeing that every estate is clean, safe and cared for and for giving
residents the opportunity to improve their estate. The Tustin Estate will be a
leading example of this programme. The principles of resident consultation on
design alongside providing tenure-blind housing stock are key to this
programme. The vision of the Great Estates programme is as below.
o Celebrate our council estates – We will celebrate our estates and be
ambitious about their future. We will always be honest about the
challenges, and challenge ourselves to make Southwark estates the
best they can be.
o Encourage integration – Our estates are part of the bedrock of
Southwark. Mixed communities playing their part in the borough’s
economy and life are integral to the future of the borough. We want to
expand and enrich our estates, with redevelopment always a last
resort.
6
o Respect where we live – Working with residents every estate should be
clean, safe and cared for. Communities should have ownership over
their estate and a shared stake in its future. High standards or repair
and maintenance will mean Southwark’s estates are great places to
live.
2.2 Resident engagement
2.2.1 In 2016 residents of Tustin Estate were engaged in discussions about the
future of their estate. As a result of these discussions it was determined to
undertake a major refurbishment programme of the three towers. Works to the
three towers bring the homes up to Decent Homes Standard and include:
replacement of Kitchens where they are 20+ yrs; replacement of Bathrooms
where they are 30+ yrs; replacement of boilers where they are 5+ yrs;
replacement of water main & waste pipes: new windows; cladding installation;
electrics upgraded; new balconies for 1st floor residents; new entrances /
lobby areas.
2.2.2 No decision was made with regards to the low-rise blocks, although some
early visioning work was undertaken. Please see the Consultation Report (Rev
3) October Event 2016 appended to this document for further details.
Consequently there has been no major investment into the low-rise blocks.
2.2.3 The Council recognises that local residents are key to determining what the
future of the estate could be and as such have reengaged with local residents
through the Tustin Community Association (TCA). The TCA responded
positively to this early engagement which sought to identify if residents were
willing to once again enter into discussions about the future of their estate. The
Council recognise that these discussions have raised a number of concerns,
7
and will continue to do so, but the Council are committed to working through
these challenges with residents.
2.2.4 The TCA has produced a Manifesto setting out what residents see as
necessary to make sure all residents and stakeholders benefit from changes
proposed. A copy of the manifesto and the response from Southwark Council
can be found on Southwark’s Tustin Estate Webpage. Please see a link to this
in the Supplementary Information section at the rear of this document. The
manifesto may be updated across duration of the programme of work. These
updates will be shared with the architects.
2.2.5 The key design requirements in the TCA manifesto in respect of the new build
options that may be developed are:
sufficient homes to rehouse existing population and meet their needs
sufficient family-sized homes with 3 / 4 bedrooms; no bedsits
Housing needs assessment before the size mix is agreed
residents’ say on the density of any redevelopment
single moves for existing Council tenants and residents during the first
phase
options for leaseholders and freeholders to remain on the estate
options for clusters of housing reserved for older people without
children
options for the location of the new school
good natural light to all rooms including bathrooms
8
private outside space for each homes
reliable district heating
green measures such as solar panels, and reductions in water and fuel
use.
2.2.6 The Council has started discussions with the local community and will continue
to lead this engagement. The Council wants to ensure there is transparency in
decision making and that residents lead the way in terms of options and
design. An Independent Tenant and Leaseholder Advisor has been appointed
and a local project group has been established with the aims of:
Providing a voice to all residents and stakeholders affected by works
Ensure local issues are addressed when decisions are made about the
proposed works
To ensure that the Council provide information and timely and appropriate
way
To comment on communication from the Council
2.2.7 Resident involvement, including representatives from the school and from the
existing businesses, in the design outputs will be key to progressing the
options element of this work as well as the preferred option and masterplan for
this option. A key component of the design work is therefore using a variety of
techniques and models to communicate and visualise the options for residents.
2.2.8 Following the completion of the master-plan of the preferred option, it is
currently intended that the masterplan will be put to a resident’s ballot
alongside a document detailing the council’s commitments to residents. The
9
resident’s ballot will ask residents if they are happy to proceed with works
based on the contents of the master-plan and council’s commitments. The
Council will develop a ballot policy over the duration of the programme of work
which will take account of GLA ballot guidance.
2.3 Planning Policy Context
2.3.1 The Tustin Estate is subject to the Southwark Planning policy framework
including the Old Kent Road Area Action Plan (OKR AAP).
2.3.2 The Old Kent Road Area Action Plan (OKR AAP) establishes a minimum
target of 20,000 new homes in the area. The OKR AAP does not anticipate
any of the increase in housing coming from Tustin Estate.
2.3.3 In addition to new homes the AAP envisages a doubling in the number of jobs
in the OKR opportunity area (10,000 additional jobs) and the social
infrastructure that will be required to support this growth including a new
secondary school, two new primary schools and expansions of 9 existing
primary schools. Healthy active lives will be encouraged through
improvements to parks, ensuring there is affordable food and places to meet in
the area. A new health hub is planned on Verney Way which would provide a
range of services including GPs and primary health care facilities for the Old
Kent Road area.
2.3.4 It is anticipated that growth will be driven in part by the proposed extension to
the Bakerloo Line from Elephant and Castle to Lewisham via at least 2
additional stations on the Old Kent Road. The nearest of these stations would
be on the former Toys-R-Us site, on the opposite site of the road to the Tustin
estate, which would make the Tustin estate a 15 minute journey from Oxford
Circus. TfL will be consulting in September 2019 on further details around the
10
tunnel alignment and location of the station box and anticipates submitting a
Transport and Works Act Order (TWAO) to Parliament in 2021. Construction
would start in 2023 and completion would be in 2030.
2.3.5 The OKR AAP establishes indicative masterplans for the main development
areas on the OKR. The council expects to submit the AAP to the planning
inspectorate for examination in 2020.Options for the Tustin estate can inform
the approach to development on sites around.
2.3.6 Over 8,000 new homes in the OKR area have been consented or are subject
to application/pre-application. Of most relevance to the Tustin estate are
proposals for 254 apartments in a mixed use scheme at 227 Ilderton Road,
131 homes at 313 Ilderton Road (Floyds Buildings Merchant), 565 homes on
the former HSS Hire depot at 775 Old Kent Road, 200 homes on the Daisy
Business Park on Sylvan Grove, redevelopment of the Aldi store on the Old
Kent Road to provide a new supermarket and homes and a number of
schemes on the northern side of Manor Grove and Hatcham Road.
2.3.7 LBS has 1:500 scale models of the schemes that have been approved and are
at pre application stage on the neighbouring sites. LBS also has a 3D digital
model of the Old Kent Road Area (Vu City) , that has approved and pre
application schemes modelled onto it. These resources will be available for
use as the project proceeds
2.4 The Site
2.4.1 The Tustin Estate is a 1960’s/1970’s brick and cavity construction estate
located to the north of the Old Kent Road and to the west of the Ilderton Road.
11
2.4.2 It is located within the Old Kent Road Area Action Plan (OKR AAP) but has not
been identified as a development opportunity. It is also located in the Old Kent
Road ward.
2.4.3 The site is approximately 5 hectares and is home to 526 residential units, a
one form entry Primary School, retail units, TRA Hall, open space, resident
parking and district heating system.
Residential Blocks – Low Rise
Building name Number and type Dwelling size Tenure Council Tenant (T) Leaseholder (LH) Freeholder (FH)
Ullswater House 48 Flats 48 x 1B 48 T
Bowness House 34 Maisonettes 1 x 2B, 33 x 3B 20 T; 14 LH
Hillbeck Close 32 Flats 28 x BS, 4 x 1B 27 T; 5 LH
Heversham House 98 Maisonettes & Flats 25 x 2B, 53 x 3B 71 T; 27 LH
Kentmere House 38 Flats 12 x BS, 26 x 1B 36 T; 2 LH
Manor Grove, 1 - 55 46 Houses
15 x 2B, 6 x 3B, 9 x 4B 11 T; 19 FH
Manor Grove, 57-79 8 x 2B, 5 x 3B, 3 x 4B 4 T; 12 FH
Residential Blocks – Towers
Ambleside Point Grasmere Point Windermere Point
217 Flats + 13 new ‘hidden homes’ (i.e. additional new homes currently under construction within the envelope of the buildings)
Non Residential
PILGRIMS’ WAY PRIMARY SCH – 1FE
1 x TRA HALL – Windermere Point
Retail units – GF Bowness House
Address Current Use GIA Sqft
801 Employment Agency 1,921
803 Day Care and Learning Centre 977.5
805 – 809 Restaurant 3,155.9
811 Hot Food Take Away 941.4
12
813 Convenience Shop 1,057.9
815 Accountancy 870.8
817 Restaurant 635
819 Hair & Beauty Salon 957.1
821 Church hall Not known
2.4.4 Residential Units: The site comprises of three 20-storey towers, four 2-storey
blocks and 3-midrise housing blocks. The low to mid-rise blocks are known as
the ‘low-rise blocks’ and have not been subject to the Southwark Housing
Investment Programme. The three towers, known as ‘the towers’ have been
the subject of major refurbishment works (see details in paragraph 2.2.1).
These works including the creation of 13 hidden homes are due to completed
in late 2020. Manor Grove properties similarly have their own identity as they
are all houses, are predominately freeholder properties and arranged to the
north of the site.
2.4.5 Pilgrims Way Primary School: The Primary School is a 1 FE primary school
with a nursery class located in the heart of Tustin Estate. It was opened in
1967 to serve the residents of the wider estate. A children’s centre was
opened in 2007 to provide additional activities and services for parents and
children in the local area. The school is located in the middle of the Estate and
is somewhat sheltered from the noise and pollution arising from Old Kent Road
and Ilderton Road. It occupies one level, has good outdoor facilities with many
trees, a pond, large open play area and astro-turf pitch; each classroom opens
out onto an outdoor space. The school benefits from staff car parking.
2.4.6 Retail units, Bowness House: Retail units on the ground floor of Bowness
House front onto Old Kent Road. The retail units are serviced from the rear of
Bowness House and benefit from an area of public realm that steps back from
13
the Old Kent Road and creates some relief from the road. Ventilation
arrangements require improvement.
2.4.7 Tenants and Residents Hall: A new Tenants and Residential Hall is being
created as part of the Major Works programme. It will be located on the ground
floor of Windermere House.
2.4.8 Open Space: The Estate benefits from a significant proportion of open space
with some of the school’s open space being made available to residents. The
open space provides both routes through the site and between blocks as well
as access to green space and trees.
2.4.9 Parking: There is a total of 173 parking bays across the estate, with 5 of these
being for blue-badge users. There is a total of 18 garages located on Manor
Grove. Parking is an issue across the estate especially the impact on residents
from retail and church users.
2.4.10 District Heating System: This provides heating and hotwater to Kentmere
House, Hillbeck Close, Manor Grove and Heversham House. (It does not
serve Ullswater House and Bowness House). Residents have a variety of
opinions about the provision of heating via a District Heating System.
14
3.0 The Design Brief
3.1 Programme of Work
3.1.1 The below table identifies the six stages of work that will be progressed to
determine an improvement and / or rebuild scheme for the Tustin Estate.
3.1.2 The scope of services (1- 4) will be led by the architectural practice with 5-6
being led by the Council.
3.1.3 The indicative timetable should be refined as part of your programme
submission.
Area of Work Dates
1. Community Engagement October 2019 – April 2020
2. Site Analysis & Feasibility October 2019 – December 2019
3. Feasibility & Options Development October 2019 – January 2020
4. Master-planning preferred option (including engaging with planning authority)
January 2020 – April 2020
5. Finalise council commitment document May 2020
6. Hold Ballot June / July 2020
3.2 Scope of services
3.2.2 The purpose of this commission is to develop an approach for the Tustin
Estate through a rigorous process of open evaluation of a range of costed
15
design options. The starting point is that nothing has been pre-determined and
all options for the Estate should be explored. Only the three towers will not be
subject to change.
3.2.3 The scope of this commission will comprise developing a number of proposal
options, selection of a preferred option and further development towards a
master-plan of the preferred option.
3.2.4 Resident engagement will be a key part of design development, evaluation and
selection and an ongoing process is envisaged at each stage of the process.
3.2.5 Interface with other Council-commissioned analyses and surveys shall also be
required throughout the process. These include:
Stock Condition Survey
Equalities and Health Impact Assessment (EqIA)
Cost and Benefit analyses of each option as it is developed; this will
include sub options, related to the extent of refurbishment
Viability Assessment
Socio-economic baseline study
Housing Needs Assessment of the estate
3.2.6 The preferred option masterplan shall be underpinned by a vision for a high
quality, environmentally sustainable, healthy and mixed neighbourhood
creating social value; up to date school facilities; flexible business units
catering to local needs; space for play and relaxation in safe surroundings with
access to nature and car parking.
16
3.2.7 Where the preferred option selected is for wholesale redevelopment or for a
large amount of new homes on infill sites, the expectation is that the master-
plan meets with GLA requirements for estate regeneration ballots and the
Mayor of London’s Good Practice guidance on estate regeneration (see link in
Supplementary Information).
3.3 Service Outputs
3.3.1 The following paragraphs set out the outputs sought for each of the 4 elements
of this scope of services.
Community Engagement
3.3.2 The Council considers that residents should have as much clarity as possible
on the process of design development and welcomes initiative in this regard,
for example strengthening in-house engagement processes by working with
local organisations.
3.3.3 The Council will lead resident engagement of the programme of work however
architects will lead engagement on the service outputs. Engagement with the
community shall be at least carried out according to the Protocol for the
Consideration of New Development Proposal (see Appendix 2), and go further
in response to resident feedback. Each engagement activity shall be supported
by visual, virtual and physical aids.
3.3.4 The community engagement work shall include but not be limited to:
o Regularly onsite presence every week –regular drop in days every week
o Attendance of monthly project group meetings where requested
o A minimum of 4 public events
17
1. Establishing the principles workshop
2. Deliverable options
3. The preferred option
4. The preferred option refined
o Consultation reports
Site Analysis
3.3.5 Site analysis shall set out:
o Site constraints that significantly impact on the redevelopment potential of
the site. Note, some work regarding existing constraints has already been
undertaken by the Council and this is available to share.
o Consolidated utilities map
3.3.6 Proposals should advise on what studies will need to be commissioned (by the
Council) in order to complete a robust feasibility study commensurate with this
stage of works.
Feasibility Study options
3.3.7 At least the following feasibility study options shall be developed with regards
to low-rise residential, commercial and education however further options may
arise from the consultation with residents.
Option 1 - ‘Maintain the Estate only’ with enhanced landscaping
Option 2 - Refurbishment and infill
Option 3 - Partial refurbishment and partial demolition and redevelopment
Option 4 - Full demolition and redevelopment
18
3.3.8 All options should be developed with a sub-option for including and excluding
Manor Grove.
3.3.9 All the options will provide an improved public realm with high quality safe
spaces for play and relaxation.
3.3.10 Options 2-4 shall deliver the requirements of the design guidance, summarised
as:
o an increase in Council Rented Homes;
o modern high quality homes fit for the future (irrespective of tenure);
o a mixed-tenure and inclusive neighbourhood with units ranging from 1 bed
to 3+bed and larger homes according to the housing need on the estate;
o improved primary school environment and facilities with possible
replacement and /or expansion;
o retail units (providing necessary ventilation and sound insulation)
o community spaces including provision for young people and sports either
on or adjacent to the site;
o densities in keeping with Tustin Estates inner city location but not
replicating the high-density developments emerging nearby.
3.3.11 All options will contribute to the council’s Great Estates Programme. The
preferred option for the Tustin Estate could contribute to the council target for
new council homes (managed by the council and at council rents) dependent
on the outcome of the selected preferred option.
3.3.12 The options development study shall comprise the following elements:
Option 1: ‘Maintain the Estate only’, landscaping and public realm
improvements
19
This option shall set out completing the works identified in the stock
condition survey over the next 30 years and a design proposal for
improved public realm only.
Option 2: Refurbishment and infill
This option shall set out a design proposal for: refurbishment of existing
buildings, the school and retail units; new-build infill housing to ensure an
increase in Council Homes; provision for community space and
improvements to the public realm.
The design proposal for the infill developments shall comprise locations for
a new residential block or blocks and / or additional units on upper levels.
Option 3 Partial refurbishment and partial demolition and redevelopment
This option shall set out a design proposal which may include refurbishing
one or more of the existing buildings and demolishing and rebuilding
others, including or excluding the school.
Option 4 Demolition and Redevelopment
This option shall set out a design proposal for full demolition of all the
buildings (except the 3 towers) and wholesale redevelopment of the
school, residential buildings and public realm.
3.3.13 Each option shall set out:
a capacity analysis in table form: quantum of residential units; and a
schedule of non-residential uses and residential accommodation;
a benefit analysis. This shall be informed by the Council-procured cost
analyses to develop a fully cost / benefit analysis of each proposal. Key
criteria for benefit analysis shall be: achieves viability (meets available
20
funding); community benefit; social value; delivers additional Council
Homes that are affordable to tenants, leaseholders and freeholders; meets
design objectives;
a response to the EqIA as provided by the Council;
benefits appraisal, based on information from the cost and viability analysis
carried out by the Council;
high-level life-cycle assessment of the proposals showing how they have
meaningfully reduced embodied carbon through material efficiency and
selection and operational carbon through passive design
biodiversity and habitat survey; and
provision of a 3D digital model to go into the VU City model.
Master-plan
3.3.14 The Masterplan of the preferred option shall be developed to RIBA 1/2 concept
design and shall include but not be limited to the following elements:
o Vision statement with key principles for redevelopment
o Plan layout at suitable scale to illustrate the scheme/ parts of the scheme
o Axonometric drawings, key views onto the site and sectional views.
o High-level schedule of accommodation, setting out residential mix and
typology across tenures; densities, numbers.
o A movement strategy; servicing strategy; and parking strategy for all users.
o An environmental strategy including ‘Cleaner, greener, safer’ s tatement
setting out the existing baseline position and the proposed approach to
lowering environmental impacts.
o Phasing/implementation plan for a commitment to one move (where
feasible)
21
o Benefit analysis review
3.4 Design Requirements
3.4.1 The scheme design shall deliver physical properties which enable a safe and
inclusive community to thrive and prosper and ensure, in accordance with
Strategic Policy SP2 of the New Southwark Plan (Amended Policies 2019)
‘Regeneration that works for all’ that ‘we revitalise our places and
neighbourhoods to create new opportunities for residents, promote wellbeing
and reduce inequalities so that people have better lives in stronger
communities’.
3.4.2 The following paragraphs set out guidance for design. These draw from
Southwark’s Planning policy documents as well as the TCA residents’
manifesto. As the site of the Tustin Estate sits within the boundaries of the Old
Rent Road Area Action Plan and is flanked on all sides by opportunity areas
identified in the AAP OKR (areas16, 17 and 18) reference shall be made to
this Planning policy document for design guidance. The Area Action Plan
makes a specific reference to Manor Grove stating ‘The streetscape and
mature trees on Manor Grove should be retained and enhanced’.
Character and Heritage
3.4.3 Particular attention is drawn to the following vision for the wider Old Kent Road
as set out in the AAP OKR, notwithstanding the retained 3 towers which will
remain.
o Old Kent Road as a boulevard with strong street frontage to back-of-
pavement and high-quality public realm that ensures place-function as well
as movement function;
22
o the hierarchy of streets and a range of high quality different typologies;
o Mitigating anti-social behaviour, safety and enhancing the experience of
being in the public realm.
Urban grain: building blocks, streets and open spaces
3.4.4 The proposed disposition and distribution of buildings shall adhere, as far as
possible, to the principles for street grid layout, public realm and open spaces
as set out in to the OKRAAP for sub-area 4.
3.4.5 The design proposals for the public realm shall:
o place good quality public green space at the heart of development;
o make provision for spaces for relaxation and play. Play spaces should
provide for toddlers through to older children and be available to everybody
on the estate regardless of tenure. Relaxation spaces should be calm and
enable space to walk the dog;
o protect the existing ecology and encourage biodiversity including the
retention of as many of the existing trees as possible and incorporating
them into a new or redesigned open space. Any trees that are removed
should be replaced by new ones;
o provide the necessary infrastructure, such as lighting and benches, to
ensure spaces are inclusive and accessible, with facilities, for all age
groups;
o promote physical health and mental wellbeing and ensure access to
nature. This should include views on to green open spaces from homes;
o demonstrate measures for mitigating anti-social behaviour and crime;
23
o work in unison with surrounding sites and facilities;
o incorporate measures to mitigate the impacts of climate change and air
pollution.
Tested options: Heights, massing and densities
3.4.6 Consideration should be made to the OKR AAP guidance regarding building
heights and massing. Where redevelopment is considered, it anticipated that
the tallest building(s) in proposals for the Tustin estate would be between 16
and 25 storeys (tier 2 as set out in Policy AAP 8). Consistent with an approach
which is based around streets, the shoulder heights for most buildings would
be below 10 storeys.
3.4.7 Where new development is proposed as an option, densities on the Tustin
estate development are expected to be not as great as elsewhere on the Old
Kent Road.
3.4.8 Where new development is proposed as an option, it will be informed by the
Resident Manifesto and Southwark planning policy. The tenure mix for the
Tustin Estate shall provide for mixed-tenure, based on firstly replacing or
refurbishing the existing Council homes and then a mixture of new council
homes and homes for sale to help fund any refurbishment proposals and/or
new homes proposals, with a variety of options for leaseholders and
freeholders including shared equity for those that want to remain on the estate,
early buy-back at market value for those that want to sell, and consideration of
rehousing as a Council tenant
3.4.9 Where new development is proposed as an option, the dwelling size mix shall
reflect the findings of the Housing Needs Survey to re-house all existing
24
residents; thereafter the units shall be a minimum of 1 bed dwellings with a
number of larger family-sized 3-bed+ dwellings .
The nature and distribution of land uses
3.4.10 The design proposals shall consider the location and interface between
different uses and services. In particular, attention is drawn to the location of
the school in relation to residential buildings.
3.4.11 Options regarding the school shall be based on improving the primary school
environment and facilities as well as developing options to replace and/or
enlarge it from the current 1-Form entry to a 2-form entry school for general
needs primary education. A 2-from entry school would be progressed on the
basis of an in-depth understanding of population and pupil projections and
agreement with the headmaster. Proposals shall comply with all current
legislation and guidance related to school design including the Southwark
School Design Guide September 2018.
3.4.12 The location of retail shall also be considered, and this in the context of the
AAP7 policy: Town Centre, leisure and entertainment, which promotes retail
along the high street, the Old Kent Road.
3.4.13 The location of clusters of accommodation for older people without children
shall be considered.
3.4.14 The policy also promotes community facilities on secondary streets. There is
no requirement to re-provide a Tenants and Residents Association Hall
(T&RA) as this is already being re-provided as part of the Major works
programme at Windermere Point, however proposals shall consider the option
for additional community spaces. This could include a café. An assessment of
25
the need for additional space should be considered to reflect any proposed
increase in population.
Climate change, sustainability and the environment
3.4.15 The design proposals shall develop an environmental sustainability strategy
that seeks to lower environmental impacts in design, construction and
management of buildings. This strategy must address all aspects of
environmental sustainability including reducing carbon emissions and flooding
and improving air quality, water quality and biodiversity.
3.4.16 The Council has declared a climate change emergency and has committed to
trying to achieve carbon neutrality by 2030. The design proposals shall
therefore integrate measures to move towards a zero carbon economy and
include renewable energy.
3.4.17 Environmental sustainability must be considered throughout the design
process giving regard to use of sustainable materials and construction
techniques, waste management, use of technology and biodiversity loss and
gain.
3.4.18 Issues around fuel poverty and reducing heating bills very important to the
local community and shall be a key consideration in the development of the
energy strategy.
3.4.19 Where new development is considered, it is expected that a district energy
centre, or linking to one of the Old Kent Road decentralised heat networks, will
form the basis of the energy strategy. This is in line with OKR AAP policy 11,
‘cleaner, greener, safer’.
3.4.20 The air quality is very poor around Ilderton road and OKR.. This area is also
very noisy. Design proposals shall include an air quality improvement strategy
26
to mitigate the effects of this in terms of location and aspect of buildings. A
district heating system which reduces the number of existing boilers also has
the potential to improve air quality. Consideration should also be given to
appropriate ventilation and greening measures.
3.4.21 Proposals OKR AAP policy 11 requires development to reduce run-off water to
a minimum 70% greenfield run off rated using Sustainable Urban Drainage
Systems (SUDs). Opportunities to provide engineered and non-engineered
solutions should be maximised.
Movement, Servicing and Parking Strategy
3.4.22 This strategy shall be informed by the OKR AAP sub area 4 sections on
access, servicing and frontages as a wider context. It shall also give regard to
the anticipated opening of an underground station to the south of Tustin Estate
in the future, in terms of movement patterns as well as the Resident Manifesto
which expresses the desire for continuity of parking and an integrated parking
strategy.
3.4.23 The movement strategy shall consider all modes of travel, giving priority to
sustainable forms of transport and provide necessary infrastructure to
encourage use of these forms of transport. Key considerations shall be
movement through and around the Estate and ensuring connectivity to the
wider area.
3.4.24 The movement strategy will address needs for key users including residents,
pupils, parents, teaching staff, customers and employees of the retail units.
3.4.25 The servicing strategy shall set out an approach to all the uses provided,
residential, retail, community and the school. Service routes shall be designed
to mitigate shortcuts through the area.
27
3.4.26 The parking strategy will need to balance council aspiration for low levels of
car parking alongside recognition of the current car parking provision available
to residents. Motorbike parking spaces are also required on the estate. It is
expected that this will be a topic of consultation with residents.
3.4.27 Cycle parking should accommodate a diverse range of needs from
conventional parking, cargo bikes, trikes, etc. It should include appropriate
supporting facilities and infrastructure such as safe storage and showers.
Design of off street parking shall be secure and safe.
Phasing and sequencing
3.4.28 The phasing plan shall be such as to cause minimal disruption to residents; the
council would expect that the majority of residents will incur only one move,
from their existing dwelling to the new. In the instance of refurbishment (where
required) a strategy for temporary accommodation and duration of works shall
be set out.
3.4.29 Regarding the sequencing of the development delivery, housing is the priority
and it is expected that housing (new and/or refurbished) shall be delivered first.
It is expected that the school shall be delivered towards the end, although this
is dependent on the design proposals.
3.4.30 Parking provision throughout the phased delivery shall also be considered so
that an adequate level of parking provision continues to be available
throughout.
3.4.31 Options shall take into account the existing and where relevant the proposed
district heating strategy. For example, refurbishment options, should take into
account which buildings are connected to the existing estate district heating
28
system; regarding new development options, the phasing shall consider early
delivery of the new district heating system.
3.4.32 Interim uses may also be considered, in particular pop-up shops that shall
enable existing retailers to continue to trade throughout the development
process.
4.0 Tender Process
4.1 Eligibility
4.1.1. This is a closed tender process. Southwark Council is seeking proposals from
up to seven architectural practices with significant expertise and experience in
working on Estate based housing programmes, with a high degree of
community engagement and multi-disciplinary collaboration.
4.1.2. Consortium proposals are welcome and encouraged where 1) the role of lead
practice is clearly defined 2) consortium bids bring additional capacity, local
knowledge and positive benefits to community engagement and local
knowledge 3) enable local small practices to participate.
4.2 Submissions
4.2.1 Proposals should be no more than 14 A4 pages in total. This limit is exclusive
of submission of CVs.
4.2.2 Your proposal is required to include the following as a minimum:
a) Your understanding of the brief including anticipated issues and solutions;
29
b) Your proposed methodology for each of the 4 elements of this scope of
services;
c) Your proposed programme including project management arrangements;
d) Exemplar illustration of similar design project, in terms of size/ scale and
use;
e) Relevant experience and knowledge of similar scope /project;
f) Relevant experience and knowledge of a similar community engagement
programme;
a) Please populate the table below.
Service Fee Days Hourly Rate
Personnel (incl. seniority)
Community Engagement
Site Analysis
Feasibility Study Options
Master-plan
Other (should you identify other areas)
Total
b) Personnel CVs
4.2.3 Please send your proposal to Sophie Hall-Thompson by Midnight Monday 23rd
September. Proposals should be submitted via email to sophie.hall-
4.3 Evaluation
4.3.1. Submissions will be evaluated against the against the below criteria:
Quality (45%)
30
Key observations about the brief, the site and its surroundings.
Evidence of sound project management and programming.
Evidence of high quality design and architectural principles
Evidence of high quality engagement with all stakeholders in equivalent
design processes. This includes the ability to listen to resident concerns,
understand them and fully incorporate them into the design process.
Demonstrable relevant skills and experience including practice and project
team diversity.
Feedback from resident engagement exhibition.
Social Value (15%)
Demonstrates where social value will be added from inception to
completion of this piece of work and in each aspect of the work. This may
include addressing workforce issues such as the BAME and gender pay
gap.
Examples of social value could be where the selected practice
(and those they collaborate with): works / employs local and SME
practices; offers careers advice alongside skills, training and
apprenticeships to local people; finds new engagement techniques that will
increase resident participation and engagement with the work and those
who are hard to reach; uses local supply chains; identifies how your
practice is addressing workforce issues such as BAME and gender pay
gap.
Costs (40%)
A best value fee proposal and schedule for all works outlined above and
any additionalities.
31
4.3.2. Council officers will evaluate the submissions against the above criteria and
the three that score highest will be shortlisted.
4.3.3. The shortlisted submissions will then enter a further round of evaluation led by
residents. This will include interviews with project group members and a public
exhibition. The council will appoint the successful practice following feedback
from local residents and discussion with the project group.
4.4 Indicative Tendering & Evaluation Timescales
Project programme & other relevant dates
14/08/19 Council issues invitation to tender
23/09/19 Tender returns are due Midnight Monday 23rd September 2019.
w/c 23/09/19 –
w/c 30/09/19
Council evaluation and shortlisting
Exhibition with local residents
Interviews
w/c 07/10/19 Council appoint successful practice(s)
4.5 Appendices
1. Site location plan
2. Charter of Principles & Protocol for the Consideration of New Development Proposal
3. Consultation Report (Rev 3) October Event, 2016
4. Tustin Estate Parking Bays Map
5. Southwark Design Guide for the 11,000 New Homes Programme
6. Southwark New Homes Design Standards
32
7. Southwark New Homes Technical Standards
8. Southwark School Design Guide, September 2018.
9. Environmental Report: Contaminated Land, Flooding, Other Environmental Hazards, 24th June 2015.
10. UK Power Network Letter, 17th June 2015.
11. Tree Survey, 2016
12. Topographical Overlay Survey
13. Desktop Utility Record Pack Overlay
14. Thames Water Search, 7th July 2015
4.6 Supplementary information
a) Tustin Estate Resident’s Manifesto
b) Estate Regeneration National Strategy
c) Better Homes for Local People: Mayor of London’s Good Practice Guidance on Estate Regeneration
d) The London Plan
e) The Council Plan, 2018-19 – 2021-22
f) Southwark Housing Strategy to 2043
g) Draft Old Kent Road Area Action Plan & further Information on the Old Kent Road Area Action Plan
h) Southwark Residential Design Guidance
4.7 Other supporting information to follow
The following shall be commissioned and shared by the council:
a) Stock Condition Survey
b) Cost and Benefit Analysis
c) Viability Analysis
33
d) Equalities and Health Impact Assessment (EqIA)
e) Housing Needs Assessment
f) Socio-economic baseline study