UAP Documents May 11, '08 3:20 AM for everyone Professional Practice Reviewer ARCHITECT’S NATIONAL CODE THE ARCHITECT’S CODE OF ETHICS “GISRIP”, “BBCC” G-eneral Objectives B-usiness I-deals B-ehavior S-uccess C-riticism R-emuneration C-reative Endeavor I-nterest of the Client P-rofessional Prerogative SPECTRUM OF THE ARCHITECTS SERVICES The Spectrum of the Architect’s Services

Upload: jhosell-kenneth-ramos

Post on 22-Oct-2014

863 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UAP Documents

UAP DocumentsMay 11, '08 3:20 AM

for everyone

Professional Practice Reviewer

 

ARCHITECT’S NATIONAL CODE

 

THE ARCHITECT’S CODE OF ETHICS

 

“GISRIP”, “BBCC”

 

G-eneral Objectives                    B-usiness

I-deals                                    B-ehavior

S-uccess                                  C-riticism

R-emuneration                          C-reative Endeavor

I-nterest of the Client

P-rofessional Prerogative

 

SPECTRUM OF THE ARCHITECTS SERVICES

 

The Spectrum of the Architect’s Services

 

UAP Doc 201 Pre-Design Services

 

Page 2: UAP Documents

“EPASSSSP” - NON CREATIVE – no design and construction

 

1.    E-conomic Feasibility Studies

2.    P-roject Financing

3.  A-rchitectural Programming                       

4.  S-ite Selection and Analysis*

5.  S-ite Utilization and Land-Use Studies*

6.  S-pace/Management Studies

7.  P-romotional Services

 

* Must be EnP, Environmental Planner

MDPE – compensation method

 

Methods of Compensation

 

1.    Percentage of Construction

2.    Multiple Direct Personnel Expense MDPE

 

Architect            = NTRMf

Consultant                  = NTRMf

Staff                = NTRMf

------------------------------

                       E = Direct Cost

Page 3: UAP Documents

E + MP + RE = Project Cost; where MP (Marginal Cost = 30%), RE (Reimbursable Expense)

Project Cost + AE = Professional Fee: where AE = Architect & Engineer Fee

N –

T –

R –

Mf – Min. Fee = 2.0 – 2.5 as Multiplier

 

3.    Lump Sum/ Fixed Fee

4.    Per Diem Plus Reimbursable Expense

5.    Combination

6.    Professional Fee and Expenses

7.    Turn Key

 

Reimbursable Expenses

Conditions:

 

1.    Pertinent to the Project

2.    Must occur within 100 K = radius

3.    Mutual agreement

 

Schedule of Payments

 

Page 4: UAP Documents

CONTRACTOR

1.    Downpayment -  20 – 50% of Project Cost

2.    Progressive Billing – base on percentage of completion (not more than 1 month)

3.    Final Billing/Payment -  98% Complete

4.    Guarantee Bond – enforced for 1 year

 

ARCHITECT

1.    Proposal Fee       – 5%

2.    Schematic Design         – 15%

3.    Design Dev’t      - 15%

4.    Contract Docs     - 50%

5.    Retention           - 15% =  Liability 10%, Supervision 5%

 

SPECIALIZED ALLIED SERVICES SAS

1.  Proposal Fee       – 5%

2.  Prelim Drawings  - 25%

3.  Final Drawings    - 50%

4.  Retention           - 20% = 3 months after the acceptance of the Architect

 

 

UAP Doc 202 Design Services: Regular Architectural Services

 

“PWSP” “SDCC” - Sequential

Page 5: UAP Documents

 

1.    P-reliminary Design/S-chematic Design

2.    W-orking Drawings/D-esign Dev’t Phase

3.    S-pecifications and Other Contract Documents/C-ontract Documents*

4.    P-art-Time Supervision/C-onstruction Phase*

 

*Under Contract Doc. Phase (Refer to UAP Doc 301 General Conditions of a Contract)

 

“GASSD”

 

1.    G-eneral Conditions – Execution, Intent – satisfaction to finish the proj., Correlation                       

2.    A-greement

3.    S-pecifications

4.    S-pecial Provisions

5.    D-rawings

 

*Under Construction Phase

Important Milestones of Construction

 

“RERCF”

 

1.      R-eference – Horizontal, Vertical

Page 6: UAP Documents

2.      E-xcavation – min. depth .60m until stable – w/ signature of the Architect, must have a permit

3.      R-ebars

4.      C-oncreting

5.      F-inishes – Mock up (samples)

 

5 M’s of Construction

1.    M-achines

2.    M-oney

3.    M-anpower

4.    M-aterial

5.    M-inutes

 

PROJECT CLASSIFICATION

UAP – degree of difficulty/complexity of design

FCP – risk of occurrence of Fire

NCP – use and occupancy

 

ARCHITECTURAL PROJECTS (SCHEDULE OF MINIMUM BASIC FEE)

 

“SMERM” “RHEAC”

 

GROUP DEFINITION MINIMUM BASIC FEES-imple (Hangars) Without partitions P50M & less 6%M-oderate (Art With partitions P50M & less 7%

Page 7: UAP Documents

Galleries)E-xceptional (Aquariums)

Requires Consultants

P50M & less 8%

R-esidences Single Detached or Duplex

10% of Proj. Const. Cost

M-onumental Buildings (Expositions, Mausoleums, Memorials)

Requires Concepts 12% of Proj. Const. Cost

R-epetitive Buildings Construction of Similar Structures

1st Structure – MBF

2nd Structure – 80% of BF

3rd Structure – 60% of BF

Succeeding   – 40% of BF

H-ousing Projects Construction of several residential units

1st Unit = 10% MBF = A

2 to 10 Units = A + (60% of MBF x N) = B

11 and above = B + (30% of MBF x N) ; where N = no. of units

E-xtensive Detailing Design of detailed Parts of appurtenances, special fittings, etc.

15% of Proj. Const. Cost

A-lterations and Additions

Structures belonging to Groups 1 to 5

MBF + 50% of MBF

C-onsultations and Arbitration

Technical matters, service as an expert witness

P200, P500

 

 

UAP Doc 203 Specialized Allied Services SAS

 

“PILAC”

Page 8: UAP Documents

 

SERVICES PARTICULARS PAYMENTS/SCHEDULE OF FEES

P-hysical Planning

Must be an EnP Type I Site Dev’t Planning

50 HAS – P5000/HAS = A

50-100 – A + P4500/HAS = B

100-200 – B + P4000/HAS = C

over 200 – C + P3000

 

Type II Subdivision Planning (Urban)  MM, Cities, Regional Centers, Provincial Capitals

100 HAS – P3000/HAS = A

100-200 – A + P2300/HAS = B

over-200 – B + P2000/HAS = C

 

Type II Subdivision Planning (Rural) other localities

100 HAS – P2000/HAS = A

100-200 – A + P1500/HAS = B

over-200 – B + P1000/HAS = CI-nterior Design Licensed IND 12 – 20% cost of workL-andscape Design

Landscape Architect

10 – 15% cost of work

A-coustic, Communication and Electronic Engineering Services

Engineer ECE 10 – 15% cost of work

C-omprehensive Planning

Must be an EnP

1.    Physical

a.    Same w/ Physical Planning

b.    MDPE

Page 9: UAP Documents

Component

2.    Economic Planning

3.    Socio-Cultural

4.    Transport

5.    Legal & Administrative

 

Civil works (preparation of detailed engineering drawings and specifications, roads, drainage, sewerage, power and communication) – 4% cost of the development

 

 

 

STANDARDS OF PROFESSIONAL PRACTICE

 

UAP DOC 204 Construction Services

 

“FC”

 

1.    F-ull Time Supervision – Team or Individual, Quality Control, Evaluation, Records – Basic Salary if Architect 1- 1.5%

2.    C-onstruction Management – CM - Team or Individual, Time and Cost Control, Coordination and Supervision – 1.5 – 3% of Construction Cost

 

Page 10: UAP Documents

3*.  P-roject Management – PM – 2 – 5% (Refer to UAP Doc 206 Comprehensive Architectural Services)

 

  Before Construction

During After

CM   Present  

PM Present – Identifies, accredits,

recommends potential

contractors & suppliers

Present Present – Advertising, Promotional

Services, Building

Administrator

 

 

UAP Doc 205 Post-Construction Services (Maintenance and Administration)

 

1.    BE – Building and Equipment Maintenance

 

If the building is Safe and habitable – will issue – Certificate of Occupancy

Good working condition and properly maintained

 

2.    BG – Building & Grounds Administration

 

a. Billing of Tenantsb. Security and Janitorial Services (Monitoring)

c. Local Ordinances

 

Method of Compensation (BG)

Page 11: UAP Documents

a. Fixed Salary Basis – monthlyb. Percentage of Gross Rentals – 4-6%

 

UAP 206 Comprehensive Architectural Services (Scope from UAP Doc 201 to 205)

 

The Project Manager – PM – 2 - 5% of Estimated Project Cost, Combination Methods if performs in regular Architectural Services for the same project – will compensate separately.

 

Basic Functions

a.    Operates as a member of Owner-Architect-Engineer-Contractor

b.    Contractor – men and equipment, project delivery as per contract, Owner – funds are available to complete project w/in budget estimates

c.     Plan, Program, Monitor activities, Adviser of material cost and Construction methods, Exercise Overall cost control.

 

Detailed Functions

a.    Pre-Construction Phase

b.    Construction Phase

 

 

UAP 207 Design-Build Services

 

Method of Project Delivery

1.    DBA Design-Build Services by Administration - 7% of Proj. Const. Cost

 

Page 12: UAP Documents

Proj. Const. Cost. in addition to Architects fee for Regular Design Services (UAP 202) 10% (if residential proj.) + 7% = 17%

 

2.    DBGMC Design Build by Guaranteed Maximum Cost

 

a.    Lump Sum

b.    If the cost is exceeded by not more than 10% it is divided = bet. Architect and Client.  However if the excess is more than 10% the Architect pays for all extra cost of the 10%

 

UAP Doc 208 Selection of the Architect & Methods of Compensation

 

1.    Direct Selection

2.    Indirect

a. Referral from satisfied clientb. Recommendation form another Architect

c. Comparative Selection

3.    Design Competition

 

Methods of Compensations (Refer to UAP Doc 201 Pre-Design Services) 

UAP Doc 301 General Conditions of a Contract

 

1.    Establishes the relationship bet:

a. Architect and Clientb. Contractor and Client

c. Architect and Contractor

 

Page 13: UAP Documents

2.    Establishes the norms of conduct

a. must have an Architectb. must have an Engineer

c. its “Conditions”

 

3.  Current Standards of the Practice whether in DESIGN and CONSTRUCTION

 

Section 1 – Definition of Documents (Glossary of Terms)

 

Section 2 – Laws Regulation

a.    Site Conditions

b.    Permits

c.     Taxes

d.    Royalties

e.    Patents

f.     Surveys

 

Section 3 – Equipment Materials “Quality and Quantity”

Section 4 – Premises Temporary Facilities

 

         “TEMPACIL”*

a.    Office – bedroom for Architect

b.    Quarters – for staying workers

c.     Warehouse – storage

Page 14: UAP Documents

d.    Accessway – road ways, bridge, hoist (elevator)

e.    Enclosure

f.     Signage

g.    Trial usage

 

*contractors expense

 

Section 5 – Protection

a.    Property (work area)

b.    Adjacent Property and Existing Utilities

c.     Life, work, and Property during emergencies

 

Section 6 – Labor, Work, and Payments

 

Labor – characteristics/quality

         No. /quality, no. of workers signed by YOU

 

Work – duration and deadlines; if delay P20,000 per day.  Liquidated Damages = 0.01 of the Contract Sum “by the government”

 

 

 

Payments

 

Page 15: UAP Documents

Contractor

1.    Progressive Billing – partial % of Completion

2.    Request for inspection

 

Architect will issue (if accept)

a.    Certificate of Acceptance <

b.    Certificate of Payment – Owner for payment – pay or not pay

c.     If 65% completion – the contractor will issue of non-financial obligation (certificate)

 

Section 7 Relationship bet. Architect and Sub-Contractor

5 copies of Drawings to:

a.    Contractor

b.    Owner

c.     Office of the Building Official (OBO)

d.    Fire Dept.

e.    Site

 

Laws Affecting Real Estate Housing, General Design, Construction, etc.1.    PD 1096 – The National Building Code

2.    PD 1185 – The Fire Code of the Philippines – Enforced by PNP Gen. Hermohenes Ebdane

Page 16: UAP Documents

3.    PD 957 – The Condominium & Subdivision Buyers Protective Law

4.    BP 220 – Socialized Housing Law

5.    BP 344 – Law Enhancing the Mobility of the Disabled (Accessibility Law)

 

Laws that regulate the Practice of Architecture1.    RA 545/RA9266 – the Architecture Law

2.    EO 164 – Regulating the Hiring of Foreign Consultants

3.    PD 49 – Intellectual Property Law

4.    PD 223 - PRC Law

5.    LOI 1000 – Letter of Instructions, mandating government support only to APO (Accredited Professional  Organization)  See print out of PRC

6.    RA 9283 – Copyright Law

 

PD – Presidential Decree

BP – Batas Pambansa

EO - Executive Order

LOI – Letter of Instruction

RA – Republic Act

 

Additional Terms:

 

1.    According to RA9266 – all projects either big or small must have a contract.  LAWYER – NOTARY – REGISTER OF CONTRACT

Page 17: UAP Documents

2.    Contractor – pays for the Building Permit (cannot be reimbursed, not included in Estimates)

3.    Architect cannot be a Contractor at the same time.

4.    Contractor is profit motivated; Builder is completion motivated; Contractor holds the money; Builder doesn’t hold the money.  15 days can a contractor, atter giving due notice to the owner/architect suspend work or terminate a contract.  Responsible for the payment of insurance for personal injury and to property; Responsible for the As-Built Plans of the Project

5.    2% per annum – Interest (if money is not fully collected)

6.    TOR – Terms of Reference

7.    Building Permit – validity 120 days, valid 12 months if constructed has not commenced; exception government structure; excepted if P15,000 proj. cost

8.    Notary – to legalize document with series no., document no., etc.

9.    Arbitration – can file a case after 30 days

10.   Specifications – are printed documents stipulating the procedural aspects of the contract

11.   Variance – is the minimum possible deviation from standards which is permitted to make a highly beneficial housing project.

12.   Project duration is computed immediately from the receipt date of the NTP

13.   Design of any religious structures is assessed professional fees

14.   Competitive bidding is mandatory for public work projects

15.   7 Days – affectivity of a Construction contract from receipt of Notice of Final Payment

16.   Civil Code – liability of Architect for Regular Design of structures – 15 years

17.   PERT – Prog. Evaluation Review Technique

18.   CPM – Critical Path Method