University Central Chilled Water Plants: Campus Planning, Sustainable and Building Planning Factors
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
Bill Mahoney, P.E. Senior Project Manager, RMF Engineering Juan Suarez, QCxp LEED AP Principal, STPCx
Joe Raia, AIA LEED AP Senior Associate, Leers Weinzapfel Associates
LEERS WEINZPAFEL ASSOCIATES • RMF ENGINEERING • TREFZ ENGINEERING
TYPOLOGY / OVERVIEW
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
1922: MCCRACKEN HEATING PLANT, OHIO STATE UNIVERSITY 1962: HEATING / COOLING PLANT, PRINCETON UNIVERSITY 2000: MOD VII CHILLED WATER PLANT, UNIVERSITY OF PENNSYLVANIA
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CAMPUS PLANNING
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
EMBEDDED OR PERIPHERAL VISIBILITY CONTEXT FUTURE DEVELOPMENT
LEERS WEINZPAFEL ASSOCIATES • RMF ENGINEERING • TREFZ ENGINEERING
CAMPUS PLANNING / UPENN DISTRIBUTION
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
REGIONAL STRATEGIES CRITICAL BUILDING DEVELOPMENT REDUNDANCY
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CENTRAL CHILLED WATER PLANT
14,000 TONS 22,000 TON-HR
ICE STORAGE
CENTRAL CHILLED WATER PLANT
50,000 TONS
2000 MEDICAL RESEARCH
CENTER
RELOCATE VARSITY BASEBALL STADIUM
UPenn Mod VI
CAMPUS PLANNING / UPENN – MOD VI CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
EMBEDDED • URBAN CONTEXT • MIXED USE: RETAIL, PARKING, CHILLED WATER PLANT AND ICE STORAGE
HIGH VISIBILITY • INTERECTION OF CAMPUS AND CITY • MAJOR PEDESTRIAN/VEHICULAR STREET
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CAMPUS PLANNING / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
PERIPHERAL • VIEWED FROM A DISTANCE OR IN MOTION
HIGH VISIBILITY • GATEWAY TO CAMPUS/CITY
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CAMPUS PLANNING / OSU DISTRIBUTION
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
REGIONAL STRATEGIES CRITICAL BUILDING DEVELOPMENT REDUNDANCY
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
NEW EAST REGIONAL CHILLED WATER PLANT 15,000 TONS
2014 ENGINEERING/CHEMISTRY BUILDING 225,000 GSF
CENTRAL CHILLED WATER PLANT
15,500 TONS
NEW SOUTH CAMPUS CHILLED
WATER PLANT 30,000 TONS
2014 MEDICAL / CANCER RESEARCH
CENTER 1.1 MILLION GSF
CAMPUS PLANNING / OSU - SOUTH CAMPUS CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
PERIPHERAL • VIEWED FROM A DISTANCE
HIGH VISIBILITY • MEDICAL CAMPUS – LARGE SCALE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
* DESIGN BY ROSS BARNEY/CHAMPLAIN ARCHITECTS
CAMPUS PLANNING / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
EMBEDDED • FUTURE DEVELOPMENT
HIGH VISIBILITY • ACADEMIC CORE CONTEXT
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
AREA OF CAMPUS DEVELOPMENT,
INCLUDING CHILLER PLANT LOCATION
$
$$
$$$
$$$$
CONFLICT W/BUILDING EXPANSION
CONFLICT W/NEW PARKING GARAGE
LIMITS FUTURE ARTS COMPLEX EXPANSION
COMMUNITY/ CITY VISIBILITY CONCERNS
CAMPUS PLANNING / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
EMBEDDED • ACADEMIC CORE CONTEXT
HIGH VISIBILITY • CITY/COMMUNITY VIEW
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
SUSTAINABILITY
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
ENVIRONMENT - NOISE REDUCTION RESOURCES – MATERIAL AND LABOR REDUCTIONS REDUNDANCY AND RELIABILITY MAINTENANCE
LEERS WEINZPAFEL ASSOCIATES • RMF ENGINEERING • TREFZ ENGINEERING
SUSTAINABILITY / ENVIRONMENTAL
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
REDUCED ENVIRONMENTAL NOISE • ELIMINATION OF ROOF TOP COOLING TOWERS • ELIMINATION OF AT-GRADE COOLING TOWERS
SKYLIGHT POTENTIAL FOR NEW BUILDINGS REDUCED MECHANICAL EQUIPMENT VISUAL CLUTTER CENTRALIZE NOISY EQUIPMENT AT ONE LOCATION LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CHILLED WATER PLANT
INCREASED dBA
ELIMINATED STAND ALONE CHILLED WATER PLANTS -5 TO 7 dBA REDUCTION
SUSTAINABILITY / RESOURCES
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
REDUCED NEED FOR DECENTRALIZED CHILLED WATER PLANTS
• ALLOWS FOR MORE BUILDING PROGRAM SPACE OR • CENTRAL PLANT ALLOW FOR SMALLER BUILDINGS
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CHILLED WATER PLANT 22,000 GSF
ELIMINATED STAND ALONE CHILLED WATER PLANTS 18,000 SF REDUCTION OR PROGRAM 14,000 SF ROOF AREA FREED UP POTENTIAL $2.5 MILLION SAVINGS
SUSTAINABILITY / RESOURCES
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
CENTRAL PLANT REDUCES STAFFING FOR MAINTENANCE AND OPERATIONS OVERSIGHT
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
CHILLED WATER PLANT 2-3 HOURS DAILY MAINTENANCEV /REVIEW
STAND ALONE CHILLED WATER PLANTS 30 MIN DAILY MAINTENANCE/REVIEW 5-6 HOURS FOR 11 BUILDINGS
BUILDING PLANNING
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
PHASING CONSIDERATIONS OPERATIONS AND MAINTENANCE LAYOUT STRATEGIES
LEERS WEINZPAFEL ASSOCIATES • RMF ENGINEERING • TREFZ ENGINEERING
PHASING / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
DYNAMIC EXPANSION
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
PHASE I
IA 20,000 TONS
IB 10,000 TONS
SCREEN WALL DEFINES PERIMETER
PHASE II
IIB 10,000 TONS
IIA 10,000 TONS
SCREEN WALL REMAINS DURING
EXPANSION
PHASING / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
OPERATIONS / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
OPERATIONS • VEHICLE ACCESS UPTO FLAT BED TRUCK • EQUIPMENT ADDED/REMOVED AT BAYS
MAINTENANCE • WORK ZONES PROVIDE EASY ACCESS
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
WORK ZONE
VEHICULAR PATH
EQUIPMENT REMOVAL
SERVICE YARD TURN AROUND
TURN AROUND
OPERATIONS / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
OPERATIONS • VEHICLE ACCESS UPTO FLAT BED TRUCK • EQUIPMENT ADDED/REMOVED AT BAYS
MAINTENANCE • WORK ZONES PROVIDE EASY ACCESS
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
OPERATIONS / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
MAINTENANCE • SCREENWALL PROTECTION
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
LAYOUT STRATEGY / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
GATHER EQUIPMENT TYPES COORDINATE ACCESS AND VIEWS GATHER DENSE CONDUITS/PIPING
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
LARGE EQUIPMENT
DENSE EQUIPMENT
VIEWS
SOLID WALL
SOLID WALL
LAYOUT STRATEGY / UPENN – MOD VII CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
GATHER EQUIPMENT TYPES COORDINATE ACCESS AND VIEWS GATHER DENSE CONDUITS/PIPING
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
STATIC EXPANSION
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
I 5,000 TONS
II UPTO 10,000 TONS @ 2,500
TON INCREMENTS
I 5,000 TONS
II UPTO 10,000 TONS @ 2,500 TON INCREMENTS
CURTAIN WALL DEFINES PERIMETER
SCREEN WALL DEFINES PERIMETER
PHASING / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
FIXED PERIMETER ENCLOSURE COOLING TOWERS SCREENED FROM VIEW • LIMITED TO PACKAGED UNITS
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
PHASING / OSU – EAST REGIONAL CW PLANT
OPERATIONS / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
OPERATIONS • VEHICLE ACCESS UPTO BOX TRUCK • EQUIPMENT ADDED/REMOVED AT FRONT BAY OR REAR WALL
MAINTENANCE • EASY ACCESS AT CENTRAL CHILLER BAY • LIMITED ACCESS ELSEWHERE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
WORK ZONE
VEHICULAR PATH
EQUIPMENT REMOVAL
OPERATIONS / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
OPERATIONS • COOLING TOWER OPERATES W/IN 3 FEET OF SCREENWALL
MAINTENANCE • COOLING TOWER BASINS CLEANED W/IN 3 FEET OF SCREENWALL
LAYOUT STRATEGY / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
LARGE EQUIPMENT
DENSE EQUIPMENT
VIEWS
OBSCURED VIEW
OBSCURED VIEW AROUND PERIMTER
GATHER EQUIPMENT TYPES • LIMITATIONS W/ COOLING TOWERS
COORDINATE ACCESS AND VIEWS GATHER DENSE CONDUITS/PIPING
LAYOUT STRATEGY / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
3D REPRESENTATION
COOLING TOWERS SELECTED TO
MINIMIZE SCREEN WALL FOOTPRINT
ONE SIDE VEHICULAR/ MAINTENANCE BAY
MINIMIZES FOOTPRINT
LAYOUT STRATEGY / OSU – EAST REGIONAL CW PLANT
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING
OBSCURE COOLING TOWERS ILLUMINTE ADJACENT SITE PATHS
THANK YOU
INTERNATIONAL DISTRICT ENERGY ASSOCIATION – CAMPUS ENERGY CONFERENCE
LEERS WEINZPAFEL ASSOCIATES • TREFZ ENGINEERING • RMF ENGINEERING