This information to Offerors is to provide answers to questions posed by the contractors and to provide
supplemental information to the contractors. This information is non-binding and is not part of the
Contract Documents.
1. FRONT ELEVATION 2. FRONT ELEVATION
3. FRONT ELEVATION 4. ROOF AREA "A"
5. ROOF AREA "A" 6. ROOF AREA "A"
U.S. Department of State Roof Maintenance Program
7. ROOF AREA "A" 8. ROOF AREA "A"
9. INTERNAL GUTTER ROOF AREA "A" 10. ROOF AREA "I"
11. ROOF AREA "I" 12. ROOF AREA "B"
U.S. Department of State Roof Maintenance Program
13. ROOF AREA "F" 14. ROOF AREA "F"
15. ROOF AREA "F" 16. ROOF AREA "F"
17. METAL WALKWAY ROOF AREA "F" 18. METAL WALKWAY ROOF AREA "F"
U.S. Department of State Roof Maintenance Program
19. ROOF AREA "G" & "H" 20. ROOF AREA "G"
21. ROOF AREA "G" 22. ROOF AREA I
23. ROOF AREA E