How Gulf Ports can plan a terminal to address impact of recurring bad weather events, bigger vessels and surge in petroleum tradeTRANSCRIPT
![Page 1: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/1.jpg)
How Gulf Ports can Plan a Terminal to Address Impactof Recurring Bad Weather Events, Bigger Vessels andSurge in Petroleum Trade
![Page 2: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/2.jpg)
Simulate it, if you can’t Predict it
• Description of the behavior of the port written in code
• Sequential movement of vessels, channel constraints, loading andunloading operations at each berth, tugs/pilots, tide etc
• Fluctuations in Cargo Being handled
• Berth Suspension due to– Bad Weather (wind, waves, lightning and swells)– Maintenance
RandomScheduled
• Variation in Vessel Size
![Page 3: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/3.jpg)
3
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Bar
rels
per
Day
Crude Oil and Petroleum Product Import from Gulf PortsDecreasing since 2005
Source:
U.S.A Total
Gulf Coast Ports(market share almost remained same)
![Page 4: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/4.jpg)
4
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
2,000,000
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Bar
rels
per
Day
Crude Oil and Petroleum Product Export from Gulf PortsIncreasing since 2001
U.S.A Total
Gulf Coast Ports(market share about to double)
Source:
![Page 5: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/5.jpg)
5
Planning and Analysis Process
• Develop conceptual alternatives• Simulate each alternative• Use simulation output data to
compare overall cost– Capital cost– Operating cost including
demurrage• Refine and repeat• Recommend optimal layout for
each phase of development
![Page 6: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/6.jpg)
6
Simulate Channel Deepening and PortDevelopment Plans
![Page 7: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/7.jpg)
7
Petroleum Terminal Expansion Planning
Tank Farm 1
Product 1
Tank Farm 2
Refinery 1
Berth 1
SPM 1 SPM 2
Berth 2
![Page 8: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/8.jpg)
8
Simulation Scenario 1
Tank Farm 1
Product 1
Tank Farm 2
Product 2
Refinery 1
Berth 1
SPM 1
Berth 2
SPM 2(Overhauled)
Power Plant 1
Refinery 2
![Page 9: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/9.jpg)
9
Simulation Scenario 2
Tank Farm 1
Product 1
Tank Farm 2
Product 2 Product 4
Product 3
Refinery 1
Berth 1
SPM 1
Berth 2
SPM 2(Overhauled)
Power Plant 1
Refinery 2
![Page 10: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/10.jpg)
10
Tank Farms
Petroleum Product Export TerminalSimulation Model Animation
![Page 11: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/11.jpg)
11
Storage/Export :13
Storage/Export : 7
Storage/Export :15
Storage/Export : 7
Plan for Storage Space Required to HandleFuture Volume
![Page 12: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/12.jpg)
12
Annual Cost of Building an Additional Berthvs. Demurrage Payment
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
mor
e
Tanker Waiting Time (Days)
Num
ber o
f Tan
kers
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
Cum
ulat
ive
Freq
uenc
y (%
)
Number of Tankers Cumulative Frequency %
10% of Arriving Tankers Wait Morethan Permissible Limit, Resulting inDemurrage Payment
![Page 13: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/13.jpg)
13
$0
$400
$800
$1,200
$1,600
$2,000
6% 17% 33% 33% 33% 67%% Increase in Daily Export
Addi
tiona
l Inf
rast
ruct
ure
Cap
ital C
ost (
US
$)
SubstationsDemurrageAdditional BerthsPumps+MeteringPipelinesTankage
Comparison of Capital Cost for Planned ThroughputIncrease
![Page 14: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/14.jpg)
14
Why Simulate?
• Evaluate the capacity of the existing system and bottlenecks
• Determine the optimal Port infrastructure and dredging fundsto accommodate planned import/export
• Establish the need for waterside export facilities expansionregarding tanker service level and demurrage cost
• Initiate required capital projects ahead of demand
![Page 15: Use of Simulation Modeling to Address Impact of Recurring Bad Weather Events, Bigger Vessels and Surge in Petroleum Trade](https://reader034.vdocuments.net/reader034/viewer/2022042815/55674c1ed8b42a5a3e8b50c7/html5/thumbnails/15.jpg)
15
Thank You for Attending. Any Questions?
Vijay AgrawalPort Analyst & Plannerphone: 510.844.0576email: [email protected]