DRAWING LIST A-000 GENERAL NOTES, ABBREVIATIONS, LEGENDS A-100 EXISTING PLAN A-140 DEMOLITION PLAN GENERAL NOTES, KEYS, LEGENDS A-150 FLOOR PLANS GENERAL NOTES, KEYS, LEGEND A-160 FINISH PLAN GENERAL NOTES, KEYS LEGENDS A-170 REFLECTED CEILING GENERAL NOTES, KEYS, LEGENDS A-180 FFE PLAN A-210 INTERIOR ELEVATIONS GENERAL NOTES, KEYS, LEGENDS A-710 TYPICAL PARTITION DETAILS, DOOR DETAILS, CASEWORK DETAILS Isgenuity LLC 500 Harrison Avenue, Suite 5F Boston, MA 02118 Tel 617 419 4660 Fax 617 419 4661 www.isgenuity.com Architect Project Number: Date Issued: NOT FOR CONSTRUCTION R.W. Sullivan Engineering The Schrafft Center 529 Main Street, Suite 203 Boston, MA 02129 Tel 617 523 8227 Fax 617 523 8016 V1 6th Floor Tissue Culture Labs 179 - 27 - 00 3/13/20 Vertex Pharmaceuticals, Inc. V1 6th Floor Tissue Culture Labs 50 Northern Ave Boston, MA 02110 ISSUED FOR BID MEP/FP Engineer FP-001 FIRE PROTECTION LEGEND, DETAILS, SCHEDULE & GENERAL NOTES FP-101 FIRE PROTECTION LEVEL 6 DEMOLITION PLAN FP-201 FIRE PROTECTION LEVEL 6 NEW WORK PLAN H-001 HVAC LEGEND, DETAILS, SCHEDULE & GENERAL NOTES H-002 HVAC SCHEDULES & DETAILS H-101 HVAC LEVEL 6 NEW WORK PLAN P-001 PLUMBING LEGEND, DETAILS, SCHEDULE & GENERAL NOTES P-101 PLUMBING LEVEL 6 DEMOLITION & NEW WORK PLAN E-001 ELECTRICAL LEGEND AND GENERAL NOTES E-101 LEVEL 6 DEMOLITION PLAN E-201 LEVEL 6 NEW WORK LIGHTING PLAN E-301 LEVEL 6 NEW WORK POWER PLAN E-401 SCHEDULES AND DETAILS FA-001 FIRE ALARM LEGEND, GENERAL NOTES, RISER, AND DETAILS FA-101 FIRE ALARM LEVEL 6 NEW WORK PLAN Issuance Schedule Number Date Description

Upload: others

Post on 27-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

DRAWING LIST

A-000 GENERAL NOTES, ABBREVIATIONS, LEGENDS

A-100 EXISTING PLAN

A-140 DEMOLITION PLAN GENERAL NOTES, KEYS, LEGENDS

A-150 FLOOR PLANS GENERAL NOTES, KEYS, LEGEND

A-160 FINISH PLAN GENERAL NOTES, KEYS LEGENDS

A-170 REFLECTED CEILING GENERAL NOTES, KEYS, LEGENDS

A-180 FFE PLAN

A-210 INTERIOR ELEVATIONS GENERAL NOTES, KEYS, LEGENDS

A-710 TYPICAL PARTITION DETAILS, DOOR DETAILS, CASEWORK DETAILS

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661 www.isgenuity.com

Architect

Project Number:

Date Issued:

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

V1 6th Floor Tissue Culture Labs

179-27-00

3/13/20

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue Culture Labs

50 Northern AveBoston, MA 02110

ISSUED FOR BID

MEP/FP Engineer

FP-001 FIRE PROTECTION LEGEND, DETAILS, SCHEDULE & GENERAL NOTESFP-101 FIRE PROTECTION LEVEL 6 DEMOLITION PLANFP-201 FIRE PROTECTION LEVEL 6 NEW WORK PLAN

H-001 HVAC LEGEND, DETAILS, SCHEDULE & GENERAL NOTESH-002 HVAC SCHEDULES & DETAILSH-101 HVAC LEVEL 6 NEW WORK PLAN

P-001 PLUMBING LEGEND, DETAILS, SCHEDULE & GENERAL NOTESP-101 PLUMBING LEVEL 6 DEMOLITION & NEW WORK PLAN

E-001 ELECTRICAL LEGEND AND GENERAL NOTESE-101 LEVEL 6 DEMOLITION PLANE-201 LEVEL 6 NEW WORK LIGHTING PLANE-301 LEVEL 6 NEW WORK POWER PLANE-401 SCHEDULES AND DETAILS

FA-001 FIRE ALARM LEGEND, GENERAL NOTES, RISER, AND DETAILSFA-101 FIRE ALARM LEVEL 6 NEW WORK PLAN

Issuance Schedule

Number Date Description

Page 2: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

& ANDL ANGLE@ AT

CENTERLINEØ DIAMETER# POUNDA/E ARCHITECT / ENGINEERAB ANCHOR BOLTACBL ACCESSIBLE (ADA COMPLIANT)ACOUS ACOUSTICALACP ACOUSTICAL CEILING PANELAD ACCESS DOORADA THE AMERICANS WITH DISABILITIES ACTADBL ADAPTABLE (ADA COMPLIANT)ADDL ADDITIONALADH ADHESIVEADJ ADJUSTABLEADJC ADJACENTAF ACCESS FLOORAFF ABOVE FINISHED FLOORAFI AIR FLOW INDICATORAGGR AGGREGATEAL ALUMINUMALT ALTERNATEANOD ANODIZEDAP ACCESS PANELARCH ARCHITECTASC ABOVE SUSPENDED CEILINGASPH ASPHALTAVAF AUDIO/VISUAL ALARM

BD BOARDBLDG BUILDINGBLKG BLOCKINGBM BEAMBOT BOTTOMBUR BUILT-UP ROOFING

CA CARD ACCESSCAB CABINETCB CASING BEADCEM CEMENTCEMTS CEMENTITIOUSCER CERAMICCG CORNER GUARDCGE CORNER END GUARDCHAN CHANNELCHBD CHALKBOARDCHFR CHAMFERCJ CONSTRUCTION JOINTCL CENTER LINECLG CEILINGCLJ CONTROL JOINTCLO CLOSETCLR CLEARCLRM CLASSROOMCMPST COMPOSITECMU CONCRETE MASONRY UNITCNTR COUNTERCO CASED OPENINGCOL COLUMNCOMP COMPUTERCONC CONCRETECONN CONNECTIONCONSTR CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTORCORR CORRIDORCPRS COMPRESSIBLE OR COMPRESSIONCR CHAIR RAILCRS COLD ROLLED STEELCS CAST STONECSK COUNTERSUNKCSMT CASEMENTCSWK CASEWORKCYL CYLINDER

DBL DOUBLEDEMO DEMOLITIONDEPT DEPARTMENTDET DETAILDF DRINKING FOUNTAINDG DECORATIVE GLASSDIA DIAMETERDIM DIMENSIONDISP DISPENSERDIV DIVISIONDMBD DRY MARKER BOARDDMPF DAMPPROOFINGDN DOWNDO DITTODOP DOOR OPENINGDPG DECORATIVE PLASTIC GLAZINGDS DOWNSPOUTDSP DRY STANDPIPEDST DOOR STOPDWG DRAWINGDWR DRAWER

E EASTEA EACHEIFS EXTERIOR INSULATION & FINISH SYSTEMEL ELEVATIONELAST ELASTOMERICELEC ELECTRICELEV ELEVATOREMER EMERGENCYENCL ENCLOSUREENGR ENGINEERENTR ENTRANCEEO EMERGENCY POWEREP ELECTRICAL PANELEPDM ETHYLENE PROPYLENE DIENE MONOMEREPRF EXPLOSION PROOFEQ EQUALEQUIP EQUIPMENTESCAL ESCALATOREW EACH WAYEWC ELECTRIC WATER COOLEREXC EXCAVATEEXH EXHAUSTEXP EXPANSIONEXIST EXISTINGEXT EXTERIOR

F/F FACE TO FACEF/T/UC FLOOR / TABLE / UNDERCOUNTERFA FIRE ALARMFACP FIRE ALARM CONTROL PANELFB FLAT BARFCO FLOOR CLEAN OUTFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDN FOUNDATIONFEC FIRE EXTINGUISHER CABINETFE FIRE EXTINGUISHERFGL FIBERGLASSFHC FIRE HOSE CABINETFHP FULL HEIGHT PARTITIONFH FULL HEIGHTFIN FINISHFL FLASHINGFLR FLOOR OR FLOORINGFLUOR FLUORESCENT

FOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUDFPRF FIREPROOFINGFS FULL SIZEFSH FIRE SPRINKLER HEADFSTP FIRESTOPPINGFT FOOT OR FEETFTG FOOTINGFURN FURNITUREFURR FURRINGFUT FUTURE

G GASGA GAGEGALV GALVANIZEDGB GRAB BARGEN GENERATORGFRC GLASS FIBER REINFORCED CONCRETEGFRG GLASS FIBER REINFORCED GYPSUMGL GLASSGLMU GLASS MASONRY UNITGMMU GLASS MESH MORTAR UNITGND GROUNDGR GRADEGRL GRILLEGRTG GRATINGGSKT GASKETGT GROUTGVL GRAVELGWB GYPSUM WALL BOARDGYP GYPSUM

HB HOSE BIBBHC HOLLOW COREHDBD HARDBOARDHDWD HARDWOODHDWE HARDWAREHGR HANGERHGT HEIGHTHM HOLLOW METALHMD HOLLOW METAL DOORHNDRL HANDRAILHO HOLD OPENHORIZ HORIZONTALHPT HIGH POINTHR HOURHSAFD HORIZONTAL SLIDING ACCORDION FIRE DOORHVAC HEATING, VENTILATION, AIR CONDITIONINGHYDR HYDRAULIC

ID INSIDE DIAMETERIF INSIDE FACEIN INCH OR INCHESINSUL INSULATIONINTR INTERIORIWH INSTANTANEOUS WATER HEATER

JAN JANITORJST JOISTJT JOINT

KIT KITCHENKO KNOCKOUTKOP KNOCKOUT PANELKPL KICK PLATE

L LEFTLAB LABORATORYLAD LADDERLAM LAMINATIONLAV LAVATORYLB POUNDLBL LABELLF LINEAR FOOTLG LENGTHLG LENGTHLH LEFT HANDLHR LEFT HAND REVERSELIB LIBRARYLIN LINEARLKR LOCKERLLH LONG LEG HORIZONALLLV LONG LEG VERTICALLNTL LINTELLONG LONGITUDINALLP LIGHTPROOFLPT LOW POINTLT LIGHTLTWT LIGHTWEIGHTLTG LIGHTINGLVR LEVER OR LOUVER

MACH MACHINEMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAX MAXIMUMMECH MECHANICALMED MEDIUMMEMB MEMBRANEMET METALMEZZ MEZZANINEMFG MANUFACTURERMH MANHOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSML METAL LATHMLDG MOLDINGMLWK MILLWORKMO MASONRY OPENINGMTD MOUNTEDMTR MORTARMULL MULLIONMVBL MOVABLE

N NORTHNA NOT APPLICABLENAT NATURALNIC NOT IN CONTRACTNO NUMBERNOM NOMINALNTS NOT TO SCALE

OA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROF OUTSIDE FACEOF/CI OWNER FURNISHED/CONTRACTOR INSTALLEDOFF OFFICEOPNG OPENINGOPP OPPOSITEOT ELECTRICAL OUTLETOXY OXYGEN

PB PANIC BARPERF PERFORATEDPERIM PERIMETERPERP PERPENDICULARPGBD PED BOARD

PL PLATEPLAM PLASTIC LAMINATEPLAS PLASTICPLBG PLUMBINGPLYWD PLYWOODPNEU PNEUMATICPNL PANELPNT PAINTPNTD PAINTEDPOL POLISHEDPOLY POLYETHYLENEPR PAIRPRCST PRECASTPREFAB PREFABRICATEDPREFIN PREFINISHEDPTD PAPER TOWEL DISPENSERPTN PARTITIONPTR PAPER TOWEL RECEPTACLEPVG PAVING

QT QUARRY TILEQTY QUANTITYQUAL QUALITY

R RISERRAD RADIUSRBR RUBBERRD ROOF DRAINREC RECESSEDREF REFERENCEREFR REFRIGERATORREG REGISTERREINF REINFORCED OR REINFORCINGREM REMOVEABLEREQD REQUIREDRESIL RESILIENTRFG ROOFINGRH RIGHT HANDRHR RIGHT HAND REVERSERLG RAILINGRM ROOMRO ROUGH OPENINGRV ROOF VENTRWL RAIN WATER LEADER

S SOUTHSC SOLID CORESCHED SCHEDULESCRN SCREENSD SOAP DISPENSERSECT SECTIONSGL SINGLESHR SHOWERSHT SHEETSHTHG SHEATHINGSHV SHELVINGSIM SIMILARSK SINKSLV SLEEVESM SHEET METALSND SANITARY NAPKIN DISPENSERSNR SANITARY NAPKIN RECEPTACLESPEC SPECIFICATIONSQ SQUARESSK SERVICE SINKSSP SOLID SURFACE POLYMERSST STAINLESS STEELST STREETSTA STATIONSTC SOUND TRANSMISSION CLASSSTD STANDARDSTL STEELSTOR STORAGESTRUCT STRUCTURALSUSP SUSPENDEDSYM SYMBOL

SYMM SYMMETRICALSYS SYSTEM

T THERMOSTATT&B TOP AND BOTTOMT&G TONGUE AND GROOVETB TOWEL BARTBM TOP OF BEAMTC TOP OF CONCRETETD TEL / DATATEL TELEPHONETEMP TEMPORARYTER TERRAZZOTF TOP OF FOOTINGTFF TOP OF FINISHED FLOORTHK THICKNESSTHRES THRESHOLDTHRU THROUGHTKBD TACKBOARDTMPD TEMPEREDTOL TOLERANCETP TOP OF PAVEMENTTPH TOILET PAPER HOLDERTS TACKABLE SURFACETSL TOP OF SLABTST TOP OF STEELTV TELEVISIONTW TOP OF WALLTYP TYPICAL

U/C UNDER COUNTER UNEX UNEXCAVATEDUNFIN UNFINISHEDUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLY

UR URINALUV ULTRAVIOLET

VAC VACUUMVAF VISUAL ALARM VCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVIF CONTRACTOR TO VERIFY IN FIELDVNR VENEERVR VAPOR RETARDER

W WESTW/ WITHW/O WITHOUTWC WATERCLOSETWD WOODWLD WELDEDWSCT WAINSCOTWT WEIGHTWTRPRF WATERPROOFINGWWF WELDED WIRE FABRIC

CL

1

A1.01

SIM

A1.01

1SIM

TOP OF SLABELEV = 100'-0"

WINDOW / LOUVER SYMBOL

DOOR MARK

ELEVATION /LEVEL MARKER

DATUM POINT ELEV = 100'-0"

1 View Name1/8" = 1'-0"

A

B

C

D A5.10

1

A1.01

SIM

1

A1.01

SIM

1

A1.01

SIM

ACCESSIBILITYCLEARANCES

REVISION SYMBOL

ACCESSIBILITY SYMBOL

BUILDING SECTION

WALL SECTION

DETAIL

PLAN / SECTION DETAIL

ELEVATION INTERIOR

ELEVATION EXTERIOR

SCALE:

1 View Name1/8" = 1'-0"A1.01

VIEW NAME: PLAN,SECTION, ELEVATION, DETAILS

VIEW NAME WITH REFERENCE

COLUMN GRIDS

PARTITION SYMBOL

FN-00FURNITURE SYSTEM SYMBOL

CURTAIN WALL PANEL SYMBOL

EQUIPMENT SYMBOL

#

ROOM TAG

/1 A1.01MATCH LINE

CEILING TYPE/HT.

ROOM NUMBER

APPROX ROOM AREA

SHEET REFERENCE

CEILING TYPE

CEILING HEIGHT

EQUIP. NUMBER

PARTITION TYPE

PANEL TYPE

WINDOW / LOUVER

MARK

COLUMN

NUMBER

FURNITURE

NUMBER

CASEWORK TAGCASEWORK TYPE

1

A5.01

COLUMN LETTER

R 2' - 6"

FINISH TAG

1

001M

12'-6"

TYPE

EQ-00

PL

X1

Room Name

101123 SF

WIN

X

#

1541-AROOM # - PRIMARY, SECONDARY, ECT.

OVERHEAD (OVER COUNTER AND SOFFITS)

CALLOUT

BREAK LINE

GRID LINE

BELOW OR BEYOND (UNDERCOUNTER AND FOOTINGS)

SCOPE OF WORK

CASED OPENING

PAIR

TYPICAL DOOR

DOOR WITH SIDELIGHT

VARYING LEAF

SLIDING

DOUBLE ACTING

TYPICAL WINDOW

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING WALL

NEW WALL

DEMOLISHED WALL

ALUMINUM

WOOD FINISH

EXISTING BUILDINGS

STEEL

CONCRETE

EARTH

RIGID INSULATION

RUBBER

SAND

GYPSUM BOARD

INSULATION

CMU

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:2

8 P

M

A-000179-27-00

3/13/20

GENERAL NOTES,ABBREVIATIONS, LEGENDS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

ABBREVIATIONS SYMBOLS LINE TYPES

DOORS / WINDOWS / WALLS

MATERIALS

Issuance Schedule

Number Date Description

Page 3: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

D

C.5

C

SOLVENT STORAGE

6032STORAGE ROOM

6031

LAB SUPPLY ROOM

6035ELEC ROOM

6036

STAIR

S3-6

PLUMBING CLOSET

621

CORRIDOR

6037

EQUIPMENT

CORRIDOR

6030

EQUIPMENT LAB

6029MONITORING LAB

6028EQUIPMENT LAB

6027

MICROSCOPE

ROOM

6022

COLD ROOM

6017EQUIPMENT LAB

6019

EQUIPMENT

CORRIDOR

6021EQUIPMENT ROOM

6023

CORRIDOR

6020

EQUIPMENT

CORRIDOR

6018

CORRIDOR

6002

CORRIDOR

6026

SCOPE OF WORK

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:2

9 P

M

A-100179-27-00

3/13/20

EXISTING PLAN

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

Issuance Schedule

Number Date Description

SCALE:

1/4" = 1'-0"1

LEVEL 6 EXISTING PLAN

Page 4: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

A. SCOPE OF WORK LINE GENERALLY INDICATES THE AREA OF GREATEST IMPACT DURING RENOVATIONS. EXISTING AREAS OUTSIDE THE SCOPE OF WORK LINE THAT ARE DISTURBED IN ORDER TO COMPLETE THIS AREA ARE CONSIDERED TO BE PART OF THE SCOPE OF WORK WHETHER INDICATED SPECIFICALLY OR NOT. CONTRACTOR SHALL ALLOW FOR REMOVAL AND REPLACEMENT OF EXISTING FINISHES OUTSIDE THE SCOPE OF WORK LINE IN ORDER TO COMPLETE THE WORK.

B. SEE HOURS OF WORK REQUIREMENTS AND COORDINATE DEMOLITION ACTIVITIES ACCORDINGLY.C. REFER TO ALL OTHER CONSULTANT AND VENDOR DRAWINGS AND SPECIFICATIONS FOR EXTENT AND

REQUIREMENTS OF REMOVAL/SALVAGE/RELOCATION OF STRUCTURAL, PLUMBING/FIRE PROTECTION, MECHANICAL AND ELECTRICAL ITEMS. COORDINATE WITH ALL ASSOCIATED TRADES.

D. REFER TO DIV. 01 SECTION "CUTTING AND PATCHING" FOR REQUIREMENTS RELATED TO CUTTING AND PATCHING DUE TO DEMOLITION ACTIVITIES.

E. REFER TO DEMOLITION SPECIFICATION (DIVISION 01) FOR REQUIREMENTS RELATED TO DEMOLITION ACTIVITIES.

F. DISPOSE OF ALL DEMOLITION ITEMS IN ACCORDANCE WITH PROJECT SPECIFICATIONS. G. REMOVE ALL ITEMS SHOWN AS DASHED LINES ON THE DEMOLITION DRAWINGS, INCLUDING ALL

ASSOCIATED FITTINGS AND ACCESSORIES ASSOCIATED WITH ITEM(S) BEING REMOVED.H. DEMOLITION KEYNOTES NOT SPECIFICALLY TAGGING AN INDIVIDUAL ITEM (NO LEADER ARROW)

REFER TO ALL ITEMS WITHIN THE ROOM OR AREA IN WHICH THE NOTE IS LOCATED. I. WHERE A PARTITION IS SHOWN TO BE DEMOLISHED, CONTRACTOR TO REMOVE ALL WALL MOUNTED

FIXTURES/FITTINGS/EQUIPMENT. J. FIRE RATINGS TO BE MAINTAINED AT ALL RATED ASSEMBLIES AT ALL TIMES. K. FOR THE PURPOSES OF A COMPLETE SCOPE OF WORK THE CONTRACTOR IS TO ASSUME THAT ALL

EXISTING WALLS TO BE DEMOLISHED THAT ARE GREATER THAN 8" THICK ARE CHASE WALLS, CONTINUOUS TO ADJACENT FLOORS AND WILL REQUIRE PATCHING.

L. RELOCATION OF ALL EQUIPMENT TO BE COORDINATED WITH OWNER.M. PROVIDE TEMPORARY SUPPORTS FOR PORTION OF DEMOLISHED WALLS TO REMAIN.

4 5 6

D

C.5

C

CORRIDOR

6002

TISSUE CULTURE

LAB

6029

MONITORING LAB

6028EQUIPMENT LAB

6027

MICROSCOPE

ROOM

6022

TISSUE CULTURE

LAB

6019

COLD ROOM

6017

EQUIPMENT

CORRIDOR

6021

EQUIPMENT ROOM

6023

CORRIDOR

6020EQUIPMENT

CORRIDOR

6018

CORRIDOR

6026

EQUIPMENT

CORRIDOR

6030

STORAGE ROOM

6031SOLVENT STORAGE

6032

CORRIDOR

6037

ELEC ROOM

6036

LAB SUPPLY ROOM

6035

PLUMBING CLOSET

621

STAIR

S3-6

SCOPE OF WORK

11

45

45

08

08

16

16

17

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

0 P

M

A-140179-27-00

3/13/20

DEMOLITION PLAN GENERALNOTES, KEYS, LEGENDS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

GENERAL DEMOLITION NOTES

SPECIFIC DEMOLITION NOTES

08 REMOVE INTERIOR LAYERS OF GYPSUM BOARD IN COORDINATION WITH NEW LAYER OF 5/8" GYPSUMBOARD, EXISTING PARTITION FRAMING TO REMAIN.

11 REMOVE AND SALVAGE DOOR AND ALL ASSOCIATED FITTINGS, EXISTING FRAME TO REMAIN. RETURNDOOR TO OWNER.

16 REMOVE PROTECTIVE FILM FROM WINDOW, EXISTING GLASS AND FRAME TO REMAIN.

17 REMOVE AND SALVAGE DOOR HARDWARE FOR REUSE ON NEW DOOR PANEL.

45 REMOVE AND SALVAGE EXISTING BENCH, LAB CASEWORK, SHELVES, AND ALL ASSOCIATEDHARDWARE/FIXTURES/FITTINGS.

SCALE:

1/4" = 1'-0"1

LEVEL 6 DEMOLITION PLAN

Issuance Schedule

Number Date Description

Page 5: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

1. ALL WORK SHALL BE PERFORMED PER APPLICABLE CODES, ORDINANCES AND PER REQUIREMENTS OF ALL APPLICABLE REGULATORY AGENCIES AND AUTHORITIES HAVING JURISDICTION.

2. ALTERATIONS/RENOVATIONS ON THIS AND OTHER FLOORS NOT SPECIFICALLY CALLED OUT AS RENOVATION AREAS ARE TO BE DONE AS NECESSARY TO COMPLETE WORK SHOWN ON THE CONTRACT DOCUMENTS. REFER TO ENGINEER CONSULTANT AND VENDOR DRAWINGS TO IDENTIFY THE SCOPE OF WORK IN AREAS IDENTIFIED OUTSIDE THE ARCHITECTURAL DOCUMENTS. THE G.C. SHALL BE RESPONSIBLE FOR THE REMOVAL AND RESTORATION OF ALL EXISTING FINISHES DISTURBED BY THE WORK. WHERE TEMPORARY M.E.P. CONNECTIONS ARE REQUIRED, ALL FINISHES SHALL BE RESTORED IMMEDIATELY TO MAINTAIN OPERATION OF THE FACILITY, EVEN IF THE WORK WILL REQUIRE TO BE REMOVED AGAIN DURING THIS PROJECT.

3. ALL OPENINGS, IN EXISTING FLOORS AND WALLS ABOVE AND BELOW THE CEILING PLENUM, BOTH EXISTING AND AS A RESULT OF DEMOLITION ACTIVITIES SHALL BE PATCHED TO COMPLETE AND FINISH EXISTING WALLS AND FLOORS CONSISTENT WITH NEW WORK. ALL PATCHES SHALL BE MADE WITH MATERIALS CONSISTENT WITH THE WALL IN WHICH THE PATCH WILL BE LOCATED.

4. THE G.C. SHALL COORDINATE AND SCHEDULE ALL WORK WITH THE CLIENT AND/OR CLIENTS AUTHORIZED REPRESENTATIVE/PROJECT MANAGER. WORK SCHEDULED IN OCCUPIED AREAS SHALL BE UNDERTAKEN IN A MANNER SO AS NOT TO DISTURB THE OPERATION OF THE FACILITY.

5. WHERE A NEW SERVICE PENETRATES AN EXISTING WALL WHICH EXTENDS TO THE UNDERSIDE OF THE STRUCTURE, THE G.C. WILL BE RESPONSIBLE FOR PATCHING AND FIRE SAFING THE WALL AND FOR PROVIDING THE REQUIRED FIRE RATING AND FINISH.

6. PROVIDE BLOCKING IN WALL THROUGHOUT AS INDICATED ON DRAWINGS FOR ALL WALL MOUNTED ITEMS, INCLUDING ITEMS FURNISHED BY OWNER.

7. ITEMS IDENTIFIED AS NOT IN CONTRACT (NIC) ARE TO BE PURCHASED AND INSTALLED BY THE OWNER. THE G.C. SHALL COORDINATE INSTALLATION OF ALL ITEMS NIC WITH THE OWNER.

8. PROVIDE ALL HEADERS, LINTELS AND SUPPORTS AS NECESSARY FOR ALL WALLS AND PARTS OF WALLS SHOWN TO BE REMOVED. ALL NEW MEMBERS SHALL BE IN CONFORMANCE WITH THE MASSACHUSETTS STATE BUILDING CODE, 9TH EDITION. THE GC IS RESPONSIBLE FOR IDENTIFYING ANY STRUCTURAL BEARING CONDITIONS THAT BECOME APPARENT DURING DEMOLITION. ANY FOUND STRUCTURAL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO REMOVAL OF STRUCTURAL MEMBERS.

9. IT IS THE INTENT OF THIS DOCUMENT THAT ALL NEW WIRING, PIPING FIXTURES, FITTINGS AND DEVICES BE RECESSED INTO EXISTING WALLS. THE CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING, REPAIRING, ETC. AS REQUIRED TO RECESS ITEMS IDENTIFIED ABOVE.

10. WHERE WALL MOUNTED ITEMS HAVE BEEN REMOVED, PATCH AND REPAIR EXISTING WALL.

1. ALL WALL PARTITIONS TO BE TYPE "B" UNLESS OTHERWISE NOTED.2. WHERE NEW WALL IS NOT DIMENSIONED LAYOUT TO ASSUME NEW WALL IS ALIGNED WITH

ADJACENT WALL.3. ALL PARTITIONS ARE TO EXTEND TO THE UNDERSIDE OF THE EXISTING DECK AND TO BE SEALED

ON BOTH SIDES.4. ALL PENETRATIONS IN SMOKE AND FIRE RATED PARTITIONS ABOVE CEILING TO BE FIRE

STOPPED.5. ALL PENETRATIONS IN NON-RATED PARTITIONS ABOVE CEILING TO BE SEALED.

4 5 6

D

C.5

C

SCOPE OF WORK

A-210

20A

20B

20C

20D

A-210

10A

10B

10C

10D

A-210

30A

30B30C

TISSUE CULTURE

LAB

6029

TISSUE CULTURE

LAB

6019

MONITORING LAB

6028

EQUIPMENT LAB

6027

CORRIDOR

6002

EQUIPMENT

CORRIDOR

6030

STORAGE ROOM

6031SOLVENT STORAGE

6032

CORRIDOR

6037

LAB SUPPLY ROOM

6035ELEC ROOM

6036

PLUMBING CLOSET

621COLD ROOM

6017

MICROSCOPE

ROOM

6022

EQUIPMENT

CORRIDOR

6021

EQUIPMENT ROOM

6023

EQUIPMENT

CORRIDOR

6018

CORRIDOR

6020

CORRIDOR

6026

V

V

V

V

19'-3" +/-

20'-4

" +/

-21'-4" +/-

19'-7

" +/

-

6019

-A

V

V

1'-0"5'

-11"

5'-1

1"12'-0"

2'-6

"

12'-0"

2'-6

"

12'-0

"

2'-6" 2'-6"

12'-0

"

4'-0" TYP.

6'-0" TYP.

4'-0

" T

YP

.

6'-0

" T

YP

.

G

G

G

G

G

G

G

G

PATCH DRYWALL AT BENCHES

1. LAB CASEWORK WILL BE FURNISHED BY OWNER GC TO COORDINATE WITH OWNER TO BRING CASEWORK IN STORAGE UP TO CONSTRUCTION SITE. G TO INSTALL ALL LAB CASEWORK. REFER TO DRAWINGS FOR LOCATION AND SPECIFIC SIZES.

2. 75% OF EPOXY TOPS WILL BE FURNISHED BY OWNER. GC TO OWN REMAINING 25% TO MATCH EXISTING 1" BLACK EPOXY.

3. ALL CASEWORK TO BE 34 3/4" HEIGHT UNLESS OTHERWISE NOTED.

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

1 P

M

A-150179-27-00

3/13/20

FLOOR PLANS GENERALNOTES, KEYS, LEGEND

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

GENERAL NOTES

PARTITION NOTES

SCALE:

1/4" = 1'-0"1

LEVEL 6 NEW WORK PLAN

Issuance Schedule

Number Date Description

LAB CASEWORK NOTES

Page 6: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

1. ALL WALLS AND SOFFITS TO BE PAINTED PT-1, UNLESS OTHERWISE NOTED.2. PROVIDE TRANSITION STRIPS AT ALL CHANGE IN FLOORING MATERIAL INTERSECTIONS.3. STRAIGHT BASE AT CARPET. COVE BASE AT ALL OTHER FLOORING.4. ALL FLOORING TO CONTINUE UNDER MILLWORK/CASEWORK UNLESS OTHERWISE NOTED.5. FINISH TAGS NOT SPECIFICALLY TAGGING AN INDIVIDUAL ITEM (NO LEADER ARROW) OR NOT

ASSOCIATED WITH A HATCH, REFER TO ALL ITEMS WITHIN THE ROOM OR AREA IN WHICH THE NOTE IS LOCATED.

EP EPOXY SURFACEMT METALPL PLASTIC LAMINATEPT PAINTRB RESILIENT BASEVCT VINYL COMPOSITION TILE

PAINT THRESHOLDS

4 5 6

D

C.5

C

EQUIPMENT

CORRIDOR

6018

CORRIDOR

6020

COLD ROOM

6017

TISSUE CULTURE

LAB

6019

EQUIPMENT

CORRIDOR

6021EQUIPMENT ROOM

6023

MICROSCOPE

ROOM

6022

CORRIDOR

6026

EQUIPMENT LAB

6027MONITORING LAB

6028

TISSUE CULTURE

LAB

6029EQUIPMENT

CORRIDOR

6030

STORAGE ROOM

6031SOLVENT STORAGE

6032

CORRIDOR

6037

ELEC ROOM

6036LAB SUPPLY ROOM

6035

STAIR

S3-6

CORRIDOR

6002

PLUMBING CLOSET

621

SCOPE OF WORK

PT-1RB-1

VCT-1

PT-1RB-1

VCT-1

EP-1EP-1

EP-1

EP-1MT-1 MT-1

MT-1 MT-1

MT-1

MT-1

MT-1

MT-1

EP-1

RB-2

RB-2

RB-2 RB-2

MT-1RB-2

MT-1

RB-2

MT-1

RB-2

ACT-1

ACT-1

PT-1

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

2 P

M

A-160179-27-00

3/13/20

FINISH PLAN GENERALNOTES, KEYS LEGENDS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

FINISH NOTES

ABBREVIATIONS - FINISHES

FINISH FLOOR PATTERN KEY

FINISH SCHEDULE

FINISH MANUFACTURER STYLE/NUMBER COLOR NOTES

ACT-1 ARMSTRONG OPTIMA 3251 WHITE BUILDING STANDARD CEILING TILE

EP-1 EPOXY BENCH FURNISHED BY OWNER

MT-1 METAL SHELVES AND CASEWORK FURNISHED BY OWNER; INSTALLED BY GC

PT-1 SHERWIN WILLIAMS OC-122 COTTON BALLS BUILDING STANDARD FIELD PAINT

RB-1 JOHNSONITE 4" HIGH 01 SNOW WHITE COVED; COLOR TO MATCH EXISTING

RB-2 JOHNSONITE 4" HIGH BLACK BLACK COVED AT LAB CABINET LOCATIONS; COLOR TO MATCH EXISTING

VCT-1 MANNINGTON SOLIDPOINT 317 COOL BEIGE BUILDING STANDARD FIELD VCT

Issuance Schedule

Number Date Description

SCALE:

1/4" = 1'-0"1

LEVEL 6 - FINISH PLAN

Page 7: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

1. ALL TYPICAL ACT CEILING HEIGHTS 9'-0" UNLESS OTHERWISE NOTED.2. CEILINGS SHALL NOT BE INSTALLED WITHOUT REVIEWED MEP COORDINATION DRAWINGS AS

REQUIRED BY THE PROJECT SPECIFICATIONS.3. AT NO TIME SHALL THE CONTRACTOR ADJUST THE CEILING HEIGHT AS INDICATED ON

DOCUMENTS WITHOUT REVIEW WITH ARCHITECT. ARCHITECT SHALL BE INFORMED OF ALL CEILING HEIGHT CONFLICTS WHEN DISCOVERED FOR REVIEW.

4. COORDINATE ALL SOFFITS ABOVE CABINETS WITH INTERIOR ELEVATIONS AND CASEWORK DETAILS.

5. ALL DEVICES SHALL BE ALIGNED AND CENTERED WITHIN GRID UNLESS OTHERWISE NOTED. 6. REFER TO ALL ENGINEERING CONSULTANT AND VENDOR DRAWINGS FOR ALL RELATED SCOPE

FOR COORDINATION.

2'x2' SUPPLY DIFFUSER

NEW CEILING GRID WITH NEW 2'x2' ACOUSTICAL PANEL CEILING

NEW SOFFIT

1'x1' SUPPLY DIFFUSER

2'x2' RETURN REGISTER

1'x1' RETURN REGISTER

EXIT SIGN

SMOKE DETECTOR RECESSED DOWN LIGHT

2'x2' RECESSED LIGHT FIXTURE

SPRINKLER

EXISTING CEILING GRID WITH EXISTING 2'x2' ACOUSTICAL PANEL CEILING

EXISTING SOFFIT

RECESSED LIGHT FIXTURE

MOTION SENSOR WIRELESS ACCESS POINT

4 5 6

D

C.5

C

TISSUE CULTURE

LAB

6029

MONITORING LAB

6028

TISSUE CULTURE

LAB

6019

EQUIPMENT LAB

6027

MICROSCOPE

ROOM

6022

EQUIPMENT

CORRIDOR

6021

EQUIPMENT ROOM

6023

EQUIPMENT

CORRIDOR

6018

COLD ROOM

6017PLUMBING CLOSET

621

EQUIPMENT

CORRIDOR

6030STORAGE ROOM

6031

SOLVENT STORAGE

6032

CORRIDOR

6002

CORRIDOR

6026

STAIR

S3-6ELEC ROOM

6036LAB SUPPLY ROOM

6035

CORRIDOR

6037

SCOPE OF WORK

9' - 0"

ACT

9' - 0"

ACT

POWER FROM CEILING; SEE ELEC DRAWINGS

POWER FROM CEILING; SEE ELEC DRAWINGS

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

3 P

M

A-170179-27-00

3/13/20

REFLECTED CEILINGGENERAL NOTES, KEYS,LEGENDS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

GENERAL CEILING NOTES

CEILING PLAN KEY

SCALE:

1/4" = 1'-0"1

LEVEL 6 REFLECTED CEILING PLAN

Issuance Schedule

Number Date Description

Page 8: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

C.5

C

EQ-1

EQ-3

EQ-3

EQ-1EQ-1

EQ-1

EQ-2

EQ-2

EQ-2

EQ-2

EQ-1 EQ-1

EQ-1EQ-1

EQ-2

EQ-2

EQ-2EQ-2

EQ-3EQ-3

8"6"

6"

8"

6"

6"

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NORTH

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

4 P

M

A-180179-27-00

3/13/20

FFE PLAN

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

EQUIPMENT SCHEDULE

TYPE

MARK TYPE WIDTH HEIGHT DEPTH

PURCHASED

BY

INSTALLED

BY COMMENTS

EQ-1 BIOSAFETY CABINET 6' - 5 1/2" 6' - 0" 2' - 6 3/8" OWNER CONTRACTOR

EQ-2 INCUBATOR 2' - 3" 3' - 6" 2' - 3" OWNER CONTRACTOR

EQ-3 U/C REFRIGERATOR 1' - 11" 2' - 9" 1' - 11" OWNER CONTRACTOR

Issuance Schedule

Number Date Description

SCALE:

1/4" = 1'-0"1

LEVEL 6 - FFE

Page 9: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

BIOSAFETY CABINET

V

WALL BASE, TYP.

OT

CL

5'-0"

2'-0

"

CL

5'-6"

INCUBATOR

CO2

OT

UNDERCOUNTER FRIDGE

CL

6'-0

"

5'-0"

EO

CL

EO

CL

5'-6" 1'-6"

V

4'-0

"

2'-0" 2'-0" 2'-0" 1'-6"

EXISTING WINDOW

INCUBATOR

CL

5"

OT

LS

TST

INCUBATOR

V

CO2 CO2 CO2

RO/DI

METAL PAPER TOWEL DISP; MANUFACTURER TO MATCH PTD IN ROOM 6027

OPEN

EYEWASH

OT OT OT

6'-0

"

2'-0" 2'-6" 2'-6"

1'-7

"

CL CL CL

CL

4'-0

"

7'-0"

4'-0" 1'-6" 1'-6" 1'-6"

MOTT 30" X 30" PEGBOARD WITH TRAY; MANUFACTURER TO MATCH

PEGBOARD IN ROOM 6027

INCUBATORS

CO2 CO2

INC INC

UNDERCOUNTER FRIDGE

CL CL

2'-6"

6'-0

"

2'-6"

V

CL CL

EOEO

1'-6"5'-6"

4'-0

"

2'-0" 2'-0" 2'-0" 2'-0" INCUBATORS

EXISTING WINDOW

WALL BASE, TYP.

CO2

INC

CL

4'-0"

6'-0

"

OT

LS

6"

CL

TST

INCUBATOR

V

CO2

MOTT 30" X 30" PEGBOARD WITH TRAY; MANUFACTURER TO MATCH

PEGBOARD IN ROOM 6027

OPEN

RO/DIEYEWASH

INC

5'-0"

CL

6'-0

"

CL

1'-7

"

4'-0

"

5'-6"

4'-0" 1'-6" 2'-0" 2'-0"

METAL PAPER TOWEL DISP; MANUFACTURER TO MATCH PTD IN ROOM 6027

BIOSAFETY CABINET

V

OT

CL

5'-6"

CL

4'-9"

2'-0

"

OPEN

3'-7

"

CL

1'-6" 1'-6"

OPEN

3'-7

"

CL

1'-6" 1'-6"

OPEN

3'-7

"

CL

1'-6"END PANEL

TYP. VOICE / DATA OUTLETS

CL

CL

2' -

10"

3' -

4"

3' -

6"

4"

3' -

2"

COUNTER - DESK (WITH BACKSPLASH)

3' -

8"

COUNTER - STANDING (WITH BACKSPLASH)

4' -

2"

CL

CLCL

CL

COUNTER - STANDING (HIGH)(WITH BACKSPLASH)

5' -

0"

4' -

0"

1' -

6"

ELECTRICAL OUTLET

ELECTRICAL OUTLET ELECTRICAL OUTLET

5' -

6"

CL

HOOK STRIPADA ROBE HOOK

CL

VARIES

VARIOUS LENGTHS

CL

4' -

8"

THERMOSTAT

WALL PHONE

LIGHT SWITCH PLATE

AFI

XR-L

7' -

8"

NC

AIR FLOW INDICATOR

NURSE CALL LIGHT

X-RAY IN USE LIGHT

AUDIO / VISUALALARM

6' -

8"

4' -

0"

FIRE ALARM PULL STATION

CLCL

4' -

0"

LS

TYP. LIGHT SWITCH

CL

4' -

0"

SLC

TYP. LIGHTING CONTROL SENSOR

4' -

6"

TELEPHONE OUTLET THERMOSTAT

5' -

0"

TO

TST

AP

4' -

0"

ANNUNCIATION PANEL

TYP. ELECTRICALOUTLETS

CL

1' -

6"

1' -

6"

CL

CARD ACCESS

CL

4' -

0"

1' - 0"

4' -

6"

CL

GENERAL NOTE: HEIGHTS INDICATED ARE FOR GENERAL CONDITIONS, UNLESS OTHERWISE NOTED. REFER TO INTERIOR ELEVATIONS FOR SPECIFIC MOUNTING HEIGHTS.

TYP. EMERGENCYELECTRICAL

OUTLETS

CL

1' -

6"

3' -

0"

4"

2' -

6"

4"

EOOT

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

1/4" = 1'-0"

3/1

3/2

02

0 1

:49:3

4 P

M

A-210179-27-00

3/13/20

INTERIOR ELEVATIONSGENERAL NOTES, KEYS,LEGENDS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

1/4" = 1'-0"10ATISSUE LAB 6019 - A

10B 10C 10D

1/4" = 1'-0"20ATISSUE LAB 6029 - A

20B 20C 20D

Issuance Schedule

Number Date Description

1/4" = 1'-0"30AMONITORING LAB 6028 - A

30B 30C

TYPICAL MOUNTING HEIGHTS

Page 10: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

MULTIPLE LAYERS OF GYPSUM BOARD (WHERE INDICATED)

MULTIPLE LAYERS OF JOINT SEALER AND BACKING WHERE MULTIPLE LAYERS OF GYPSUM BOARD ARE SHOWN

FLOOR RUNNER

3/8"

TY

PIC

AL

JOINT SEALER AND BACKING

-PROVIDE FIRE STOPPING AT FIRE RATED PARTITIONS

- PROVIDE SMOKE STOPPING AT SMOKE PARTITIONS

- PROVIDE ACOUSTICAL SEALANT AT ACOUSTICAL PARTITIONS

GYPSUM BOARD

SCHEDULED BASE

3/8"

PA

RT

ITIO

N A

S S

CH

ED

ULE

D

ADJACENT MATERIALS

JOINT SEALER AND BACKING

5" UNLESS OTHERWISE NOTED

BOOKENDS WHERE REQUIRED

METAL SHELF

SCHEDULED SHELVING BRACKET, TYP.

LOCATER CLIP ATTACHED TO SHELF (TYP.)

48" SCHEDULED SHELVING STANDARD - CUT TO SUIT FIELD CONDITIONS IF REQUIRED

CLEAR HEIGHT BETWEEN SHELVES

1' -

1"

TY

P.

1' - 0" TYP.

6" T

YP

.

PROVIDE BLOCKING IN WALL

CONFIRM DIMENSIONS MATCHES SHELVES IN ROOM 6027

MARINE EDGE WITH EASED EDGES

4"

3"

TOE KICK HEIGHT

TOE KICK DEPTH

FACE OF CASEWORK BELOW

2' - 6" BACKSPLASH

JOINT SEALANT

SCHEDULED WALL BASE

4"

SIDESPLASH

1"

3' -

0"

EPOXY

FILLER PANEL

1" EPOXY

DOOR AND WINDOW CONSTRUCTION:

ACOUS ACOUSTICAL CORE WOODAC ALUMINUM CLAD WOODAL ALUMINUM HC HOLLOW CORE WOODHM HOLLOW METALLL LEAD LINED FRAME SC SOLID CORE WOODSS STAINLESS STEELTG TEMPERED SAFETY GLASS

DOOR GLASS TYPE:

-- NO GLASS REQUIREDCR CLEAR WIREDFR FIRE RATED PER SPECIFICATIONSIG INSULATING GLASSLG LAMINATED GLASSTF CLEAR TEMPERED FLOATTI TEMPERED INSULATINGLE LEAD GLASS

FRAME CONSTRUCTION:

AC ALUMINUM CLAD WOODAL ALUMINUMPS PRESSED STEELSS STAINLESS STEELWD WOOD

DOOR FACING AND FINISH:

AF ALUMINUM FACTORY FINISHCC COPPER CLADDINGCL HARDWOOD, TRANSPARENT FINISHMF METAL FACTORY FINISHMP METAL PAINTEDWD WOOD PAINTED

FIRE RATING:

BLANK NO FIRE RATING REQUIREDA180 3 HOUR RATING ('A' LABEL REQUIRED)B60 1 HOUR RATING (B LABEL REQUIRED)B90 1- 1/2 HOUR RATING ('B' LABEL REQUIRED)C45 3/4 HOUR ('C' LABEL REQUIRED)20 1/3 HOUR RATING 30 1/2 HOUR RATING

REMARKS:

1. TRANSOM OR SIDELIGHT ADJACENT2. SPECIAL HEIGHT DOOR3. SPECIAL ALUMINUM DOOR AND FRAME4. SECURITY TIE IN REQUIREMENTS5. SPECIAL WOOD DOOR AND FRAME6. SOUND GASKETING7. WEATHERING STRIP8. MAGNETIC HOLD OPENS9. LIGHT GASKET10. FIELD MEASUREMENT REQUIRED11. DOUBLE ACTING REMOVE FRAME STOP12. LEAD LINING REQUIRED13. AUTOMATIC DOORS14. CODE ACCESS HARDWARE15. EXISTING DOOR16. STAINLESS STEEL KICK PLATE17. ROTON HINGE

SE

E S

CH

ED

ULE

SEE SCHEDULE

A SINGLEG HALF GLAZED

TEMPERED GLAZING

SEE SCHEDULE

6"4'

- 0

"

6" 6"

SE

E S

CH

ED

ULE

UNDERSIDE OF STRUCTURE

JOINT SEALER AND BACKING

PROVIDE CASING BEAD WHERE EXPOSED TO VIEW

SOUND ATTENUATION INSULATION

SUSPENDED CEILINGWHERE SCHEDULED

5/8" GYPSUM BOARD

SCHEDULED BASE

JOINT SEALER AND BACKING

TOP OF SLAB

BA

SE

PLA

NC

EIL

ING

HE

AD

G NO FIRE RESISTANCE RATINGNO ACOUSTICAL RATING

EXISTING PARTITION W/ NEW GWB

EXISTING WALL ASSEMBLY TO REMAIN

1/8" EASED EDGES

3/4" MARINE GRADE PLYWOOD SUBSTRATE

1" x 4" INTEGRAL BACK AND SIDE SPLASHES WITH EASED EDGE

PROVIDE BLOCKING

INTEGRAL SINK

4"EASED EDGE

1" EPOXY WITH MARINE GRADE PLYWOOD SUBSTRATE

2' - 6"

MARINE EDGE

TOE KICK HEIGHT

TOE KICK DEPTH

FACE OF CASEWORK BELOW

SCHEDULED WALL BASE

3"

4"

1"

3' -

0"

1 SINGLE DOOR 6019 (SALVAGED EXISTING):

4 HINGES TCA3786 5 X 4 1/2 26D MC1 LOCKSET 60 DG1 8237 LNW 1 1/4" CTE WBS RH 32D SA1 CYLINDER CORE DG1 6300 DO NOT DUPLICATE MK X 3 KEYS 15 SA1 DOOR STOP 446 US26D RO3 DOOR SILENCERS 608 GREY RO

Scale: Date Issued:

Project Number:

Isgenuity LLC500 Harrison Avenue, Suite 5FBoston, MA 02118Tel 617 419 4660Fax 617 419 4661www.isgenuity.com

Architect

NOT FOR CONSTRUCTION

R.W. Sullivan EngineeringThe Schrafft Center529 Main Street, Suite 203Boston, MA 02129Tel 617 523 8227Fax 617 523 8016

As indicated

3/1

3/2

02

0 1

:49:3

5 P

M

A-710179-27-00

3/13/20

TYPICAL PARTITIONDETAILS, DOOR DETAILS,CASEWORK DETAILS

Vertex Pharmaceuticals, Inc.

V1 6th Floor Tissue CultureLabs

ISSUED FOR BID

MEP/FP Engineer

SCALE:

SECTION DETAIL

3" = 1'-0"11 TYPICAL PARTITION AT BASE DETAIL

SCALE:

SECTION DETAIL

3" = 1'-0"12 TYPICAL GYPSUM BOARD PARTITION / ADJACENT MATERIAL

SCALE:

PLAN DETAIL

3/4" = 1'-0"13 DOOR FRAME LOCATION

Issuance Schedule

Number Date Description

SCALE:

SECTION DETAIL

1 1/2" = 1'-0"14 ADJUSTABLE SHELVES- SECTION

SCALE:

SECTION DETAIL

1 1/2" = 1'-0"20 STRAIGHT BENCH COUNTERTOP ABOVE CABINETS

DOOR ABBREVIATIONSDOOR FRAME TYPESDOOR PANEL TYPES

LOCATION DOOR FRAME

RATING HDWR COMMENTSMARK ROOM NAME

OPENING PANEL

TYPE MATLWIDTH HEIGHT TYPE MATL THICK

6019-A TISSUE CULTURE LAB 3' - 6" 8' - 0" G MP 1 3/4" EXISTING EXISTING REUSE SALVAGED

SCALE:

SECTION DETAIL

1 1/2" = 1'-0"10 PARTITION TYPE G

SCALE:

SECTION DETAIL

1 1/2" = 1'-0"21 TYPICAL LAB SINK

DOOR HARDWARE

Page 11: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

1. ALL WORK TO OCCUR AT OWNER'S CONVENIENCE. NOTIFY OWNER WELL IN ADVANCE OF

BEGINNING ANY PHASE OF WORK.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND SYSTEMS TO WHICH NEW

CONNECTIONS ARE MADE. LOCATIONS OF PIPING, ELEVATIONS, SIZES, ETC. HAVE BEEN

OBTAINED FROM THE BEST SOURCES AVAILABLE AND MUST BE FIELD VERIFIED PRIOR TO

COMMENCING WORK IN AREAS WHERE RENOVATIONS ARE TO TAKE PLACE. NOTIFY THE

ARCHITECT FOR DIRECTION IF ANY DIFFERENCES ARISE BETWEEN ON-SITE CONDITIONS AND

CONDITIONS SHOWN ON THE DRAWINGS AS EXISTING.

3. NEW WORK IS DRAWN IN HEAVILY OR IS NOTED ON PLANS. REFER TO ARCHITECTURAL

DETAILED PLANS FOR ADDITIONAL INFORMATION.

4. EXISTING FIRE PROTECTION PIPING AND EQUIPMENT ARE DRAWN LIGHTLY OR ARE NOTED ON

PLANS.

5. EXISTING SPRINKLER PIPING, HEADS AND DEVICES TO BE REMOVED ARE DRAWN

CROSSHATCHED OR ARE NOTED ON PLANS.

6. INCLUDE THE COST OF ALL ALARM SHUTDOWNS & FIRE WATCHES IN THE BID FOR THIS WORK.

NOTIFY OWNER'S ALARM COMPANY SUFFICIENTLY IN ADVANCE OF SHUTDOWNS TO PERMIT

ALARM COMPANY TO PERFORM THE SHUTDOWN ON SCHEDULE.

7. COORDINATE SPRINKLER SYSTEM SHUTDOWN WITH OWNER AND GENERAL CONTRACTOR,

PERFORM SHUTDOWNS ON PREMIUM TIME IF NECESSARY.

NOTIFY OWNER AT LEAST (1) WEEK PRIOR TO ANY SHUTDOWN.

8. AFTER ANY SHUTDOWN, RETURN REMAINING SYSTEM TO ACTIVE CONDITION AS SOON AS

POSSIBLE.

9. IN NO CASE SHALL THE SPRINKLER SYSTEM BE INACTIVE AFTER WORKING HOURS.

10. IT SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION SUBCONTRACTOR DURING

DEMOLITION TO SUPPORT AND PROTECT FROM DAMAGE ALL FIRE PROTECTION SYSTEMS

WHICH ARE EXISTING TO REMAIN. FIRE PROTECTION SYSTEMS SHALL BE SUPPORTED IN

ACCORDANCE WITH NFPA 13.

11. IN AREAS WITH FINISHED CEILING, CONCEALED SPRINKLER HEADS SHALL BE USED UNLESS

OTHERWISE NOTED.

12. IN AREAS WITHOUT FINISHED CEILING, UPRIGHT SPRINKLER HEADS SHALL BE USED UNLESS

OTHERWISE NOTED.

13. PROVIDE HEAD GUARDS IN ALL ANY POSSIBLE MECHANICAL & STORAGE ROOMS.

14. THE FIRE PROTECTION SUBCONTRACTOR SHALL REFER TO ALL ARCHITECTURAL DRAWINGS

FOR COMPLETE COORDINATION OF SPRINKLER SYSTEM WITH ALL WALLS, SOFFITS, CEILING

TYPES AND CEILING HEIGHTS.

15. ALL SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE COORDINATED BY THE FIRE

PROTECTION SUBCONTRACTOR BASED ON THE INTENDED USE OF EACH ROOM/AREA IN WHICH

THE SPRINKLER HEAD(S) IS LOCATED.

16. FIRESTOP ALL RESULTING PENETRATIONS IN RATED AND ANY FULL HEIGHT PARTITIONS.

17. SPRINKLER HEADS SUPPLIED BY FLEXIBLE HOSES TO MAY BE CAREFULLY REMOVED AND

RELOCATED.

18. SPRINKLER HEADS MUST BE COMPLETELY COORDINATED WITH FINAL LIGHTING LAYOUTS AND

DIFFUSER LOCATIONS TO ARRIVE AT A SUITABLE PATTERN CONSISTENT WITH PROPER

SPRINKLER HEAD COVERAGE. SPRINKLER HEADS TO BE LOCATED IN CENTER OF CEILING TILE.

19. PRIOR TO THE START OF CORING ANY STRUCTURAL MEMBER, IF ANY, THE FIRE PROTECTION

SUBCONTRACTOR SHALL COORDINATE LOCATION OF PENETRATION WITH STRUCTURAL

ENGINEER AND GENERAL CONTRACTOR. THE FIRE PROTECTION SUBCONTRACTOR SHALL

PREPARE AND SUBMIT TO STRUCTURAL ENGINEER AND ARCHITECT A SET OF PENETRATION

DRAWINGS DURING COORDINATION DRAWING REVIEW PERIOD.

20. SPRINKLER SYSTEM AND ALL COMPONENTS, DESIGNED IN ACCORDANCE WITH NFPA 13, STATE

BUILDING CODE, CITY OF BOSTON REQUIREMENTS, BUILDING OWNER'S INSURANCE COMPANY

AND OTHER APPLICABLE NFPA STANDARDS GOVERNING THE INSTALLATION OF SPRINKLER

SYSTEMS, SYSTEM DRAINS, ETC. THE FIRE PROTECTION SUBCONTRACTOR SHALL SUBMIT HIS

SHOP DRAWINGS TO LOCAL FIRE DEPARTMENT, BUILDING DEPARTMENT AND OWNER'S

INSURANCE COMPANY FOR APPROVAL.

21. ALL MATERIALS & COMPONENTS SHALL BE UL LISTED AND APPROVED BY OWNER'S INSURANCE

COMPANY.

22. ALL PIPING, VALVES AND FITTINGS NECESSARY TO COORDINATE THIS SYSTEM WITH NEW DUCT

WORK, LIGHTING, ARCHITECTURAL FINISHES AND STRUCTURAL MEMBERS SHALL BE PROVIDED

BY THE FIRE PROTECTION CONTRACTOR.

23. THE FIRE PROTECTION SYSTEM SHALL BE COMPLETELY COORDINATED WITH ALL OTHER

TRADES BEFORE INSTALLATION BEGINS.

24. DO NOT RUN ANY PIPING WITHIN 3'-0" ABOVE OR IN FRONT OF ABOVE-CEILING HVAC BOXES.

PROVIDE PIPE FITTINGS, OFFSETS ETC AS REQUIRED.

25. SPRINKLER PIPING SHALL NOT RUN ABOVE ANY ELECTRICAL, TELEPHONE, IT PANELS OR GEAR

ROOMS.

26. PROVIDE-WRAP-AROUND-TYPE PIPE LABELING ON ALL EXISTING TO REMAIN PIPING IN ALL

SCOPE OF WORK AREAS.

27. PROVIDE FULL SPRINKLER PROTECTION DURING CONSTRUCTION.

IN AREAS WHERE SEVERAL DIFFERENT OCCUPANCIES EXIST, THE SPRINKLER SYSTEMS SHALL BE DESIGNED TO MEET THE MOST

HYDRAULICALLY DEMANDING DENSITY AND AREA REQUIREMENTS. PROVIDE A MINIMUM 10 PSI CUSHION FOR ALL HYDRAULIC

CALCULATIONS.

PROVIDE AUTOMATIC SPRINKLER SYSTEMS OVER ENTIRE FLOOR AND CEILING WITHIN THE SCOPE OF WORK. SYSTEM SHALL

BE BASED ON NFPA STANDARDS AND OWNER'S INSURANCE COMPANY COVERAGE REQUIREMENTS AND ACCORDING TO THE

FOLLOWING GENERAL GUIDELINES:

LOCATION DENSITY AND AREA

1. OPEN OFFICE SPACE, CONFERENCE ROOM, BATHROOMS,

ETC. (LIGHT HAZARD)

0.10 GPM/FT² OVER 1500 FT²

WITH A 100 GPM HOSE ALLOWANCE

2. LABORATORY SPACE (ORDINARY HAZARD GROUP I)

0.15 GPM/FT² OVER 1500 FT²

WITH A 250 GPM HOSE ALLOWANCE

FIRE PROTECTION GENERAL NOTES

SPR SPRINKLER PIPING

PIPE CAP

PIPE CONTINUATION

PIPE UP THRU SLAB OF FLOOR ABOVE

PIPE DROP OR RISE

VIF VERIFY IN FIELD

NTS NOT TO SCALE

PIPE DOWN THRU FLOOR SHOWN

ETBR EXISTING TO BE REMOVED PIPE

ETR EXISTING TO REMAIN PIPE

CTECONNECT TO EXISTING

SPR

FIRE PROTECTION LEGEND

SYMBOL ABBR DESCRIPTION

B.O.B. BOTTOM OF BEAM

B.O.P. BOTTOM OF PIPE

ETR EXISTING TO REMAIN

ETBR EXISTING TO BE REMOVED

CTE CONNECT TO EXISTING

SPR

NEW EXISTING

SPRINKLER HEAD SCHEDULE

SYMBOL

RESPONSE

TYPE

DESCRIPTION MANUFACTURER TEMPERATURE MODEL # K-FACTOR LOCATION COMMENTS

QUICK

RESPONSE

CONCEALED SPRINKLER RELIABLE

135°F COVER

165°F HEAD

G5-56 5.6

ALL AREAS WITH FINISHED CEILINGS UNLESS

NOTED OTHERWISE

1. WHITE COVER PLATE IN ALL AREAS2)

2. PROVIDE AQUAFLEX STAINLESS STEEL SPRINKLER

HOSE AND FITTING WITH CEILING GRID MOUNT BRACKET

- EXISTING TO BE REMOVED - - - - - -

- EXISTING TO REMAIN SPRINKLER - - - - - -

THE FIRE PROTECTION SUBCONTRACTOR SHALL COORDINATE THE FINISHES OF ALL SPRINKLER HEADS WITH THE ARCHITECT PRIOR TO THE START OF WORK.

NTS1

4" MIN

18

" M

IN

STORAGE

STORAGE

SPRINKLER HEAD

4" MIN

SHELVING

SPRINKLER HEAD

4" MIN

CEILING

WALL

WALL

CEILING

SPRINKLER HEAD

C

D

A

A ≥ 3*C or 3*D

WHICHEVER IS LARGER

JOIST

B

A

OBSTRUCTION

CEILING

CEILING

SPRINKLER HEAD

SPRINKLER HEAD

B

A

CEILING

OBSTRUCTION

SPRINKLER HEAD

WALL

A ≥ (D - 8") + B

WHERE: D ≤ 30"

D

18" Minimum

(No Max)

CEILING

OBSTRUCTION

SPRINKLER HEAD

WALL

24" Max

NO ADDITIONAL

PROTECTION IS

REQUIRED

1. SPRINKLER IN CLOSET

8.6.3.3 Minimum Distances from Walls. Sprinklers shall be located

a minimum of 4 in. (102 mm) from a wall.

2. Ceiling Mounted Obstructions

8.6.5.1.2* Sprinklers shall be arranged to comply with on of the

following arrangements:

1) Subsection 8.5.5.2, Table 8.6.5.1.2, and Figure 8.6.5.1.2(a)

shall be followed.

2) Sprinklers shall be permitted to be spaced on opposite sides

of obstructions not exceeding 4 ft (1.2 m) in width, provided

the distance from the centerline of the obstruction to the

sprinklers does not exceed one-half the allowable distance

permitted between sprinklers.

3) Obstructions located against the wall and that are not over

30 in. (762 mm) in width shall be permitted to be protected in

accordance with Figure 8.6.5.1.2(b) below.

4) Obstructions located against the wall and that are not over

24 in. (610 mm) in width shall be permitted to be protected in

accordance with Figure 8.6.5.1.2(c) below. The maximum

distance between the sprinkler and the wall shall be

measured from the sprinkler to the wall behind the

obstruction and not to the face of the obstruction.

A.8.6.5.1.2 The intent of 8.6.5.1.2(3) is to apply to soffits that are

located within the 18 in. (457 mm) plane from the sprinkler

deflector. A soffit or other obstruction (i.e., Shelf) located

against a wall that is located entirely below the 18 in. (457

mm) plane from the sprinkler deflector should be in

accordance with 8.6.5.3.3. (See Figure A.8.6.5.1.2)

3. The Three Times Rule

A.8.6.5.2.1.3 The rules of 8.6.5.2.1.3 (known as the "Three Times

Rule") have been written to apply to obstructions where

the sprinkler can be expected to get water to both sides of

the obstruction without allowing a significant dry shadow

on the other side of the obstruction. This works for small

non-continuous obstructions and for continuous

obstructions where the sprinkler can throw water over and

under the obstruction, such as the bottom chord of an

open truss or joist. For solid continuous obstructions, such

as a beam, the Three Times Rule is ineffective since the

sprinkler cannot throw water over and under the

obstruction. Sufficient water must be thrown under the

obstruction to adequately cover the floor area on the other

side of the obstruction. To ensure this, compliance with the

rules of 8.6.5.1.2 is necessary.

A.8.6.5.3.3 When obstructions are located more than 18 in. (457

mm) below the sprinkler deflector, an adequate spray

pattern develops and obstructions up to and including 4 ft

(1.2 m) wide do not require additional protection

underneath. examples are ducts, decks, open grate

flooring, catwalks, cutting tables, overhead doors, soffits,

ceiling panels, and other similar obstructions. The width of

an object is the lesser of the two horizontal dimensions

(with the length being the longer horizontal dimension).

Sprinkler protection is not required under objects where

the length is greater than 4 ft (1.2 m) and the width is 4 ft

(1.2 m) or less.

4. Clearance to Storage

8.6.6 Clearance to Storage (Standard Pendent and Upright Spray

Sprinklers)

8.6.6.1 The clearance between the deflector and the top of the

storage shall be 18 in. (457 mm) or greater.

8.6.6.2 The 18 in. (457 mm) dimension shall not limit the height of

shelving on a wall or shelving against a wall in accordance

with 8.6.6, 8.7.6, 8.8.6 and Section 8.9.

8.6.6.2.1 Where shelving is installed on a wall and is not directly

below sprinklers, the shelves, including storage thereon,

shall extend above the level of a plane located 18 in. (457

mm) below ceiling sprinkler deflectors.

8,6,6,2,2 Shelving and any storage thereon, directly below the

sprinklers shall not extend above a plane located 18 in.

(457 mm) below the ceiling sprinkler deflectors.

8.6.6.3 Where other standards specify greater clearance to

storage minimums, they shall be followed.

Note: Maintain Clearances as indicated by Rule #4 - Clearance to Storage

Distance from Sprinklers to Side of

Obstruction (A)

Maximum Allowable

Distance of Deflector

Above Bottom of

Obstruction (B)

(in.)

Less than 1 ft 0

1 ft to less than 1 ft 6 in. 2

1

2

1 ft 6 in. to less than 2 ft 3

1

2

2 ft to less than 2 ft 6 in. 5

1

2

2 ft 6 in. to less than 3 ft 7

1

2

3 ft to less than 3 ft 6 in. 9

1

2

3 ft 6 in. to less than 4 ft 12

4 ft to less than 4 ft 6 in. 14

4 ft 6 in. to less than 5 ft 16

1

2

5 ft to less than 5 ft 6 in. 18

5 ft 6 in. to less than 6 ft 20

6 ft to less than 6 ft 6 in. 24

6 ft 6 in. to less than 7 ft 30

7 ft to less than 7 ft 6 in. 35

For S.I. Units, 1 in. = 25.4 mm; 1 ft = 0.3048 m

Note: For A and B, refer to Figure 8.6.5.1.2(a).

Table 8.6.5.1.2

Figure 8.6.5.1.2(a)

Figure 8.6.5.1.2(b)

Figure 8.6.5.1.2(c)

NFPA 13 - SPRINKLER OBSTRUCTION GUIDELINES

NOTES:

1. REFER TO CUT SHEET FOR MAXIMUM TOTAL BENDS FOR ASSOCIATED HOSE LENGTH

BRAIDED FLEXIBLE SPRINKLER CONNECTION

2 NTS

END BRACKET ASSEMBLY

SPRINKLER HEAD

RELIABLE MODEL G5-56

REDUCING OUTLET

NUT

VICTAULIC AQUAFLEX

STAINLESS STEEL FLEXIBLE

BRAIDED HOSE

REFER TO CUT SHEET FOR

MAXIMUM TOTAL BENDS

1"NPT THREADS

HANGER SUPPORT FROM BUILDING

STRUCTURES WITH SURGE

RESTRAINT PER NFPA ON ALL ARM

OVERS GREATER THAN 12" AND WITH

SYSTEM PRESSURE OVER 100 PSI.

NIPPLE UP

BRANCH OR MAIN

PIPE HANGERS

NOTE:

ALL HANGERS, HARDWARE, AND RODS SHALL BE ELECTRO GALVANIZED

NTS

THE EXISTING SPRINKLER SYSTEM SHALL REMAIN ACTIVE

DURING CONSTRUCTION. UPRIGHT SPRINKLER HEADS SHALL BE

INSTALLED AT THE START OF DEMOLITION, PROVIDED IN

ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13, AND BE

MAINTAINED THROUGHOUT CONSTRUCTION. IT IS THE GENERAL

CONTRACTOR'S RESPONSIBILITY TO MAINTAIN/RE-WORK THE

FIRE SPRINKLER SYSTEM LAYOUT THROUGHOUT ALL PHASES OF

CONSTRUCTION AS NEW WALLS ARE ERECTED AND EGRESS

PATTERNS ARE REVISED.

2 3

ELECTRO

GALVANIZED CARBON

STEEL SWIVEL RING

STRAP HANGER

ELECTRO

GALVANIZED

THREADED ROD

ELECTRO GALVANIZED

STEEL REVERSIBLE

BEAM CLAMP

-TYPE 23

LOCK NUT

BEAM, PURLIN OR TRUSS

HANGER (TYP)

SINGLE NUT

(TYP)

DOUBLE NUT (TYP)

ELECTRO

GALVANIZED

THREADED ROD

ANCHOR SECURELY TO

BUILDING STRUCTURE

FP-001

FIRE PROTECTION

LEGEND, DETAILS,

SCHEDULE &

GENERAL NOTES

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20NONE

Drawn By: JES Checked By: WMN

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 12: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

D

C.5

C

SCOPE OF WORK

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

STORAGE ROOM6031

SOLVENT STORAGE6032

CORRIDOR6037

LAB SUPPLY ROOM6035

ELEC ROOM6036

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

CORRIDOR6026

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

STACKED INCUBATORS

STACKED INCUBATOR

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

V

V

V

V

6019

-A

V

V

3"

SPR

SP

R

SP

R

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SCOPE OF

WORK.

3"

SP

RS

PR

SP

R

EXISTING UPRIGHT SPRINKLER HEAD AND ASSOCIATED

RISE NIPPLE SHALL BE REMOVED & CAPPED.

1

FIRE PROTECTION DEMOLITION NOTES

EXISTING UPRIGHT SPRINKLER HEAD BELOW DUCTWORK AND

ASSOCIATED RISE NIPPLE SHALL BE REMOVED BACK TO

1"SPR BRANCH LINE OUTLET. RESULTING 1"SPR THE OUTLET

WILL BE USED FOR NEW WORK CONNECTION.

3

EXISTING SPRINKLER HEAD AND ASSOCIATED FLEX HOSE,

CEILING TILE MOUNT BRACKET, AND COUPLING SHALL

REMAIN (TYPICAL)

4

EXISTING COLD ROOM DRY SPRINKLER HEADS AND

ASSOCIATED PIPING SHALL REMAIN.

5

EXISTING UPRIGHT SPRINKLER HEAD AND ASSOCIATED

RISE NIPPLE SHALL BE REMOVED, RESULTING 1"SPR

BRANCH OUTLET WILL BE USED FOR NEW WORK

CONNECTION.

2

1

3

2

1

3

ETR

ETR

ETR

ETR

2

2

1

2

1

2

2

44

4

4

5

5

ETR

ETR

ETR

1"

1"

1"

1"

1"

3"

3"

3"3"

3"

3"

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SP

R

SPR

SPR

SP

R

SPR

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

1

3

4

5

2

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

FIRE PROTECTION

LEVEL 6

DEMOLITION PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

FP-101

SCALE:

1/4" = 1'-0"1 FIRE PROTECTION LEVEL 6 DEMOLITION PLAN

Drawn By: JES Checked By: WMN

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 13: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

D

C.5

C

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

STORAGE ROOM6031

SOLVENT STORAGE6032

CORRIDOR6037

LAB SUPPLY ROOM6035

ELEC ROOM6036

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

CORRIDOR6026

6019

-A

3"

SPR

3"

3"

3"3"

3"

3"

SP

R

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SPR

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SP

R

SPR

SPR

SP

R

SPR

SP

R

SP

R

SP

R

SP

R

SPR

SP

R

SP

R

SP

R

SCOPE OF

WORK.

3"

SP

RS

PR

SP

R

CAP 1"SPR BRANCH OUTLET.1

FIRE PROTECTION DEMOLITION NOTES

CONNECT TO 1"SPR BRANCH OUTLET BELOW DUCTWORK

WITH NEW SPR FLEX HOSE AND INSTALL NEW FLEX

CONCEALED SPR HEAD AND CEILING TILE MOUNT BRACKET.

3

EXISTING SPRINKLER HEAD AND ASSOCIATED FLEX HOSE,

BRACKET, AND COUPLING SHALL REMAIN (TYPICAL)

4

EXISTING DRY SPRINKLER HEAD AND ASSOCIATED PIPING

SHALL REMAIN.

5

CONNECT TO 1"SPR BRANCH OUTLET, PROVIDE ARM

OVER AND EXTEND TO NEW LOCATION, INSTALL NEW

FLEX CONCEALED SPR HEAD WITH FLEX HOSE AND

CEILING TILE MOUNT BRACKET.

2

3

2

3

ETR

ETR

ETR

ETR

2

2

1

2

2

2

44

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

5

5

4

4

4

4

4

4

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

1"

1"

1"

1"

1"

1

1

1

4 5 6

D

C.5

C

9' - 0"ACT

9' - 0"ACT

EXISTING TO REMAIN

UNLESS OTHERWISE

NOTED

FIRE PROTECTION

LEVEL 6

NEW WORK PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

FP-201

SCALE:

1/4" = 1'-0"1 FIRE PROTECTION LEVEL 6 NEW WORK PLAN

Drawn By: JES Checked By: WMN

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 14: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

BALL VALVE W/HOSE

BIBB END, BRONZE

CAP AND CHAIN

SUPPLY PIPING (TYP.)

RETURN PIPING (TYP.)

BALL VALVE

GLOBE VALVE

BALANCING VALVE

ANGLE GLOBE VALVE

PRESSURE REDUCING

VALVE

HORIZONTAL CHECK

VALVE

2-WAY CONTROL

VALVE

3-WAY CONTROL

VALVE

BUTTERFLY VALVE

QUICK CLOSING VALVE

W/ FUSIBLE LINK

SELF CONTAINED

RADIATION VALVE

"Y" STRAINER

"Y" STRAINER W/ BLOW

DOWN

GATE VALVE

GATE VALVE W/ HOSE

BIBB END, BRONZE

CAP & CHAIN

PRESSURE REDUCING

VALVE

EXPANSION JOINT

PRESSURE RELIEF

VALVE

DIRECTION OF FLOW

PIPE DROP

PIPE RISE/DROP

PIPE RISE/DROP

PENETRATION

BRANCH CONNECTION

BOTTOM CONNECTION

45° OR 90°

CAPPED PIPE

GRAPHIC BREAK &/OR

CONTINUATION

UNION

FLEX PIPE

CONNECTOR

AIR VENT (AUTOMATIC)

AIR VENT (MANUAL)

FLOW SWITCH

PRESSURE SWITCH

THERMOMETER

THERMOMETER WELL

PRESS./ TEMP.

TAP(PETE'S PLUG)

PRESSURE GAUGE

PRESSURE GAUGE W/

COIL SYPHON

PRESSURE GAUGE W/

DAMPENER

IN LINE PUMP

BASKET STRAINER

BUCKET TRAP

THERMOSTATIC TRAP

FLOAT &

THERMOSTATIC TRAP

& VALVE TRAIN

DIRT LEG

PITCH UP/DOWN IN

DIRECTION OF ARROW

PIPE GUIDE

PIPE ANCHOR

FLANGES

REDUCED PRESSURE

BACKFLOW PREVENTER

CLEAN-OUT FOR

CONDENSATE

DRAIN

MV

PT

TW

UP

xxx

xxx

xxx

X

X

X

X

X

DESIGNATION

NUMBER

MAXIMUM CFM

MINIMUM CFM

ELECTRIC kW

VAV BOX

DENOTES EQUIPMENT

NOT REQUIRING

ELECTRICAL INPUT

DENOTES EQUIPMENT

REQUIRING ELECTRICAL

INPUT

DENOTES EQUIPMENT

REQUIRING ELECTRICAL

INPUT

DENOTES HVAC

DUCTWORK RISER

DENOTES CONTROL

DEVICES

AIR DISTRIBUTION

DEVICE

NECK SIZE

FLOW RATE (CFM)

GENERAL SYMBOLS

REVISION NUMBER

THERMOSTAT

HUMIDISTAT (MOUNT 54"

AFF)

SPEED SWITCH

SMOKE DETECTOR

REMOTE SENSOR

CONNECT TO EXISTING

EXTENT OF REMOVAL

SUPPLY AIR ARROW

RETURN/EXHAUST AIR

ARROW

UNDERCUT DOOR

DOOR LOUVER

UC

DL

CARBON MONOXIDE

SENSOR

(QUANTITY) TYPE

xxx

XXX

SUPPLY AIR DUCT TURN

90° UP

SUPPLY AIR DUCT TURN

90° DOWN

RETURN AIR DUCT TURN

90° UP

RETURN AIR DUCT TURN

90° DOWN

ROUND DUCT TURN 90°

UP

ROUND DUCT TURN 90°

DOWN

SUPPLY AIR DUCT UP &

PENETRATING FLOOR

ABOVE

RETURN AIR DUCT UP

& PENETRATING

FLOOR ABOVE

ROUND DUCT UP &

PENETRATING FLOOR

ABOVE

VOLUME DAMPER

COMBINATION FIRE AND

SMOKE DAMPER

BACKDRAFT DAMPER

FIRE DAMPER

SMOKE DAMPER

AUTOMATIC CONTROL

DAMPER (ELECTRIC OR

PNEUMATIC)

DUCT MOUNTED

HUMIDIFIER

DOUBLE LINE SINGLE LINE

FLEXIBLE DUCT

FLEXIBLE CONNECTION

(RECT.) BREAK &/OR

CONTINUATION (ROUND)

EXISTING DUCTWORK AND

EQUIPMENT TO REMAIN

EXISTING DUCTWORK

AND/OR EQUIP. TO BE

REMOVED

CONCENTRIC REDUCER

ECCENTRIC REDUCER

RECTANGULAR TO

ROUND TRANSITION

DUCT W/ 1" ACOUSTICAL

LINER

(RECT.)

VERTICAL OFFSET UP OR

DOWN (ARROW INDICATES

DIRECTION OF FLOW)

(ROUND)

DUCT REMOVED AND HOLE

CAPPED/BLANKED OFF

HORIZONTAL OFFSET

SMOOTH RADIUS ELBOW

ELBOW W/ TURNING VANES

TRUNK TEE

SQUARE BULLHEAD TEE

W/TURNING VANES

90° BRANCH

TAKE-OFF

90° BRANCH

TAKE-OFF

(RECT. TO

ROUND)

90° BRANCH

TAKE-OFF

(BELLMOUTH)

45° BRANCH

TAKE-OFF

(RECTANGULAR)

45° BRANCH TAKE-OFF

(ROUND)

LINEAR SIDEWALL

DIFFUSER (W/SHEET METAL

CONNECTION PLENUM W/1"

LINING & BRANCH FOR

EVERY 4' OF LINEAR.)

LINEAR SIDEWALL

DIFFUSER (W/SHEET

METAL CONNECTION

PLENUM W/1" LINING &

BRANCH FOR EVERY 4' OF

LINEAR.)

SIDEWALL DUCT MTD.

REG./GRILLE

EXHAUST AIR DUCT

TURN 90° UP

EXHUAST AIR DUCT

TURN 90° DOWN

EXHAUST AIR DUCT UP

& PENETRATING FLOOR

ABOVE

SUPPLY AIR DUCT DOWN

& PENETRATING FLOOR

ABOVE

RETURN AIR DUCT

DOWN & PENETRATING

FLOOR BELOW

EXHAUST AIR DUCT

DOWN & PENETRATING

FLOOR BELOW

VD

VD

FSD

FSD

BDD

BDD

FD

FD

SD

SD

ACD

ACD

MD

MD

UP

DN

UP

DN

BOOT BY LD MFG'R

DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE

PIPING SYMBOLS

SHEETMETAL SYMBOLS

MOTORIZED

DAMPER

AV

FS

PS

NOT USED

S / E / R FOR SUPPLY, EXHAUST OR RETURN

FLOOR / LEVEL

UNIT NUMBER

(WHERE SMOOTH RADIUS

ELBOWS CANNOT BE

INSTALLED)

GENERAL ABBREVIATIONS

ABREV DESCRIPTION

A COMPRESSED AIR

AC AIR CONDITIONING UNIT

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER

AD ACCESS DOOR

AHU AIR HANDLING UNIT

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFR ABOVE FINISHED ROOF

AP ACCESS PANEL

APD

AIR PRESSURE DROP (INCHES OF

WATER)

AS AIR SEPARATOR

ATC

AUTOMATIC TEMPERATURE

CONTROL

AV

AIR VENT (AUTOMATIC)

B BOILER

BDD BACKDRAFT DAMPER

BHP BRAKE HORSE POWER

BTUH BRITISH THERMAL UNITS PER HOUR

C CONTRACTOR

CRAC COMPUTER ROOM A.C. UNIT

CC COOLING COIL

CD CONDENSATE DRAIN

CF CHEMICAL FEED

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CM CONSTRUCTION MANAGER

CNR CONDENSER WATER RETURN

CNS CONDENSER WATER SUPPLY

CO CLEAN OUT

COND CONDENSATE

CP CONDENSATE PUMP

CT COOLING TOWER

CTR COOLING TOWER RETURN

CTS COOLING TOWER SUPPLY

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CW CITY WATER

D DRAIN

DBT DRY BULB TEMP °F

DIA DIAMETER

DOV DRAIN OFF VALVE

DTR

DUAL TEMPERATURE WATER

RETURN

DTS DUAL TEMPERATURE WATER SUPPLY

DX DIRECT EXPANSION

E

EXISTING (BEFORE SYMBOL)

EA EXHAUST AIR

EHC ELECTRIC HEATING COIL

EAT ENTERING AIR TEMPERATURE

EBB ELECTRIC BASE BOARD

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

ERV

ENERGY RECOVERY VENTILATION

UNIT

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETBR EXISTING TO BE REMOVED

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

EXP EXPANSION

F FILL

FA FRESH AIR

FCU FAN COIL UNIT

FD FIRE DAMPER

FF FINAL FILTER

FLA FULL LOAD AMPS

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPT FAN POWERED TERMINAL BOX

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSD FIRE & SMOKE DAMPER

FT FINNED TUBE RADIATION

G NATURAL GAS

GA GAUGE

GAL GALLONS

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GLYCOL RETURN

GS GLYCOL SUPPLY

GUH GAS UNIT HEATER

H HUMIDIFIER

HG HOT GAS

HP HORSE POWER OR HEAT PUMP

HPR

HIGH PRESSURE CONDENSATE

RETURN

HPS

HIGH PRESSURE STEAM (60# & UP)

HTHW HIGH TEMPERATURE HOT WATER

HV HEATING VENTILATING

HVAC

HEATING, VENTILATING & AIR

CONDITIONING

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

ID INSIDE DIAMETER

IU INDUCTION UNIT

KW KILOWATT

KWH

KILOWATT-HOUR(S)

LAT LEAVING AIR TEMPREATURE

LBS / HR POUNDS PER HOUR

LPR

LOW PRESSURE CONDENSATE

RETURN

LPS

LOW PRESSURE STEAM (2# TO 15#)

LRA LOCKED ROTOR AMPS

LTHW LOW TEMPERATURE HOT WATER

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH1,000 BTU/HOUR

MD MOTORIZED DAMPER

MFG'R MANUFACTURER

MIN MINIMUM

MPR

MEDIUM PRESSURE CONDENSATE

RETURN

MPS

MEDIUM PRESSURE STEAM (16# TO

50#)

MTD MOUNTED

MTHW MEDIUM TEMPERATURE HOT WATER

MUA MAKE UP AIR

MV

AIR VENT (MANUAL)

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OD OUTSIDE DIAMETER

OED OPEN ENDED DUCT

P PUMP

PC PLUMBING CONTRACTOR

PCHWR PROCESS CHILLED WATER RETURN

PCHWS PROCESS CHILLED WATER SUPPLY

PD

PRESSURE DROP (FEET OF WATER )

PF PRE FILTER

PH PRE HEAT COIL

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

PSIA

POUNDS PER SQUARE INCH

ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC

PACKAGED TERMINAL AIR

CONDITIONER

PTHP PACKAGED TERMINAL HEAT PUMP

RA RETURN AIR

RAF RETURN AIR FAN

RHC REHEAT COIL

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RP RADIANT PANEL

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RVD REMOTE VOLUME DAMPER

S SUPPLY AIR DEVICE

SA SUPPLY AIR

SATT SOUND ATTENUATING UNIT

SD

SMOKE DAMPER OR SMOKE

DETECTOR

SF SUPPLY AIR FAN

SG SPECIFIC GRAVITY

SP

STATIC PRESSURE (INCHES OF

WATER )

SPC STATIC PRESSURE CONTROLLER

SS STAINLESS STEEL

TA TRANSFER AIR

TAC THRU WALL AIR CONDITIONER

TB TERMINAL BOX

TEMP TEMPERATURE

TSP TOTAL STATIC PRESSURE

TW THERMOMETER WELL

TYP TYPICAL

UC UNDERCUT

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UV UNIT VENTILATOR

V VOLTS

VAV

VARIABLE AIR VOLUME TERMINAL

BOX

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

VP VACUUM PUMP

VTR VENTED THROUGH ROOF

W WATTS

WAC WINDOW AIR CONDITIONER

WBT WET BULB TEMPERATURE °F

WH WALL HEATER

WMS WIRE MESH SCREEN

WPD

WATER PRESSURE DROP (FEET)

GENERAL NOTES

1. THE HEATING, VENTILATING AND AIR CONDITIONING (HVAC)

CONTRACTOR SHALL VISIT THE SITE TO DETERMINE ALL

PRE-EXISTING CONDITIONS AND WORK NECESSARY PRIOR

TO SUBMISSION OF BID PRICE.

2. THE HVAC CONTRACTOR SHALL BE FAMILIAR WITH ALL

CONTRACT DOCUMENTS FOR ALL TRADES AND

COORDINATE WITH OTHER CONTRACTORS.

3. DRAWINGS ARE DIAGRAMMATIC ONLY, FINAL ROUTING OF

DUCTWORK, PIPING AND EQUIPMENT LOCATIONS SHALL

BE DETERMINED IN THE FIELD. ADDITIONAL OFFSETS,

ELBOWS, ETC., SHALL BE PROVIDED AND INSTALLED

WITHOUT ADDITIONAL COST TO THE OWNER.

4. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED

IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA

STANDARDS.

5. SUPPLY AND RETURN DUCT MAINS FROM AIR HANDLING

EQUIPMENT SHALL BE INTERNALLY LINED AS PER

SPECIFICATIONS A MINIMUM OF 15'-0" FROM THE UNIT

UNLESS OTHERWISE NOTED. ALL DUCTWORK DIMENSIONS

INDICATED ARE CLEAR INSIDE DIMENSIONS.

6. VOLUME DAMPERS SHALL BE INSTALLED AT BRANCHES,

SPLITS, AND TAKE-OFFS. ALL LOW PRESSURE SUPPLY,

RETURN AND EXHAUST DUCTWORK.

7. MINIMUM SIZE OF ALL HVAC PIPING SHALL BE 3/4" UNLESS

OTHERWISE NOTED.

8. INSTALL SMOKE DETECTORS IN DUCT SYSTEMS IN

ACCORDANCE WITH NFPA.

9. THE HVAC CONTRACTOR SHALL COORDINATE ALL

ELECTRICAL AND PLUMBING REQUIREMENTS WITH THE

ELECTRICAL AND PLUMBING CONTRACTORS.

10. THE HVAC CONTRACTOR SHALL FIELD MEASURE EXACT

SIZES AND VERIFY ALL OPENINGS FOR SHAFTS AND

LOUVERS PRIOR TO SUBMISSION OF SHOP DRAWINGS AND

INSTALLATION.

11. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR

FINAL LOCATIONS OF DIFFUSERS, REGISTER, GRILLES,

THERMOSTATS, ETC.

12. THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL ALL

INCIDENTAL ACCESSORIES NECESSARY TO MAKE THE

HVAC WORK COMPLETE AND READY FOR OPERATION.

13. ALL HVAC WORK SHALL BE IN ACCORDANCE WITH

APPLICABLE FEDERAL, STATE AND LOCAL CODES.

14. ALL HVAC EQUIPMENT SHALL BE INSTALLED IN

ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

15. FIRE DAMPERS AND ACCESS PANELS SHALL BE INSTALLED

AT ALL 2-HOUR RATED PARTITIONS AND FLOOR

PENETRATIONS. IN ADDITION COMBINATION FIRE/SMOKE

DAMPERS AND ACCESS PANELS SHALL BE INSTALLED AT

PENETRATIONS OF ALL RATED SHAFT ENCLOSURES

CONNECTING THREE STORIES OR MORE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION LOCATIONS.

16. TRANSFER DUCTS IN RATED PARTITIONS SHALL BE

INSTALLED WITH FIRE DAMPERS.

17. ISOLATION VALVES SHALL BE INSTALLED IN SUPPLY AND

RETURN PIPING ON EACH FLOOR AT EACH MAIN BRANCH

AND AT EACH BRANCH OR RUN-OUT SERVING MORE THAN

ONE PIECE OF EQUIPMENT.

18. SHUTOFF VALVES SHALL BE INSTALLED IN THE SUPPLY

AND RETURN PIPING TO ALL EQUIPMENT TO ALLOW FOR

SERVICING. UNIONS OR FLANGES SHALL BE ARRANGED

SUCH THAT EQUIPMENT CAN BE SERVICED WITHOUT

CUTTING, AND WITH MINIMAL DISRUPTION OF PIPING

SERVING THE EQUIPMENT.

19. THE HVAC CONTRACTOR SHALL FURNISH TO THE GENERAL

CONTRACTOR ALL INFORMATION REQUIRED FOR SETTING

OF WALL, ROOF AND PARTITION OPENINGS FOR HVAC

WORK. THIS INFORMATION SHALL BE FURNISHED IN A

TIMELY MANNER SUCH THAT CONSTRUCTION SCHEDULE IS

NOT JEOPARDIZED.

20. THE HVAC CONTRACTOR SHALL INFORM AND COORDINATE

WITH THE OWNER ALL NECESSARY INTERRUPTIONS TO

EXISTING BUILDING SYSTEMS AND SERVICE THAT MAY

AFFECT THE NORMAL OPERATION OF OCCUPIED

PORTIONS OF THE BUILDING. THE OWNER SHALL BE

INFORMED OF ANY INTERRUPTIONS AT LEAST TWO (2)

WEEKS IN ADVANCE.

21. THE HVAC CONTRACTOR SHALL COORDINATE ANY

PREMIUM WORK REQUIRED FOR THIS PROJECT WITH THE

GENERAL CONTRACTOR.

22. THE HVAC CONTRACTOR SHALL COORDINATE WITH THE

GENERAL CONTRACTOR PHASING REQUIREMENTS OF THE

PROJECT.

23. THE AUTOMATIC TEMPERATURE CONTROL (ATC)

CONTRACTOR SHALL COORDINATE THERMOSTAT

LOCATIONS WITH ARCHITECTURAL FURNITURE PLANS.

THERMOSTATS SHALL BE INSTALLED 54" ABOVE FINISHED

FLOOR UNLESS OTHERWISE NOTED.

24. EXISTING FIBEROUS DUCT LINERS WHICH ARE CUT DURING

RENOVATION SHALL BE RE-SEALED SO THAT NO FIBEROUS

LINER MEDIA IS EXPOSED TO THE AIRSTREAM.

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD VD

VD VD

VAV-X-X

XXX

XXX

X.X

X.X

DESIGNATION

NUMBER

MAXIMUM CFM

MINIMUM CFM

WATER

FLOW RATE

MBH

VAV WITH

HYDRONIC HEAT

VAV WITH

ELECTRIC HEAT

CARBON DIOXIDE

SENSOR

FPT BOX

SERVICE

CLEARANCE

H

H

UNIT

#

X-X

#

DP

HI

LO

0.02"

HIGH PRESSURE SIDE

DIFF. PRESSURE SENSOR

DESIGN PRESSURE

DIFFERENTIAL (IN. H2O)

LOW PRESSURE SIDE

T

H

S

RS

CO₂

SD

CO

H-001

HVAC LEGEND,

DETAILS, SCHEDULE

& GENERAL NOTES

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20NONE

Drawn By: DO Checked By: EJE

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 15: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

AIR DISTRIBUTION DEVICE SCHEDULE

ITEM SERVICE TYPE NECK SIZE AIR PATTERN MATERIAL

MANUFACTURER / MODEL

NUMBER

REMARKS

A RADIAL SUPPLY CEILING DIFFUSER

(SEE DRAWINGS)

RADIAL 2-WAY ALUMINUM PRICE / FRFD1,2,3,4,5

B RETURN/EXHAUST LOUVERED GRILLE

(SEE DRAWINGS)

45 DEG. DEFLECTION STEEL PRICE / 5301,2,3,4

NOTES:

1. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR MOUNTING TYPE.

2. DEVICES IN GRID CEILINGS SHALL BE LAY-IN TYPE UNLESS OTHERWISE NOTED.

3. DEVICES IN SHEETROCK AND PLASTER CEILINGS SHALL BE SURFACE MOUNTED.

4. ALL COLOR AND FINISHES TO BE APPROVED BY ARCHITECT.

5. DIFFUSERS TO BE 24"x24" FACE

VARIABLE & CONSTANT VOLUME BOX SCHEDULE

ITEM TYPE MAX CFM MIN CFM

Δ PRESSURE

IN. H₂O (MAX)

HOT WATER COIL

INLET STATIC

PRESSURE

(IN.)

INLET

CONNECTION

SIZE (IN.)

MAX BOX

DEPTH (IN.)

SILENCER

LINING

THICKNESS

LINING

HOSPITAL

GRADE

ACCESS

DOOR

BEFORE

COIL

ACCESS

DOOR

AFTER

COIL

MANUFACTURER /

MODEL NUMBER

REMARKS

AIR WATER

INTEGRAL

EXTERNAL

SEE

SCHEDULE

MBH EWT °F LWT °F EAT °F

LAT °F

(MIN)

GPM

AIR Δ

PRESSURE

(IN H₂O)

FPI MAX.

MAX Δ

PRESSURE

(FT. H₂O)

MIN NO.

ROWS

VAV-S-6019 VARIABLE VOLUME 800 400 0.7 18 150 120 55 95 1.3 0.5 10 8 2 1.5 10Ø 13 NO NO 1" YES YES BY HVAC PRICE / SDV

VAV-R-6019 VARIABLE VOLUME 920 460 0.7 - - - - - - - - - - 1.5 12Ø 13 NO NO 1" YES YES BY HVAC PRICE / SDE

VAV-S-6029 VARIABLE VOLUME 800 400 0.7 18 150 120 55 95 1.3 0.5 10 8 2 1.5 10Ø 13 NO NO 1" YES YES BY HVAC PRICE / SDV

VAV-R-6029 VARIABLE VOLUME 920 460 0.7 - - - - - - - - - - 1.5 12Ø 13 NO NO 1" YES YES BY HVAC PRICE / SDE

NOTES

MATERIAL

TO MATCH

DUCT

MATERIAL

DAMPER

STIFFENING

OUTSIDE END

BEARING

INSIDE END

BEARING

RECTANGULAR DAMPER

FOR DUCTS 19" TO 48"x12"

TWO BLADE DAMPER

ARRANGEMENT

DUCT

EXTENSION FOR WRAPPED

DUCT

WING NUT & ARM (TYP)

ROUND DAMPER

3/8" QUADRANT

DUCT

1/2" QUADRANT

DUCT

3/8"Ø ROD PIN

16 GA. BLADE

RECTANGULAR

DAMPER FOR DUCTS

UP TO 18"x12"

22 GA. BLADE

3/8"Ø ROD PIN

NOTES:

1. FOR DUCTS OVER 12" HIGH USE MULTIPLE BLADES.

2. ALL BRANCH DUCTS (SUPPLY, RETURN & EXHAUST) SHALL HAVE VOLUME

DAMPERS, INCLUDING RUNOUTS TO DIFFUSERS (MANDATORY).

DUCT SIDE ELEVATION

1/8" ALL AROUND 1/8" ALL AROUND

DUCT DEPTH

NTSVOLUME DAMPER (SINGLE BLADE)

NTS

NOTES:

1. FOR STRAP AND TRAPEZE HANGER SIZE, REFER TO SMACNA DUCT STANDARDS.

2. NO POP RIVETS ALLOWED; USE SELF-TAPPING SHEET METAL SCREWS ONLY.

3. COORDINATE WITH STRUCTURAL.

4. REVIEW SEISMIC SECTION OF SPECS FOR ATTACHMENT.

C-CLAMP

(TYP.)

STRUCTURAL STEEL OR

BUILDING STRUCTURE

HANGER

STRAPS

ANGLES

SPOT WELD ANGLE TO

STRUCTURAL STEEL

1/2"Ø MIN

HANGER ROD

(TYP.)

BAND

STRAP HANGER TRAPEZE HANGER

HANGER STRAP

3/8" BOLT (MIN)

41" MAX.

BAND OF SAME SIZE

AS HANGER STRAP.

RECTANGULAR & ROUND DUCT HANGER DETAIL (LOW VELOCITY)

DOUBLE THICKNESS TURNING

VANES (SEE TURNING VANE

DETAIL)

FULL RADIUS

WHERE POSSIBLE

(R=W)

RECTANGULAR ELBOW

RADIUS ELBOW

LOW VELOCITY

ELBOWS

LOW VELOCITY

TRANSITIONS

AIR FLOW

DIVERGING FLOW

R

R

LOW VELOCITY

OFFSETS

30° ELBOWS 45°

MAX.

AIR FLOW

CONTRACTION FLOW

W

W

W

20° MAX.

30° MAX.

R=1-1/2W

NTSLOW VELOCITY TRANSITION TAKEOFFS & ELBOWS

NTS

STANDARD FEATURES:

1. NEOPRENE GASKET

TO MINIMIZE AIR

LEAKAGE.

2. PRE-DRILLED HOLES

FOR QUICK

MOUNTING.

3. CONSTRUCTED OF

HEAVY DUTY

GALVANIZED STEEL.

OPTIONAL FEATURES:

1. 26 GAUGE GALV. QUANDRANT

VOLUME DAMPER W/TIGHT

FITTING GASKETING TO

MINIMIZE LEAKAGE AT

DAMPER PIVOT POINTS.

2. HEAVY DUTY HARDWARE IS

AVAILABLE FOR

APPLICATIONS WITH

INCREASED STATIC

PRESSURE.

NOTES:

ALL ROUND AND RECTANGULAR BELLMOUTH FITTINGS

SHALL BE INCLUDED WITH THE FOLLOWING FEATURES:

45° RECTANGULAR

TAKE-OFF

RECTANGULAR

BELL MOUTH

FITTING

MODEL RBMD

PREFERED

TAKE-OFF FITTING

ALTERNATE

TAKE-OFF FITTING

RECTANGULAR BRANCH DUCT TAKE-OFFS

BELLMOUTH

CONNECTION

MODEL BMD

BELLMOUTH

MODEL BMD

W/ END FLAPS

BENT OVER

MINI-BELLMOUTH

CONNECTION

MODEL MBMD

OVAL-BELLMOUTH

CONNECTION

MODEL OVBMD

STANDARD 45°

REGULAR TO ROUND

BOOT CONNECTION

MODEL 33000

ROUND BRANCH DUCT TAKE-OFFS

PREFERED ALTERNATE ALTERNATE ALTERNATE ALTERNATE

TAKE-OFF FITTING TAKE-OFF FITTING TAKE-OFF FITTING TAKE-OFF FITTING TAKE-OFF FITTING

VD VD

VD VD

VD

AIR FLOW

AIR FLOW

VDVD

BELL MOUTH CONNECTION DETAIL

NTS

INSULATION

PROVIDE VIBRATION ISOLATOR ON

PIPING LOCATED IN MECHANICAL

EQUIPMENT ROOMS.

LOCK NUTS

PIPE ROLL

INSULATION

PROTECTION

SADDLE WELDED TO

PIPE

BOLT (TYP.)

ANGLE IRON

SUPPORT BY HVAC

INSULATION AS

SPECIFIED

INSULATION PROTECTION

SHIELD

NOTES:

1. FOR TYPE OF HANGER AND INSULATION REQUIREMENTS REFER TO SPECIFICATIONS.

2. SERVICE PIPING AS INDICATED IN SPECIFICATIONS SHALL BE INSTALLED ON ROLLER HANGERS.

3. COORDINATE WITH STRUCTURAL.

PIPE HANGER AND PIPE ROLLER

A B

PROVIDE ACCESS TO CONTROLS AS

PER MANUFACTURER'S

RECOMENDATIONS

CD

AIR FLOW

EXHAUST BOX

TRANSITION

A. SCHEDULED INLET DUCT SIZE UNLESS OTHERWISE NOTED

B. BOX OUTLET SIZE

C. BOX INLET SIZE

D. SCHELUDED INLET DUCT SIZE UNLESS OTHERWISE NOTED

NOTES:

NTSEXHAUST BOX

NTS

ACCESS PANEL BY

HVAC CONTRACTOR

ACCESS PANEL BY

BOX MANUFACTURER

TRANSITION BY

CONTRACTOR

PROVIDE ACCESS TO CONTROLS AS PER

MANUFACTURER'S RECOMENDATIONS

TRANSITION

NOTES:

A. SCHEDULED INLET DUCT SIZE UNLESS OTHERWISE NOTED

B. BOX INLET SIZE

C. BOX OUTLET SIZE

D. COIL OUTLET SIZE

E. SCHEDULED DISCHARGE DUCT SIZE UNLESS OTHERWISE NOTED

AB

COIL

C D

E

SUPPLY BOX WITH COIL

18" MIN.

36" MAX.

HWS

HWR

NTS

PRESSURE AND TEMPERATURE TAPS

BALL VALVE WITH CAPPED

HOSE ADAPTOR (TYP.)

HOT WATER COIL

PER SPECIFICATIONS

SEE A.T.C. SPECIFICATIONS

CONTROL VALVE

SEPARATE BALANCING

VALVE WITH GAUGE PORTS

REFER TO DWG

FOR PIPE SIZES

STRAINER

BALL VALVE (TYP.)

OR BUTTERFLY

VALVE WHEN

LARGER THAN 2".

BALL VALVE WITH CAPPED

HOSE ADAPTOR (TYPICAL)

NOTE:

COIL FLANGES, READY FOR BOLTING TO DUCTWORK FLANGES.

TYPICAL FOR IN-DUCT COIL AND TERMINAL BOX COIL.

TYPICAL VAV REHEAT/DUCT-MOUNTED

HOT WATER COIL PIPING

H-002

HVAC SCHEDULES &

DETAILS

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20NONE

Drawn By: DO Checked By: EJE

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 16: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

D

C.5

C

SCOPE OF WORK

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

STORAGE ROOM6031

SOLVENT STORAGE6032

CORRIDOR6037

LAB SUPPLY ROOM6035

ELEC ROOM6036

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

CORRIDOR6026

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

STACKED INCUBATORS

STACKED INCUBATOR

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

V

V

V

V

6019

-A

V

V

56x1456x14

56x14

56x14

60x16

60x16

56

x1

4

10Ø

12Ø

40x18

56x12

14x12

14x1210x12

VD

VD

VD

VD

VAV-S

6019

A-8"Ø

200

(TYP.4)

B-16x16

460

(TYP.2)

10

Ø1

4x12

14x1210x12

VD

VD

VD

VD

VAV-S

6029

VAV-E

6019

VAV-E

6029

A-8"Ø

200

(TYP.4)

B-16x16

460

(TYP.2)

20x12

20x12

3/4"

HW

S

HW

R

3/4"

EXISTING HWS&R

1

1 1

1

2

2

2

2

T

T

16x12

16x1

2

VD

VD

16x12

VD

VD

NEW WORK NOTES:

EXISTING CONTROL ALARM DROPS (4) ON WALL SHALL BE REUSED

FOR INCUBATORS IN T.C. LAB 6029 (THERE ARE 4 DOUBLE

STACKED INCUBATORS) PROVIDE ADDITIONAL AS REQUIRED

PROVIDE ALARMS AT INCUBATORS IN ROOM 6019 (THERE ARE 4

DOUBLE STACKED INCUBATORS)

1

2

HVAC LEVEL 6

NEW WORK PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

H-101

SCALE : 1/4" = 1'-0"1 HVAC LEVEL 6 NEW WORK PLAN

Drawn By: DO Checked By: EJE

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 17: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

PLUMBING FIXTURE SCHEDULE

DESIGNATION DESCRIPTION MANUFACTURER MODEL# TYPE

FAUCET

MANUFACTURER

FAUCET / TRIM/ MODEL SUPPLIES TRAP / WASTE LAB WASTE

LAB

VENT

CW TW HW RO NDCW NDHW ADA CARRIER COMMENTS / DESCRIPTION

LSK-1

EPOXY

LABORATORY

SINK

BY OTHERS -

BENCH INTEGRAL

SINK

CHICAGO

A) # 930-GN8BVB-317-XKCP-HW/CW

B) # 828-RO

PROVIDE CHICAGO

1016 1/2"SUPPLIES W/

LOOSE KEY HANDLE

FOR NDHW, NDCW

PROVIDE 2"ACID RESISTING P-TRAP W/ CO

PLUG.PROVIDE ACID RESISTING GRID

STRAINER AND TAILPIECE. PROVIDE ACID

RESISTING OVERFLOW DRAIN FOR SINK,

TIE-IN TO TAIL PIECE.

2" 2" - - -

1

2

"

1

2

"

1

2

" - N/A

1. PROVIDED & INSTALL BELOW DECK NDCW, NDHW, RO SHUT-OFF

VALVES AND CONNECT TO FAUCETS INLET WATER SUPPLIES.

EW-1

EMERGENCY

EYEWASH

GUARDIAN G5022-HG-VB

DECK MOUNT

POINT OF USE

EYEWASH/DRENCH

HOSE UNIT

- -

1

2

"SHUT OFF VALVE - - - -

1

2

" - - - - - N/A

1. PROVIDE BELOW DECK SHUT-OFF VALVE AND CONNECT TO

EYEWASH WATER INLET.

2. PROVIDE WITH INTEGRAL VACUUM BREAKER & HOSE GUIDE

EXISTING TO REMAIN

CONNECT TO EXISTING

ETR

CTE

AFFABOVE FINISHED FLOOR

GENERAL CONTRACTOR

PLUMBING GENERAL NOTES

1. PLUMBING SUBCONTRACTOR SHALL REFER TO THE ARCHITECTURAL DETAILED PLANS AND LABORATORY

PLANNING DRAWINGS FOR EXACT LOCATIONS OF ALL ELEVATIONS, FIXTURES, AND LABORATORY GAS

OUTLETS.

2. PLUMBING SUBCONTRACTOR SHALL REFER TO ARCHITECTURAL AND LABORATORY PLANNING DRAWINGS,

INCLUDING THESE DOCUMENTS, FOR EXACT LOCATIONS OF EQUIPMENT TO BE PIPED UNDER THE

PLUMBING SCOPE OF WORK.

3. PLUMBING SUBCONTRACTOR SHALL REFER TO THE ARCHITECTURAL LABORATORY PLANNING DRAWINGS

FOR ALL ELEVATIONS, LAB BENCH AND CASEWORK DETAILS.

4. COORDINATE PIPING DEMOLITION WITH OWNER TURN OVER ALL DEMOLISHED COPPER PIPE, VALVES AND

FITTINGS TO OWNER.

5. ALL NEW WORK IS DRAWN HEAVY.

6. EXISTING PIPING AND FIXTURES TO REMAIN ARE DRAWN LIGHT.

7. ALL HATCHED OR SHADED IN FIXTURES AND ASSOCIATED FIXTURE PIPING SHALL BE DISCONNECTED AND

REMOVED BACK TO NEAREST STACK, MAIN OR RISER. NO DEAD END PIPING PERMITTED.

8. THE LOCATIONS OF PIPING, FIXTURES, ELEVATIONS, ETC. HAVE BEEN TAKEN FROM THE BEST SOURCES

AVAILABLE AND MUST BE VERIFIED IN THE FIELD PRIOR TO COMMENCING WORK IN RENOVATED AREAS.

9. SINCE PORTIONS OF THE EXISTING BUILDING SHALL REMAIN IN OPERATION DURING CONSTRUCTION, THE

PHASING REQUIREMENTS SHALL BE MET BY THIS SUB-CONTRACTOR AND ALL REQUIRED PIPES, VALVES,

AND FITTINGS NECESSARY TO ACCOMPLISH SAME SHALL BE PROVIDED. COORDINATION OF THIS IS VERY

IMPORTANT.

10. DEBRIS REMOVAL FROM THE CONSTRUCTION SITE WILL BE COMPLETED BY A PREDETERMINED ROUTE AT

PREDETERMINED TIMES. COORDINATE WITH THE HOSPITAL.

11. DURING DEMOLITION WORK THIS SUBCONTRACTOR SHALL COORDINATE WITH THE OWNER'S SAFETY

OFFICER REGARDING REMOVAL OF PIPE AND PLUMBING IN HAZARDOUS AREAS. FLUSHING OR

DECONTAMINATION OF SYSTEMS MAY BE REQUIRED PRIOR TO THE START OF DEMOLITION.

12. PLUMBING SUB-CONTRACTOR IS REQUIRED TO GIVE MINIMUM 5 DAYS NOTICE FOR ANY PLUMBING SYSTEM

SHUT-DOWNS THAT ARE REQUIRED. THESE SHUT-DOWNS MUST BE COORDINATED WITH CHILDREN'S

HOSPITAL ENGINEERING AND MAINTENANCE OFFICES.

13. ALL NEW PIPE PENETRATIONS & SLEEVES SHALL BE FIRE STOPPED & SMOKE STOPPED, SEE SPECIFICATION

FOR REQUIREMENTS AND DIGITALLY PICTURES OF FINISH WORK SHALL BE PROVIDED TO OWNER, AND

ENGINEER PRIOR TO CLOSE-OUT

GC

FUME HOODFH

CAP EXISTING PIPECEP

BUILDING AUTOMATION SYSTEMBAS

PIPING IDENTIFICATION SCHEDULE (PLUMBING)

SYSTEM TAG PLAN TAG

PIPE JACKETING PIPE IDENTIFICATION VALVE TAGS

JACKET COLOR

MANUFACTURER

MATERIAL

BACKGROUND LETTERING BACKGROUND LETTERING

MANUFACTURER

MATERIAL

NON-DOMESTIC COLD WATER NDCW TAN 42438-R1 LIGHT GREY GREEN LIGHT GREY WHITE ROWMARK 2XX-322

NON-DOMESTIC HOT WATER NDHW BROWN 41079-R2 LIGHT GREY RED LIGHT GREY RED ROWMARK 2XX-326

NON-DOMESTIC HOT WATER CIRCULATION NDHC GREY L7-1228V LIGHT GREY YELLOW LIGHT GREY RED ROWMARK 2XX-326

REVERSE OSMOSIS/ DE-IONIZED WATER RODI - - - - - - - - - - - - - - - - WHITE BLACK ROWMARK 2XX-204

CARBON DIOXIDE CO2 - - - - - - - - GREY WHITE GREY WHITE ROWMARK 2XX-312

LABORATORY COMPRESSED AIR CA - - - - - - - - YELLOW BLACK BLACK YELLOW ROWMARK 3XX-407

LABORATORY VACUUM LVAC - - - - - - - - YELLOW BLACK BLACK YELLOW ROWMARK 3XX-407

LABORATORY WASTE LW - - - - - - - - GREEN WHITE - - - - - - - - - - - -

LABORATORY VENT LV - - - - - - - - GREEN WHITE - - - - - - - - - - - -

SPRINKLER SPR - - - - - - - - RED WHITE - - - - - - - - - - - -

REMOVE TO THIS POINTRTTP

BIO SAFETY CABINETBSC

EXISTING TO BE REMOVED & RELOCATEDETBR&R

PRESSURE GAUGE

BV BALL VALVE

NORMALLY CLOSED VALVE

ETBR EXISTING TO BE REMOVED

ETR EXISTING TO REMAIN

PRV PRESSURE REDUCING VALVE

VIV VALVE IN VERTICAL

TMV THERMOSTATIC MIXING VALVE

PIPE UNION

PIPE CONNECT TO EXISTING

PIPE RISER

PIPE CAP OR PLUG

PIPE CONTINUATION

PIPE UP THROUGH SLAB ABOVE

PIPE DOWN THROUGH FLOOR SHOWN

PIPE RISE/DROP

W&T WASTE AND TRAP

CO CLEANOUT

CA COMPRESSED AIR PIPING

N NITROGEN PIPING

CO2 HIGH PRESSURE CARBON DIOXIDE PIPING

LW LAB WASTE PIPING

LV LAB VENT PIPING

ROS REVERSE OSMOSIS WATER SUPPLY PIPING

TWS TEMPERED WATER SUPPLY PIPING

TWR TEMPERED WATER RETURN PIPING

NDCW NON-DOMESTIC COLD WATER PIPING

NDHW NON-DOMESTIC HOT WATER PIPING

NDHC NON-DOMESTIC HOT WATER CIRCULATION PIPING

CTE

PLUMBING LEGEND

EMERGENCY SHOWER STATION (DEMO/NEW)

ESS

EMERGENCY EYEWASHEW

CA

N

CO2

LW

LV

NDCW

NDHW

NDHC

TWS

TWR

ROS

LABORATORY GAS TURRET BALL VALVE

LW&LV LABORATORY WASTE & VENT PIPING

SYMBOL ABBR DESCRIPTION

CA

N

CO2

LW

LV

NDCW

NDHW

NDHC

TWS

TWR

ROS

EXISTING NEW

LVAC LABORATORY VACUUM PIPING

SW SOLVENT WASTE PIPINGSWSW

BVNC

PGPG

REGULATOR

4 PIPE HANGERS FROM BOTTOM OF SLAB

UNINSULATED PIPEINSULATED PIPE

POLYPROPYLENE PIPE

METAL "V" CHANNEL

W/ CLEVIS HANGER

HANGER (TYP)

INSULATION

SHIELD

INSULATION

ELECTRO

GALVANIZED

THREADED ROD

ELECTRO

GALVANIZED

THREADED ROD

ELECTRO

GALVANIZED

THREADED ROD

NOTE:

1.ALL HANGERS, HARDWARE, AND RODS SHALL BE ELECTRO GALVANIZED

2. ALL MISCELLANEOUS IRON & STEEL SHALL BE FURNISHED UNDER THIS CONTRACT AS REQUIRED FOR PROPER

SUPPORT OF ALL SYSTEMS INSTALLED UNDER DIV. 22

NTS

DOUBLE NUT

SINGLE NUT

DOUBLE NUT

SINGLE NUT

DOUBLE NUT

SINGLE NUT

ELECTRO GALVANIZEDTHREADED ROD

ALL PIPE SIZES

ANCHOR SECURELY TOBUILDING STRUCTURE

DOUBLE NUT

CLEVIS HANGER

SINGLE NUT

NUT & WASHER

12"

6" 6"

3

NOTES:

1. PROVIDE NON-COMPRESSIBLE INSULATION SECTION WITH SHIELD AT

EACH SUPPORT POINT FOR INSULATED PIPING.

2. PROVIDE "UNICUSHION" OR OTHER APPROVED RESILIENT WRAPPING

AROUND ALL UNINSULATED PIPING AT EACH SUPPORT POINT.

3. ALL HANGERS, HARDWARE, AND RODS SHALL BE ELECTRO GALVANIZED

4. REFER TO DRAWINGS FOR PIPE SIZES

TRAPEZE HANGER

DOUBLE LOCK

NUTS &

WASHERS

PIPE RACK

CHANNEL

(UNISTRUT OR

EQUAL P1000) 48"

LONG

PIPE CLIPS

(TYPICAL)

LV

AC

TW

S

CO₂

RO

S

RO

S

ND

CW

ND

HW

1

2

" ALL THREAD ROD

SUPPORT FROM BUILDING STRUCTURE

SEGMENT OF NON-

COMPRESSIBLE INSULATION

EXTEND BEYOND INSULATION

SHIELD IN BOTH DIRECTIONS

A

A

SECTION 'A-A'

PIPING INSULATION

18 GAUGE ELECTRO

GALVANIZED STEEL INSULATION

SHIELD

PIPE CLIP

NTS

ANCHOR SECURELY TO

BUILDING STRUCTURE

ANCHOR SECURELY

TO BUILDING

STRUCTURE

PROVIDE

PIPE SADDLE

(TYPICAL)

LVACLVAC

LAB TURRET SCHEDULE

SYMBOL MANUFACTURER OUTLET MODEL TYPE REMARK

T-1CHICAGO

LAB VACUUM BALL VALVE

(SINGLE)

986-909-VCP WALL MONTED 1. INDEXED FOR VACUUM.

DETAIL OF LAB VACUUM CONNECTION AT BIO SAFETY CABINETNTS

1

CEILING

NOTES:

1. REFER TO PLUMBING DRAWINGS FOR PIPING & SERVICES REQUIRED AT EACH BSC.

2. THE LOCATION OF LAB VAC PIPE DROP, IN THE WALL, SHALL BE COORDINATED IN THE FIELD IN ACCORDANCE WITH

BIO SAFETY CABINET INTEGRAL TURRET LOCATION.

3. PLUMBING SUBCONTRACTOR SHALL INSTALL ALL LOOSE TRIM & TURRETS IN THE BSC.

4. DETAIL NOTED IS BASED ON A LESS THAN 6'-0" WIDE BSC & PLUMBING SUBCONTRACTOR SHALL PROVIDE ADDITIONAL

CONNECTION FOR BSC 6'-0" OR LONGER. REFER TO THE BSC SCHEDULE FOR ADDITIONAL INFORMATION.

FLOOR

VACUUM & AIR TURRETS TO BE

PROVIDED BY BIO SAFETY CABINET

VENDOR AND TO BE INSTALLED BY

PLUMBING CONTRACTOR

BSC

NEW

3

4

"VACUUM PIPING ABOVE

CEILING TO VACUUM SYSTEM

PROVIDE SHUT-OFF VALVE

VALVE MUST BE ACCESSIBLE,

COORDINATE LOCATION

IN FIELD

PROVIDE WALL ESCUTCHEONS

NTS2

CO2 PIPING AT INCUBATORS

INCUBATOR

ELEVATION

CEILING

INCUBATOR

VERIFY ELEVATION/LOCATION OF CO2 SET-UP WITH

VERTEX PRIOR TO INSTALLATION

FLOOR

NEW

1

2

" CO2 OR HIGH PRESSURE

NIT PIPING ABOVE CEILING NEW

1

2

"CO2

PIPING DROP IN WALL

TYGON TUBING PROVIDED BY OWNER

(INSTALLED BY MOVE-IN CREW

NOT PLUMBER)

PROVIDE CO2 APOLLO SHUT-OFF BALL VALVE TO

MATCH EXISTING IN ROOM 6027 WITH

CONNECTION ADAPTER FOR PRESSURE

REGULATOR PROVIDED BY OTHER

SHUT-OFF VALVE TO BE INSTALLED AT 7'-6" ABOVE

FINISH FLOOR IN ACCESSIBLE LOCATION TO THE

SIDE OF THE STACKED INCUBATORS.

NEW

3

4

"VACUUM PIPE

IN WALL

BSC

TW

S

PROVIDED & INSTALLED BY OWNER

P-001

PLUMBING

LEGEND, DETAILS,

SCHEDULE &

GENERAL NOTES

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20NONE

Drawn By: JES Checked By: WMN

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 18: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

4 5 6

D

C.5

C

SCOPE OF WORK

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

STORAGE ROOM6031

SOLVENT STORAGE6032

CORRIDOR6037

LAB SUPPLY ROOM6035

ELEC ROOM6036

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

CORRIDOR6026

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

STACKED INCUBATORS

STACKED INCUBATOR

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

V

V

V

V

6019

-A

V

V

NEW

1

2

"NDCW,

1

2

"NDHW DROPS & 2"LW&V

IN WALL PARTITION TO NEW LAB SINK LSK-1

CONNECT TO EXISTING LAB WASTE PIPE IN WALL

1

PLUMBING DMOLITION AND NEW WORK NOTES

NEW 1

1

2

"ROS DROP & RISE IN WALL PARTITION TO FEED THE NEW

RO FAUCET. PROVIDE

1

2

"RO SHUT-OFF VALVE IN CASEWORK .

3

NEW

3

4

"LAVC SHUT-OFF BALL VALVE EXPOSED ALONG THE BSC .

PROVIDE PIPE REDUCER AND CONNECTION ADAPTORS TO BSC

PRE-PIPED PIPING.

7

REMOVE PORTION OF THE 1

1

2

"TWS AND CONNECT ON BOTH ENDS

WITH NEW 1

1

2

"TWS LOOP AND EXTEND TO NEW EMERGENCY EYE

WASH LOCATIONS.

8

CONNECT TO EXISTING 2"NDCW AND 1

1

2

"NDHW MAINS WITH NEW

1

2

"NDCW &

1

2

"NDHW PIPING, PROVIDE SHUT-OFF VALVES AND

EXTEND TO NEW LAB SINK LOCATIONS.

9

NEW 1"LVAC DROP IN WALL TO APPROXIMATELY 2 FEET ABOVE

FINISH FLOOR TO

3

4

"LAVC SHUT-OFF BALL VALVE EXPOSED

ALONG WALL TO SERVE THE BSC'S.

6

REMOVE PORTION OF THE 1

1

2

"ROS AND CONNECT ON BOTH ENDS

WITH NEW 1

1

2

"ROS LOOP AND EXTEND TO NEW RO FAUCET

LOCATIONS.

10

NEW (2) 1

1

2

"TWS DROP & RISE IN WALL PARTITION TO

FEED THE NEW EMERGENCY EYE WASH EW-1. PROVIDE

1

2

" TW

SHUT-OFF VALVE IN CASEWORK SERVING EW-1.

2

NEW

3

4

"LVAC DROP IN WALL TO WALL MOUNTED VACUUM

TURRET (T-1)

5

CONNECT TO EXISTING 3"LVAC MAIN WITH NEW 1

1

2

"LVAC PIPING,

PROVIDE SHUT-OFF VALVE AND EXTEND TO LAB VACUUM TURRETS

AND BIO SAFETY CABINETS

11

NEW

1

2

"CO2 DROP IN WALL TO SHUT-OFF BALL VALVE

LOCATED ALONG WALL AT 7'-6" OF FINISH FLOOR. LOCATE

THE VALVE TO THE SIDE OF THE STACKED INCUBATORS AND

PROVIDE CONNECTION ADAPTOR TO PRESSURE REGULATOR

AND SERRATION CONNECTION TO TYGON TUBING PROVIDED

AND INSTALLED BY OWNER TO SERVE STAKED INCUBATOR.

REFER TO DETAIL NO: #2 ON DRAWING P.001

4

NDHW

CA

ROS

NDHC

NDCW

LVAC

N

CO2

1"

1

1

2

"

3"2"2"

1

1

2

"

3

4

"

TWR

TWS

1"

1

1

2

"1

1

2

"

ND

HW

CA

RO

S

ND

HC

ND

CW

LV

AC

N

CO

2

TW

R

TW

S

TWR

NDHW

CA

TWS

NDHC

NDCW

LVAC

N

CO2

ROS

1"

1

1

2

"

3"2"2"

1

1

2

"

3

4

"

1"

1

1

2

"1

1

2

"

LV

LV

LV

2"

2"

2"

CO

2

CO2

TWR

NDHW

CA

ROS

TWS

NDHC

NDCW

LVAC

N

CO2

ND

CW

ND

HW

CA

LV

AC

RO

S

RO

S

CO

2

TW

S

TW

S

ND

CW

ND

HW

LV

AC

RO

S

RO

S

TW

R

ND

HW

CA

TW

S

ND

HC

ND

CW

LV

AC

N

CO

2

RO

S

ND

CW

ND

HW

CO

2

TW

TW

LV

LV

AC

LV

AC

LVAC

LVAC

LV

AC

CO2

NDHW

NDCW

LVAC

NDHW

NDCW

LVAC

TWR

NDHW

CA

ROS

TWS

NDHC

NDCW

LVAC

N

CO2

CO2

CO2

ND

CW

ND

HW

CO

2

TW

TW

LV

TW

RO

S

RO

S

RO

S

RO

S

TW

ROS

ROS

ND

CW

ND

HW

RO

S

CO

2

CO

2

TW

TW

LV

AC

RO

S

LV

T-1

T-1

T-1

T-1

INC'S

INC'S

INC'S

BSC

BSC

BSC

BSC

BSC

BSC

BSC

BSC

LVAC

LVACLVAC

LVAC

LVAC

LV

AC

LV

AC

LV

AC

LV

AC

LV

AC

ETR

ETR

ETR

ETR

ETR

LSK-1

EW-1

EW-1 LSk-1

1

2

"

3

4

"

1"

3

4

"

3

4

"

LV

AC

1

2

4

4

6

9

8

10

12

3

5

7

5 4

4

4

11

5

6

7

5

4

7

7

13

AP

1

2

3

CONNECT TO NEW

1

2

"CO2 EXISTING

1

2

"CO2 PIPE, PROVIDE

SHUT-OFF BALL VALVE AND EXTEND TO NEW INCUBATORS . ALSO

ADD AN ISOLATION VALVE ON EXISTING PIPE TO ROOM 6027

12

INSTALL A 12"x12" WALL ACCESS PANEL AT EXISTING OPEN END

CONDENSATE DRAIN LOCATION. COORDINATE COLOR WITH

ARCHITECT.

13

1"

1

1

2

"

INCS

1

2

"

1

1

2

"

3

4

"

1

2

"

1

2

"

1

1

2

"

1

2

"

1

1

2

"

2"

2"

1

1

2

"

1

1

4

"

1

1

2

"

3

4

"

PLUMBING

LEVEL 6

DEMOLITION &

NEW WORK PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

P-101

SCALE:

1/4" = 1'-0"1 PLUMBING - LEVEL 6 DEMOLITION & NEW WORK PLAN

Drawn By: JES Checked By: WMN

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 19: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

CONTACTOR, RATING AND TYPE AS NOTED ON DRAWINGS

"EWC" - INDICATES CONNECTION TO ELECTRIC WATER COOLER

"ATC" - INDICATES CONNECTION TO AUTOMATIC TEMPERATURE

CONTROL PANEL

"DDC" - INDICATES CONNECTION TO DIRECT DIGITAL CONTROL PANEL

"FSD" - INDICATES CONNECTION TO FREE/SMOKE DAMPER

"MD" - INDICATES CONNECTION TO MOTORIZED DAMPER

"P" - INDICATES POWER CONNECTION

"T" - INDICATES TEL/DATA CONNECTION

DISCONNECT SWITCH (FUSED), "AS" INDICATES AMPERE SWITCH RATING,

"AF" INDICATES AMPERE FUSE RATING.

HOME RUN, 3/4"C. WITH 2#12 AND 1#12 GND. CONNECTED TO A 20A-1P

CIRCUIT BREAKER. "N22A" REPRESENTS PANEL NAME AND "2" INDICATES

CIRCUIT NUMBER IN PANEL. WHEN MULTIPLE CIRCUITS ARE SHOWN,

HASH MARKS INDICATE NUMBER OF PHASE AND NEUTRAL CONDUCTORS

(GROUND CONDUCTOR IS NOT INDICATED IN HASH MARKS).

JUNCTION BOX, 4 11/16" SQUARE (UNLESS OTHERWISE NOTED)

JUNCTION BOX, FLUSH MOUNT IN FLOOR, REFER TO SPECIFICATIONS FOR

TYPE

30AS

30AF

"C" - INDICATES DEVICE TO BE MOUNTED ABOVE COUNTER SURFACE

"INC" - INDICATES DEVICE FOR AN INCUBATOR MOUNTED AT 7'-6" A.F.F.

"GFCI" - INDICATES RECEPTACLE FED FROM GFCI TYPE CIRCUIT BREAKER

"WP" - INDICATES RECEPTACLE MOUNTED IN A WEATHERPROOF

ENCLOSURE

DUPLEX RECEPTACLE - "2" INDICATES CIRCUIT NUMBER

EXISTING SPECIAL PURPOSE RECEPTACLE - FIELD CONFIRM EXACT NEMA

CONFIGURATION

WALL MOUNTED, SINGLE OR DOUBLE FACE ILLUMINATED EXIT SIGN,

FED FROM LIFE SAFETY BRANCH WITH FACES AND ARROWS AS

INDICATED ON DRAWINGS.

UNIVERSAL MOUNT SINGLE OR DOUBLE FACE ILLUMINATED EXIT SIGN,

FED FROM LIFE SAFETY BRANCH WITH FACES AND ARROWS AS

INDICATED ON DRAWINGS.

SINGLE POLE TOGGLE SWITCH, WALL MOUNTED AT 48" UNLESS

OTHERWISE NOTED. "a" INDICATES LIGHT FIXTURE CONTROL

DETAIL IDENTIFIER

"1" INDICATES DETAIL NUMBER

"E0.0" INDICATES SHEET NUMBER

DRAWING REVISION MARKER

DRAWING REVISION CLOUD

LIGHT FIXTURE NOTES

(TYPICAL FOR ALL LIGHT FIXTURES):

"FR1" INDICATES FIXTURE TYPE AS

SPECIFIED ON THE LIGHTING FIXTURE

SCHEDULE.

"2,a" INDICATES FIXTURE IS

CONNECTED TO CIRCUIT #2 AND

CONTROLLED BY SWITCH "a"

THREE-WAY TOGGLE SWITCH, WALL MOUNTED AT 48" UNLESS OTHERWISE

NOTED. - "a" INDICATES LIGHT FIXTURE CONTROL

FOUR-WAY TOGGLE SWITCH, WALL MOUNTED AT 48" UNLESS OTHERWISE

NOTED. - "a" INDICATES LIGHT FIXTURE CONTROL

MANUAL MOTOR STARTER W/THERMAL OVERLOAD PROTECTION & PILOT

LIGHT

DISCONNECT SWITCH (UNFUSED).

CIRCUIT BREAKER IN NEMA 1 ENCLOSURE

120/208V,3Ø,4W SURFACE MOUNTED PANEL, "CR2W4A" INDICATES PANEL

DESIGNATION

FLEXIBLE POWER CONNECTION TO EQUIPMENT AS NOTED

QUAD RECEPTACLE

DUPLEX RECEPTACLE WITH INTEGRAL GROUND FAULT CIRCUIT

INTERRUPTER

POWER POLE - PROVIDE AS SPECIFIED ON DRAWINGS

HOME RUN, 3/4"C. WITH 4#10 AND 1#10 GND. CONNECTED TO A 30A-3P

CIRCUIT BREAKER-REFER TO THE BRANCH CIRCUIT SCHEDULE FOR

CONDUCTOR SIZES AND QUANTITIES. . "N22A" REPRESENTS PANEL

NAME AND "2,4,6" INDICATES CIRCUIT NUMBERS IN PANEL.

N22A-2,4,6

30A-3P+

"C" - INDICATES MOUNTED ABOVE COUNTER HEIGHT

CEILING MOUNTED LOW VOLTAGE OCCUPANCY SENSOR. MATCH

EXISTING BUILDING STANDARDS. "a,b" - INDICATES DEVICE CONTROLLING

MULTIPLE POLE SWITCHING

N22A-2,4

EXISTING DEVICE, EQUIPMENT OR WIRING TO BE REMOVED

EXISTING DEVICE, EQUIPMENT OR WIRING TO REMAIN

NEW DEVICE, EQUIPMENT OR WIRING

VARIABLE FREQUENCY DRIVE

ELECTRIC TRAP PRIMER

MAGNETIC MOTOR STARTER

TIME CLOCK/SWITCH, RATING AND TYPE AS NOTED ON DRAWINGS

CONTROL PANEL

FLEXIBLE POWER CONNECTION NOTES:

PULL BOX, SIZED AS REQUIRED PER THE NATIONAL ELECTRIC CODE

MOTOR ("NUMBER" INDICATES HORSE POWER - 5 HORSEPOWER)

CONDUIT TURNING UP

CONDUIT TURNING DOWN

COMMUNICATION DEVICE NOTES:

WALL PHONE WORK AREA OUTLET DEVICE

RECEPTACLE NOTES:

2'X2' LIGHT FIXTURE

2'X4' LIGHT FIXTURE

ELECTRICAL LEVEL 6 DEMOLITION PLAN

ELECTRICAL LEGEND AND GENERAL NOTES

DESCRIPTION

E-101

E-001

DRAWING No

PROJECT GENERAL NOTES

TP

J

J

PB

5

N22A-2

2

EMERGENCY DUPLEX RECEPTACLE

C

CP

CB

TC

VFD

PP

1X4' LIGHT FIXTURE

DOWN LIGHT

WALL WASHER

WALL MOUNTED LIGHT

1

E0.0

1

ELECTRICAL DRAWING LIST

DRAWING NOTES AND DESIGNATIONS

EXISTING CONDITIONS DESIGNATIONS

LINE TYPE LEGEND

POWER DEVICES LEGEND

POWER DISTRIBUTION EQUIPMENT LIGHTING CONTROL LEGEND

LIGHTING LEGEND

TELECOMMUNICATIONS LEGEND

WALL MOUNTED LOW VOLTAGE OCCUPANCY SENSOR, WALL MOUNTED AT

48" UNLESS OTHERWISE NOTED. MATCH EXISTING BUILDING STANDARDS.

1. THE CONTRACTOR SHALL FURNISH LABOR, MATERIALS, TOOLS AND OTHER

EQUIPMENT REQUIRED TO INSTALL THE WORK SHOWN AND SPECIFIED. THE

CONTRACTOR SHALL FURNISH AND INSTALL ITEMS NECESSARY FOR A COMPLETE

ELECTRICAL SYSTEM. MATERIALS SHALL BE NEW AND SHALL BEAR THE REGISTERED

UL MARK. WORK SHALL CONFORM WITH THE NATIONAL FIRE PROTECTION

ASSOCIATION STANDARD 70 (NEC), THE NATIONAL ELECTRICAL CODE (NEC), AND

APPLICABLE FEDERAL, STATE AND LOCAL CODES. CONTRACTOR SHALL SECURE

PERMITS AND PAY THE FEES REQUIRED TO CARRY OUT HIS WORK. THE CONTRACTOR

SHALL FURNISH COPIES OF CERTIFICATES AND PERMITS TO THE ARCHITECT.

2. THE DRAWINGS AND SPECIFICATIONS INDICATE THE INTENT OF THE DESIGN AND

SHALL BE CONSIDERED AS DIAGRAMMATIC ONLY. EXACT LOCATIONS FOR OUTLETS

AND EQUIPMENT SHALL BE DETERMINED AT THE SITE, AS WORK PROGRESSES

DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE

CONTRACTOR AT THE SITE. FINAL WORK SHALL BE DOCUMENTED ON AS BUILT

RECORD DRAWINGS.

3. PIPING, CONDUITS AND EQUIPMENT OF ALL TRADES SHALL BE PROPERLY

COORDINATED AND SET TO MAINTAIN THE CLEARANCES REQUIRED BY APPLICABLE

FEDERAL, STATE AND LOCAL CODES.

4. CONDUIT RUNS CROSSING EXPANSION JOINTS SHALL HAVE EXPANSION OR

EXPANSION DEFLECTION TYPE FITTINGS, AS REQUIRED VERIFY EXISTING JOINTS BY

FIELD MEASUREMENTS.

5. OUTDOOR ELECTRICAL EQUIPMENT SHALL BE NEMA 3R TYPE, UNLESS OTHERWISE

NOTED.

6. RACEWAYS AND CABLE SHALL BE RUN CONCEALED IN FINISHED SPACES UNLESS

OTHERWISE NOTED.

7. WIRING DEVICES SHALL BE MOUNTED IN ACCORDANCE WITH THE LATEST

REQUIREMENTS OF THE ACCESSIBILITY CODE.

8. EXIT SIGNS AND EMERGENCY BATTERY UNITS AND LIGHTING FIXTURES DESIGNATED

AS NIGHT LIGHTS SHALL BE UNSWITCHED.

9. ALL BRANCH CIRCUITS, (LIGHTING AND POWER) SHALL HAVE A DEDICATED NEUTRAL

CONDUCTOR. COMMON OR SHARING OF NEUTRALS WILL NOT BE ALLOWED. NO MORE

THAN (3) CIRCUITS (SIX CURRENT CARRYING CONDUCTORS) SHALL BE RUN IN A

SINGLE CONDUIT.

10.RECEPTACLES, SWITCHES, LIGHTING FIXTURES, SMOKE DETECTORS, ETC INDICATE

QUANTITY, EXACT LOCATIONS OF DEVICES SHALL BE DETERMINED IN THE FIELD AND

COORDINATED WITH ARCHITECTURAL DRAWINGS

11.THIS IS A STANDARD SYMBOL LIST. ALL DEVICE SYMBOLS AND ABBREVIATIONS MAY

NOT NECESSARILY APPEAR ON THE FLOOR PLANS OR DETAIL SHEET. ONLY THOSE

SYMBOLS INDICATED ON THE FLOORS PLANS ARE USED AND OTHERS SHOULD BE

DISREGARDED.

12.MOUNTING HEIGHTS SHALL BE AS INDICATED ON ARCHITECTURAL DRAWINGS. THE

MOUNTING HEIGHT DETAIL SHALL BE USED AS A GUIDE IN THE ABSENCE OF THE

ARCHITECTURAL DRAWINGS.

13.CONTRACTOR SHALL VERIFY ALL DOORS SWINGS BEFORE INSTALLING SWITCH BOXES.

14.FOR EXACT LOCATION OF LIGHTING FIXTURES, SEE REFLECTED CEILING PLAN

DRAWINGS. FOR MOUNTING HEIGHT OF UNDERCABINET LIGHTING FIXTURES AND

OTHER TASK LIGHTING, REFER TO ARCHITECTURAL ELEVATION DRAWINGS.

15.ELECTRICAL CONTRACTOR IS TO COORDINATE THE EXACT LOCATION OF LIGHTING

FIXTURES IN MECHANICAL AND STORAGE AREAS WITH OTHER TRADES.

16.FOR EXACT LOCATION OF MECHANICAL EQUIPMENT, (AC UNITS, FANS, PUMPS, ETC)

REFER TO RESPECTIVE TRADES DRAWINGS.

17.CURRENT CARRYING MATERIAL USED SHALL BE COPPER, INCLUDING PANELBOARD

BUS MATERIALS AND TRANSFORMER WINDINGS.

18.FURNISH GROUNDING/ BONDING BUSHINGS ONTO ALL CONDUIT ENTERING/ LEAVING

BOXES.

19. ALL GROUND CONDUCTORS SHALL BE GREEN, ISOLATED GROUND CONDUCTORS

SHALL BE GREEN/ YELLOW STRIPED, AND NEUTRAL CONDUCTORS SHALL BE WHITE.

20.WHERE EXISTING BRANCH CIRCUITS ARE REUSED TO FEED NEW CIRCUITS FED FROM

GFCI OR AFCI CIRCUIT BREAKERS OR WHICH FEED NEW GFCI RECEPTACLES, THE

CONTRACTOR SHALL FIELD VERIFY IF EACH CIRCUIT CONTAINS A DEDICATED

NEUTRAL WHICH IS REQUIRED FOR PROPER OPERATION OF GFCI AND AFCI CIRCUIT

BREAKERS AND RECEPTACLES. IF A DEDICATED NEUTRAL IS NOT PRESENT,

CONTRACTOR SHALL INFORM ARCHITECT AND ENGINEER IN WRITING VIA RFI.

21.ALL TELECOMMUNICATIONS CABLING SHALL BE PLENUM RATED.

22.THE CONTRACTOR SHALL CARRY ALL PREMIUM TIME COSTS ASSOCIATED WITH

CABLING REQUIRED IN OCCUPIED TENANT AREAS.

FR1

2,a

2,a

FR1

FR1

2,a

VOLUME CONTROL SWITCH

SPEAKER (FLUSH CEILING MOUNTED)

PUBLIC ADDRESS/PAGING LEGEND

NOTES:

1. REFER TO MECHANICAL AND PLUMBING PLANS AND SCHEDULES

FOR ACTUAL EQUIPMENT NAME AND ASSOCIATED DESCRIPTION.

MECHANICAL EQUIPMENT TAG "EF"

INDICATES EQUIPMENT TYPE (EXHAUST

FAN) "1" INDICATES EQUIPMENT NUMBER

EF

1

MECHANICAL EQUIPMENT IDENTIFIER LEGEND

W

2,a

R1

2,a

WW1

2,a

W1

EMERGENCY QUAD RECEPTACLE

EMERGENCY DUPLEX RECEPTACLE WITH INTEGRAL GROUND FAULT

CIRCUIT INTERRUPTER

480/277V,3Ø,4W SURFACE MOUNTED PANEL, "L45" INDICATES PANEL

DESIGNATION

S251

L45

SPSP

VV

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION

DIGITAL PROXIMITY CARD READER

ELECTRIC STRIKE PROVIDED BY DOOR HARDWARE MANUFACTURER,

WIRED BY SECURITY CONTRACTOR

DEMOLITION GENERAL NOTES

WIRING METHODS

SECURITY DEVICES LEGEND

1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE FULL EXTENT OF THE SCOPE OF

DEMOLITION. DISCONNECT AND MAKE SAFE ALL ELECTRICAL EQUIPMENT IDENTIFIED

FOR REMOVAL ON THE ARCHITECTURAL, HVAC, PLUMBING AND FIRE PROTECTION

PLANS. THE ELECTRICAL SCOPE MAY EXTEND BEYOND THE AREA DEFINED BY THE

ARCHITECTURAL DEMOLITION LIMITS TO FULLY COMPLY WITH THE VARIOUS

REQUIREMENTS DEFINED BY THESE NOTES.

2. THE ELECTRICAL DEMOLITION PLANS INDICATE GENERAL INTENT AND ARE NOT

INTENDED TO SHOW ALL COMPONENTS AND ITEMS TO BE REMOVED OR RETAINED.

THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMISSION OF

THEIR BID TO BECOME FAMILIAR WITH THE ACTUAL WORKING CONDITIONS AND

EXTENT OF WORK. DEVICES AND EQUIPMENT LOCATED ON WALLS AND/OR CEILINGS

DESIGNATED TO BE REMOVED SHALL BE DISCONNECTED AND MADE SAFE. THE

ELECTRICAL CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S

REPRESENTATIVE AND ARCHITECT OF ANY UNANTICIPATED OR HIDDEN CONDITIONS

ENCOUNTERED DURING DEMOLITION.

3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ALL

SYSTEMS OR BUILDING COMPONENTS DAMAGED DURING EXECUTION OF THE WORK.

DAMAGE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE DESTRUCTION OR DISPOSAL

OF ITEMS INTENDED TO REMAIN OR BE SALVAGED.

4. THE ELECTRICAL CONTRACTOR SHALL CIRCUIT TRACE AND LABEL ALL EXISTING

BRANCH CIRCUITS AND FEEDERS WITHIN OR ASSOCIATED WITH THE DEMOLITION

SCOPE, PRIOR TO DE-ENERGIZING AND DISCONNECTION. ALL CIRCUITS WITHIN

PANELBOARDS, LOAD CENTERS, MOTOR CONTROL CENTERS, AND SWITCHBOARDS

IDENTIFIED FOR REMOVAL, SHALL BE TRACED AND FIELD LABELED TO ENSURE THAT

NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS AFFECTED.

5. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY TRADE'S WORK, THE

ELECTRICAL CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR ALL

ELECTRICAL ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING SAME AS

REQUIRED, IN ACCORDANCE WITH THE PLANS AND/OR AS DIRECTED AFTER

COMPLETION OF OTHER TRADES WORK IN THAT AREA.

6. THE ELECTRICAL CONTRACTOR SHALL IDENTIFY ALL BRANCH CIRCUITS, FEEDERS AND

SYSTEM COMPONENTS WHICH ARE TO REMAIN WITHIN THE AREA OF DEMOLITION

SCOPE. THERE SHALL BE NO INTERRUPTION OF SERVICE TO ANY AREA OUTSIDE THE

SCOPE LIMITS WITHOUT WRITTEN APPROVAL FROM THE OWNER'S REPRESENTATIVE.

EXISTING EQUIPMENT TO REMAIN SHALL BE LEFT IN A CODE COMPLIANT CONDITION.

7. THE ELECTRICAL CONTRACTOR SHALL TAKE INVENTORY OF ELECTRICAL ITEMS THAT

ARE REMOVED AND PROVIDE A LIST TO THE OWNER FOR THEIR SELECTION OF ITEMS

TO BE RETAINED. ALL ITEMS REJECTED BY THE OWNER SHALL BECOME THE

PROPERTY OF THE CONTRACTOR, AND SHALL BE REMOVED FROM THE SITE AND

DISPOSED OF LEGALLY.

8. THE ELECTRICAL CONTRACTOR SHALL DE-ENERGIZE AND REMOVE ALL CONDUCTORS

AND RACEWAYS WITHIN THE AREA OF DEMOLITION SCOPE TO THEIR POINT OF ORIGIN.

ITEMS IDENTIFIED FOR DEMOLITION SHALL NOT BE ABANDONED IN PLACE. RACEWAYS

THAT ENTER MASONRY WALLS AND FLOORS SHALL BE CUT FLUSH AT THE SURFACE

FOR PATCHING BY OTHERS. ALL CIRCUIT BREAKERS ASSOCIATED WITH THE

DEMOLITION SHALL BE DE-ENERGIZED, TRIPPED TO THE "OFF" POSITION AND

RE-LABELLED AS "SPARE". NEW TYPED UPDATED CIRCUIT DIRECTORIES SHALL ALSO

BE PROVIDED.

9. THE ELECTRICAL CONTRACTOR SHALL TEMPORARILY SUPPORT ALL ITEMS TO REMAIN

THAT ARE AFFECTED BY THE DEMOLITION OF BUILDING STRUCTURAL COMPONENTS

(WALLS, CEILINGS, PARTITIONS, ETC). CONTRACTOR SHALL TEMPORARILY SUPPORT

ITEMS AND SHALL PROVIDE PERMANENT SUPPORTS WHEN FINALIZED STRUCTURES

ARE IN PLACE.

10. ALL EXISTING ELECTRICAL EQUIPMENT THAT ARE TO BE RELOCATED SHALL BE

STORED IN A SAFE MANNER UNTIL SUCH TIME AS TO BE REINSTALLED. ANY DAMAGE

INCURRED TO EQUIPMENT SHALL BE RECTIFIED BY THE ELECTRICAL CONTRACTOR.

11. ALL REMOVED ITEMS SHALL BE LEGALLY DISPOSED OF UNLESS IDENTIFIED FOR

REUSE. THE OWNER'S REPRESENTATIVE SHALL INSPECT ALL RETAINED ITEMS, PRIOR

TO PLACEMENT IN THE IDENTIFIED STORAGE LOCATION BY THE ELECTRICAL

CONTRACTOR.

12.THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY FUNCTIONAL DURING THE

ENTIRE DEMOLITION AND CONSTRUCTION PERIOD. REUSE OF EXISTING FIRE ALARM

RACEWAYS SHALL NOT BE ALLOWED. ALL REQUIRED SYSTEM SHUTDOWNS SHALL BE

COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE AND THE

AUTHORITY HAVING JURISDICTION. DEMOLITION OF THE EXISTING SYSTEM SHALL NOT

COMMENCE UNTIL THE NEW SYSTEM HAS BEEN COMPLETELY INSTALLED, TESTED AND

APPROVED BY THE AUTHORITY HAVING JURISDICTION.

13. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE SYSTEMS, INCLUDING BUT

NOT LIMITED TO, TELEPHONE, DATA, SECURITY, PAGING, CCTV, ETC SHALL BE

INCLUDED IN THIS CONTRACT.

14.REMOVED FLUORESCENT AND HID LAMPS AND BATTERIES SHALL BE RECYCLED BY A

FACILITY APPROVED BY THE OWNER'S REPRESENTATIVE. A UNIFORM HAZARDOUS

WASTE MANIFEST SHALL BE PREPARED FOR ALL DISPOSALS AND RETURNED WITH ALL

APPLICABLE SIGN-OFFS PRIOR TO APPLICATION FOR FINAL PAYMENT.

15. ALL BALLASTS IN LIGHTING FIXTURES TO BE DISPOSED SHALL BE VERIFIED TO BE PCB

FREE. ALL BALLASTS MANUFACTURED PRIOR TO 1979 AND NOT LABELED AS PCB FREE

SHALL BE CONSIDERED TO CONTAIN PCB's. PROVIDE WRITTEN REPRESENTATION TO

THE OWNER'S REPRESENTATIVE THAT CONFIRMS PCB FREE WASTE, WHERE PCB FREE

WASTE CANNOT BE VERIFIED. BALLASTS SHALL BE RECYCLED BY A FACILITY

APPROVED BY THE OWNER'S REPRESENTATIVE, WITH PCB COMPONENTS ELIMINATED

BY A HIGH TEMPERATURE INCINERATION. A UNIFORM HAZARDOUS WASTE MANIFEST

SHALL BE PREPARED FOR ALL DISPOSALS AND RETURNED WITH ALL APPLICABLE

SIGN-OFFS, PRIOR TO APPLICATION FOR FINAL PAYMENT. ALL HANDLING SHALL

CONFORM TO EPA REQUIREMENTS PROVIDE BREAKOUT COST FOR THIS SCOPE.

NORMAL SYSTEM FEEDERS

NORMAL BRANCH CIRCUITS

LOW VOLTAGE SYSTEM (TELEPHONE,

DATA, AND CATV) WIRING

EMERGENCY SYSTEM BRANCH CIRCUITS

XHHW/XHHW-2 CONDUCTORS IN EMT

THHN/THWN/XHHW/XHHW-2 CONDUCTORS IN

EMT OR MC CABLE

TYPE CMR, CM, MPR AND MP CABLES

THHN/THWN/XHHW/XHHW-2 CONDUCTORS IN

EMT

CR

ES

DRY TYPE TRANSFORMER, "T2" INDICATES SIZE AS PER TRANSFORMER

SCHEDULE. REFER TO 'DRY TYPE TRANSFORMER SCHEDULE' FOR FEEDER

AND CIRCUIT BREAKER SIZES

T2

KVA 15

LOW VOLTAGE SWITCH, WALL MOUNTED AT 48" UNLESS OTHERWISE

NOTED. FINISH SELECTED BY OWNER. LOW VOLTAGE SWITCH SHALL

BE COMPLETELY COMPATIBLE WITH LOW VOLTAGE VACANCY SENSOR

BEING CONTROLLED. 'D' - DENOTES DIMMER TYPE

LIGHT FIXTURE FED FROM EMERGENCY BRANCH

DOWN FED FROM LIGHT LIFE SAFETY BRANCH

QUAD RECEPTACLE WITH INTEGRAL GROUND FAULT CIRCUIT

INTERRUPTER

ELECTROMECHANICAL LOCKSET. PROVIDED BY DOOR HARDWARE

MANUFACTURER, WIRED BY SECURITY CONTRACTOR

EL

DOOR POSITION SWITCH CONTACTDPS

REQUEST TO EXIT DEVICEREX

TELECOMMUNICATIONS WORK AREA OUTLET DEVICE

AS A MINIMUM, FOR EACH SECURITY DEVICE PROVIDE A 4-11/16" x 2" DEEP

SQUARE BACK BOX AND SINGLE GANG MUD RING WITH (1) 1-1/4" CONDUIT

STUBBED UP TO ACCESSIBLE CEILING. REFER TO DETAIL 6/E401 AND

SPECIFICATIONS FOR ADDITIONAL ACCESS CONTROL REQUIREMENTS.

WIRELESS ACCESS POINT DEVICE

WAP

TP

FIELD WIRED, UL LISTED, MULTI-OUTLET RACEWAY WITH DEVICES, AS

INDICATED, MOUNTED 2'-0" ON CENTER. FOR ALL LOCATIONS PROVIDE

WIREMOLD V4000 BASE, COVER, AND DIVIDER. PROVIDE ALL REQUIRED

ACCESSORIES FOR A COMPLETE AND OPERABLE SYSTEM.

NEW SPECIAL PURPOSE RECEPTACLE - REFER TO 'SPECIAL PURPOSE

RECEPTACLE SCHEDULE' FOR NEMA CONFIGURATION AND ADDITIONAL

INFORMATION

1

1

480/277V,3Ø,4W FLUSH MOUNTED PANEL, "L45" INDICATES PANEL

DESIGNATION

L45

120/208V,3Ø,4W FLUSH MOUNTED PANEL, "CR2W4A" INDICATES PANEL

DESIGNATION

S251

CEILING MOUNTED LOW VOLTAGE VACANCY SENSOR. MATCH EXISTING

BUILDING STANDARD. "a,b" - INDICATES DEVICE CONTROLLING MULTIPLE

POLE SWITCHING

a

3

a

4

a

OC

SLIDE TO OFF DIMMER SWITCH, WALL MOUNTED AT 48" UNLESS

OTHERWISE NOTED. "a" INDICATES LIGHT FIXTURE CONTROL

D

a

a,b

OC

a,b

VC

Da

LV

ELECTRICAL LEVEL 6 NEW WORK LIGHTING PLANE-201

ELECTRICAL LEVEL 6 NEW WORK POWER PLANE-301

ELECTRICAL SCHEDULES AND DETAILSE-401

SPEAKER (WALL MOUNTED)SPSP

MAG LOCKSET. PROVIDED BY DOOR HARDWARE MANUFACTURER,

WIRED BY SECURITY CONTRACTOR

ML

POKE THROUGH TYPE FLOOR BOX. PROVIDE THOMAS & BETTS FLUSH

MOUNTED POKE THROUGH FLOOR BOX MODEL #FPT4-2P-6C-* AND COVER

MODEL #FPT4-CVR-*; COORDINATE FINISH COLOR WITH ARCHITECT.

PROVIDE WITH (1) DUPLEX RECEPTACLE AND PROVISIONS FOR TEL/DATA

FLUSH CEILING MOUNTED DUPLEX RECEPTACLE

FIRE ALARM LEGEND, GENERAL NOTES, RISER, AND DETAILSFA-001

FIRE ALARM LEVEL 6 NEW WORK PLANFA-101

NOTES:

1.

AS A MINIMUM, FOR EACH TELECOMMUNICATION DEVICE PROVIDE A 4-11/16" x 2"

DEEP SQUARE BACK BOX AND SINGLE GANG MUD RING WITH (1) 1-1/4" CONDUIT

STUBBED UP TO ACCESSIBLE CEILING.

NOTES:

1.

EXISTING DEVICE SHALL BE REMOVED INCLUDING ALL ASSOCIATED RACEWAYS

AND CIRCUITRY BACK TO ITS SOURCE

EXISTING DEVICE SHALL REMAIN AND SHALL BE MAINTAINED

EXISTING DEVICE SHALL BE RELOCATED

NEW LOCATION OF EXISTING TO BE RELOCATED DEVICE. EXTEND AND MODIFY

EXISTING WIRING AS REQUIRED TO NEW DEVICE LOCATION. MATCH EXISTING

WIRING

EXISTING DEVICE TO BE REPLACED WITH NEW. NEW DEVICE SHALL HAVE THE

SAME ELECTRICAL CHARACTERISTICS AS EXISTING DEVICE BEING REPLACED,

UNLESS INDICATED OTHERWISE

X

XM

XR

XL

XN

FLUSH CEILING MOUNTED TELECOMMUNICATIONS WORK AREA

OUTLET DEVICE

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20

ELECTRICAL

LEGEND AND

GENERAL NOTES

N.T.S.

E-001

Drawn By: DM Checked By: AJR

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 20: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6020

STAIR 3S3-6

MECH.PIPING606

PLUMB.CLOSET621

LIFESAFETY605

EQUIPMENTLAB

D

LV

F

F

D

LV

D

LV

F

'0262' (XM)

'LB263' (XM)

X

X

XR

XR

XR

XR

XR

XR

XR

XR

XR

XR

X

X

XM XM

XMXM

XM XM

XMXM

XM

XMXM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

AREA OF RENOVATION

ELECTRICAL

LEVEL 6

DEMOLITION PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

E-101

1

ELECTRICAL DEMOLITION PLAN

1/4"=1'-0"

DEMOLITION PLAN GENERAL NOTES:

1. REFER TO GENERAL DEMOLITION NOTES ON DRAWING E-001 FOR ADDITIONAL

REQUIREMENTS.

2. WORK MAY BE REQUIRED OUTSIDE OF THE PROJECT'S AREA OF RENOVATION. CONTRACTOR

SHALL NOT ASSUME THAT AREA OF RENOVATION IS CONSIDERED THE SCOPE OF WORK AREA.

3. EXISTING LIGHTING BRANCH CIRCUIT SHALL BE INTERCEPTED IN A NEW JUNCTION BOX AND

MADE SAFE FOR EXTENSION TO NEW FIXTURES BEING PROVIDED FOR THE PROJECT. REFER

TO NEW WORK PLAN FOR EXTENT OF WORK.

Drawn By: DM Checked By: AJR

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 21: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

5 6

6019

-A

VIPERLAB6014

DSE LAB6015DSE

LAB6016

MECH.PIPING606

LIFESAFETY605

D

LV

D

LV

D

LV

'0262' (XM)

'LB263' (XM)

XM XM

XMXM

XM XM

XM

AREA OF RENOVATION

5 6

TISSUE CULTURELAB6029

MONITORING LAB6028

TISSUE CULTURELAB6019

EQUIPMENT LAB6027

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

COLD ROOM6017PLUMBING CLOSET

621

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

STAIR

XL

XL

L1

L1

L1

L1

L1L1

1

1

1

1

1

1

2

2

ELECTRICAL

LEVEL 6

NEW WORK LIGHTING PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

E-201

1

ELECTRICAL LIGHTING NEW WORK PLAN

1/4"=1'-0"

LIGHTING PLAN GENERAL NOTES:

1. REFER TO DRAWING E-001 FOR LEGEND AND GENERAL NOTES.

2. LIGHT FIXTURES SHALL BE INSTALLED AT MOUNTING HEIGHTS AND LOCATIONS AS

INDICATED ON THE ARCHITECTURAL REFLECTED CEILING PLANS, ELEVATIONS, PART

PLANS AND DETAILS. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR

INFORMATION.

4. EDGE-LIT TYPE EXIT SIGNS SHALL BE PROVIDED WITH MIRROR-BACKING AS REQUIRED TO

SUIT FIELD CONDITIONS AND SPECIFIC INSTALLED LOCATIONS.

5. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES ONLY. EXACT NUMBERS

SHALL BE DETERMINED IN FIELD AND SHALL BE NOTED ON THE CONTRACTORS' AS-BUILT

DRAWINGS.

6. EXIT SIGNS, FIXTURES DESIGNATED AS NIGHT LIGHTS AND EMERGENCY BATTERY UNITS

SHALL BE CONNECTED TO AN UNSWITCHED, CONSTANT "ON" SOURCE AS INDICATED. THE

ASSOCIATED CIRCUIT BREAKER SHALL BE PROVIDED WITH A HANDLE LOCK.

7. BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND INSTALLED FOR A MAXIMUM

VOLTAGE DROP OF 3%. CONTRACTOR SHALL PROVIDE #10AWG CONDUCTORS FOR ALL

120V CIRCUITS GREATER THAN 60 FEET IN LENGTH AND #10AWG CONDUCTORS FOR ALL

277V CIRCUITS GREATER THAN 140 FEET IN LENGTH. CONTRACTOR SHALL PROVIDE

#8AWG CONDUCTORS FOR ALL 120V CIRCUITS GREATER THAN 100 FEET IN LENGTH, BUT

LESS THAN 160 FEET IN LENGTH AND #8AWG CONDUCTORS FOR ALL 277V CIRCUITS

GREATER THAN 225 FEET, BUT LESS THAN 350 FEET IN LENGTH. REFER TO

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND OPTIONS.

LIGHTING PLAN TAGGED NOTES:

CONNECT TO EXISTING LIGHTING BRANCH CIRCUIT MAINTAINED FROM THE DEMOLITION

PHASE OF THE PROJECT VIA EXISTING/RELOCATED CONTROL DEVICE. EXTEND AND

MODIFY EXISTING WIRING AS REQUIRED; MATCH EXISTING WIRING.

LIGHTING CONTROL SYSTEM MANUFACTURER (LUTRON) SHALL PROVIDE ON SITE

RE-PROGRAMMING AND COMMISSIONING OF ALL LIGHTING CONTROL SYSTEM

COMPONENTS WITH THE AREA OF RENOVATION.

1

Drawn By: DM Checked By: AJR

2

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 22: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

5 6

SCOPE OF WORK

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

STACKED INCUBATORS

STACKED INCUBATOR

BIOSAFETY CABINET

BIOSAFETY CABINET

STACKED INCUBATOR

V

V

V

V

6019

-A

V

V

VIPERLAB6014

DSE LAB6015DSE

LAB6016

MECH.PIPING606

LIFESAFETY605

XL

XL

XL

XL

XL

XL

XMXM

XM

XMXM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

INC

INC

INC

INC

CEILING MTD

UTILITY PANEL

INC

CEILING MTD

UTILITY PANEL

INC

INC

AREA OF RENOVATION

'0262' (XM)

'LB263' (XM)

O262-331

O262-341

O262-351

O262-361

O262-371

O262-381

O262-391

O262-401

O262-411

O262-421

O262-451

O262-471

LB263-331

LB263-341

LB263-351 LB263-36

1

LB263-37,391

37 39 37 39 37 39

LB263-38,401

3840

38

4038

40

LB263-411

41

41

41

41

LB263-54,561

LB263-421

54

56

54

54

56

56

LB263-58,601

58

58

58

60

60

60

LB263-611

LB263-621

LB263-631

U.C. REF/FREEZ

U..C REF/FREEZ

ELECTRICAL

LEVEL 6

NEW WORK POWER PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

E-301

POWER PLAN GENERAL NOTES:

1. REFER TO GENERAL DEMOLITION NOTES ON DRAWING E-001 FOR ADDITIONAL

REQUIREMENTS.

2. REFER TO DRAWING E-001 FOR LEGEND AND GENERAL NOTES.

3. RECEPTACLES, SWITCHES AND DEVICES SHALL BE INSTALLED AT MOUNTING HEIGHTS

AND LOCATIONS AS INDICATED ON THE ARCHITECTURAL ELEVATIONS, PART PLANS AND

DETAILS. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR INFORMATION.

4. CIRCUIT NUMBERS ARE SHOWN FOR DESCRIPTIVE PURPOSES ONLY. EXACT NUMBERS

SHALL BE DETERMINED IN FIELD AND SHALL BE NOTED ON THE CONTRACTORS' AS-BUILT

DRAWINGS.

5. BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND INSTALLED FOR A MAXIMUM

VOLTAGE DROP OF 3%. CONTRACTOR SHALL PROVIDE #10AWG CONDUCTORS FOR ALL

120V CIRCUITS GREATER THAN 60 FEET IN LENGTH AND #10AWG CONDUCTORS FOR ALL

277V CIRCUITS GREATER THAN 140 FEET IN LENGTH. CONTRACTOR SHALL PROVIDE

#8AWG CONDUCTORS FOR ALL 120V CIRCUITS GREATER THAN 100 FEET IN LENGTH, BUT

LESS THAN 160 FEET IN LENGTH AND #8AWG CONDUCTORS FOR ALL 277V CIRCUITS

GREATER THAN 225 FEET, BUT LESS THAN 350 FEET IN LENGTH. REFER TO

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND OPTIONS.

6. COORDINATE EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITH HVAC, PLUMBING

AND FIRE PROTECTION DRAWINGS.

1

ELECTRICAL POWER NEW WORK PLAN

1/4"=1'-0"

Drawn By: DM Checked By: AJR

POWER PLAN TAGGED NOTES:

UTILIZE EXISTING SPARE 20A-1P CIRCUIT BREAKER IN PANEL INDICATED TO FEED NEW

LOAD.

1

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 23: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

FINISHED FLOOR

TELE/DATA OUTLET. FACEPLATE

TO MATCH RECEPTACLES UNLESS

OTHERWISE NOTED.

RECEPTACLE, REFER TO SYMBOL

LIST FOR SPECIFICATION

6'-8"

(MIN)

LIGHT SWITCHES OR DIMMERS. REFER

TO SYMBOL LIST FOR SPECIFICATION.

FINISHED

CEILING

(VARIES)

NOTES:

1. ALL MOUNTING HEIGHTS SHALL BE

MEASURED FROM FINISHED FLOOR TO

CENTERLINE OF DEVICE EXCEPT FIRE

ALARM VISUAL DEVICES.

2. DEVICES SHALL BE INSTALLED ON A

COMMON VERTICAL CENTERLINE

WHEREVER POSSIBLE

3. ALL DEVICES SHALL BE INSTALLED AT

MOUNTING HEIGHTS AS INDICATED ON

THIS DETAIL UNLESS OTHERWISE NOTED.

4. MOUNT DEVICE ABOVE COUNTER AT 4'-0"

A.F.F. TO CENTER

ABOVE

COUNTER

DEVICE SEE

NOTE 4

BACKSPLASH

TYPICAL MOUNTING HEIGHTS

8'-0"

4'-6"

4'-0"

4'-0"

C

1'-6"

NTS TYPICAL RECEPTACLE LABELING NTS TYPICAL COVERPLATE AND SWITCH NTS21 3

NORMAL POWER

RECEPTACLES SHALL BE

WHITE WITH BRUSHED

STAINLESS STEEL ENGRAVED

COVERPLATE; EMERGENCY

POWER RECEPTACLES SHALL

BE RED WITH BRUSHED

STAINLESS STEEL ENGRAVED

COVERPLATE

NOTES:

1. THE ELECTRICAL CONTRACTOR SHALL PROVIDE PTOUCH LABEL TO MATCH BUILDING STANDARDS.

PANEL AND CIRCUIT NUMBER SHALL BE INDICATED.

S291-16

DUPLEX RECEPTACLE NEMA 5-20R

SEE NOTE 1

COVER PLATE, JUNCTION BOX, ETC. LINE VOLTAGE AND LOW

VOLTAGE SWITCHES

R251-16 R251-16

SEE NOTE 1

NOTES:

1. THE ELECTRICAL CONTRACTOR SHALL PROVIDE PTOUCH LABEL TO MATCH BUILDING STANDARDS.

PANEL AND CIRCUIT NUMBER SHALL BE INDICATED.

LIGHTING FIXTURE SCHEDULE

FIXTURE

TYPE

DESCRIPTION

LIGHT FIXTURE ACCEPTABLE MANUFACTURERS AND CATALOG NUMBER LAMPS

FIXTURE

TOTAL

WATTAGE

MOUNTING VOLTAGE NOTES

MANUFACTURER CATALOG NUMBER QUANTITY TYPE

L1 8' LINEAR RECESSED LED FIXTURE

AMERLUX GRUV6-HE-GRID-A16-PL-8-30-HW-120/277-*-IND-HILUME-5-ECO

- LED 8W/FT RECESSED UNV

LIGHTING FIXTURE SCHEDULE NOTES:

LF1. REFER TO ARCHITECT'S REFLECTED CEILING PLANS AND ELEVATIONS FOR FINAL LOCATIONS AND MOUNTING

HEIGHTS OF ALL FIXTURES.

LF2. CATALOG NUMBERS INDICATED ARE FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR FINAL

FIXTURE COORDINATION AND INSTALLATION. CONTRACTOR SHALL PROVIDE ALL ACCESSORIES REQUIRED FOR

INSTALLATION OF LIGHT FIXTURES INCLUDING, BUT NOT LIMITED TO, BAR HANGERS, SWIVEL STEM HANGERS,

PENDANTS, END CAPS, CONNECTORS, MOUNTING BOXES, MOUNTING CLIPS,

LF3. COORDINATE LIGHTING FIXTURE INSTALLATION AND TRIM KIT WITH CEILING TYPE. PROVIDE FRAME KIT AS

REQUIRED TO INSTALL FIXTURE IN CEILING TYPE.

LF4. FINAL FINISHES AND COLORS OF ALL LIGHT FIXTURES SHALL BE APPROVED BY ARCHITECT AND LIGHTING

DESIGNER.

LF5. ALL FIXTURES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE BY THREADED ROD OR CHAIN. REFER TO

THE SPECIFICATIONS FOR METHOD. SUPPORTING FIXTURES FROM HUNG CEILING IS NOT ALLOWED.

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20

ELECTRICAL

SCHEDULES AND

DETAILS

N.T.S.

E-401

Drawn By: DM Checked By: AJR

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 24: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

FIRE ALARM STROBE ONLY DEVICE, UNIT RATED OUTPUT

75cd UNLESS OTHERWISE NOTED

HEAT DETECTOR, COMBINATION FIXED TEMPERATURE AND

RATE-OF-RISE TYPE - 195° UNLESS OTHERWISE INDICATED

FIRE ALARM SYSTEM LEGEND

MANUAL PULL STATION

SMOKE DETECTOR

REMOTE TEST AND ALARM INDICATING STATION

REMOTE ALARM INDICATOR

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

ADDRESSABLE MONITOR MODULE

ADDRESSABLE CONTROL MODULE

F

FACP

FATC

S

H

RELAY

FIRE/SMOKE DAMPER

RI

RTS

EXISTING DEVICE SHALL BE REMOVED INCLUDING ALL ASSOCIATED RACEWAYS

AND CIRCUITRY BACK TO ITS SOURCE

EXISTING DEVICE SHALL REMAIN AND SHALL BE MAINTAINED

EXISTING DEVICE SHALL BE RELOCATED

NEW LOCATION OF EXISTING TO BE RELOCATED DEVICE. EXTEND AND MODIFY

EXISTING WIRING AS REQUIRED TO NEW DEVICE LOCATION. MATCH EXISTING

WIRING

EXISTING DEVICE TO BE REMOVED AND REPLACED WITH NEW MAINTAIN

EXISTING CIRCUITRY FOR CONNECTION OF NEW DEVICE

DETAIL IDENTIFIER

"1" INDICATES DETAIL NUMBER

"FA-000" INDICATES SHEET NUMBER

DRAWING REVISION MARKER

DRAWING REVISION CLOUD

1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE FULL EXTENT OF THE

SCOPE OF DEMOLITION. DISCONNECT AND MAKE SAFE ALL FIRE ALARM

EQUIPMENT IDENTIFIED FOR REMOVAL ON THE ARCHITECTURAL, HVAC,

PLUMBING AND FIRE PROTECTION PLANS. THE FIRE ALARM SCOPE MAY EXTEND

BEYOND THE AREA DEFINED BY THE ARCHITECTURAL DEMOLITION LIMITS TO

FULLY COMPLY WITH THE VARIOUS REQUIREMENTS DEFINED BY THESE NOTES.

2. THE FIRE ALARM DEMOLITION PLANS INDICATE GENERAL INTENT AND ARE NOT

INTENDED TO SHOW ALL COMPONENTS AND ITEMS TO BE REMOVED OR

RETAINED. THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO

SUBMISSION OF THEIR BID TO BECOME FAMILIAR WITH THE ACTUAL WORKING

CONDITIONS AND EXTENT OF WORK. DEVICES AND EQUIPMENT LOCATED ON

WALLS AND/OR CEILINGS DESIGNATED TO BE REMOVED SHALL BE

DISCONNECTED AND MADE SAFE. THE ELECTRICAL CONTRACTOR SHALL

IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE AND ARCHITECT OF ANY

UNANTICIPATED OR HIDDEN CONDITIONS ENCOUNTERED DURING DEMOLITION.

3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF

ALL SYSTEMS OR BUILDING COMPONENTS DAMAGED DURING EXECUTION OF

THE WORK. DAMAGE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE

DESTRUCTION OR DISPOSAL OF ITEMS INTENDED TO REMAIN OR BE SALVAGED.

4. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY TRADE'S WORK, THE

ELECTRICAL CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR

ALL FIRE ALARM ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING

SAME AS REQUIRED, IN ACCORDANCE WITH THE PLANS AND/OR AS DIRECTED

AFTER COMPLETION OF OTHER TRADES WORK IN THAT AREA.

5. THE ELECTRICAL CONTRACTOR SHALL IDENTIFY ALL SYSTEM COMPONENTS

WHICH ARE TO REMAIN WITHIN THE AREA OF DEMOLITION SCOPE. THERE

SHALL BE NO INTERRUPTION OF SERVICE TO ANY AREA OUTSIDE THE SCOPE

LIMITS WITHOUT WRITTEN APPROVAL FROM THE OWNER'S REPRESENTATIVE.

EXISTING EQUIPMENT TO REMAIN SHALL BE LEFT IN A CODE COMPLAINT

CONDITION .

6. THE ELECTRICAL CONTRACTOR SHALL TAKE INVENTORY OF FIRE ALARM ITEMS

THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER FOR THEIR

SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS REJECTED BY THE OWNER

SHALL BECOME THE PROPERTY OF THE CONTRACTOR, AND SHALL BE

REMOVED FROM THE SITE AND DISPOSED OF LEGALLY.

7. IN ALL EXISTING OR NEW AREAS SPECIFIED OR SHOWN TO BE PAINTED, THE

ELECTRICAL CONTRACTOR SHALL REMOVE ALL FIRE ALARM ITEMS AS

REQUIRED, INCLUDING BUT NOT LIMITED TO, FIRE ALARM DEVICES, REMOTE

INDICATING DEVICES, DEVICE PLATES, ETC. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR STORING THE REMOVED DEVICES IN A SAFE AND SECURE

PLACE. THE ELECTRICAL CONTRACTOR SHALL REINSTALL THE SAME DEVICES

AFTER COMPLETION OF PAINTING. ANY ITEM NOT REMOVED AND PAINTED

OVER SHALL BE SUITABLY CLEANED OR REPLACED WITH A NEW ITEM BY THE

ELECTRICAL CONTRACTOR.

8. ALL EXISTING FIRE ALARM EQUIPMENT THAT ARE TO BE RELOCATED SHALL BE

STORED IN A SAFE MANNER UNTIL SUCH TIME AS TO BE REINSTALLED. ANY

DAMAGE INCURRED TO EQUIPMENT SHALL BE RECTIFIED BY THE ELECTRICAL

CONTRACTOR.

9. ALL REMOVED ITEMS SHALL BE LEGALLY DISPOSED OF UNLESS IDENTIFIED FOR

REUSE. THE OWNER'S REPRESENTATIVE SHALL INSPECT ALL RETAINED ITEMS,

PRIOR TO PLACEMENT IN THE IDENTIFIED STORAGE LOCATION BY THE

ELECTRICAL CONTRACTOR.

10.THE WORK ON THIS PROJECT MAY BE PERFORMED IN PHASES. THE

ELECTRICAL CONTRACTOR SHALL COORDINATE AND SCHEDULE HIS WORK AND

ALLOW SUFFICIENT TIME AND COSTS TO ACCOMMODATE THE PHASING OF

WORK. ANY ADDITIONAL COSTS INCURRED DUE TO LACK OF PROPER

COORDINATION AND COMMUNICATION BY THE ELECTRICAL CONTRACTOR, WITH

THE GENERAL CONTRACTOR, OTHER TRADES OR OWNER'S REPRESENTATIVE,

SHALL BE ABSORBED BY THE ELECTRICAL CONTRACTOR WITHOUT ANY COSTS

TO THE OWNER. COORDINATE PHASING REQUIREMENTS WITH THE ARCHITECT

AND THE OWNER.

11.THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY FUNCTIONAL DURING

THE ENTIRE DEMOLITION AND CONSTRUCTION PERIOD. REUSE OF EXISTING

FIRE ALARM RACEWAYS SHALL NOT BE ALLOWED. ALL REQUIRED SYSTEM

SHUTDOWNS SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER'S

REPRESENTATIVE AND THE AUTHORITY HAVING JURISDICTION. DEMOLITION OF

THE EXISTING SYSTEM SHALL NOT COMMENCE UNTIL THE NEW SYSTEM HAS

BEEN COMPLETELY INSTALLED, TESTED AND APPROVED BY THE AUTHORITY

HAVING JURISDICTION.

12.EXISTING FIRE ALARM SYSTEM SHALL REMAIN AND INTACT DURING

CONSTRUCTION. AT NO TIME SHALL ANY PART OF THE BUILDING BE WITHOUT

FIRE ALARM COVERAGE.

13.HEAT DETECTORS SHALL BE INSTALLED BY THE ELECTRICAL CONTRACTOR AT

THE START OF DEMOLITION IN ANY AREAS WHERE THE SPRINKLER SYSTEM HAS

BEEN DISABLED UNTIL THE NEW SPRINKLER SYSTEM HAS BEEN FULLY

INSTALLED AND COMMISSIONED. HEAT DETECTORS SHALL BE CONNECTED TO

THE EXISTING FIRE ALARM SYSTEM VIA A NEW ADDRESSABLE MODULE.

EXISTING DEVICE, EQUIPMENT OR WIRING TO BE REMOVED

EXISTING DEVICE, EQUIPMENT OR WIRING TO REMAIN

NEW DEVICE, EQUIPMENT OR WIRING

DEMOLITION GENERAL NOTES

PROJECT GENERAL NOTES

1

E-004

1

DRAWING NOTES AND DESIGNATIONS

EXISTING CONDITIONS DESIGNATIONS

LINE TYPE LEGEND

1. THE CONTRACTOR SHALL FURNISH LABOR, MATERIALS, TOOLS AND OTHER

EQUIPMENT REQUIRED TO INSTALL THE WORK SHOWN AND SPECIFIED. THE

CONTRACTOR SHALL FURNISH AND INSTALL ITEMS NECESSARY FOR A

COMPLETE ELECTRICAL SYSTEM. MATERIALS SHALL BE NEW AND SHALL BEAR

THE REGISTERED UL MARK. WORK SHALL CONFORM WITH THE NATIONAL FIRE

PROTECTION ASSOCIATION STANDARD 70 (NEC), THE NATIONAL ELECTRICAL

CODE (NEC), AND APPLICABLE FEDERAL, STATE AND LOCAL CODES.

CONTRACTOR SHALL SECURE PERMITS AND PAY THE FEES REQUIRED TO CARRY

OUT HIS WORK. THE CONTRACTOR SHALL FURNISH COPIES OF CERTIFICATES

AND PERMITS TO THE ARCHITECT.

2. THE DRAWINGS AND SPECIFICATIONS INDICATE THE INTENT OF THE DESIGN AND

SHALL BE CONSIDERED AS DIAGRAMMATIC ONLY. EXACT LOCATIONS FOR

OUTLETS AND EQUIPMENT SHALL BE DETERMINED AT THE SITE, AS WORK

PROGRESSES DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED

BY THE CONTRACTOR AT THE SITE. FINAL WORK SHALL BE DOCUMENTED ON AS

BUILT RECORD DRAWINGS.

3. SMOKE DETECTORS, FIRE ALARM DEVICES, ETC INDICATE QUANTITY, EXACT

LOCATIONS OF DEVICES SHALL BE DETERMINED IN THE FIELD AND

COORDINATED WITH ARCHITECT.

4. THIS IS A STANDARD SYMBOL LIST. ALL DEVICE SYMBOLS AND ABBREVIATIONS

MAY NOT NECESSARILY APPEAR ON THE FLOOR PLANS OR DETAIL SHEET. ONLY

THOSE SYMBOLS INDICATED ON THE FLOORS PLANS ARE USED AND OTHERS

SHOULD BE DISREGARDED.

5. MOUNTING HEIGHTS SHALL BE AS INDICATED ON ARCHITECTURAL DRAWINGS.

THE MOUNTING HEIGHT DETAIL SHALL BE USED AS A GUIDE IN THE ABSENCE OF

THE ARCHITECTURAL DRAWINGS.

6. MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM SHALL BE COORDINATED

WITH THE FIRM WHO HOLDS THE EXISTING SYSTEM MAINTENANCE CONTRACT.

THE FIRM WHO HOLDS THE EXISTING SYSTEM MAINTENANCE CONTRACT SHALL

MAKE ALL FINAL CONNECTIONS, AND PERFORM ALL PROGRAMMING AND

TESTING. ALL COSTS ASSOCIATED WITH FINAL CONNECTIONS, PROGRAMMING

AND TESTING SHALL BE INCLUDED UNDER THIS CONTRACT AND SHALL BE THE

RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR.

7. WHEN AVAILABLE FROM THE MANUFACTURER, ALL FIRE ALARM STROBES SHALL

BE FIELD ADJUSTABLE AND THE POWER SUPPLY SHALL BE SIZED BASED ON ALL

THE STROBES' HIGHEST SETTING.

FIRE ALARM SPEAKER/STROBE COMBINATION UNIT, RATED

90db OUTPUT AND 75cd UNLESS OTHERWISE NOTED

NOTES:

1. AT A MINIMUM, ELECTRICAL CONTRACTOR SHALL PROVIDE TYPED

LABELS WITH PTOUCH MACHINE TO INDICATE FIRE ALARM DEVICE AND

ADDRESS OR ZONE NUMBER. COORDINATE EXACT NAMING WITH

FACILITY'S PERSONNEL. IF FACILITY STANDARD IS ENGRAVED

COVERPLATES, THE ELECTRICAL CONTRACTOR SHALL PROVIDE

ENGRAVED COVERPLATES TO MATCH FACILITY REQUIREMENTS.

TYPICAL FIRE ALARM LABELING

COVER PLATE, JUNCTION BOX, ETC.

SEE NOTE 1

RED LED

SEE NOTE 1

CONTROL MODULE

ADDRESS #2-002

NTS

J

1

FIRE ALARM

PULL STATION

FINISHED FLOOR

6'-8"

(MIN)

NOTES:

1. ALL MOUNTING HEIGHTS SHALL BE

MEASURED FROM FINISHED FLOOR TO

CENTERLINE OF DEVICE EXCEPT FIRE

ALARM VISUAL DEVICES.

2. DEVICES SHALL BE INSTALLED ON A

COMMON VERTICAL CENTERLINE

WHEREVER POSSIBLE

3. ALL DEVICES SHALL BE INSTALLED AT

MOUNTING HEIGHTS AS INDICATED ON

THIS DETAIL UNLESS OTHERWISE NOTED.

TYPICAL MOUNTING HEIGHTS

4'-0"

NTS

EXISTING

FIRE ALARM NOTES:

FA1. REFER TO FIRE ALARM DRAWINGS FOR EXACT QUANTITIES OF FIRE ALARM DEVICES.

FA2. NEW FIRE ALARM EQUIPMENT SHALL MATCH EXISTING MANUFACTURER

FA3. ELECTRICAL CONTRACTOR SHALL RE-PROGRAM, TEST AND RE-CERTIFY FIRE ALARM SYSTEM

UPON COMPLETION OF WORK.

FA4. FIRE ALARM SYSTEM AND INSTALLATION SHALL COMPLY WITH APPLICABLE REGULATIONS OF

NFPA #72, LIFE-SAFETY CODE #101, NATIONAL ELECTRIC CODE AND LOCAL FIRE DEPARTMENT.

FA5. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL NECESSARY HARDWARE AND SOFTWARE FOR A

COMPLETE AND OPERABLE EXTENSION OF THE EXISTING FIRE ALARM SYSTEM.

FA6. FIRE ALARM WIRING TERMINATIONS SHALL BE MADE ON TERMINAL BLOCKS; NO SPLICES ARE

ALLOWED.

FA7. ELECTRICAL CONTRACTOR SHALL FIELD CONFIRM THAT ENOUGH BATTERY CAPACITY EXISTS FOR

THE FIRE ALARM SYSTEM TO OPERATE FOR 60 HOURS IN NON-ALARM CONDITION AND CAPABLE

OF OPERATING IN ALARM FOR 15 MINUTES AT THE END OF THE 60 HOUR PERIOD WITH THE

ADDITION OF THE NEW FIRE ALARM DEVICES. PROVIDE ADDITIONAL POWER SUPPLY AND BATTERIES

FA8. EXISTING FIRE ALARM SYSTEM SHALL REMAIN ACTIVE AND INTACT DURING CONSTRUCTION. AT

NO TIME SHALL ANY PART OF THE BUILDING BE WITHOUT FIRE ALARM COVERAGE.

FA9. SYSTEM MANUFACTURER SHALL PROVIDE SITE SPECIFIC INSTALLATION WIRING DIAGRAM OF THE

FIRE ALARM SYSTEM, AND VERIFICATION CERTIFICATE OF SYSTEM OPERATING PRIOR TO FINAL ACCEPTANCE.

FA10. ALL FIELD WIRING AND EQUIPMENT SHALL BE AS REQUIRED PER MANUFACTURERS WIRING

DIAGRAMS.

FA11. ALL FIRE ALARM WIRING SHALL BE CLASS A (OUTGOING AND RETURNING CIRCUITS SHALL BE

NOT BE PHYSICALLY INSTALLED IN THE SAME RACEWAY); FAULT ISOLATOR MODULES SHALL BE

INSTALLED IN THE FACP TO PROTECT SIGNAL LINE CIRCUITS WHEN THEY LEAVE THE FACP & WHEN

THEY RETURN TO FACP. ALSO, FAULT ISOLATOR MODULES WILL BE PROVIDED FOR EVERY 18

ADDRESSABLE FIRE ALARM DEVICES.

IF REQUIRED.

AND BE COMPLETELY COMPATIBLE WITH EXISTING SYSTEM.

FA12. INTERCEPT EXISTING SIGNAL LOOP AND EXTEND TO NEW DEVICES. MATCH EXISTING WIRING.

XMXM

XM

X X X X X

X X X X X X X X X X X X

XR

REFER TO

NOTE FA12

REFER TO

NOTE FA12

XM

XM

XM

XM

S SS

F

FA13. INTERCEPT EXISTING INITIATION LOOP AND EXTEND TO NEW DEVICES. MATCH EXISTING WIRING.

XM

XM

XM

XM XM

XM

XM

XM

XM

XM

X X

SMOKE DAMPER

FA14. 24VDC SHALL BE SUPPLIED FROM THE FIRE ALARM SYSTEM TO ALL EQUIPMENT WHICH

IS LISTED TO OPERATE AT 24VDC

PATIENT ROOM FIRE ALARM ANNUNCIATOR

FAA

TAMPER SWITCH

FLOW SWITCH

FIRE ALARM VISUAL DEVICE. BOTTOM OF

LENS SHALL BE A MINIMUM OF 80" AFF OR

6" BELOW CEILING, WHICHEVER IS LOWER.

WHERE POSSIBLE, DEVICE SHALL BE

LOCATED DIRECTLY ABOVE LIGHT SWITCH

OR PULL STATION.

LENS

LENS

1

PARTIAL FIRE ALARM RISER

N.T.S.

XM

S

XM

S

XM

S

XM

S

XM

S

XM XM XM XM XM XM

XM

X X X X X X X X XX

X

X

X

X

X

X

X

FATC

X

XM

XR

XL

XN

2

F F F FF

F XL

CM

MM

FSD

R

SD

TS

TS

F

S

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

NORTH

ISSUED FOR BID

3/2/20

FIRE ALARM

LEGEND, GENERAL

NOTES, RISER, AND

DETAILS

N.T.S.

FA-001

Drawn By: DM Checked By: AJR

V1 6th Floor Tissue CultureLabs

:3/13/20

Page 25: V1 6th Floor Tissue Culture Labs - Wise Construction...double acting typical window existing to remain existing to be removed existing wall new wall demolished wall aluminum wood finish

5 6

TISSUE CULTURELAB6029

TISSUE CULTURELAB6019

MONITORING LAB6028

EQUIPMENT LAB6027

CORRIDOR6002

EQUIPMENTCORRIDOR

6030

PLUMBING CLOSET621

COLD ROOM6017

MICROSCOPEROOM6022

EQUIPMENTCORRIDOR

6021

EQUIPMENT ROOM6023

EQUIPMENTCORRIDOR

6018

CORRIDOR6020

6019

-A

VIPERLAB6014

DSE LAB6015DSE

LAB6016

MECH.PIPING606

LIFESAFETY605

F

F

F

XL

XL

XM

AREA OF RENOVATION

FIRE ALARM

LEVEL 6

NEW WORK PLAN

Scale: Date Issued:

Project Number:

Isgenuity LLC

500 Harrison Avenue, Suite 5F

Boston, MA 02118

Tel 617 419 4660

Fax 617 419 4661

www.isgenuity.com

Architect

R.W. Sullivan Engineering

The Schrafft Center

529 Main Street, Suite 203

Boston, MA 02129

Tel 617 523 8227

Fax 617 523 8016

MEP/FP Engineer

Job #: 200041.00

Issuance Schedule

Number Date Description

NOT FOR CONSTRUCTION

179-27-00

Vertex Pharmaceuticals, Inc.

Tissue Culture Lab

KEY PLAN

1 2 3 5 7

8

A.7

B

C

C.5

E

F

G

OFFICE6010

OFFICE6011

OFFICE6012

DSELAB6016

6019

MICROSCOPEROOM6022

EQUIPMENTLAB6027

MONITORINGLAB6028

EQUIPMENTLAB6029

STORAGEROOM6031

SOLVENTSTORAGE6032

GLASSWASH6069

OPENOFFICEAREA6063

CELLCULTURE6058

MASSSPEC6057

OPEN LAB6056

EQUIPMENTCORRIDOR

6053

DNAROOM6055

TISSUECULTURE6054

6050

EQUIPMENT6048

STORAGE/FREEZERROOM6045

HUMANBIOLOGY

LABORATORY6046

OFFICE6042

OFFICE6043

EQUIPMENTROOM6039

STABILITYCHAMBER

6040

MASSSPEC6038

MASSSPEC6025

ELECROOM6036

LABSUPPLYROOM6035

BIOREPOSITORYROOM6068

SAMPLERECEIVING

ROOM6074

CONFERENCE6067

CONFERENCE6003

CONFERENCE6004

CONFERENCE6005

VIPERLAB6014

EQUIPMENTCORRIDOR

6021

EQUIPMENTROOM6023

COLDROOM6047

COLDROOM6052

MEETINGAREA6059

OPENOFFICEAREA6007

INNOVATIONBAR6008

COPY6009

OPENOFFICEAREA6013

EQUIPMENTCORRIDOR

6018

DSE LAB6015

COLDROOM6017

EQUIPMENTCORRIDOR

6030

CORRIDOR6002

CORRIDOR6001

CORRIDOR6075

CORRIDOR6073

CORRIDOR6006

OPENOFFICEAREA6041

TEL/DATAIDF6072

CORRIDOR6071

CORRIDOR6037

D

E5

E6

E3

4

STORAGE6060

STORAGE6064

KITCHEN6065

BREAKRM6066

MEDIAPREPROOM6062

POD6033

POD6034

COPY/MAIL6044

CORRIDOR6026

CORRIDOR6020

CONFERENCE6061

6

STAIR 1S1-6

SERVICEELEVATOR

LOBBY602

STAIR 2S2-6

STAIR 3S3-6

ELEV #2

ELEV #3

ELEV #4

ELEV #8

ELEV #7

ELEV #6

ELEV #5

MECH.PIPING606

NORMALELECTRICAL

ROOM604

PLUMB.CLOSET621

LIFESAFETY605

PLUMB.CLOSET620

JANITOR607

MEN610

WOMEN609

SHOWER608

BIOWASTESTORAGE

651

EQUIPMENTLAB

CLINICALBIOMARKERS

OPEN LAB

ELEVATORLOBBY601

CORRIDOR6049

IMPORTANT NOTE:

SCOPE OF WORK

NORTH

ISSUED FOR BID

3/2/20

1

4

" = 1'-0"

FA-101

1

FIRE ALARM NEW WORK PLAN

1/4"=1'-0"

Drawn By: DM Checked By: AJR

V1 6th Floor Tissue CultureLabs

:3/13/20