Page 1: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

DRAPP 2012

Page 2: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Agenda•Welcome and Introductions•Calendar Overview•Acquisition Status•Final Product Specs•Final Ortho Status – with Kucera•DAT Process – with IntraSearch•Feedback on WMS•Ordering Procedures and Options•Q & A

Page 3: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Calendar OverviewMilestone DatePhoto Acquisition of Mountains June 2012

Delivery of Interim Product for Areas 1, 2, and 4 to DAT and WMS

June 2012

Delivery of Interim Product for Area 3 to DAT and WMS

August 2012

Compiling Orders for Final Imagery July/August 2012

DAT Review September/October 2012

Delivery of Final, DAT-approved Ortho-imagery

December 2012

Page 4: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Acquisition StatusArea 3

Potential Issues – Smoke from the High

Park Fire Airspace restrictions

due to firefighting

6/19 – 40% completed

6/21 - 80% completed

6/22 - 90% completed

6/23 – 100% completed

 http://www.firedetect.noaa.gov/viewer.htm

NOAA Smoke Map 6/13/2012

Page 5: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Final Product Specs 4 Band

Areas 1 and 4 6in resolution ASPRS Class 1 Map Accuracy Standards for 1”=100’ RMSE < 1ft on the ground

Areas 2 and 3 1 ft resolution ASPRS Class 2 Map Accuracy Standards for 1’= 400’ RMSE < 4ft on the ground

Page 6: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Final Ortho Status Final orthorectified imagery for Eastern Plains (Area 2)

has been delivered to IntraSearch (6/21) for Data Acceptance Testing.

Pilot images for Denver (Area 1) and Weld County (Area 4) are expected first of July.

DEM is 65% updated for Area 1

DEM is 35% updated for Area 4

More from John @ Kucera…

Page 7: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Area 3 Aerial Flyover/Acquisition Status

Completed on 6/23 No apparent issue with smoke from fires to

the North and South. Smoke drifting away from Area 3 on flying days

Record heat did present turbulence issues over mountains and reduced aircraft performance – flying generally confined to morning hours

Imagery currently being reviewed

Page 8: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Georeferencing & DEM Status

Interim orthophotographyArea 1, 4 (6” resolution) within 2’Area 2 (12” resolution) within 3’

Area 2 (Eastern Plains) Source DEM – supports final accuracy (within 4’)

Area 4 (Weld County) DEM – generally not supporting Class 1 (1’) ortho accuracy – regenerated

Area 1 (Denver Metro) DEM – marginally supported Class 1/1’ ortho accuracy – opted to regenerate

Area 3 (Mountains) Source DEM – incomplete coverage – will be regenerated

Aerotriangulation Accuracy* Area 1, 4 – horizontally within 0.5’* Area 2 – vertical – generally within 1’ Area 1 and 4 and within 2’ Area 2* Some areas need vertical refinement

Page 9: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Final Orthophoto Production Status

Area 2 Eastern Plains – final orthos recently submitted – no major rectification issues

Areas 1 & 4 – Denver Metro & Weld County – pilot orthos to be posted this week

Area 1 & 4 final ortho progress delivery starting late Summer – early Fall

Area 3 – MountainsInterim orthos – by July 15

Pilot – July 30Final orthos – starting late Summer – earlyFall

Page 10: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Kucera Q&A

Page 11: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Printed Samples

IntraSearch brought printed samples for you to view.

Page 12: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

DAT Process A comprehensive review of every tile of the 2012 DRAPP imagery

The DAT process will verify the positional accuracy of the imagery and ensure its aesthetic and functional quality. In general terms, the DAT review will examine all the imagery for the following types of errors: Images that do not meet the project’s accuracy specifications

RMSE of 4ft on 1 ft ortho, 1ft on 6in ortho Misalignments in linear features (roads, curbs, building edges, etc.) Warped or wavy bridges/overpasses/viaducts/railroad lines/warehouses etc. Obvious seams between images Blurred or out-of-focus imagery, blemishes, “noise”, smears Pronounced changes in color balance and contrast Dark shadows or bright/washed-out spots in the imagery Buildings that obscure more than 25 percent of adjacent roadways and other

transportation features Obscured valley bottoms in the mountain areas

Page 13: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Control Network

IntraSearch37 Panels29 Photo

Kucera30 Panels26 Photo

Page 14: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

IntraSearch Q&A

Page 15: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

WMS Stats

Page 16: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Feedback on WMS Comments?

Concerns/Issues?

Features/Requirements: Anything to add? Anything to remove? Anything to improve?

Upcoming Services Service with final ortho imagery will be released in July. Eastern Plains will be the first to be loaded. Metadata will be included.

Page 17: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Orders Time to start compiling custom orders

for raw imagery tiles. Member governments can request the

entire dataset. Need to choose resolution, format, and extent. Specify projection

Business partners already specified an extent, resolution and format.

Page 18: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Orders Resolution Options

6-inch in Area 1 and 4 1-foot in Areas 1, 2, 3, 4

(we can resample up if you prefer)

Format Options Compressed GeoTIFF Uncompressed GeoTIFF JPEG2000 Mr. SID

Page 19: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Orders Projection Options

State Plane Colorado Central, NAD 83 (US Survey Feet) State Plane Colorado North, NAD 83 (US Survey Feet) State Plane Colorado Central, HARN (US Survey Feet) State Plane Colorado North, HARN (US Survey Feet) UTM Zone 13 North, NAD 83 (Meters)

Extent Send an AOI Delivery will be in PLSS tiles (shapefile on website)

Stay tuned for an email regarding how to order!

Page 20: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

Questions?

Page 21: Welcome and Introductions Calendar Overview Acquisition Status Final Product Specs Final Ortho Status – with Kucera DAT Process – with IntraSearch Feedback

For more information, contact Ashley Summers at [email protected] or 303-

480-6746.