welcome to the jovial kick-off meeting...kick-off: april 2016 instrumental design: october 2016...
TRANSCRIPT
Welcome to the JOVIAL Kick-off meeting
JOVIAL Jovian Oscillations through radial Velocimetry ImAging
observations at several Longitudes
JOVIAL Kick-off meeting • Objectives of the meeting
•Programme
•JOVIAL project overview • Context
• History of the project •Scientific objectives •Work programme •Organisation
2010, February 15th DSI Science Workshop - Observatoire de Nice 3 3 JOVIAL Kick-off Meeting
Objectives of the meeting
• Definition of the scientific objectives • Position of the project in the scientific context • Organisation of the science groups • Technical organisation of the network • Identify key technical issues (telescope) • Task responsabilities and planning • Data policy
2010, February 15th DSI Science Workshop - Observatoire de Nice 4 4 JOVIAL Kick-off Meeting
Kick-off agenda
5 JOVIAL Kick-off Meeting
Monday, April 18th Observatoire de Nice, La Nef room
Presentation of the JOVIAL project Lunch
Science with JOVIAL
Tuesday, April 19th Observatoire de Nice, La Nef room
Mode physics Lunch
Instrument Session Other science/ complementary projects
Meeting Dinner Restaurant Les Pêcheurs
Kick-off agenda
6 JOVIAL Kick-off Meeting
Wednesday, April 20th University of Nice, Fizeau building, Room Olivier Chesneau
Technical plans Visit of the laboratory and the instrument bench Lunch Organisation of the project Discussion Meeting end
Thursday, April 21th
Calern Observatory Visit of the observatory
JOVIAL
• Observation strategy – Fourier imaging tachometer – Observation network
• Scientific goals
− Internal structure of giant planets by seismology
− Study of planetary atmosphere dynamics
7 JOVIAL Kick-off Meeting
Internal structure of giant planets
• Only few constraints • Mass, radius • Gravitational moments • Heat flux • Surface composition
• Non uniqueness
• Initial conditions (formation) • Evolution (core erosion) • Equations Of State
Having access to the internal structure would give unique clues to formation and evolution of the Solar System
8
(see T. Guillot & M. Ikoma)
JOVIAL Kick-off Meeting
R/Rjup
Wei
ghtin
g fu
nctio
ns
M J2
J4
J6
J8
H+-H2 transition
Core
JUNO will enter the jovian system in June Gravitational moments measurements directly probe the outer regions
Guillot, 2005
Gravitational moments
9 JOVIAL Kick-off Meeting
(see D. Durante)
Seismology of giant planets (see B. Mosser & J. Jackiewicz)
• As terrestrial seismology, asteroseismology allows the study of internal structure
• Modes frequencies depends on density (and rotation)
• Modes of different degrees penetrate to different depths
10 JOVIAL Kick-off Meeting
νobs - νtheoretical
Inversion method
ρobs - ρtheoretical
Mode types
11 JOVIAL Kick-off Meeting
• Following the main restoring force, modes could be of different types
• Acoustic modes or p modes • Gravity modes or g modes • Surface modes or f modes
Recent results in seismology of giant planets
• Jupiter • SYMPA project: 2000 – 2010 - Gaulme et al 2011
• Saturn
• Cassini - Hedman & Nicholson 2013
Open a new window on the interior of giant planets
12 JOVIAL Kick-off Meeting
Detection of Jovian global oscillations
•Ground based observations with SYMPA
•Power excess in the range [800 – 3000] µHz
•~ 20 individual peaks with mean amplitude 30 cm/s ± 10 cm/s •Regularly spaced peaks: ∆ν0= 154.5 µHz ± 1.5 µHz
• Fundamental frequency good agreement with most models (mean density) Individual modes identification requires long continuous observation with good spatial resolution Gaulme et al, 2011
13 13 JOVIAL Kick-off Meeting
Saturn • Density waves in Saturn rings (Hedman & Nicholson, 2013)
• Compatible with f-modes • Predicted by Porco & Marley 1991 • Cassini observations of stellar
occultations • Identification of azimutal number • Saturn f-modes have long life-time • Consequences on internal structure
to be studied – See Jim Fuller’s talk
14 JOVIAL Kick-off Meeting
Project history
SYMPA project (2000-2010) Echoes proposal for JUICE mission Doppler Sismo Imager (R&T CNES 2009 -2013) 2014: JIVE in NM (NASA-EPSCOR)
2015: JOVIAL selection • ANR (Agence Nationale pour la recherche) white
program • 4 years project (2016 -2019) • 420 k€
15 JOVIAL Kick-off Meeting
Probing internal structure
16
• Complete gravitational moments (JUNO)
• Measure the size of the core
• Investigate H-H2 transition
• Give internal rotation profile
16 JOVIAL Kick-off Meeting
Wind speed measurement • Cloud-tracking is affected by cloud
deformation and waves • Doppler measurements give true
aerosol displacement • Complete High Angular Resolution
follow-up - See R. Hueso
17 JOVIAL Kick-off Meeting
Best detection level: 1 bar
Top of the cloud (visible)
Resolved images and velocity maps
Detection of acoustic modes
18 10 December 2010 JPL Pasadena 18 JOVIAL Kick-off Meeting
Mode excitation
• Few theoretical works • Estimation by Bercovici & Schubert
for Jupiter: 0.5 m/s • Energy in convection is sufficient • Solar mechanism would be
inefficient
• Other coupling mechanism ? • Kappa mechanism ? • Humid convection ?
See Ethan Dedrick’s talk
19 JOVIAL Kick-off Meeting
Instrumental Concept
• JOVIAL is a Doppler Spectro-Imager – Mach-Zehnder Interferometer: – spectral FT at each point of the image – Measures the Doppler shift of reflected
solar lines
• Optimisation of mesurement stability, precision, resolution – Large Field Optique Adaptative – Simultaneous multi-sites observations – Noise level < 4 cm/s in 2 weeks
20 20 JOVIAL Kick-off Meeting
(1+v/c)
Fourier tachometer
σ spectrum S(σ)
∆
∆
detector FTS
telescope
interferogram TF
I(∆) =A(∆)e2iΠ∆σ0
σ0
21 JOVIAL Kick-off Meeting
Telescope
AO Deformable mirror
Schack-Hartman Correlation WFS
Modular Optical Interface
Mach-Zehnder
Polarizer Cubes
Detector
Filter
Calibration & Alignement Unit
Transfer Optics
Thermal control
Output Optics
Telescope Tracking System
Acquisition & Control
Electronics, software Optics Mechanics
Interferometer Vacuum Enclosure
Thermic Key
OPD Modulation
Control Panel
Optical Bench and Mechanical Interface
Network Time
Server
Vacuum Pump
Bloc Diagramme
22 22 JOVIAL Kick-off Meeting
Work programme
• Complete the DSI prototype at Calern with CIAO Adaptive Optics – See M. Carbillet & F. Martinache
• Study and realisation of two new MZ and vacuum tanks • Deliver MZ for JIVE in NM • Build a complete third instrument with AO • Develop data processing pipe-line • Achieve one or more observing runs on Jupiter and
Saturn
23 JOVIAL Kick-off Meeting
The JOVIAL network
Goal: Simultaneous observations from 3 sites Target: Duty-cycle > 50 % over two weeks Observatoire de Calern (France) • C2PU: 1 m telescope with DSI prototype New Mexico (USA) • Dunn Solar telescope (Sacramento Peak) Okayama Observatory (Japan) • Telescope de 1.88 m • Other options ?
24 24 JOVIAL Kick-off Meeting
The JOVIAL network
Possible evolutions • Larger telescopes • Additional instrument
– AO for JIVE
• Space mission (see O. Mousis)
– Saturn – Uranus
25 25 JOVIAL Kick-off Meeting
Planning
26
Kick-off: April 2016 Instrumental design: October 2016 Integration and tests: June 2017 Delivery, commissioning: December 2017 Observations of Jupiter: May 2018 Data processing, first results: June 2019 Observations of Saturn: July 2019 Archiving, dissemination: December 2019
26 JOVIAL Kick-off Meeting
Budget
• Instrument study and realisation: 215 k€
• Manpower - 3 years non-permanent 130 k€
• Logistics and missions: 45 k€
• Consumable: 30 k€
Total: 420 k€
27 27 JOVIAL Kick-off Meeting
Organisation Management
OCA+IAS
Instrumental development
OCA
Optics
OCA
Mechanics
OCA
Thermal studies
IAS
Instrument Control
NMSU
AIV
OCA
Vacuum Tank Test
IAS
Integration and tests
OCA
Transport & Commissioning
OCA+NMSU
Observations
OCA+NMSU+EPS
Calern (France)
OCA
Okayama (Japan)
EPS
Apache Point (USA)
NMSU
Data processing
IAS
Image processing
OCA
Frequency
IAS
Wind speed maps
NMSU
Science
OCA
Mode physics and inversion
Jackiewicz
Interior model
Guillot
Atmosphere Morales
Formation of solar system
Ida
28 JOVIAL Kick-off Meeting
Objectives of the meeting • Definition of the scientific objectives • Position of the project in the scientific context • Organisation of the science groups • Technical organisation of the network • Identify key technical issues (telescope) • Task identification and planning • Data policy • Choice of a logo
2010, February 15th 29 29 JOVIAL Kick-off Meeting