Page 1: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

1

NAVAL SEA SYSTEMS COMMAND

What’s New in Nonskid?

Mega Rust

Norfolk, VA

June 2017

Mr. Mark Ingle, P.E.

SEA 05P2

(202) 781-3665

[email protected]

Distribution A: Approved for Public Release

Page 2: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

2

OBJECTIVES • Summarize evolving Naval Sea Systems Command (NAVSEA) organization and coating requirements: •• Headquarters NAVSEA organization & objectives. • Summarize what’s new at NAVSEA regarding nonskid and maintenance coating cost reduction strategies for conventional, roller/spray applied nonskid: •• Published FY-18 updates to Standard Item 009-32. •• Published new, Commercial Item Descriptions for nonskid sprayer. • Summarize what’s new at NAVSEA regarding thermal spray nonskid: •• Published draft Standard Item 009-BB. •• Published new, MIL-PRF-32577 thermal spray nonskid wire specification. •• Published update to MIL-STD-1687 to Technical Publication 1687 on thermal spray training/certification processes. • Discuss pending future update to the MIL-PRF-24667 roller/spray applied nonskid specification. Presentation intended to stimulate discussion and leverage technical community expertise.

Page 3: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

Naval Systems Engineering Directorate (SEA 05)

Technical Domain Manager (TDM) Chief Systems Engineer (CSE)

Office of the CHENG

SEA 05B Deputy / COS

(SEA 05B1)

Aircraft Carrier Design &

Systems Engineering

(SEA 05V)

Chief Finance Office

(SEA 05B3)

Surface Ship Design &

Systems Engineering

(SEA 05D)

Integrated Warfare Systems

Engineering (SEA 05H)

Cost Engineering &

Industrial Analysis

(SEA 05C)

Ship Integrity &

Performance Engineering

(SEA 05P)

Chief Workforce Office

(SEA 05B2)

Special Projects

(SEA 00U/05X)

Executive Director / CHENG

Deputy / Chief Technology Officer

(SEA 05B)

Littoral and Mine Warfare

Design & Systems Engineering

(SEA 05L)

Technology Office

(SEA 05T)

Submarine/Submersible

Design & Systems

Engineering

(SEA 05U)

Technical Policy &

Standards (SEA 05S)

Undersea Warfare Systems

Engineering

(SEA 05N) (NUWCNPT TD)

Surface Warfare Systems

Engineering

(SEA 05W) (NSWCDD TD)

Marine Engineering

(SEA 05Z)

L&MW Warfare Systems

Engineering

(SEA 05M) (NSWCPC TD)

Explosive Ordnance

Engineering

(SEA 05E) (NSWC IH TD)

T&E Technical

Advisor

Deputy Commander /

CHENG (SEA 05)

Chief HR & Admin

Office

(SEA 05B6)

Draft: June 2017

3

Page 4: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

Code Product Related Specs All All Technical Products, Managerial All

AF Antifouling Coating Systems MIL-PRF-24647

TNK Tank Coatings, Epoxy Primers MIL-PRF-23236

MIL-DTL-24441

PRM Primers, Single Component TT-P-645

TOP Topside, Alkyds & Polysiloxanes MIL-PRF-24635

INT Interior Coatings (SEA 08) MIL-DTL-24607

MIL-PRF-24596

MIL-DTL-15090

MIL-DTL-1115

HT High Temp Coatings, Metallic TT-P-28

PWD Powder, Interior, Cosmetic MIL-PRF-24712

NSK Nonskid MIL-PRF-24667

DCK Deck Coverings MIL-D-3134

MIL-PRF-3135

MIL-PRF-24613

MIL-PRF-32171

SUR Abrasive blasting, surface prep MIL-A-22262

SEL Sealants & Preservatives MIL-PRF-16173

NAVSEAINST 9630.1

DOC Policy Documents NSTM 631, NSTM 634

S636-MAN, CCAMM

Standard Item 009-32

Standard Item 009-26

COR Corrosion/PCOE Policy/Design DODI 5000.67

RSH Research & Development To be determined

UNDS Regulations, Underwater hull TBD

NAVAIR

Aircraft Engines

SEA 08R

SEA 08T

TWH: Underwater Hull Husbandry

SDMs: Surface, Submarine,

Carrier

Technical Authority Pyramid - Coatings & Corrosion Control Draft: June 2017

Navy Employee Navy Developmental Employee Contractor

Ingle all

Castle

(EM) All, COR

Lemieux

(EA) All, RSH

Vacant

(EM) NSK, All

Wegand

(EM) RSH, NSK

Lattner

(EM) COR

Haslbeck

(EM) All, AF

J. Martin

(EM) TOP, TNK

Melhuish

(EM) All, NSK

Brinckerhoff

(EM) All

Tagert

(EM) TNK, NSK

Vacant

(EM) VA-Class

Jones

(EM) NSK, DCK

Iezzi

(EM) RSH TOP

Smith

(EM) UNDS

Wigle

(EM) CCAT

Slebodnick

(EM) RSH, TNK, NSK

Truman

(LE) COR

Carroll

(LE) NSK

Thomas

COR

Cassidy

(LE) DOCs

Preston-

Baker (LE) COR

Stanke

TNK, All

White

COR, All

Adams

(LE) NSK, RSH

Miller

TNK, NSK

Zuwiala

COR

Dolph

DOCs

Park

DOCs

Foster

All

Sheridan

RSH, All

F. Martin

HT, COR

Spicer

TNK, NSK

Holm

(LE) AF

Webb

RSH Intern

All

Ellor

COR

Ault

(LE) TNK, RSH

Langaster

(LE) TNK

Ranero

(EM) All, NSK

EAs

EMs

LEs

Kogler

SUR

TWH

4

Delegated signature authority

Ong

(EA) All

Eppard

(EM) NSK, TNK

Duckworth

(EA) All

Distribution A: Approved for Public Release

HQ

CNSP N42

Aviation

USMC AVN

Aviation

USFF N43

Maintenance

Page 5: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

5

Looking for Good Ideas • NAVSEA working cooperatively with community to address Strategic framework: - Deliver ships on-time. - Promote culture of affordability.

Brief at antifouling

program review

Attend FNC review

CWP Funded NAVSEA

program.

NAVSEA/Shipyard

teams

Brief at meetings

Meet with industry

Serve on Executive Committee

Attend quarterly review

NAVSEA supports Surface

Preparation and Coatings

Panel Meetings

SSRAC

Mega Rust,

NACE,

PACE

PCOE

Chairs annual public meeting to

update Standard Item 009-32 and

new Standard Item 009-BB.

Vendors, government, and

industry submit changes, all

changes evaluated

Page 6: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

6

FY-18, Change 1, Standard Item 009-32

Published • FY-18, Change 1, Standard Item 009-32 published by CNRMC on 7 Mar 2017 on the Standard Specifications for Ship Repair and Alteration Committee (SSRAC) website. “Top Five” Most significant new/modified requirements. 1. Require flight deck nonskid applicator to abrasive blast 20% of deck area.

3.11.6.2 flight deck areas receiving a nonskid system and prepared to

NACE/SSPC-SP WJ-2, a minimum of 20 percent of the total area receiving a nonskid

system shall be abrasively blasted to an NACE 2/SSPC-SP 10 level of cleanliness.

The areas to be prepared to NACE 2/SSPC-SP 10 shall be as directed by the SUPERVISOR.

- Abrasive blasting on LHA, LHD, LPD, and LSD flight decks MAY NOT use steel shot, steel grit, ferrous

media or stainless steel shot.

- Abrasive blasting may be accomplished with mineral media, crushed glass, SSPC-AB 4 media, or other

media as required in the Tables/Lines.

Distribution A: Approved for Public Release

Corrosion destroys profile. Contractor required to re-establish profile in areas with known corrosion.

Corrosion pits DO NOT constitute surface profile and will not support effective coating adhesion.

Page 7: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

7

FY-18, Change 1, Standard Item 009-32

20% of the Deck to Be Blasted – But What Is the Intent?

ISSUE: Field activity requested clarification about waterjet cleaning of deck revealing “acceptable”

surface profile – is blasting still required?

Measure profile in first 100 ft2 3.2 mils

second 100 ft2 5.8 mils

third 100 ft2 6.0 mils

fourth 100 ft2 5.9 mils

fifth 100 ft2 6.1 mils

Historically nonskid would be applied over surface.

NAVSEA INTENT: FY-18, Change 1, Standard Item 009-32 requires blasting to ensure that areas with

corrosion or lost profile are corrected to reduce the risk of premature nonskid failure.

FY-18, Change 1, Standard Item 009-32 requires blasting and

waterfront team selects areas required.

- Must correct areas with low profile.

- Correct areas with excessive or high profile.

- Consistent with historical requirement: ”If such profile is not present on decks and aircraft elevators, repair activity shall establish proper

profile.”

Intent is to prevent corrosion degrading profile over repeated waterjet/coating cycles. Distribution A: Approved for Public Release

1st

2nd

3rd

4th 5th

Page 8: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

8

FY-18, Change 1, Standard Item 009-32

Published Sketches to Show Profile Measurement Best Practices

2. Clarify that profile readings are not to be taken in areas with appreciable corrosion pitting:

- Updated paragraphs 3.10.5.1 and 3.11.4 to add simple statement:

“Surface profile shall be validated on areas without visible pitting.”

Distribution A: Approved for Public Release

Full-scale nonskid

test panel

NAVSEA Guidance – Step 1 – Overview

ISSUE: Initial condition of flight deck before replacement includes multiple different conditions of the steel deck that

will directly influence the ability of the final nonskid applied to the deck to achieve specified service life.

Initial Condition

After Nonskid Removal Using Ultra High Pressure Waterjet (UHPWJ)

Corrosion under nonskid

V V V

Nonskid Removal

Sketches appear on NST Center web site to allow entire community to review content and approach.

Page 9: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

NAVSEA Guidance – Step 2 – Post UHPWJ Condition

ISSUE: Decks after UHPWJ cleaning include multiple surface conditions that require abrasive blasting.

GUIDANCE:

1. After nonskid removal validate SSPC-WJ2 cleanliness. Areas without extensive corrosion staining may have ACCEPTABLE

surface profile.

1. Define areas with LOW profile that does not satisfy requirements.

Define areas where profile is reading HIGH because of residual corrosion pitting/staining.

Define areas WITHOUT profile that simply represent rusted steel that has been waterjet cleaned.

3. Collect representative surface profile data from areas without visible pitting or corrosion metal loss using

ASTM D4417, Method B or Method C, in accordance with SSPC-PA 17.

Do not collect surface profile data from areas WITHOUT surface profile or with LOW surface profile.

Collect surface profile data from areas with HIGH profile or staining.

4. Abrasive blast area WITHOUT surface profile and with LOW surface profile to satisfy SSPC-SP 10 near white metal level of

cleanliness. Abrasive blasting materials and operating parameters shall be selected in accordance with Standard Item 009-32

requirement to establish the required surface profile.

Areas with HIGH surface profile may be abrasive blasted as directed by the SUPERVISOR.

Standard Item 009-32 – Sketches Showing Best Practices

Distribution A: Approved for Public Release

LOW HIGH 5 mils

to

8 mils WITHOUT

ACCEPTABLE

Page 10: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

NAVSEA Guidance – Step 3 – Final UHPWJ and Abrasive Blasted Deck Surfaces

ISSUE: Abrasive blasted decks require representative surface profile data collection.

GUIDANCE:

1. For abrasive blast cleaned areas and area where UHPWJ cleaning revealed ACCEPTABLE surface profile,

follow the requirements of SSPC PA-17, Appendix B to document and verify abrasive blasting process control

using a test coupon of blasting on a known area of smooth, un-corroded steel.

2. Validate SSPC-SP 10 near-white metal cleanliness using SSPC-VIS 1 for Rust Grade C or D in areas with visible

pitting or corrosion metal loss (as shown in red, center). Do not collect profile data in such areas because

the profile measurement will indicate a HIGH numerical value due to the localized corrosion metal loss.

3. Validate SSPC-SP 10 near-white metal cleanliness and collect required surface profile data using ASTM D4417,

Method B or Method C from ACCEPTABLE areas without visible pitting or appreciable staining.

4. Validate SSPC-WJ 2 cleanliness and collect required surface profile data using ASTM D4417, Method B or

Method C from areas with HIGH levels of retained staining and surface profile. Additional abrasive blasting in such areas shall be as directed by the SUPERVISOR

5. Report required data on Standard Item 009-32 Appendices.

10

Standard Item 009-32 – Abrasive Blasted Profile Assessment

Distribution A: Approved for Public Release

Condition of deck after

abrasive blasting and

UHPWJ cleaning

HIGH

SSPC-VIS 1

ACCEPTABLE -

ASTM D4417 HIGH

ASTM D4417

5 mils

to

8 mils

Page 11: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

11

FY-18, Change 1, Standard Item 009-32

Published Allowance to Use Steel Shot on Amphibious Ships

3. Allow use of steel shot or media on LHA, LHD, LPD, AND LSD tanks while still precluding

risk of residual steel shot on flight deck.

3.1.3.5 Steel media, defined as steel shot, steel grit, stainless steel media, and

SSPC-AB 4 media containing steel abrasive SHALL NOT be used for surface preparation on LHA,

LHD, LPD, and LSD Class ship flight deck, hangar, vertical replenishment deck, elevators,

catwalk, and superstructure above the flight deck. Steel media may be used on tanks and

voids below the flight, hangar, and vehicle storage decks and associated ramps with

containment that prevents release of the steel media onto the flight deck, hangar, vertical

replenishment deck, elevators, catwalk, and superstructure above the flight deck. SSPC-AB 4

media that does not contain steel abrasive or MIL-A-22262 abrasive may be used on flight

decks and other areas of LHA, LHD, LPD, and LSD Class ships. The following checkpoints apply

ONLY when steel media is being used on an LHA, LHD, LPD, or LSD Class ship on tanks and

voids below the flight, hangar, and vehicle storage decks and associated ramps.

- Four new (G) points to validate that the media is contained and that:

“ . . . media blasting equipment, steel media, wastes from steel media blasting, materials used to contain steel media, and workers conducting steel media blasting shall not be

allowed to transit or otherwise come into contact with the flight, hangar, and vehicle

storage decks and associated ramps. Accomplish a start of blasting media containment

inspection to ensure blast media is contained within the confines of the work area.

Any media detected outside of the containment shall be reported to the SUPERVISOR.”

Distribution A: Approved for Public Release

NO STEEL SHOT, GRIT, OR MEDIA ABOVE,

ON, OR OVER FLIGHT DECK

STEEL SHOT, GRIT, OR MEDIA

Page 12: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

12

FY-18, Change 1, Standard Item 009-32

Steel Shot Can Be Used – But What Is the Intent?

ISSUE: Field activity requested clarification about FY-18, Change 1, Standard Item 009-32 intent

regarding use of steel shot to prepare decks on an LPD.

NAVSEA INTENT: FY-18, Change 1, Standard Item 009-32 states that steel shot not to be used “above”

to preclude risk of shot escaping from containment and contaminating flight deck.

Intent is to prevent steel shot from contaminating flight deck – must consider during work planning.

Distribution A: Approved for Public Release

Field activity plan requested use of steel shot

No steel shot on deck above hangar

because any shot escaping aft

contaminates flight deck

Shot can be used:

- Not VERTREP.

- Not above flight deck.

Shot can be used:

- Isolated deck.

- Not above flight deck.

Field activity plan showed steel

shot prohibited on flight deck

Page 13: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

13

FY-18, Change 1, Standard Item 009-32

Published Limitations on Low Temperature Nonskid

4. Prohibit used of MIL-PRF-24667, TYPE VIII, LOW TEMPERATURE CURE NONSKID on amphibious

ships.

Note (83) - MIL-PRF-24667, Type VIII nonskid shall not be used on LHA, LHD, LPD,

and LSD Class ship flight decks.

- NRL conducted both small-scale and full-scale nonskid heat resistance testing.

- Small-scale and full-scale test results indicate MIL-PRF-24667 nonskid vulnerable to delamination.

Distribution A: Approved for Public Release

Jig showing deflection in small-scale

nonskid test panel

Cracking / corrosion after five heat cycles

Full-scale nonskid

test panel

Type VIII nonskids do not perform effectively when subject to heating by exhaust gas.

Page 14: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

14

FY-18, Change 1, Standard Item 009-32

Published Sketches Explaining Tie-Down Coating

5. Published slides on NST Center website to clarify that tie-down coating is to conduct

surface preparation in a manner that streamlines production without increasing corrosion risk.

- Updated paragraph 3.11.4 .1 to remove the term “bars.”

Distribution A: Approved for Public Release

Full-scale nonskid test panel

SSPC-SP 2 or SP 3 in these areas

NAVSEA Guidance Surface Cleanliness & Coating Integrity Validation on Tie Downs

ISSUE: Interpretation of surface cleanliness and coating integrity validation requirements on aircraft and vehicle tie-downs highly

variable across RMCs & shipbuilders.

GUIDANCE:

1. Surface preparation to SSPC-SP 2 or SP 3 is authorized in areas that are shielded or shadowed from abrasive blast or waterjet cleaning or power tool cleaning.

2. Required surface profile measurements to be taken in areas that can be abrasive blasted to SSPC-SP 10 or waterjet cleaned to NACE/SSPC- WJ-2/L or power tool cleaned to SSPC-SP 15.

3. Tie-down coating coverage shall be validated without use of a mirror or flashlight on all fittings.

10% of all tie-downs in each work zone shall be inspected using a mirror and flashlight.

4. For tie-down installation, NAVSEA Drawing 803-1916300, Note T-1D requires that 100% of crossbars to be tested

to ensure proper fit of the TD-1 hook. Excessive coating runs, drips, sags, puddles, or inadequate removal of old coating during surface preparation can interfere with fit of the TD-1 hook.

Page 15: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

15

FY-18, Change 1, Standard Item 009-32

Reduce Tie Down Surface Preparation – But What is Intent?

ISSUE: Field activity requested clarification about how to

reduce surface preparation on vehicle lashing

tie-down fitting:

- Surface preparation inherently

challenging due to re-entrant shape.

NAVSEA INTENT: FY-18, Change 1, Standard Item 009-32 removes “bars” and intent is to preclude

expending resources coating surfaces that will be damaged by hooks.

Steel Deck

Expending resources coating surfaces that will be damaged by hooks is not value added.

Distribution A: Approved for Public Release

SSPC-SP 2 or SP 3

in these areas

Page 16: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

16

Action Item to Develop Standard Item 009-32

Define Acceptable Reuse of Nonskid Mixing Blades

Distribution A: Approved for Public Release

NAVSEA Guidance

Nonskid Mixing Blade Cleanliness

ISSUE: Nonskid mixing blades that are free of previously applied paint/nonskid may be reused to

mix nonskid.

Reused blade that Blade contaminated with

is free of nonskid - with nonskid –

ACCEPTABLE for use NOT ACCEPTABLE for use

New blade that is

free of nonskid -

ACCEPTABLE for use

GUIDANCE: 1. Blades shall be 95% free of residual coating or corrosion staining when viewed without magnification.

2. Up to 5% cured coating or corrosion staining may be retained in corners, welds, corrosion pits,

and other irregular surface areas.

3. All retained coating and corrosion staining, when wiped with solvent applied to a clean

light-colored rag, shall not leave any colored residue on the rag.

6. Published sketch on NST Center website to clarify the intent of paragraph 3.11.11.1 that states: 3.11.11.1 Verify that nonskid mixing blade is free of previously cured paint/nonskid.

Page 17: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

PUBLISHED: Commercial Item Description (CID) A-A-59982, “Application Spray Equipment

for Nonskid Coatings.”

Progressive cavity pump Spray gun diffuser Able to spray all qualified nonskid

1,000 gallons without repair 30 minutes of spraying Electronic, pneumatic safety controls

Rotor speed control (1–200 rpm) <10 lbs for unit Able to spray >10 ft2/min.

Multiple hopper sizes

New equipment will speed nonskid production and extend service life – will need ASTM F718 updates.

17

Published A-A-59982

Commercial Item Description for Nonskid Sprayer

Distribution A: Approved for Public Release

Page 18: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

18 Distribution A: Approved for Public Release

PUBLISHING: Commercial Item Description (CID) A-A-XX695, “Mixer for Nonskid Coatings.”

- “Lessons learned” that nonskid mixing is a manual process and that inadequately mixed

nonskid exhibits irregular cure.

- Effective performance demonstrated on nonskid deck at Puget Sound Naval Shipyard.

Mix all qualified nonskid Double vortex mixing blades

6,000 gal. mixed without repair Three blades per unit per can

1.7 hp pneumatic motor Blades for 5 & 6 gallon cans

1 to 175 rpm speed control

New equipment will speed production and reduce risk. Will need updated ASTM F718s.

Publishing A-A-XX695

Commercial Item Description for Nonskid Mixer

Page 19: What’s New in Nonskid? - Home - NST  · PDF fileWhat’s New in Nonskid? Mega Rust Norfolk, VA ... 2 OBJECTIVES • Summarize ... crushed glass, SSPC-AB 4 media, or other

19

● NAVSEA has had two cases of mis-mixed nonskid failing to cure in past two years. Analyses by NSWC and NRL indicate incomplete mixing or failure to add hardener.

Acceptable

Decks had acceptable nonskid, soft nonskid, and sticky nonskid due to inadequate mixing – will need ASTM F718 updates.

Soft, sticky

areas

Samples scraped

off the deck

Soft, deformed nonskid

Sticky nonskid scraped off primer

Soft nonskid scraped off primer

DRAFT – FOUO – Predecisional Not Approved for Public Release

Publishing A-A-XX695

Commercial Item Description for Nonskid Mixer