14
Keeping our Promises Whitelee Windfarm Infrastructure Contract 90.5 km of access roads 59 km floating on deep peat Access Road Construction

Upload: others

Post on 15-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

90.5 km of access roads

59 km floating on deep peat

Access Road Construction

Page 2: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Wham Brae Culvert Construction

Page 3: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Floating Road Construction near Ardochrig

Page 4: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Crane Hardstanding Construction in Fluid

Peat

T39 – Array 7

Page 5: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

T39 – Array 7

T21 – Array 7

Turbine Base Excavation in Fluid Peat

Page 6: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

140 turbine bases

199,000 cu. m. engineered fill

50,000 cu. m. concrete

On site batching plant

Turbine Base Construction

Page 7: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Turbine Installation Operations

T39 – Array 7

Page 8: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Tower Sections

Page 9: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Nacelle Installation

Page 10: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Lifting the Blades

Page 11: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Ardochrig Substation

Lochgoin Control Building

986 km Cables HV/LV/SCADA

140 Transformers

Switchgear

Electrical Infrastructure

Page 12: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Lochgoin Reservoir – February 2009

Page 13: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Ardochrig Substation & Array 12 – February 2009

Page 14: Whitelee Windfarm Infrastructure Contract Access Road

Keeping our Promises

Whitelee Windfarm – Infrastructure Contract

Completed turbines between Dunwan Dam & Lochgoin Reservoir - June 2009