Whitelee Windfarm – Infrastructure Contract
90.5 km of access roads
59 km floating on deep peat
Access Road Construction
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Wham Brae Culvert Construction
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Floating Road Construction near Ardochrig
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Crane Hardstanding Construction in Fluid
Peat
T39 – Array 7
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
T39 – Array 7
T21 – Array 7
Turbine Base Excavation in Fluid Peat
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
140 turbine bases
199,000 cu. m. engineered fill
50,000 cu. m. concrete
On site batching plant
Turbine Base Construction
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Turbine Installation Operations
T39 – Array 7
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Tower Sections
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Nacelle Installation
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Lifting the Blades
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Ardochrig Substation
Lochgoin Control Building
986 km Cables HV/LV/SCADA
140 Transformers
Switchgear
Electrical Infrastructure
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Lochgoin Reservoir – February 2009
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Ardochrig Substation & Array 12 – February 2009
Keeping our Promises
Whitelee Windfarm – Infrastructure Contract
Completed turbines between Dunwan Dam & Lochgoin Reservoir - June 2009