• NATIONAL AND INTERNATIONAL COMPANY WITH A

TURNOVER OF €7.9bn

• NATIONALLY 250 EDUCATION PROJECTS VALUING £3.5 BILLION IN THE LAST 10 YEARS

• LOCALLY 35 EDUCATION PROJECTS VALUING £380 MILLION IN THE LAST 10 YEARS

• THE RIGHT LOCAL DELIVERY TEAM SUPPORTED FROM OUR BRISTOL OFFICE 4 MILES AWAY

• PROVEN TEAM THAT HAVE WORKED TOGETHER ON MANY SUCCESSFUL SCHOOL PROJECTS

Page 3: WIA New Build

A TIGHT AND CONSTRAINED SITE

Page 4: WIA New Build

AN EFFICIENT SOLUTION

Page 5: WIA New Build

CONNECTIVITY

Page 6: WIA New Build

THE RIGHT EDUCATIONAL SOLUTION

Page 7: WIA New Build

SOME OF THE HIGHLIGHTS

• NEW TECHNOLOGY MULTI MATERIALS FACILITY

• NEW MUSIC DEPARTMENT

• NEW 6TH FORM

• NEW SCIENCE, ART, MATHS, ENGLISH, HUMANITIES &MFL

• FLEXIBLE TEACHING SPACES

• INTERNATIONAL CORE WITH ALL DAY DINING FACILITY

• INTERACTIVE THEATRE

• NEW LARGE HALL AS WELL AS AN EXTENSION TO THE DRAMA HALL

• OUTDOOR TEACHING SPACES

• OUTDOOR DINING SPACES

• 2000M2 EXTRA OUTDOOR PLAY AREA

AND MUCH, MUCH MORE…….

Page 8: WIA New Build

Early Works

Technology & Sports Classrooms

Eliminating Temporary Classrooms with extra new build

Initial small site set up for Technology extension Aug 2012-Dec 2012

Early Asbestos surveys carried out during holiday periods

Minor enabling works and further investigation surveys carried out during this phase in preparation for new build

Classrooms built on sports hall viewing platform

Main Works

Maximising New Build

New building including new 6th form and music: Integrating with the existing buildings and eliminating Wet Travel

Full site set up but Academy remains fully operational

Carefully planned site logistics

Main build construction takes place Dec 2012-July 2014

July 2014 Academy fully decants into new building

Final Phase

Demolition of the old creating masses of external hard play

2200sqm more external space than you currently have

Demolition of old buildings and construction of external landscape July 2014-Dec 2014

BAM on site following completion of new build to support Academy

Extended aftercare

APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION

Page 9: WIA New Build

APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION

Page 10: WIA New Build

APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION

Page 11: WIA New Build

APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION

Page 12: WIA New Build

CONSIDERATE CONTRACTORS

WE HAVE BEEN NAMED THE

“MOST CONSIDERATE CONTRACTOR”

• INDUSTRY STANDARD SCORE = 32 /40

• BAM AVERAGE SCORE = 35.5 /40

WE ALWAYS ACHIEVE

“PERFORMANCE BEYOND COMPLIANCE”

ON OUR PROJECTS

Page 13: WIA New Build

ANY QUESTIONS?