Page 1: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Work Zone Impact Strategies

Module 6

Page 2: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated
Page 3: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

TMP Overview 3

Identification of TMP Strategies Should be based on:

type of work zone traffic conditions anticipated WZ impacts project constraints construction phasing/staging plan conditions in surrounding area (e.g.,

alternate routes and modes, access)

Page 4: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

TMP Overview 4

Some Considerations Agency WZ policies

E.g., Maximum WZ queue lengths/delays allowed

Lane Closure policies/charts that specify when a lane closure is permitted

Analytical/modeling tools used by the agency

Concerns of stakeholders

Page 5: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Successful Strategies

Minimize traffic delays Maintain or improve safety for road users

and workers Maintain business and resident access Allow timely completion of the work

Page 6: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Work Zone Mobility Strategies

Full Closure Phasing/ Staging Restrict hours of operations Manage Demand Maintain Capacity

Page 7: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Full Closure

Provision in Subpart K Safest for workers Typically shortens project duration Used successfully in urban areas where

alternate route network exists

Page 8: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Full Road Closure Strategies

Full road closureWeekend full closureLimited capacity closureNighttime/off-peak closureIntermittent closure including rolling

roadblocks

Page 9: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Full Road Closure

Page 10: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Partial Road Closure

Page 11: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Full Closure Example

Full Closure of I-95 near Wilmington, DE (7 months) Ads in local newspapers,

outreach events, public meetings, “Survival Guide,” colorful character known as the traffic “creep,” radio, Express bus routes

The morning the full closure started, media were on hand to witness the congestion they expected would ensue. Questioning whether they were in the right place, the media were confused by the lack of congestion

Page 12: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

0

10

20

30

40

50

60

70

80

90

100

OR I-84 KY I-65 MI M-10 OH I-670 WA SR-395 DE I-95

% reduction in project duration

Source: Full Road Closure for Work Zone Operations

Page 13: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Phasing/staging

By Halves/Sides

Adjacent/Parallel

Serial/Segmental

Closure/Detour

Combinations

Page 14: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Lane Closure

Page 15: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

One-Lane/Two-Way Operation

Page 16: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Runaround

Page 17: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Intermittent Closure

Page 18: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Lane Shift

Page 19: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Roadway Shift

EXISTING

PROPOSED

20’

Page 20: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Applications

Crossover

Page 21: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated
Page 22: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Restrict Hours of Work

Night work only Lane closure restrictions

Work when traffic volumes are lower Louisiana RS 48:279 - how is this

implemented?

Page 23: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Night Work

Page 24: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

But do it safely

Page 25: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Recent Research

NCHRP 475 – Procedures to Determine when to Undertake Night Work

NCHRP 476 – Guidelines for Design and Operation of Nighttime Traffic Control

Page 26: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Ohio DOT MOT/PLC Policy

Page 27: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Operational Strategies

Improvements to alternate route to accommodate additional traffic during project

Traffic Signal retiming Intersection geometric improvements – commercial

vehicles

Incident management plan for work zoneDemand reduction strategies

Page 28: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Manage Demand

Reduce demand to match reduced capacity through work zone

Cooperation from business, transit, and public necessary

Page 29: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Managing Demand (Vehicle Flow) Through WZ

Unm

anaged demand

Managed dem

andReduce daily person trips * Reduce daily

vehicle trips (via mode &

occupancy rate)

Reduce daily vehicles thru work

zone (via alternative routes)

Attenuate vehicle flow rate thru work

zone *

* Requires partnering with business & employers

Page 30: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Manage Demand: Reduce Total Travel Discourage discretionary travel Redefine essential travel (temporarily) Non-traditional work schedules (e.g., 4-day

weeks) Telecommuting Cooperation/support of major employers

needed

31

Page 31: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Manage Demand: Reduce Vehicle Trips

Special express bus Additional transit

service Van and car pooling Agency led; employer

support helpful

Page 32: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Manage Demand: Reduce Vehicles Through Work Zone

Encourage alternative routes Agency led

Page 33: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Manage Demand: Attenuate Vehicle Flow Rate

Work Zone Vehicle Flow Rate

0

500

1000

1500

2000

2500

3000

Time of day

Ve

hic

le f

low

ra

te (

ve

h/h

ou

r)

UnmanagedManaged/attenuated

Page 34: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Maintain or Augment Capacity

• Advance work to maintain capacity – Widen/strengthen shoulders and utilize during

construction– Build structure off site and move with

complete closure– Others?

Page 35: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Maintain and Augment Capacity Utilize/widen shoulder Diversion Reversible lanes Parallel route improvements Visual barriers

Page 36: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Reversible lane with moveable barrier

Page 37: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Shift to utilize shoulder

Page 38: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Maintain and Augment Capacity Alternative Modes

o Bus o Rail transito Commuter rail

Incentives

Page 39: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Innovative Contracting Strategies

Design – Build Accelerates process – work can begin as design is

being completed A + B Bidding

Encourages reduced construction time Minimizes impacts

Lane Rental Charge assesses to contractor for lane closure

Incentive/Disincentive Encourages contractor to minimize construction time

Page 40: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Public Information StrategyEngage Stakeholders early

Determine their needs Will they cooperate with other strategies

Inform public of possible work zone impacts Significant projects may require major PR

campaignPublic may not be happy, but possibly “less

mad…”

Page 41: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Project Coordination Coordination with other projects

Ensure TMPs for all projects are coordinated Signing Lane Closures Work restrictions

Utilities coordination Schedule necessary adjustments to avoid construction delays

Identify and begin early Separate contract?

Right-of-way coordination Determine needs early

Coordination with other transportation infrastructure Transit Railroads

Page 42: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Example Decision Matrix

Page 43: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Analyzing Alternatives - Comparison of Impacts

Viable Alternatives Need to Address:

1. Community Impacts

2. Traffic Impacts

3. Safety Impacts

4. Duration - exposure

5. Agency Responsibilities

6. Constructability

7. Benefit vs. Cost

Page 44: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Community Impacts Other User

Accommodations “In urban or suburban areas where

pedestrian activity is likely, pedestrian access must also be provided during construction. This may require providing temporary sidewalks, protection from drop offs, adjustment to traffic signals, etc.” (BDE)

“The needs and control of all road users through a work zone shall be an essential part of highway construction, utility work, maintenance operations, and the management of traffic incidents.” (MUTCD)

Page 45: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

All Road Users Accommodated?

Page 46: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Community Impacts Maintaining access to adjacent properties

Effects of Work Zone on Businesses

Page 47: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Community Impacts

Miscellaneous

“Unofficial” detour phenomenon

Other facility users

Page 48: Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated

Questions?