Climate Resilient Participatory Afforestation and Reforestation Project
PROCUREMENT PLAN
Version: 5.1
Bangladesh Forest Department
Ministry of Environment and Forests
Updateded on 02/07/2015
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Contract Value
(Threshold)
Goods >=US$ 2,000,000 ICB All contracts
<US$2,000,000 NCB First contract by the project regardless of value in NCB and
thereafter, all contracts valued $1,000,000 or more
DC All contracts
<=BDT 5,00,000 RFQ/ Shopping Post review
>= US$10,000,000 ICB All contracts.
<US$10,000,000 NCB All contracts valued US$10,000,000 or more
<=BDT 10,00,000 RFQ/ NS Post review
DC All contracts
<US$500,000 FBS All contracts valued $500,000 or more
<US$300,000 LCS Post review
<US$300,000 CQ Post review
IC All contracts valued US$300,000 or more; Procurement and FM
Consultant Irrespective of value
Selective contracts meeting the
requirements of 3.8 to 3.11 of the
Consultant Guidelines
SSS Prior agreement
Services All contracts valued $500,000 or more
Agreed Procurement Threshold as per Grant Agreement
Expenditure
Category
Procurement Method Contracts Subject to Prior Review
Works
>=US$500,000 QCBS /QBS
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls Threshold
Total estimated value of
contract (in Lakh Taka)
Total number of
packages
Number of contract
awarded up to
02/07/2015
Total value of awarded
contracts up to 02/07/2015
1 Goods 4711.202 195 135 -
2 Works 2438.692 37 19 -
3 Services** 4291.540 24 14 -
4 Non Cons. Services 3024.791 11 10 -
Total 14466.225 267 178 0
Taka in Lac
**Service conducted for Total Project period
Procurement Plan Summary
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls Summary
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
2
3 BFD/G1 Supply of Laptop (No 28), Desktop (No
12) & Printers (No 12)
Lot 1 40.4 (31.22) 49.877 NCB BG Yes 11/22/2013
(11/19/2013)
2/9/2014
(3/3/2014)
3/23/2014
(5/18/2014)
Flora limited
4 BFD/G2 Supply of Cross Country Vehicle No 1 65.00 (67.76) 80.247 NCB BG No 12/10/2013
(12/24/2013)
2/18/2014
(5/18/2014)
4/1/2014
(6/17/2014)
Pragoti I.L
5 BFD/G6 Supply of Photocopiers (12 No) and
Multimedia projectors (2 No)
Lot 1 25.00 (16.26) 30.864 NCB BG No 4/28/2014
(4/28/2014)
6/16/2014
(6/5/2014)
7/14/2014
(6/26/2014)
Flora limited
6 BFD/G112 Purchasing of Promotional/Branding
items for CRPAR Project
Lot 1 2.00 (1.95) 2.469 RFQ BG No 6/6/2014
(6/8/2014)
6/20/2014
(6/25/2014)
7/4/2014
(6/28/2014)
Espiration
Enterprise
7
8 BFD/G3 Supply of Double Cabin Pick-up No 1 50.00 (42.40) 61.728 NCB BG No 12/10/2013
(12/24/2013)
2/18/2014
(5/18/2014)
4/1/2014
(8/28/2014)
RANGS L.
9 BFD/G4 Supply of Motor Cycles No 40 60.00 74.074 NCB BG No 5/29/2014
(6/5/2014)
8/7/2014
(8/28/2014)
9/18/2014
(9/3/2014)
Grameen
Motors
10 BFD/G5 Supply of Mechanised Patrol Vessel No 20 120.00 864.198 NCB BG No 6/1/2015 7/31/2015 7/30/2016
11 BFD/G7 Supply of Furniture for PIU Lot 1 5.00 6.173 RFQ BG No 8/15/2014
(11/11/2014)8/29/2014
(11/30/2014)
9/12/2014 Otobi Limited Re-
Invitation of
RFQ
12 BFD/G8 Supply and Installation of Air cooler No 6 9.70 11.975 NCB BG No 2/15/2015 4/1/2015 5/1/2015
13 BFD/G9 Procurement of Equipments (Computer
Accessories and others) for RIMS Unit for
its upgradation
Lot 1 33.00 40.741 NCB BG No 2/15/2015 4/1/2015 5/1/2015
14 BFD/G114 Supply of Furniture Lot 1 15.00 18.519 NCB BG No 2/15/2015 4/1/2015 5/1/2015
15 BFD/G115 Procurement of equpiments required for
providing internet facilities at PIU.
No 1 0.50 0.617 RFQ BG No 9/25/2014 10/9/2014 10/30/2014
16 BFD/G196 Procurement of automated Accounting
and Financial Mgt. Software for CRPARP.
No 1 4.9 (4.65) 6.049 RFQ BG No 9/25/2014
(12/1/2014)
10/9/2014
(12/23/2014)
11/8/2014
(1/22/2015)Impel Services and
Solutions Ltd.
17 1010.500
18
19
20
21 BFD/G10 Poly-propylene Nursery Bags (7" x 5" size)
(Nusery Materials-153600 nos.)
Lot 1 1.152 (1.152) 1.422 RFQ BG NO 11/3/2013
(11/3/2013)
11/17/2013
(11/14/2013)
12/17/2013
(11/24/2013)
M/S Nasrin
Traders
22 Bariala Bamboo (Nusery Materials) 256
nos.
Lot 1
Fiscal Year : 2013-2014
Social Forest Division, Barisal
11/14/2013
(11/22/2013)
M/S Sonia
Const.10/15/2013
(11/12/2013)
Packages Completed in FY: 2013-2014
Packages Carried over to FY: 2014-2015
BFD/G11 RFQ BG
Procurement Plan for Goods Contract for CRPAR Project
NO 10/1/2013
(10/1/2013)
Project Implementation Unit (PIU)
1.0620.86 (0.86)
Estimated value, PIU Total=
Field Offices (10 Forest Divisions)
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 4 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
23 Muli Bamboo (Nusery Materials) 512 nos.
24 Sungrass (Nusery Materials) 128 bundle
25 BFD/G12 Nursery Equipments LS LS 0.51 (052) 0.6296 RFQ BG NO 9/22/2013
(9/29/2013)
10/6/2013
(11/12/2013)
11/5/2013
(11/22/2013)
M/S Sonia
Const.
26 BFD/G13 Stakes (Planting Materials) Nos. 140800 3.52 (3.49) 4.346 RFQ BG NO 4/15/2014
(5/5/2014)
4/29/2014
(5/11/2014)
5/29/2014
(5/18/2014)
Khayer &
Brothers
27 BFD/G14 Cowdung (Planting Materials) Kg. 64000 1.92 (1.92) 2.3704 RFQ BG NO 4/15/2014
(4/16/2014)
4/29/2014
(5/11/2014)
5/29/2014
(5/18/2014)
M/S Janani
Traders
28 BFD/G15 Fertilizer (Planting Materials) Kg. 8960 2.24 (2.24) 2.7654 RFQ BG NO 4/15/2014
(5/7/2014)
4/29/2014
(5/11/2014)
5/29/2014
(5/18/2014)
Khayer &
Brothers
29 BFD/G101 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Barisal Social FD
man-days 4928 14.784
(14.784)
18.252 Force
AccountBG No
30 BFD/G109 Supply of Arhar seed Kg 256 0.256 (0.256) 0.316 RFQ BG No 4/15/2014
(5/7/2014)
4/29/2014
(5/11/2014)
5/29/2014
(5/18/2014)
Janani Traders
31 BFD/G110 Supply of Stationeries for Plantation
journal
Lot 1 0.32 (0.32) 0.395 RFQ BG No 5/15/2014
(6/9/2014)
5/29/2014
(6/18/2014)
6/29/2014
(6/23/2014)
Khayer &
brothers
32 BFD/G111 Supply of equipments for Plantation Lot 1 0.32 (0.32) 0.395 RFQ BG No 5/15/2014
(6/9/2014)
5/29/2014
(6/12/2014)
6/29/2014
(6/22/2014)
Nusrat Traders
33
34 BFD/G16 Poly-propylene Nursery Bags in 7´´x 5´´
size (Nusery Materials-)
Lot 1 0.54 (0.54) 0.667 RFQBG
No 11/3/2013
(10/31/2013)
11/17/2013
(12/5/2013)
12/17/2013
(12/18/2013)
M/S Nasrin
Traders
35 BFD/G17 Compost/Decomposed Cowdung/
(Planting and Nursery Materials-)
cum. 33 0.281 0.347 RFQ
36 BFD/G18 Cowdung /Decomposed Cowdung
(Nursery and Planting Materials-)
Kg. 30000 0.885 (0.885) 1.093 RFQ BG No 12/10/2013
(12/17/2013)
12/24/2013
(3/12/2014)
2/24/2014
(3/18/2014)
M/S Alam
Traders
37 Bariala Bamboo(Nusery Materials-
)180nos.
Lot 1 0.567 0.700
38 Muli Bamboo(Nusery Materials-)360nos.
39 Sungrass (Nusery Materials-)90bundle
40 BFD/G20 Stakes (Planting Materials-) Nos. 92400 1.655 (1.617) 2.043 RFQ BG No 2/10/2014
(12/17/2013)
2/24/2014
(6/4/2014)
4/25/2014
(6/10/2014)
M/S Alam
Traders
41 BFD/G21 Urea Kg. 5584 0.96 (0.959) 1.185 RFQ BG No 3/6/2014
(12/17/2013)
3/16/2014
(3/13/2014)
4/16/2014
(3/19/2014)
M/S Islam
Traders
42 BFD/G102 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Feni Social FD
man-
days
2402 7.206 (6.85) 8.896 Force
AccountBG No
Social Forest Division, Feni
DROPPED
DROPPED
11/14/2013
(11/22/2013)
M/S Sonia
Const.10/15/2013
(11/12/2013)
BFD/G11 RFQ BG
BFD/G19 RFQ
NO 10/1/2013
(10/1/2013)
1.0620.86 (0.86)
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 5 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
43
44 BFD/G22 Poly propylene nursery Bags 7" x5" bags
(1500000 nos) and 10" x 6" bags
(1464000 nos) (Nusery Materials-)
Lot 1 23.694
(22.19)
29.252 NCB BG No 10/15/2013
(10/24/2013)
12/10/2013
(11/25/2013)
1/21/2014
(1/8/2014)
M/S Badhan
Enterprise
45 BFD/G23 Soil cum. 4318.5 10.796
(10.795)
13.328 NCB BG No 12/30/2013
(12/31/2013)
2/17/2014
(1/15/2014)
3/31/2014
(1/23/2014)
CCA
46 BFD/G24 Compost/Decomposed Cowdung/
(Planting Materials-)
cum. 1439.374 12.235
(12.234)
15.105 NCB BG No 12/30/2013
(12/31/2013)
2/17/2014
(1/15/2014)
3/31/2014
(1/23/2014)
M/S Shakil
Enterprise
47 BFD/G25 Bariala Bamboo; Muli Bamboo, Sungrass
(Nusery Materials-)
Lot 1 16.144
(16.139)
19.931 NCB BG No 12/30/2013
(12/31/2013)
2/17/2014
(1/15/2014)
3/31/2014
(1/23/2014)
Fashion House
48 BFD/G26 Stationaries Lot 1 1.667 (1.65) 2.06RFQ
BG No 4/1/2014
(4/9/2014)
4/15/2014
(4/21/2014)
5/15/2014
(4/30/2014)
Hosting
Computer
49 BFD/G27 Bio-Pesticides Lot 1 0.7925
(0.783)
0.98RFQ
BG No 4/1/2014
(4/9/2014)
4/15/2014
(4/29/2014)
5/15/2014
(5/18/2014)
M/S Alamgir
Store
50 BFD/G28 GI Wire Kg. 333.95 0.334 (0.334) 0.4123 RFQ
BG No 12/1/2013
(12/5/2013)
12/15/2013
(1/9/2014)
1/14/2014
(1/23/2014)
Shakil
Enterprise
51 BFD/G29 Jute rope Kg 500.00 0.5 (0.495) 0.617 RFQ
BG No 4/1/2014
(4/9/2014)
4/15/2014
(4/21/2014)
5/15/2014
(4/28/2014)
M/S Shah
Amanat
Traders
52 BFD/G30 Nursery Equipments Lot 1 4.416 (4.36) 5.452RFQ
BG No 4/1/2014
(4/9/2014)
4/15/2014
(4/21/2014)
5/15/2014
(4/28/2014)
M/S Shah
Amanat
Traders
53 BFD/G31 Fertilizer (Nusery Materials-) Kg. 17934 4.48 (4.48) 5.5352 RFQ BG No 12/1/2013
(12/5/2013)
12/15/2013
(1/9/2014)
1/14/2014
(1/23/2014)
Fashion House
54 BFD/G32 Temporary shed materials Lot 1 3.690 4.56 RFQ
55 BFD/G33 Stakes (Planting Materials-) Nos 1250000 25.00 (24.94) 30.86 NCB BG No 2/22/2014
(3/13/2014)
4/12/2014
(5/8/2014)
5/23/2014
(5/18/2014)
M/S
Modhumati
Const.
56 Lot No. I : Supply of Compost/
Decomposed Cow-dung for plantation
raising under Fashiakhali, Fulchari,
Maherghona, PMKhali Range
796875 23.91 (22.89) 29.514 M/S Shakil
enterprise
57 Lot No. II: Supply of Compost/
Decomposed Cow-dung for plantation
raising under Bagkhali, Eidgao, Idgor and
Joarianala Range.
765625 22.969
(22.89)
28.356 M/S Fashion
House
58 BFD/G97 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Cox's Bazar North FD
man-days 73382 220.146
(220.146)
271.785 Force
AccountBG No
59
BG 4/24/2014
(5.27.2014)
No 6/26/2014
(6/11/2014)
6.12.2014
(6/4/2014)
DROPPED
Cox's Bazar North Forest Division, Cox's Bazar
Cox's Bazar South Forest Division, Cox's Bazar
BFD/G96 Kg NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 6 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
60 BFD/G34 Poly-propylene Nursery Bags in 7´´x 5´´
bags (3028800 Nos.) and 10´´x 6´´ bags
(1464000 Nos.)(Nusery Materials)
Lot 1 34.94 (34.35) 43.136 NCB BG No 3/21/2014
(3/24/2013)
5/2/2014
(4/7/2014)
5/23/2014
(4/21/2014
M/S Mahaboob
Corp
Rebidding
61 BFD/G35 Soil cum. 5556.00 13.89 (13.33) 17.148 NCB BG No 12/24/2013
(12/22/2013)
2/11/2014
(1/19/2014)
3/25/2014
(1/25/2014)
N.R
Enterprise
62 BFD/G36 Compost/Decomposed
Cowdung/(Nursery Materials)
cum. 1852.37 15.7452
(15.55)
19.439 NCB BG No 12/24/2013
(12/22/2013)
2/11/2014
(1/19/2014)
3/25/2014
(1/25/2014)
N.R
Enterprise
63 BFD/G37 Bariala Bamboo 8066 nos; Muli Bamboo
16136 nos; Sungrass (Nusery Materials-)
3349 bundle
1 25.187
(24.98)
31.095 NCB BG No 12/24/2013
(12/22/2013)
2/11/2014
(1/19/2014)
3/25/2014
(1/26/2014)
Mir
Shahedul
Islam
64 BFD/G38 Stationaries for official use Lot 1 1.5 (1.5) 1.852 RFQ BG No 1/20/2014
(1/26/2014)
2/3/2014
(2/13/2014)
2/17/2014
(3/4/2014)
Madhumati
Const.
65 BFD/G39 Bio- Pesticides Lot 1 1.135 (1.131) 1.401 RFQ BG No 1/20/2014
(1/23/2014)
2/3/2014
(2/13/2014)
2/17/2014
(2/25/2014)
Madhumati
Const.
66 BFD/G40 GI Wire Kg 465.0 0.465 (0.465) 0.574 RFQ BG No 1/20/2014
(1/23/2014)
2/3/2014
(2/13/2014)
2/17/2014
(2/20/2014)
Madhumati
Const.
67 BFD/G41 Nursery Equipments Lot 1 7.056 (7.05) 8.711 NCB BG No 2/24/2014
(3/5/2014)
4/15/2014
(4/28/2014)
5/26/2014
(5/8/2014)
Madhumati
Const.
68 BFD/G42 Fertilizer for Nursery Kg. 8184.00 2.046 (1.64) 2.526 RFQ BG No 1/20/2014
(1/23/2014)
2/3/2014
(2/13/2014)
2/17/2014
(2/24/2014)
Madhumati
Const.
69 BFD/G43 Temporary shed materials lot 1 2.161 2.668 RFQ
70 Lot No. I : Supply of Compost/
Decomposed Cow-dung for plantation at
Cox’s Bazar, Panerchara and Rajarkul
Range.
1093750.0 32.81 (32.15) 40.509 N.R
Enterprise
71 Lot No. II : Supply of Compost/
Decomposed Cow-dung for plantation at
Dhoapalong, Inani and Ukhiya Range.
1109375.0 33.28 (32.61) 41.088 N.R
Enterprise
72 Lot No. III : Supply of Compost/
Decomposed Cow-dung for plantation at
Whykong, Teknaf and Shilkhali Range.
921875.00 27.65 (27.10) 34.144 N.R
Enterprise
73 Lot No. I : Supply of Stakes for plantation
at Cox’s Bazar, Dhoapalong, Inani and
Rajarkul Range.
1187500 23.75 (23.51) 29.321 Mir Shahedul
Islam
74 Lot No. II : Supply of Stakes for plantation
at Ukhiya, Whykong, Shilkhali and Teknaf
Range.
1312500 26.25 (25.99) 32.407 Mir Shahedul
Islam
75 BFD/G98 Supply of Stationery for Nursery and
Plantation
Lot 1 3.884 (3.88) 4.795 RFQ BG No 5/1/2014
(5/6/2014)
5/15/2014
(5/12/2014)
5/29/2014
(5/14/2014)
M/S Hamid
Enterprise
NCB 5/24/2014
(6/5/2014)
Kg
BFD/G45
DROPPED
NCB 6/21/2014
(6/7/2014)
6/21/2014
(6/7/2014)
No.
5/24/2014
(6/5/2014)
BG No 4/5/2014
(5/26/2014)
BFD/G44
No 4/5/2014
(5/28/2014)
BG
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 7 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
76 BFD/G99 Supply of Urea for Plantation Kg 25000 6.25 7.716 NCB
77 BFD/G100 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Cox's Bazar South FD
man-days 129731 389.193
(389.19)
480.485 Force
AccountBG No
78
79 BFD/G46 Poly-propylene Nursery Bags 7´´x 5´´ bags
774000nos,Poly-propylene Nursery
Bags10´´x 6´´ bags 1650000nos bags
Lot 1 19.83 (19.83) 24.4815 NCB BG No 12/26/2013
(1/8/2014)
2/13/2014
(1/20/2014)
3/13/2014
(2/20/2014)
M/S Nasrin
Traders
80 BFD/G47 Soil (3940.75 Cubic Meter) cum. 3940.75 9.85 (9.85) 12.1605 NCB BG No 10/22/2013
(10/29/2013
12/10/2013
(12/31/2013)
1/7/2014
(1/24/2014)
M/S Jamal &
Brothers
81 BFD/G48 Cowdung /Compost (Nursery Materials-) cum. 1313.55 11.17 (11.16) 13.7901 NCB BG No 10/22/2013
(10/30/2013
12/10/2013
(12/31/2013)
1/7/2014
(1/24/2014)
M/S Jamal &
Brothers
82 BFD/G49 Bariala Bamboo 4040n0s; Muli Bamboo
9405nos;Sungrass (Nusery Materials-year-
1)2220 bundle
Lot 1 14.43 (14.34) 17.8148 NCB BG No 10/22/2013
(10/31/2013
12/10/2013
(1/2/2014)
1/7/2014
(1/25/2014)
M/S Rakib
Enterprise
83 BFD/G50 GI Wire (Nusery Materials-) Kg. 300 0.3 (0.26) 0.3704 RFQ BG No 1/10/2014
(1/23/2014)
1/24/2014
(2/26/2014)
2/21/2014
(3/5/2014)
M/S Jamal &
Brothers
84 BFD/G51 Survey, Nursery and Plantation
Stationaries
LS LS 0.88 (0.875) 1.0864 RFQ BG No 1/10/2014
(1/23/2014)
1/24/2014
(2/26/2014)
2/21/2014
(3/7/2014)
M/S Islam
Traders
85 BFD/G52 Nursery Equipments (Hose pipe,
Dao,Spade,Busket, Hoe, Cissors etc)
LS LS 4.36 (4.357) 5.3827 RFQ BG No 1/10/2014
(1/23/2014)
1/24/2014
(2/26/2014)
2/21/2014
(3/7/2014)
M/S Islam
Traders
86 BFD/G53 Biopesticides LS LS 0.638 (0.63) 0.7877 RFQ BG No 1/10/2014
(1/23/2014)
1/24/2014
(4/20/2014)
2/21/2014
(4/24/2014)
M/S K.R.
Traders
87 BFD/G54 Fertilizer (Nusery and planting materials-
)
Kg. 11494 2.24 (2.20) 2.7671 RFQ BG No 1/10/2014
(1/23/2014)
1/24/2014
(2/26/2014)
2/21/2014
(3/5/2014)
M/S Jamal &
Brothers
88 BFD/G55 Stakes (Planting Materials-) Nos. 645000 12.9 (12.25) 15.9259 NCB BG No 3/18/2014
(3/31/2014)
5/6/2014
(5/15/2014)
6/3/2014
(5/23/2014)
M/S Shah
Munir
Enterprise
89 BFD/G56 Cowdung /Compost (Planting Materials) Cum. 2832 24.0 (23.8) 29.6296 NCB BG No 4/22/2014
(6/4/2014)
6/10/2014 (
6/10/2014)
6/24/2014
(6/17/2014)
M/S Jamal &
BrothersRebidding
90 BFD/G103 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Ctg. North FD
man-
days
47849 143.548
(143.66)
177.220 Force
AccountBG No
91
92 BFD/G57 Poly-propylene Nursery Bags in 7´´x 5´´
bags (2237400 Nos.) and 10´´x 6´´ bags
(300000 Nos.)
(Nusery Materials)
Lot 1 19.33 (16.58) 23.86481 NCB BG No 10/22/2013
(11/18/2013)
12/10/2013
(12/26/2013)
1/7/2014
(1/13/2014)
M/S Nasrin
Traders
93 BFD/G58 Soil (Nursery Materials) cum. 2626.0 6.564 (6.56) 8.10479 NCB BG No 11/5/2013
(12/2/2013)
12/24/2013
(1/1/2014)
1/21/2014
(1/16/2014)
M/S Jamal &
Brothers
Chittagong North Forest Division, Chittagong
Chittagong South Forest Division, Chittagong
DROPPED
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 8 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
94 BFD/G59 Supply of Bariala bamboo, muli bamboo
and sungrass.
Lot 1 15.29 (15.22) 18.87654 NCB BG No 11/5/2013
(12/2/2013)
12/24/2013
(1/1/2014)
1/21/2014
(1/16/2014)
M/S Jamal &
Brothers
95 BFD/G59-A Supply of GI Wire (Nusery Materials) Kg 612 0.32 (0.314) 0.39506 RFQ BG No 3/1/2014
(3/16/2014)
3/15/2014
(5/8/2014)
3/29/2014
(5/16/2014)
M/S
Chowdhury
Traders
96 BFD/G60 Bio-Pesticides, (Nusery Materials) LS LS 2.23 (0.62) 2.7486 RFQ BG No 3/10/2014
(3/16/2014
3/24/2014
(5/8/2014)
4/24/2014
(5/16/2014)
M/S Mukti
Traders
97 BFD/G61 Nursery Equipment: (Spray Machine
32nos. Chalnee 32nos Jharna 32nos.
Spade32nos Dao 32nos.Hose Pipe 2630
ft.(N. Mate )
Lot 1 3.03 ( 2.24) 3.7417 RFQ BG No 3/10/2014
(3/16/2014
3/24/2014
(5/8/2014)
4/24/2014
(5/16/2014)
M/S
Tradelink
98 BFD/G62 Fertilizer (Nusery Materials-) Kg. 4651.90 1.396 ( 1.7235 RFQ
99 BFD/G63 Cowdung (Nursery Materials) cum. 876.00 7.4454 (7.43) 9.1919 NCB BG No 11/5/2013
(12/2/2013)
12/24/2013
(1/1/2014)
1/21/2014
(1/16/2014)
M/S Jamal &
Brothers
100 BFD/G64 Supply of Stationeries Lot 1 1.84 (1.81) 2.2716 RFQ BG No 3/10/2014
(3/16/2014
3/24/2014
(5/8/2014)
4/24/2014
(5/16/2014)
M/S
Chowdhury
Traders
101 BFD/G65 Stakes (Planting Materials) Nos. 1864500 37.45 (37.16) 46.2346 NCB BG No 4/22/2014 (
5/6/2014)
6/10/2014
(5/18/2014)
6/24/2014
(5/26/2014)
M/S Jamal &
Brothers
Rebidding
102 BFD/G66 Fertilizer (Planting Materials) Kg. 21015 6.304 (5.04) 7.7827 NCB BG No 1/25/2014
(2/3/2014)
3/15/2014
(3/9/2014)
3/29/2014
(3/20/2014)
M/S Jamal &
Brothers
103 BFD/G67 Cowdung (Planting Materials-) cum. 8141 69.20 (68.74) 85.4302 NCB BG No 4/22/2014 (
5/6/2014)
6/10/2014
(5/18/2014)
6/24/2014
(5/26/2014)
M/S Jamal &
Brothers
Rebidding
104 BFD/G104 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Ctg. North FD
man-
days
87661 262.983
(263.04)
324.670 Force
AccountBG No
105 BFD/G113 Supply of Jute rope kg 749 0.749 (0.745) 0.925 RFQ BG No 5/10/2014
(5/11/2014)
5/24/2014
(6/10/2014)
6/7/2014
(6/16/2014)
M/S Mukti
Traders
106
107 BFD/G68 Old fishing Net kg 310 0.363 0.4481 RFQ
108 BFD/G69 Poly-propylene bags (7´´x 5´´) 684480
nos; Poly-propylene bags (10´´x 6´´)
180000 nos; Poly-propylene bags (16´´x
9´´) 8250 nos.
Lot 1 6.663 (6.18) 8.2259 NCB BG No 10/22/2013
(11/4/2013)
12/10/2013 (
12/29/2013)
1/7/2014
(1/12/2014)
M/S Mukti
Traders
109 BFD/G70 Loamy Soil Nursery Materials
1067.18cum, Loamy Soil Planting
Materials 340cum.
Cum. 1407.18 3.373 (3.37) 4.1642 RFQ BG No 10/21/2013
(10/30/2013)
11/4/2013
(12/19/2013)
12/4/2013
(1/16/2014)
M/S Jamal &
Brothers
110 BFD/G71 Bariala Bamboo1558nos; Muli Bamboo
2976nos;Sungrass (Nursery Materials)
571bundle
Lot 1 4.657 (4.65) 5.7494 RFQ BG No 11/15/2013
(11/21/2013)
11/29/2013
(12/19/2013)
12/29/2013
(1/12/2014)
M/S Rakib
Enterprise
DROPPED
Coastal Forest Division, Chittagong
MERGED WITH PACKAGE BFD/G66
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 9 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
111 BFD/G72 Fertilizer (Urea) (Nursery and Plantation) Kg 12704.6 3.176 (2.52) 3.9210 RFQ BG No 12/21/2013
(12/30/2013)
1/4/2014
(1/22/2014)
2/3/2014
(2/28/2014)
M/S BRS
112 BFD/G73 Cow-dung (Nursery Materials)
356.1cum;Cow-dung (Plantation
Materials) 1991.6 cum.
Lot 1 19.787
(19.76)
24.4284 NCB BG No 10/22/2013
(11/7/2013)
12/10/2013 (
12/29/2013)
1/7/2014
(1/12/2014)
M/S Jamal &
Brothers
113 BFD/G74 Stakes (2.5m) (Planting Materials) 55440
nos; Stakes (2m) (Planting Materials)
537000 nos; Stakes (3.4m) (Planting
Materials)8400 nos.
Lot 1 12.798
(12.80)
15.8000 NCB BG No 2/10/2014
(2/12/2014)
3/31/2014
(4/10/2014)
4/28/2014
(4/17/2014)
M/S Jamal &
Brothers
114 BFD/G105 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Ctg. Coastal FD
man-
days
42305 126.915
(92.25)
156.685 Force
AccountBG No
115
116 BFD/G75 Cow dung Kg 91000 2.73 (2.75) 3.3704 RFQ BG No 9/23/2013
(9/25/2013)
10/7/2013
(10/24/2013)
11/7/2013
(4/30/2014)
M/S Jannat
Enterprise
117 BFD/G76 Stationeries: Lot 1 1.27 (1.269) 1.568 RFQ BG No 9/23/2013
(9/25/2013)
10/7/2013
(10/24/2013)
11/7/2013
(4/30/2014)
M/S Jannat
Enterprise
118 BFD/G77 Plantation and Nursery material and
equipment .
Lot 1 4.93 (4.92) 6.086 RFQ BG No 11/10/2013
(11/12/2013)
11/24/2013
(11/28/2013)
12/24/2013
(4/30/2014)
M/S Jannat
Enterprise
119 BFD/G78 Polypropyline bag. No. 65520 0.491 (0.491) 0.606 RFQ BG No 11/10/2013
(11/12/2013)
11/24/2013
(12/31/2013)
12/24/2013
(4/30/2014)
M/S Nasrin
Traders
120 BFD/G79 Fertilizer kg. 3128 0.93 (0.656) 1.148 RFQ BG No 2/10/2014
(2/25/2014)
2/24/2014 (
4/10/2014)
3/24/2014
(4/30/2014)
M/S Jannat
Enterprise
121 BFD/G106 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Noakhali Coastal FD
man-
days
35562 106.687
(82.63)
131.712 Force
Accoun
t
BG No
122
123 BFD/G80 Survey & preparation of pre-planting &
pre-nursery raising maps
nos 27 0.66 (0.66) 0.815 RFQ BG NO 9/24/2013
(9/30/2013)
10/8/2013
(10/24/2013)
10/29/2013
(11/03/2013)
M/S Nasrin
Traders
124 BFD/G81 Poly bag (16"x9") for Enrichment
Plantation
Lot 1 0.54 (0.54) 0.667 RFQ BG NO 9/24/2013
(9/30/2013)
10/8/2013
(10/24/2013)
10/29/2013
(11/03/2013)
M/S Nasrin
Traders
125 BFD/G82 Compost Cowdung- 100.28 Cum, poly
propylene bag (16"X9")-18000 nos and
soil-115.55 cum for mangrove nursery
Lot 1 1.14 (1.11) 1.407 RFQ BG NO 9/24/2013
(9/30/2013)
10/8/2013
(10/24/2013)
10/29/2013
(11/03/2013)
M/S Nasrin
Traders
126 BFD/G83 Poly bags (7 x 5) (nursery materials: ) nos 239280 1.795 (1.794) 2.216 RFQ BG NO 11/15/2013
(11/21/2013)
11/29/2013
(12/12/2013)
12/29/2013
(12/26/2013)
M/S Nasrin
Traders
127 BFD/G84 Soil ( nursery materials: ) 230
Cum,Compost/ Decomposed Cowdung for
nursery 74 Cum
Lot 1 1.2 (1.19) 1.481 RFQ BG NO 11/15/2013
(11/21/2013)
11/29/2013
(12/12/2013)
12/29/2013
(12/26/2013)
M/S Equra
Coastal Forest Division, Noakhali
Coastal Forest Division, Bhola
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 10 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
128 BFD/G85 Bariala bamboo ( nursery) 483 Nos,
Sungrass 260 bundle,Sieve / chaloni
(nursery material: ) 23 nos
Lot 1 1.718 (1.70) 2.121 RFQ BG NO 11/15/2013
(11/21/2013)
11/29/2013
(12/12/2013)
12/29/2013
(12/26/2013)
M/S Equra
129 BFD/G86 Compost/ Decomposed Cowdung for
plantations
Cum 729 6.196 (6.18) 7.649 NCB BG NO 4/5/2014
(4/21/2014)
5/24/2014
(5/8/2014)
6/21/2014
(5/21/2014)
M/S Naeem
Enterprise
130 BFD/G87 Urea (planting materials:) Kg. 6574 1.826 (1.823) 2.254 RFQ BG NO 4/25/2014
(5/6/2014)
5/9/2014
(5/18/2014)
6/9/2014
(8/6/2014)
Md.
Mahmudul
Hasan
131 BFD/G107 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Bhola Coastal FD
man-
days
26897 80.691
(38.90)
99.619 Force
AccountBG
132
133 BFD/G88 Poly-propylene Nursery Bags in 16´´x 9´´
bags 16500 nos ,Poly-propylene Nursery
Bags in 7´´x 5´´ bags 255600 nos.
Lot 1 2.412 (2.412) 2.978 RFQ BG No 11/1/2013
(11/13/2013)
11/15/2013
(11/24/2013)
12/15/2013
(12/4/2013)
M/S Nasrin
Traders
134 BFD/G89 Soil 313.82cum, Cowdung/Compost
192.16 cum.(Nursery Materials)
lot 1 2.4242 2.993 RFQ
135 BFD/G90 Bariala Bamboo 660 nos,
Hoglapata/Sungrass 213 bdl, Nursery
Shed
lot 1 2.0325 (2.02) 2.509 RFQ BG No 1/1/2014
(1/22/2014)
1/15/2014
(1/29/2014)
2/15/2014
(2/6/2014)
M/S Khairun
Nahar
136 BFD/G91 Mangrove Nursery (i) Nursery materials
(Bamboo baskets, Gunny bags, shootly,
ropes etc.) (ii) Watcher Shed materials
(Hoglapata, Poles etc.) (iiI) Nursery
Fencing materials (Fishing nets, poles etc.)
(iv) Cowdung/compost (v) stationeries
Lot 1 3.84 (3.834) 4.741 RFQ BG No 10/15/2013
(10/22/2013)
10/29/2013
(10/28/2013)11/29/2013
(11/1/2013)
M/S Munna
Enterprise
137 BFD/G92 Urea (Nursery & Plantation Materials) Kg 7890 1.9725 2.435 DPM BG No 3/8/2014 3/22/2014 4/21/2014
138 BFD/G93 Stationaries (Nursery & Plantation
Materials)
LS LS 1.3004 (1.28) 1.605 RFQ BG No 1/1/2014
(1/22/2014)
1/15/2014
(1/29/2014)
2/15/2014
(6/6/2014)
M/S Shadhin
Enterprise
139 BFD/G94 Cowdung/Compost (Planting Materials-) Kg 192750 5.7825 (4.39) 7.139 RFQ BG No 5/20/2014
(5/29/2014)
6/3/2014
(6/2/2014)
6/17/2014
(6/9/2014)
M/S Munna
Enterprise
140 BFD/G95 Stakes (Planting Materials-) Nos. 333900 9.892 (9.87) 12.212 NCB BG No 4/24/2014
(5/29/2014)
6/12/2014
(6/2/2014)
6/26/2014
(6/9/2014)
M/S Munna
Enterprise
141 BFD/G108 Engaging daily labours in plantation and
nersury program (Non-consulting
services) for Patuakhali Coastal FD
man-
days
42397 127.191
(112.82)
157.026 Force
AccountBG No
142 2281.610
143
Coastal Forest Division, Patuakhali.
Estimated Price (Field Offices Total) :FY 2013-2014=
DROPPED
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 11 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
144
145
146
147
148 Social Forest Division, Feni
149 BFD/G116 Supply of Poly-propylene Nursery Bags Lot 1 0.765
(0.765)
0.944 RFQBG
No 10/1/2014
(10/22/2014)
10/15/2014
(11/16/2014)11/14/2014 M/S. Nasrin
Traders
150 BFD/G117 Supply of Compost/Decomposed
Cowdung and Loamy soil
Lot 1 1.680
(1.677)
2.074 RFQ BG No 10/1/2014
(10/22/2014)
10/15/2014
(11/16/2014)11/14/2014 M/S. Sumon &
Brothers
151 BFD/G118 Supply of Bamboo No 165 0.33
(0.330)
0.407 RFQ BG No 10/1/2014
(10/22/2014)
10/15/2014
(11/16/2014)11/14/2014 M/S. Alam
Traders.
152 BFD/G119 Supply of Urea fertilizer Kg 5439 0.87
(0.870)
1.074 RFQ BG No 10/1/2014
(10/22/2014)
10/15/2014
(11/16/2014)11/14/2014 M/S. Sumon &
Brothers
153 BFD/G120 Supply of Stakes (Planting Material) No 94500 2.360 2.914 RFQ BG No 4/1/2015 4/15/2015 5/15/2015
154 Coastal Forest Division, Noakhali
155 BFD/G121 Supply of Cow dung and soil Lot 1 4.37
(3.974)
5.395 RFQ BG No 9/13/2014 9/27/2014 10/27/2014 M/S. Kabir
Traders
156 BFD/G122 Supply of Stationeries LS LS 2.600
(2.600)
1.975 RFQ BG No 9/1/2014 9/15/2014 10/15/2014 B.K Traders
157 BFD/G123 Supply of Bariala bamboo No 1300 4.489
(3.434)
2.407 RFQ BG No 9/1/2014 9/15/2014 10/15/2014 Ahsan & Sons
158 BFD/G124 Supply of old fishing net, nylon rope and
gunny bag
Lot 1 1.6022
(1.602)
4.259 RFQ BG No 9/1/2014 9/15/2014 10/15/2014 B.K Traders
159 BFD/G125 Supply of poly propylyne bag No 117760 0.8832
(0.788)
1.090 RFQ BG No 10/1/2014 10/15/2014 11/14/2014 M/S. Nasrin
Traders
160 BFD/G126 Supply of stakes for plantation Lot 1 4.300
(4.116)
5.309 RFQ BG No 9/1/2014 9/15/2014 10/15/2014 Ahsan & Sons
161 BFD/G127 Supply of Fertilizer kg. 4974 1.044
(0.903)
1.289 RFQ BG No 10/1/2014 10/15/2014 11/14/2014 Ahsan & Sons
162 Coastal Forest Division, Bhola
163 BFD/G128 Procurement of survey and mapping
materials
Lot 1 1.305 (1.30) 1.611 RFQ BG No 9/10/2014
(10/28/2014)
9/24/2014
(11/9/2014)
10/24/2014 M/S Afroza &
Ten Sports
164 BFD/G129 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 16´´x 9´´ )
Lot 1 2.36 (2.36) 2.914 RFQ BG No 9/10/2014
(9/29/2014)
9/24/2014
(10/14/2014)
10/24/2014 M/S Sonia
Construction
165 BFD/G130 Supply of soil and decomposed cowdung
for nursery
Lot 1 2.74 (2.71) 3.383 RFQ BG No 9/10/2014
(9/29/2014)
9/24/2014
(10/14/2014)
10/24/2014 M/S Hyder
Builders
Fiscal Year : 2014-2015
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 12 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
166 BFD/G131 Procurement of nursery materials (Bariala
bamboo, sungrass, sieve etc. )
Lot 1 1.957 (1.70) 2.416 RFQ BG No 9/10/2014
(9/29/2014)
9/24/2014
(10/14/2014)
10/24/2014 Md. Humayun
Kabir Noman
167 BFD/G132 Supply of decomposed cowdung for
plantation
Cum 563.0 4.785 5.907 RFQ BG No 3/1/2015 3/15/2015 4/14/2015
168 BFD/G133 Supply of Urea for plantation Kg 7580.0 1.895 2.340 RFQ BG No 3/1/2015 3/15/2015 4/14/2015
169 Chittagong North Forest Division, Chittagong
170 BFD/G134 Supply of soil and decomposed cowdung
for nursery raising
Lot 1 20.55 (20.40) 25.370 NCB BG No 10/1/2014
(10/20/2014)
11/15/2014
(11/18/2014)
12/13/2014 M/S. Jamal &
Brothers
171 BFD/G135 Supply of Bariala Bamboo, Muli bamboo
and sungrass
Lot 1 17.18 (17.08) 21.210 NCB BG No 10/1/2014
(10/20/2014)
11/15/2014
(11/18/2014)
12/13/2014 M/S. Jamal &
Brothers
172 BFD/G136 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 10´´x 6´´ )
Lot 1 22.542
(22.36)
27.830 NCB BG No 10/1/2014
(10/20/2014)
11/15/2014
(11/10/2014)
12/13/2014 M/S. Nasrin
Traders
173 BFD/G137 Supply of various nursery materials (
Equipment , GI wire, Rope etc.)
Lot 1 2.375 2.932 RFQ BG No 10/1/2014 11/15/2014 12/13/2014
174 BFD/G138 Procurement of fertilizer for nursery Kg. 4570 1.880 2.321 RFQ BG No 9/21/2014 10/5/2014 11/2/2014
175 BFD/G139 Supply of nursery stationaries LS LS 1.452 1.793 RFQ BG No 10/15/2014 10/29/2014 11/28/2014
176 BFD/G140 Procurement of Stakes No 2956250 59.125 72.994 NCB BG No 12/1/2014 1/15/2015 2/12/2015
177 Lot I: supply of Decomposed cowdung for
plantation
cum 6343 53.920 66.568
178 Lot 2: supply of Decomposed cowdung for
plantation
cum 6067 51.570 63.667
179 BFD/G142 Procurement of fertilizer for plantation Kg 25625 4.933 6.090 RFQ BG No 3/8/2015 3/22/2015 4/19/2015
180 Chittagong South Forest Division, Chittagong
181 BFD/G143 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 10´´x 6´´ )
Lot 1 36.28 (36.15) 44.790 NCB BG No 10/15/2014
(10/26/2014)
11/29/2014
(11/20/2014)
12/27/2014 M/S. Mukti
Traders
182 BFD/G144 Supply of soil for nursery raising cum 4724 11.81 (11.76) 14.580 NCB BG No 11/10/2014
(11/24/2015)
12/25/2014
(12/22/2015)
1/22/2015 M/S. Jamal &
Brothers
183 BFD/G145 Supply of decomposed cowdung for
nursery raising
cum 1575 13.39 (13.38) 16.531 NCB BG No 11/10/2014
(11/24/2015)
12/25/2014
(12/22/2015)
1/22/2015 M/S. Jamal &
Brothers
184 BFD/G146 Supply of Bariala Bamboo, Muli bamboo
and sungrass for Nursery program
Lot 1 28.883
(28.78)
35.658 NCB BG No 11/10/2014
(11/24/2015)
12/25/2014
(12/22/2015)
1/22/2015 M/S. Jamal &
Brothers
185 BFD/G147 Procurement of Nursery materials and
equipment (Spray machine, sieve, jhama,
Hose pipe, GI wire etc.)
Lot 1 2.86 (2.85) 3.531 RFQ BG No 2/1/2015
(1/15/2015)
2/15/2015
(1/25/2015)
3/15/2015 Trade Ling
186 BFD/G148 Supply of Bio-pesticides for Nursery LS LS 0.584 0.721 RFQ BG No 3/1/2015 3/15/2015 4/12/2015
187 BFD/G149 Supply of Fertilizer for Nursery Kg 8788 1.780 2.198 RFQ BG No 4/1/2015 4/15/2015 5/13/2015
12/13/2014BG No 12/1/2014
Th
e p
lan
ne
d
da
tes h
as b
ee
n m
od
ifie
d a
s p
er
fie
ld c
on
text
with
th
e s
ug
ge
stio
ns b
th
e c
on
ce
rne
d
DF
O.
BFD/G141 NCB 11/15/2014
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 13 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
188 BFD/G150 Supply of Stationeries (Nursery and
Plantation)
Lot 1 2.030 2.506 RFQ BG No 4/7/2015 4/21/2015 5/19/2015
189 BFD/G151 Supply of Fertilizer for Plantation Raising Kg 39600 7.920 9.778 NCB BG No 4/1/2015 5/16/2015 6/13/2015
190 BFD/G152 Supply of Jute rope for Plantation Raising Kg 1581 1.581 1.952 RFQ BG No 4/5/2015 4/19/2015 5/17/2015
191 Lot I: Supply of Stakes (Planting Material) No 1950000 39.000 48.148
192 Lot II: Supply of Stakes (Planting Material) No 1839400 36.788 45.417
193 Lot I: Supply of decomposed cowdung
(Planting material)
cum 4050 34.425 42.500
194 Lot II: Supply of decomposed cowdung
(Planting material)
cum 4100 34.850 43.025
195 Lot III: Supply of decomposed cowdung
(Planting material)
cum 4100 34.850 43.025
196 Lot IV: Supply of decomposed cowdung
(Planting material)
cum 4295 36.507 45.070
197 Coastal Forest Division, Chittagong
198 BFD/G155 Supply of old fishing nets Kg 609 0.67 (0.596) 0.827 RFQ BG No 9/18/2014
(9/22/2014)
10/2/2014
(10/13/2014)
10/30/2014 M/S Chowdhury
Traders
199 BFD/G156 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 10´´x 6´´ )
Lot 1 6.797 (6.79) 8.391 NCB BG No 10/1/2014
(10/22/2014)
11/15/2014
(11/16/2014)
12/13/2014 M/S Chowdhury
Traders
200 BFD/G157 Supply of soil and decomposed cowdung
for nursery
Lot 1 4.91 (4.89) 6.062 RFQ BG No 11/1/2014
(10/29/2014)
11/15/2014
(11/12/2014)
12/13/2014 M/S S.M. Traders
201 BFD/G158 Supply of Bariala Bamboo, Muli bamboo
and sungrass for Nursery program
Lot 1 4.553 (4.51) 5.621 RFQ BG No 11/1/2014
(10/29/2014)
11/15/2014
(11/12/2014)
12/13/2014 M/S Rakib
Enterprise
202 BFD/G159 Supply of Urea for Nursery development Kg 1669 0.334 0.412 RFQ BG No 12/27/2014 1/10/2015 2/7/2015
203 BFD/G160 Supply of stakes (Planting Material) Lot 1 20.700 25.556 NCB BG No 2/15/2015 4/1/2015 4/29/2015
204 BFD/G161 Supply of Decomposed cowdung for
plantation
kg 949750 28.492 35.175 NCB BG No 3/1/2015 4/15/2015 5/15/2015
205 BFD/G162 Supply of sootly for Plantation work Kg 391 0.391 0.483 RFQ BG No 3/21/2015 4/4/2015 5/2/2015
206 BFD/G163 Supply of Urea for current plantation and
maintenance of previous plantation
Kg 13148 2.630 3.247 RFQ BG No 4/8/2014 4/22/2014 5/6/2014
207 Cox's Bazar North Forest Division, Cox's Bazar
208 BFD/G164 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 10´´x 6´´ )
Lot 1 29.12 (28.92) 35.951 NCB BG No 9/25/2014
(9/17/2014)
11/9/2014
(11/9/2014)
12/7/2014 M/S Chowdhury
Traders
BFD/G154 NCB
No 3/1/2015
Th
e p
lan
ne
d
da
tes h
as b
ee
n m
od
ifie
d a
s p
er
fie
ld c
on
text w
ith
th
e s
ug
ge
stio
ns b
th
e c
on
ce
rne
d
DF
O.
BG No 2/15/2015 5/16/2015
BFD/G153 NCB BG 5/30/20154/15/2015
4/1/2015
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 14 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
209 BFD/G165 Supply of soil and decomposed cowdung
for nursery
Lot 1 26.92 (27.53) 33.235 NCB BG No 10/1/2014 11/15/2014
(11/26/2014)12/13/2014 M/S Shakil
enterprise
210 BFD/G166 Supply of Bariala Bamboo, Muli bamboo
and sungrass
Lot 1 20.17 (20.14) 24.901 NCB BG No 10/1/2014 11/15/2014
(11/26/2014)12/13/2014 Mir Shahedul
Islam
211 BFD/G167 Supply of nursery equipments including
GI wire and bio-pesticides
Lot 1 6.33 (5.98) 7.815 NCB BG No 10/1/2014 11/15/2014
(11/26/2014)12/13/2014 N.R Enterprise
212 BFD/G168 Procurement of fertilizer for nursery Kg. 6751 1.35 (1.348) 1.667 RFQ BG No 10/15/2014 10/29/2014 11/26/2014 M/S Alamgir
Store
213 BFD/G169 Supply of nursery stationaries Lot 1 2.45 (2.40) 3.025 RFQ BG No 9/15/2014
(11/10/2014)
9/29/2014
(11/26/2014)10/27/2014 Hosting
Computers &
stnrs
214 BFD/G170 Supply of Arhar and Bogemdalia seeds for
plantation
Kg 2266 2.260 2.790 RFQ BG No 1/15/2015 1/29/2015 2/26/2015
215 BFD/G171 Supply of Jute rope Kg 1133 1.130 1.395 RFQ BG No 12/20/2014 1/3/2015 1/31/2015
216 Lot I: Supply of Stakes for Bufferzone
plantation
No 1612500 32.250 39.815
217 Lot 2: Supply of Stakes for Corezone
plantation
No 1220000 24.400 30.123
218 Lot I: Supply of Decomposed cowdung for
Bufferzone plantation
Kg 743750 22.310 27.543
219 Lot II: Supply of Decomposed cowdung for
Bufferzone plantation
Kg 781250 23.430 28.926
220 Lot III: Supply of Decomposed cowdung
for Corezone plantation
Kg 1187500 35.620 43.975
221 Lot IV: Supply of Decomposed cowdung
for Corezone plantation
Kg 828125 24.840 30.667
222 BFD/G174 Procurement of fertilizer for plantation Kg 28325 5.660 6.988 NCB BG No 2/1/2015 3/18/2015 4/15/2015
223 Cox's Bazar South Forest Division, Cox's Bazar
224 BFD/G175 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ and 10´´x 6´´ )
Lot 1 17.963
(17.955)
22.177 NCB BG No 10/1/2014
(10/30/2014)
11/15/2014
(11/17/2014)12/13/2014 Mahaboob Corp.
225 BFD/G176 Supply of soil and decomposed cowdung
for nursery
Lot 1 15.115
(15.09)
18.660 NCB BG No 10/1/2014 11/15/2014 12/13/2014 M/S Jaker Ullah
226 BFD/G177 Supply of Bariala Bamboo, Muli bamboo
and sungrass
Lot 1 12.971
(12.52)
16.014 NCB BG No 10/1/2014 11/15/2014 12/13/2014 M/S Jaker Ullah
227 BFD/G178 Supply of nursery equipments LS LS 3.73 (3.59) 4.605 RFQ BG No 9/25/2014 10/9/2014 11/6/2014 M/S Modhumati
Const.
2/15/2015 3/15/2015No 1/1/2015BG
No 1/1/2015 2/15/2015 3/15/2015BG
BFD/G172 NCB
BFD/G173 NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 15 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
228 BFD/G179 Procurement of fertilizer for nursery Kg. 4208 0.841 (0.847) 1.038 RFQ BG No 9/30/2014 10/14/2014 11/11/2014 M/S Modhumati
Const.
229 BFD/G180 Supply of Nursery stationaries including
GI wire and Bio-Pesticides
LS LS 1.62 (1.25) 2.000 RFQ BG No 9/15/2014 9/29/2014 10/27/2014 M/S Modhumati
Const.
230 BFD/G181 Supply of Plantation Stationeries LS LS 3.000 3.704 RFQ BG No 1/8/2015 1/22/2015 2/19/2015
231 Lot I: Supply of Stakes for plantation No 1072500 21.350 26.358
232 Lot 2: Supply of Stakes for plantation No 1220000 24.400 30.123
233 Lot I: Supply of Decomposed cowdung for
plantation
Kg 1333125 40.000 49.383
234 Lot 2: Supply of Decomposed cowdung for
plantation
Kg 1525000 45.750 56.481
235 BFD/G184 Procurement of fertilizer for plantation Kg 23025 4.605 5.685 RFQ BG No 2/25/2015 3/11/2015 4/8/2015
236 Social Forest Division, Barisal
237 BFD/G185 Supply of Poly-propylene Nursery Bags in
two different sizes ( 7´´x 5´´ )
No 64800 0.49 (0.486) 0.605 RFQ BG No 10/15/2014
(10/30/2014)
10/29/2014
(11/11/2014)11/26/2014 M/S Nasrin
Traders
238 BFD/G186 Supply of Stakes for Plantation No 87560 2.190 2.704 RFQ BG No 3/28/2015 4/11/2015 5/9/2015
239 BFD/G187 Supply of Decomposed cowdung for
plantation
Kg 27000 0.810 1.000 RFQ BG No 3/20/2015 4/3/2015 5/1/2015
240 BFD/G188 Procurement of fertilizer for plantation Kg 3780 0.950 1.173 RFQ BG No 4/1/2015 4/15/2015 5/15/2015
241 Coastal Forest Division, Patuakhali.
242 BFD/G189 Supply of Poly-propylene Nursery Bags in
16´´x 9´´ and in 7´´x 5´´ sizes .
Lot 1 4.814 (4.81) 5.944 RFQ BG No 9/18/2014
(9/29/2014)10/2/2014 10/30/2014 M/S Nasrin
Traders
243 BFD/G190 Procurement of various mangrove
nursery materials
lot 1 4.815(4.80) 5.944 RFQ BG No 9/18/2014
(9/10/2014)
10/2/2014 10/30/2014 M/S Munna
Enterprise
244 BFD/G191 Supply of Bariala Bamboo and Hoglapata lot 1 4.1235 (4.11) 5.091 RFQ BG No 9/18/2014
(10/21/2014)10/2/2014 10/30/2014 Md. Azhar
Uddin
245 BFD/G192 Supply of soil and decomposed cowdung
for nursery raising
Lot 1 2.86 (2.86) 3.541 RFQ BG No 9/18/2014
(10/21/2014)10/2/2014 10/30/2014 Md. Baschu
Mia
246 BFD/G193 Supply of decomposed cowdung and urea
fertilizer for plantation raising
Lot 1 15.512 19.150 NCB BG No 2/1/2015 3/18/2015 4/15/2015
247 BFD/G194 Supply of stakes for plantation raising No 772150 23.008 28.405 NCB BG No 2/1/2015 3/18/2015 4/15/2015
248 BFD/G195 Supply of sootly and soil for plantation lot 1
249 BFD/G197 Supply of materials for nursery and
plantation.
lot 1 2.8336
(2.82)
3.498 RFQ BG No 9/25/2014 10/9/2014 11/6/2014 Md. Azhar
Uddin
250 Coastal Forest Division, Bhola
251 BFD/G198 Supply of Stationeries lot 1 1.000 1.235 RFQ BG No 12/15/2014 12/29/2014 1/12/2015
252 BFD/G199 Supply of Poles, Old fishing Nets,
Hoglapata, Spades, Basket for Golpata
Nursery raising.
lot 1 0.859 1.060 RFQ BG No 12/15/2014 12/29/2014 1/12/2015
BG
Proposed to be dropped by concerned DFO.
3/24/20152/24/2015
No 1/5/2015
BFD/G183 NCB BG No 1/15/2015
2/19/2015 3/19/2015BFD/G182 NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 16 PP-Goods
1 USD = 81 BDT
Sl. No. Contract
Package
Number
Contract Description Unit Qty/ Nos. Estimated
Price in lakh
Taka (Actual
Contract
Price in
Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Prior
Review
(Yes /
No)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Name of
Consultant/
Firm
Pro
gres
s o
f P
rocu
rem
ent
as o
f
02
/07
/20
15
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Goods Contract for CRPAR Project
253 BFD/G200 Supply of Gunny Bags, Nylon ropes,
Bamboo posts, Flags, Arhar seeds,
Sootly for plantation.
lot 1 1.687 2.083 RFQ BG No 12/22/2014 1/5/2015 2/2/2015
254 BFD/G201 Supply of Stakes for nursery and
plantation.
lot 1 16.361 20.199 NCB BG No 2/8/2015 3/25/2015 4/22/2015
255 Cox's Bazar South FD
256 BFD/G202 Supply of Office Stationaries Lot 1 1.500 1.852 RFQ BG No 1/20/2015 2/4/2015 2/25/2015
257 Project Implementation Unit (PIU)
258 Lot A: Procurement of ERDAS software and
related services for RIMS Unit No 1 30.00 37.04
259 Lot B: Procurement of ArcGIS software
and related services for RIMS Unit No 1 25.00 30.86
260 Procurement of Equipments for RIMS
upgrading and ICT equipment for field
networking
Lot 1 163.500 201.852 NCB BG No 5/8/2015 6/22/2015 8/6/2015
261 1419.092
262 4711.202
BFD/G204
BFD/G203
DC BG Yes
Field Offices Estimated Value (Goods) FY 2014-15=
Procurement Plan (Goods), Total=
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 17 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 18 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 19 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 20 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 21 PP-Goods
Rebidding
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 22 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 23 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 24 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 25 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 26 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 27 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 28 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 29 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 30 PP-Goods
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 31 PP-Goods
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated
Price in lakh
Taka (Actual
Contract Price
in Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R/B
G)
Pri
or
Rev
iew
2 (
Yes
/
No
)
Planned Date of
Bid Opening
(Actual Date of
Proposals
Submission)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Nam
e o
f C
on
sult
ant/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 0
9/0
3/2
01
4
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
2 Social Forest Division, Barisal
3BFD/W1 Installation of Plantation signboards at
various sites.
Lot 1 1.28 (1.28) 1.580 RFQ BG No 4/30/2014
(6/9/2014)
5/14/2014
(6/12/2014)
6/14/2014
(6/22/2014)
M/S Nusrat
Traders
4 Social Forest Division, Feni
5BFD/W2 Installation of Plantation signboards at
various sites.
Nos 15 0.96 (0.959) 1.185 RFQ BG No 4/15/2014
(12/29/2013)
4/29/2014
(6/15/2014)
5/29/2014
(6/25/2014)
M/S Islam
Traders
6 Coastal Forest Division, Patuakhali.
7BFD/W3 Earth Work for 15 ha Mound Plantation in
Patuakhali District
Cum 10950 14.783
(14.755)
18.249 NCB BG No 2/22/2014
(5/29/2014)
4/12/2014
(6/2/2014)
6/12/2014
(6/9/2014)
Md. Manibur
Rahman
Sohel
8BFD/W15 Installation of Plantation Boards at
various sites.
Nos 32 2.35 ( 2.35) 2.901 RFQ BG No 4/15/2014
(5/26/2014)
4/29/2014
(5/28/2014)
5/29/2014
(6/18/2014)
M/S Gazi
Enterpise
9BFD/W16 Earth Work for 10 ha Mound Plantation in
Barguna District
Cum 7300 9.855 (9.855) 12.167 RFQ BG No 4/1/2014
(4/16/2014)
4/15/2014
(4/27/2014)
5/15/2014
(5/14/2014)
M/S Munna
Enterprise
10 Cox's Bazar North Forest Division, Cox's Bazar
11BFD/W4 Installation of Plantation signboards at
various sites.
Nos 50 5.00 (4.976) 6.173 RFQ BG No 5/1/2014
(5/26/2014)
5/15/2014
(6/4/2014)
6/15/2014
(6/11/2014)
M/S Royel
Cox
Associate
12 Cox's Bazar South Forest Division, Cox's Bazar
13BFD/W5 Installation of Plantation signboards at
various sites.
Nos 100 10.00 (9.99) 12.346 NCB BG No 2/22/2014
(6/9/2014)
4/12/2014
(6/18/2014)
6/12/2014
(6/23/2014)
Mir Shahedul
Islam Chy
14 Chittagong North Forest Division, Chittagong
15BFD/W6 Installation of Plantation signboards at
various sites.
Nos 29 2.700 (2.699) 3.333 RFQ BG No 5/1/2014
(5/26/2014)
5/15/2014
(6/6/2014)
6/15/2014
(6/22/2014)
M/S Rakib
Enterprise
16 Chittagong South Forest Division, Chittagong
17
BFD/W7 Installation of Plantation signboards at
various sites.
Nos 81 7.65 (7.633) 9.44 RFQ BG No 5/1/2014
(5/12/2014)
5/15/2014
(6/5/2014)
6/15/2014
(6/16/2014)
Mir Shahedul
Islam Chy
18 Coastal Forest Division, Chittagong
19BFD/W8 Installation of Plantation signboards at
various sites.
Lot 1 5.30 (5.253) 6.54 RFQ BG No 5/1/2014
(5/29/2014)
5/15/2014
(6/5/2014)
5/30/2014
(6/17/2014)
M/S Rakib
Enterprise
20BFD/W9 Earth work for making mound Cum. 10220 15.33 (15.28) 18.93 NCB BG No 4/18/2014
(4/24/2014)
6/6/2014
(5/12/2014)
6/8/2014
(6/27/2014)
Mir Shahedul
Islam ChyRebidding
21 Coastal Forest Division, Noakhali
Procurement Plan for Works Contract under CRPARP
Fiscal year 2013-2014
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls32 PP-Works
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated
Price in lakh
Taka (Actual
Contract Price
in Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R/B
G)
Pri
or
Rev
iew
2 (
Yes
/
No
)
Planned Date of
Bid Opening
(Actual Date of
Proposals
Submission)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Nam
e o
f C
on
sult
ant/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 0
9/0
3/2
01
4
Rem
ark
s
Procurement Plan for Works Contract under CRPARP
22BFD/W10 Temporary shed No. 12 1.40 (1.40) 1.73 RFQ BG No. 9/20/2013
(9/25/2013)
10/4/2013
(10/24/2014)
11/4/2014
(4/30/2014)
M/S Jannat
Enteprise
23BFD/W11 Making of Mounds & site cleaning. Cum 25600 17.46
(17.459)
21.56 NCB BG No. 11/22/2013
(12/8/2013)
1/10/2014
(2/11/2014)
3/10/2014
(5/30/2014)
M/S Jannat
Enteprise
24BFD/W12 Installation of Plantation signboards at
various sites.
Lot 1 1.22 (1.22) 1.51 RFQ BG No. 11/15/2013
(11/12/2013)
11/29/2013
(12/31/2013)
1/28/2014
(4/30/2014)
M/S Jashim &
Brothers
25 Coastal Forest Division, Bhola
26
BFD/W13 Installation of Plantation signboards at
various sites.
Nos. 12 0.810 (0.805) 1.00 RFQ BG No 5/1/2014
(5/21/2014)
5/15/2014
(6/9/2014)
6/15/2014
(6/22/2014)
Md. Swapan
Golder
27BFD/W14 Construction of mounds for Plantation. Cum 10220 15.33 (15.30) 18.9259 NCB BG No 3/22/2014
(4/2/2014)
5/10/2014
(4/28/2014)
6/10/2014
(6/9/2014)
M/S Mahir &
MunemRebidding
28 Project Implementation Unit
29
BFD/W17 Repair and Rennovation works of PIU
office space at Mohakhali Bana Bhaban
Sq. ft 3800.0 9.84 (9.80) 12.14815 RFQ BG No 5/15/2014
(5/20/2014)
6/5/2014
(6/5/2014)
7/6/2014
(6/30/2014)
Prime
International
30 121.267
31
32
33
34
35 BFD/W18 Installation of RCC Plantation Signboards Nos 15 1.500 1.852 RFQ
BGNo 4/15/2015 4/29/2015 5/29/2015
36
37 BFD/W19 Construction of temporary sheds No 21 2.250 2.778 RFQ BG No 9/1/2014 9/15/2014 10/15/2014
38 BFD/W20 Making of earthen mounds No 51200 10.920 13.481 NCB BG No 10/1/2014 10/31/2014 12/30/2014
39 BFD/W21 Installation of RCC Plantation Signboards
and RCC pillars
Lot 1 2.22 (2.15) 2.741 RFQ BG No 11/1/2014 11/15/2014 12/15/2014 M/S Kabir
Traders
40
41 BFD/W22 Making of earthen mounds for plantation No 14400 9.855 12.167 RFQ BG No 1/15/2015 1/29/2015 2/26/2015
42 BFD/W23 Installation of RCC Plantation Signboards No 46 2.310 2.852 RFQ BG No 4/15/2015 4/29/2015 5/29/2015
43
44 BFD/W24 Installation of RCC Plantation Signboards No 113 11.300 13.951 NCB BG No 2/15/2015 4/16/2015 5/14/2015
45
Estimated value, Works : FY 2013-2014
Social Forest Division, Feni
Fiscal year 2014-2015
Chittagong North Forest Division, Chittagong
Chittagong South Forest Division, Chittagong
Coastal Forest Division, Noakhali
Coastal Forest Division, Bhola
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls33 PP-Works
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated
Price in lakh
Taka (Actual
Contract Price
in Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R/B
G)
Pri
or
Rev
iew
2 (
Yes
/
No
)
Planned Date of
Bid Opening
(Actual Date of
Proposals
Submission)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date of
Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date of
Completion)
(m/d/y)
Nam
e o
f C
on
sult
ant/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 0
9/0
3/2
01
4
Rem
ark
s
Procurement Plan for Works Contract under CRPARP
46 BFD/W25 Installation of RCC Plantation Signboards No 153 15.530 19.173 NCB BG No 3/12/2015 4/26/2015 6/10/2015
47
48 Lot I: Making of earthen mounds Cum 13140 19.710 24.333
Lot II: Making of earthen mounds Cum 7300 10.950 13.519
49 BFD/W27 Installation of RCC Plantation Signboards No 52 4.100 5.062 RFQ BG No 4/15/2015 4/29/2015 5/29/2015
50
51 BFD/W28 Installation of RCC Plantation Signboards No 113 11.300 13.951 NCB BG No 2/2/2015 3/19/2015 4/16/2015
52
53 BFD/W29 Installation of RCC Plantation Signboards No 94 9.400 11.605 RFQ BG No 3/1/2015 3/15/2015 4/12/2015
54
55 BFD/W30 Installation of RCC Plantation Signboards Lot 1 0.540 0.667 RFQ BG No 3/30/2015 4/13/2015 5/11/2015
BFD/W31 Making of earthen mounds Cum 7300 9.860 12.173 RFQ BG No 12/15/2014 12/29/2014 1/26/2015
BFD/W32 Installation of RCC Plantation Signboards No 38 1.900 2.346 RFQ BG No 4/15/2015 4/29/2015 5/27/2015
56
57 BFD/W 33 Construction of Forest Camp Offices No 9 460.000 567.901 NCB BG NO 12/1/2014 2/15/2015 10/15/2014
58 BFD/W 34 Construction of Forest Camp Offices No 9 460.000 567.901 NCB BG NO 12/1/2014 2/15/2015 10/15/2014
59 BFD/W 35 Construction of Forest Camp Offices No 9 460.000 567.901 NCB BG NO 12/1/2014 2/15/2015 10/15/2014
60 BFD/W 36 Construction of Forest Camp Offices No 8 408.000 503.704 NCB BG NO 12/1/2014 2/15/2015 10/15/2014
61 BFD/W 37 Construction of Forest Camp Offices No 8 408.000 503.704 NCB BG NO 12/1/2014 2/15/2015 10/15/2014
62
63 2317.425
64 2438.692
2/3/2015 3/3/2015
Coastal Forest Division, Patuakhali.
Cox's Bazar North Forest Division, Cox's Bazar
BFD/W26 NCB BG
Total Estimated Value (Works) Fy 2014-2015=
No 12/20/2014
Procurement Plan, Works (Total)=
Cox's Bazar South Forest Division, Cox's Bazar
Social Forest Division, Barisal
Project Implementation Unit (PIU)
Coastal Forest Division, Chittagong
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls34 PP-Works
1 USD = 81 BDT
Sl.
No.
Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated
Price in lakh
Taka (Actual
Contract Price
in Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Pri
or
Rev
iew
(
Yes
/ N
o)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date
of
Completion)
(m/d/y)
Nam
e o
f C
on
sult
ant/
Fir
m
Pro
gres
s o
f P
rocu
rem
ent
as
of
09
/03
/20
14
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
2 Project Implementation Unit (PIU)
3 BFD/NCS-1 Employing firm for
providing outsourced
workforces at various
positions in PIU.
Lot 1 40.00 49.383 NCB BG Yes 2/15/2015 4/16/2015 12/31/2016
4
5 BFD/NCS-2 Engaging daily labours in
plantation and nursery
program for Feni Social FD
man-
days
10955 32.86 40.568 Force
AccountBG No
6 BFD/NCS-3 Engaging daily labours in
plantation and nursery
program for Noakhali
Coastal FD
man-
days
81538 244.62 302.000 Force
AccountBG No
7 BFD/NCS-4 Engaging daily labours in
plantation and nursery
program for Bhola Coastal
FD
man-
days
68556 205.67 253.914 Force
AccountBG No
8 BFD/NCS-5 Engaging daily labours in
plantation and nursery
program for Ctg. North FD
man-
days
126149 378.45 467.222 Force
AccountBG No
9 BFD/NCS-6 Engaging daily labours in
plantation and nursery
program for Ctg. South FD
man-
days
205621 616.86 761.556 Force
AccountBG No
Procurement Plan for Non-Consulting Services Contracts for CRPAR Project
Field Forest Divisions
FY: 2014-2015
1 USD = 81 BDT
Sl.
No.
Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated
Price in lakh
Taka (Actual
Contract Price
in Contract
Currency)
Estimated
Price in
US$.000
(Actual
Contract
Price in
Contract
Currency)
Pro
ced
ure
/ M
eth
od
Pro
cure
men
t G
uid
elin
e
(PP
R /
BG
)
Pri
or
Rev
iew
(
Yes
/ N
o)
Planned Date
of Bid Opening
(Actual Date of
Bid Opening)
(m/d/y)
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
(m/d/y)
Planned Date
of Completion
(Actual Date
of
Completion)
(m/d/y)
Nam
e o
f C
on
sult
ant/
Fir
m
Pro
gres
s o
f P
rocu
rem
ent
as
of
09
/03
/20
14
Rem
ark
s
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Procurement Plan for Non-Consulting Services Contracts for CRPAR Project
10 BFD/NCS-7 Engaging daily labours in
plantation and nursery
program for Ctg. Coastal FD
man-
days
100520 301.56 372.296 Force
AccountBG No
11 BFD/NCS-8 Engaging daily labours in
plantation and nursery
program for Cox. North FD
man-
days
147919 443.76 547.852 Force
AccountBG No
12 BFD/NCS-9 Engaging daily labours in
plantation and nursery
program for Cox. South FD
man-
days
129840 389.52 480.889 Force
AccountBG No
13 BFD/NCS-
10
Engaging daily labours in
plantation and nursery
program for Barisal FD
man-
days
18436 55.307 68.280 Force
AccountBG No
14 BFD/NCS-
11
Engaging daily labours in
plantation and nursery
program for Patuakhali
Coastal FD
man-
days
105395 316.184 390.351 Force
AccountBG No
15 3024.79Total Estimated value (NCS=)
Procurement Plan for Consultancy Services Contract For CRPARP
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated Price
in lakh Taka as
per DPP
(Actual
Contract Price
in Contract
Currency)
Estimated
Price in US$
‘000 as per
PAD (Actual
Contract
Price in
Contract
Currency)
Procedure/
Method
Procurement
Guideline
(PPR / BG)
Prior
Review2
(Yes / No)
Planned Date
of Proposals
Submission
(Actual Date
of Proposals
Submission)
[mm/dd/year]
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
[mm/dd/year]
Planned Date
of Completion
(Actual Date of
Completion)
[mm/dd/year]
Nam
e of
Consu
ltan
t/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 09/0
3/2
014 Remarks
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Project Implementation Unit
1 BFD/S1 Consultancy services on
administering training
programs for BFD
officials and project
beneficiaries on various
aspects of CRPAR Project
contract single 400 493.827 CQS BG No 2/5/2015 4/6/2015 9/27/2016
2 BFD/S2 Capacity Development
Specialist- Individual
Local
mm 28 56.00 69.136 IC BG No 7/11/2014
(7/13/2014)
10/24/2014
(12/1/2014)
10/13/2016 Dr. Khaled
Mesbahuzz
aman
3 BFD/S3 Technical Study for
Landuse mapping,
assessment and
monitoring of proposed
afforestation/reforestatio
n sites
contrac
t
single 324.0 400.000 FBS BG No 9/29/2014
(11/18/2014)2/13/2015 12/4/2016
4 BFD/S4 Technical Study for
strengthening RIMS and
development of Forest
Resource Assessment
and monitoring protocol
contrac
t
single 324.0 400.000 FBS BG No 9/29/2014
(10/30/2014)2/13/2015 12/4/2016
5 BFD/S5 Technical Study for
developing
communication strategy,
awareness campaign and
web-based information
dissemination system
contrac
t
single 150.0 185.185 FBS BG No 12/27/2014
(12/24/2015)4/12/2015 12/2/2016
6 BFD/S6 Technical Study for third
party monitoring
contrac
t
single 283.5 350.000 FBS BG No. 9/22/2014
(11/18/2014)2/13/2015 11/3/2016
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 37 PP-Service
Procurement Plan for Consultancy Services Contract For CRPARP
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated Price
in lakh Taka as
per DPP
(Actual
Contract Price
in Contract
Currency)
Estimated
Price in US$
‘000 as per
PAD (Actual
Contract
Price in
Contract
Currency)
Procedure/
Method
Procurement
Guideline
(PPR / BG)
Prior
Review2
(Yes / No)
Planned Date
of Proposals
Submission
(Actual Date
of Proposals
Submission)
[mm/dd/year]
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
[mm/dd/year]
Planned Date
of Completion
(Actual Date of
Completion)
[mm/dd/year]
Nam
e of
Consu
ltan
t/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 09/0
3/2
014 Remarks
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
7 BFD/S7 Resource Assessment
Specialist (Individual
International)
mm 18 218.7 270.000 IC BG No 7/11/2014
(7/15/2014)
10/24/2014 4/16/2016
8 BFD/S8 MIS/GIS Specialist
(Individual Local)
mm 28 70.00 86.420 IC BG No. 7/11/2014
(7/13/2014)
10/24/2014
(12/3/2014)
10/13/2016 Md.
Mahmudur
Rahman
9 BFD/S9 Updating Forestry Master
Plan for Bangladesh:
Technical Study for
Review of Forestry
Master Plan and different
Sectoral Studies for
Forestry Master Plan
Updating and Technical
Study for Developing
Strategy, update Forestry
Master Plan and Prepare
time specific Plans
contrac
t
single 984.0 1214.815 QCBS BG Yes 10/21/2014
(12/29/2014)3/2/2015 12/21/2016
10 BFD/S11 Forest Management
policy/ Institution
(Individual International)
mm 24 291.6 360.000 IC BG Yes 7/11/2014
(7/15/2014)
10/24/2014
(11/16/2014)10/13/2016 Dr. Ram
Avtar
Sharma
11 BFD/S12 Forest Management
policy/ Institution
(Individual National)
mm 28 70.00 86.420 IC BG No. 7/11/2014
(7/13/2014)
10/24/2014 10/13/2016
12 BFD/S13 Design, Supervision and
Monitoring Consultant
for field infrastructure
contrac
t
single 230 283.951 FBS BG No 9/22/2014
(10/30/2014)1/4/2015 10/25/2016
13 BFD/S14 Project Manager (Senior
Individual Consultant)-
54 mm
mm 34 83.15 102.654 IC BG No 9/9/2013
(9/3/2013)
12/8/2013
(3/24/2014)
12/31/2016 Md. Iklil
Mondal
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 38 PP-Service
Procurement Plan for Consultancy Services Contract For CRPARP
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated Price
in lakh Taka as
per DPP
(Actual
Contract Price
in Contract
Currency)
Estimated
Price in US$
‘000 as per
PAD (Actual
Contract
Price in
Contract
Currency)
Procedure/
Method
Procurement
Guideline
(PPR / BG)
Prior
Review2
(Yes / No)
Planned Date
of Proposals
Submission
(Actual Date
of Proposals
Submission)
[mm/dd/year]
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
[mm/dd/year]
Planned Date
of Completion
(Actual Date of
Completion)
[mm/dd/year]
Nam
e of
Consu
ltan
t/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 09/0
3/2
014 Remarks
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
14 BFD/S15 Financial Management
Specialist (Senior
Individual Consultant)-
54 mm
mm 34 84.04 103.753 IC BG Yes 9/9/2013
(9/3/2013)
12/8/2013
(3/13/2014)
12/31/2016 Md.
Monsururu
zzaman
Khan
15 BFD/S16 Procurement Specialist
(Senior Individual
Consultant) -36 months
mm 36 96.94 119.679 IC BG Yes 6/10/2013 9/1/2013
(1/1/2014)
6/21/2015 Shah
Eyamin-Ul
Islam
16 BFD/S17 Communication/Informat
ion Specialist- 30 mm
mm 30 66.31 81.864 IC BG No 9/9/2013
(9/3/2013)
12/8/2013
(4/1/2014)
9/30/2016 Ambareen
Khan
17 BFD/S18 Accounting Expert
(Individual Consultant)-
54 mm
mm 35 52.5 64.815 IC BG No. 9/9/2013
(9/3/2013)
12/8/2013
(2/10/2014)
12/31/2016 Masoodul
Huq
18 BFD/S19.
1 -19.10
Accountant (Individual
Junior Consultant) – 8
Nos-
mm 280 168.0 207.407 IC BG No 9/9/2013
(9/3/2013)
12/8/2013
(2/16/2014)
12/31/2016 8 Individuals
19 BFD/S20.
1 -20.10
Community Mobilization
Officer (Individual Junior
Consultant) – 9 Nos
mm 315 189.0 233.333 IC BG No 9/9/2013
(9/3/2013)
12/8/2013
(2/16/2014)
12/31/2016 9 Individuals
20 BFD/S21 Financial Audit Firm Contrac
t
Single 16.2 20.000 FBS BG No 12/25/2014 4/4/2015
21 BFD/S22 Procurement Specialist
(Senior Individual
Consultant) - 2 positions,
06 months each
mm 12 30.0 37.037 IC BG Yes 8/25/2014 2/21/2015 Mahbube
Moula Md.
Mahedy
Hasan (S-
22.2)
22 BFD/S23 Accountant (Individual
Junior Consultant) – 2
Nos-
mm 54 32.4 40.000 IC BG No 9/5/2014 10/1/2014 12/31/2016
23 BFD/S24 Community Mobilization
Officer (Individual Junior
Consultant) – 1 No
mm 27 16.2 20.000 IC BG No 9/5/2014 10/1/2014 12/31/2016
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 39 PP-Service
Procurement Plan for Consultancy Services Contract For CRPARP
Sl. No. Contract
Package
Number
Contract Description Unit Qty/
Nos.
Estimated Price
in lakh Taka as
per DPP
(Actual
Contract Price
in Contract
Currency)
Estimated
Price in US$
‘000 as per
PAD (Actual
Contract
Price in
Contract
Currency)
Procedure/
Method
Procurement
Guideline
(PPR / BG)
Prior
Review2
(Yes / No)
Planned Date
of Proposals
Submission
(Actual Date
of Proposals
Submission)
[mm/dd/year]
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
[mm/dd/year]
Planned Date
of Completion
(Actual Date of
Completion)
[mm/dd/year]
Nam
e of
Consu
ltan
t/
Fir
m
Pro
gre
ss o
f P
rocu
rem
ent
as o
f 09/0
3/2
014 Remarks
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
24 BFD/S25 Design, Supervision and
Monitoring Consultancy
for supplying of
Mechanised patrol vessel
Contract Single 55.0 67.901 SSS BG Yes 3/1/2015 4/1/2015 7/30/2016
Total 4291.540 5298.198
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 40 PP-Service
Procurement Processing Schedule for Prior Review Contracts - Goods
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission of
the Bidding
Document to
the Bank
Bank's No
Objection to draft
bidding document
Publication of
IFB in
Newspapers
and UNDB,
CPTU (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission of
Bid Evaluation
Report (BER) to
the Bank
Bank's No
Objection to
BER
Issue of
Notification
of Award
Signing of the
contract
contract award
publication on
UNDB, CPTU (if
Applicable)
Delivery
completion
Completion of
contractual
obligations
Planned 9/9/2013 10/9/2013 10/18/2013 10/23/2013 10/25/2013 11/22/2013 12/20/2013 12/29/2013 1/12/2014 2/9/2014 N/A 3/23/2014 3/23/2015
Revised 5/20/2014 5/20/2015
Actual 9/2/2013 9/17/2013 9/24/2013 10/26/2013 10/26/2013 11/19/2013 1/22/2014 1/28/2014 2/4/2014 3/3/2014 N/A 5/18/2014 5/18/2015
* Planned date will be put once and shall remain unchanged
Procurement Processing Schedule for Post Review Contracts (NCB only) - Goods
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission of
the Bidding
Document to
the Bank
Bank's No
Objection to draft
bidding document
Publication of
IFB in
Newspapers
and UNDB,
CPTU (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission of
Bid Evaluation
Report (BER) to
the Bank
Bank's No
Objection to
BER
Issue of
notification of
Award
Signing of the
contract
contract award
publication on
UNDB, CPTU (if
Applicable)
Delivery
completion
Completion of
contractual
obligations
Planned 10/1/2013 11/10/2013 11/12/2013 12/10/2013 1/21/2014 2/18/2014 4/1/2014 4/1/2015
Revised
Actual 11/1/2013 11/24/2013 11/24/2013 12/24/2013 4/20/2014 5/18/2014 6/17/2014 6/17/2015
Planned 10/1/2013 11/10/2013 11/12/2013 12/10/2013 1/21/2014 2/18/2014 4/1/2014 4/1/2015
Revised 7/30/2014 7/30/2015
Actual 11/1/2013 11/24/2013 11/24/2013 12/24/2013 4/20/2014 5/18/2014
Planned 10/1/2013 11/10/2013 11/12/2013 12/10/2013 1/21/2014 2/18/2014 4/1/2014 4/1/2015
Revised 4/1/2014 5/15/2014 5/17/2014 5/29/2014 7/10/2014 8/7/2014 9/18/2014 9/18/2015
Actual 4/1/2014 5/22/2014 5/22/2014 6/5/2014 8/6/2014 8/28/2014
Planned 9/1/2014 12/1/2014 12/3/2014 12/31/2014 2/11/2015 3/11/2015 6/9/2015 6/8/2016
Revised
Actual
Planned 3/1/2014 4/5/2014 4/7/2014 4/28/2014 5/19/2014 6/16/2014 7/14/2014 7/14/2015
Revised
Actual 3/20/2014 4/9/2014 4/9/2014 4/28/2014 5/11/2014 6/5/2014 6/26/2014 6/26/2015
Planned 10/15/2014 11/5/2014 11/7/2014 11/28/2014 12/26/2014 1/23/2015 3/24/2015 3/23/2016
Revised
Actual
Planned 9/1/2013 9/15/2013 9/17/2013 10/15/2013 11/12/2013 12/10/2013 1/21/2014 1/21/2015
BFD/G6
BFD/G4Supply of
Motor Cycles
Supply of
Double Cabin
Pick-up
NCB
BFD/G22
Poly propylene
nursery Bags
7" x5" bags
(1500000 nos)
and 10" x 6"
NCB
BFD/G1
Supply of
Laptop (No
28), Desktop
(No 12) &
Printers (No
NCB
NCB
BFD/G5
Supply of
Mechanised
Patrol Vessel
NCB
BFD/G3
BFD/G2
Supply of
Cross Country
Vehicle
Supply of
Photocopiers
(12 No) and
Multimedia
projectors (2
NCB
NCB
BFD/G9
Procurement of
Equipments
(Computer
Accessories
and others) for
NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 41
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission of
the Bidding
Document to
the Bank
Bank's No
Objection to draft
bidding document
Publication of
IFB in
Newspapers
and UNDB,
CPTU (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission of
Bid Evaluation
Report (BER) to
the Bank
Bank's No
Objection to
BER
Issue of
Notification
of Award
Signing of the
contract
contract award
publication on
UNDB, CPTU (if
Applicable)
Delivery
completion
Completion of
contractual
obligations
Revised
Actual 9/1/2013 9/20/2013* 9/23/2013 10/24/2013 11/21/2013 11/25/2013 1/8/2013
Planned 10/1/2013 11/30/2013 12/2/2013 12/30/2013 1/20/2014 2/17/2014 3/31/2014
Revised
Actual 10/1/2013 12/15/2013* 12/17/2013 12/31/2013 1/13/2014 1/15/2014 1/23/2014
Planned 10/1/2013 11/30/2013 12/2/2013 12/30/2013 1/20/2014 2/17/2014 3/31/2014
Revised
Actual 10/1/2013 12/15/2013* 12/17/2013 12/31/2013 1/13/2014 1/15/2014 1/23/2014
Planned 10/1/2013 11/30/2013 12/2/2013 12/30/2013 1/20/2014 2/17/2014 3/31/2014
Revised
Actual 10/1/2013 12/15/2013* 12/17/2013 12/31/2013 1/13/2014 1/15/2014 1/23/2014
Planned 10/1/2013 1/29/2014 1/31/2014 2/21/2014 3/14/2014 4/11/2014 5/23/2014
Revised
Actual 10/1/2013 2/18/2014* 2/20/2014 3/13/2014 4/27/2014 5/8/2014 5/18/2014
Planned 10/1/2013 11/30/2013 12/2/2013 12/30/2013 1/20/2014 2/17/2014 3/31/2014
Revised 3/9/2014 3/9/2014 3/21/2014 4/4/2014 5/2/2014 5/23/2014
Actual 10/1/2013 3/9/2014* 3/10/2014 3/24/2014 4/1/2014 4/7/2014 4/21/2014
Planned 10/1/2013 12/1/2013 12/3/2013 12/24/2013 1/14/2014 2/11/2014 3/25/2014
Revised
Actual 10/1/2013 12/5/2013* 12/7/2013 12/22/2013 1/6/2014 1/19/2014 1/25/2014
Planned 10/1/2013 12/1/2013 12/3/2013 12/24/2013 1/14/2014 2/11/2014 3/25/2014
Revised
Actual 10/1/2013 12/5/2013* 12/7/2013 12/22/2013 1/6/2014 1/19/2014 1/25/2014
Planned 10/1/2013 12/1/2013 12/3/2013 12/24/2013 1/14/2014 2/11/2014 3/25/2014
Revised
Actual 10/1/2013 12/5/2013* 12/7/2013 12/22/2013 1/6/2014 1/19/2014 1/26/2014
Planned 10/1/2013 2/1/2014 2/3/2014 2/24/2014 3/17/2014 4/14/2014 5/26/2014
Revised
Actual 10/1/2013 2/17/2014* 2/19/2014 3/5/2014 4/6/2014 4/28/2014 5/8/2014
Planned 10/1/2013 3/15/2014 3/17/2014 4/5/2014 4/26/2014 5/24/2014 6/21/2014
Revised
Actual 10/1/2013 5/6/2014* 5/8/2014 5/26/2014 6/2/2014 6/5/2014 6/7/2014
Planned 10/1/2013 3/15/2014 3/17/2014 4/5/2014 4/26/2014 5/24/2014 6/21/2014
Revised BFD/G45
Supply of
stakes for
plantation
(Two lots)
NCB
BFD/G44
Supply of
compost/deco
mposed
cowdung for
plantation
(Three lots)
NCB
BFD/G41Nursery
EquipmentsNCB
BFD/G36
Compost/Deco
mposed
Cowdung/(Nur
sery Materials)
NCB
BFD/G37
Bariala
Bamboo 8066
nos; Muli
Bamboo 16136
NCB
BFD/G34
Poly-propylene
Nursery Bags
in 7´´x 5´´ bags
(3028800
Nos.) and 10´´x
NCB
BFD/G35 Soil NCB
BFD/G25
Bariala
Bamboo; Muli
Bamboo,
Sungrass
(Nusery
NCB
BFD/G33
Stakes
(Planting
Materials-)
NCB
BFD/G23 Soil NCB
BFD/G24
Compost/Deco
mposed
Cowdung/
(Planting
Materials-)
NCB
BFD/G22
Poly propylene
nursery Bags
7" x5" bags
(1500000 nos)
and 10" x 6"
NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 42
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission of
the Bidding
Document to
the Bank
Bank's No
Objection to draft
bidding document
Publication of
IFB in
Newspapers
and UNDB,
CPTU (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission of
Bid Evaluation
Report (BER) to
the Bank
Bank's No
Objection to
BER
Issue of
Notification
of Award
Signing of the
contract
contract award
publication on
UNDB, CPTU (if
Applicable)
Delivery
completion
Completion of
contractual
obligations
Actual 10/1/2013 5/7/2014* 5/9/2014 5/28/2014 6/2/2014 6/5/2014 6/8/2014
Planned 10/1/2013 12/5/2013 12/7/2013 12/26/2013 1/16/2014 2/13/2014 3/13/2014
Revised
Actual 10/1/2013 12/12/2013* 12/15/2013 1/8/2014 1/20/2014 1/20/2014 2/20/2014
Planned 9/15/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 9/15/2013 10/1/2013* 10/3/2013 10/29/2013 12/15/2013 12/31/2013 1/24/2014
Planned 9/15/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 9/15/2013 10/2/2013* 10/3/2013 10/30/2013 12/15/2013 12/31/2013 1/24/2014
Planned 9/15/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 9/15/2013 10/2/2013* 10/3/2013 10/31/2013 12/15/2013 1/2/2014 1/25/2014
Planned 10/15/2013 2/25/2014 2/27/2014 3/18/2014 4/8/2014 5/6/2014 6/3/2014
Revised
Actual 10/15/2013 2/26/2014* 2/28/2014 3/31/2014 5/15/2014 5/15/2014 5/23/2014
Planned 10/15/2013 4/1/2014 4/3/2014 4/22/2014 5/13/2014 6/10/2014 6/24/2014
Revised
Actual 10/15/2013 5/15/2014* 5/17/2014 6/4/2014 6/8/2014 6/10/2014 6/17/2014
Planned 9/1/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 9/15/2013 10/1/2013* 10/3/2013 11/18/2013 12/19/2013 12/26/2013 1/13/2014
Planned 10/1/2013 10/15/2013 10/17/2013 11/5/2013 11/26/2013 12/24/2013 1/21/2014
Revised
Actual 10/1/2013 10/28/2013* 10/30/2013 12/2/2013 12/24/2013 1/1/2014 1/16/2014
Planned 10/1/2013 10/15/2013 10/17/2013 11/5/2013 11/26/2013 12/24/2013 1/21/2014
Revised
Actual 10/1/2013 10/28/2013* 10/30/2013 12/2/2013 12/24/2013 1/1/2014 1/16/2014
Planned 10/1/2013 10/15/2013 10/17/2013 11/5/2013 11/26/2013 12/24/2013 1/21/2014
Revised
Actual 10/1/2013 10/28/2013* 10/30/2013 12/2/2013 12/24/2013 1/1/2014 1/16/2014
Planned 10/15/2013 4/1/2014 4/3/2014 4/22/2014 5/13/2014 6/10/2014 6/24/2014
Revised
Actual 10/15/2013 4/10/2014* 4/12/2013 5/6/2014 5/8/2014 5/18/2014 5/26/2014
BFD/G63
Cowdung
(Nursery
Materials)
NCB
BFD/G65
Stakes
(Planting
Materials)
NCB
BFD/G58Soil (Nursery
Materials) NCB
BFD/G59
Supply of
Bariala
bamboo, muli
bamboo and
sungrass.
NCB
BFD/G56
Cowdung
/Compost
(Planting
Materials)
NCB
BFD/G57
Poly-propylene
Nursery Bags
in 7´´x 5´´ bags
(2237400
NCB
BFD/G49
Bariala
Bamboo
4040n0s; Muli
Bamboo
9405nos;Sungr
NCB
BFD/G55
Stakes
(Planting
Materials-)
NCB
BFD/G47Soil (3940.75
Cubic Meter)NCB
BFD/G48
Cowdung
/Compost
(Nursery
Materials-)
NCB
BFD/G45
Supply of
stakes for
plantation
(Two lots)
NCB
BFD/G46
Poly-propylene
Nursery Bags
7´´x 5´´ bags
774000nos,Pol
y-propylene
NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 43
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission of
the Bidding
Document to
the Bank
Bank's No
Objection to draft
bidding document
Publication of
IFB in
Newspapers
and UNDB,
CPTU (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission of
Bid Evaluation
Report (BER) to
the Bank
Bank's No
Objection to
BER
Issue of
Notification
of Award
Signing of the
contract
contract award
publication on
UNDB, CPTU (if
Applicable)
Delivery
completion
Completion of
contractual
obligations
Planned 10/15/2013 1/4/2014 1/6/2014 1/25/2014 2/15/2014 3/15/2014 3/29/2014
Revised
Actual 10/15/2013 1/7/2014* 1/9/2014 2/3/2014 3/9/2014 3/9/2014 3/20/2014
Planned 10/15/2013 4/1/2014 4/3/2014 4/22/2014 5/13/2014 6/10/2014 6/24/2014
Revised
Actual 10/15/2013 4/10/2014* 4/12/2013 5/6/2014 5/8/2014 5/18/2014 5/26/2014
Planned 9/15/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 9/15/2013 10/6/2013* 10/8/2013 11/4/2013 12/18/2013 12/29/2013 1/12/2014
Planned 9/15/2013 10/1/2013 10/3/2013 10/22/2013 11/12/2013 12/10/2013 1/7/2014
Revised
Actual 10/15/2013 10/10/2014* 10/12/2013 11/7/2013 12/18/2013 12/29/2013 1/12/2014
Planned 9/15/2013 1/20/2014 1/22/2014 2/10/2014 3/3/2014 3/31/2014 4/28/2014
Revised
Actual 10/15/2013 1/15/2014* 1/18/2014 2/12/2014 3/20/2014 4/10/2014 4/17/2014
Planned 2/1/2014 3/15/2014 3/17/2014 4/5/2014 4/26/2014 5/24/2014 6/21/2014
Revised
Actual 2/1/2014 3/31//2014* 4/2/2014 4/21/2014 4/27/2014 5/8/2014 5/21/2014
Planned 2/1/2014 4/1/2014 4/3/2014 4/24/2014 5/15/2014 6/12/2014 6/26/2014
Revised
Actual 10/1/2013 5/11/2014* 5/11/2014 5/29/2014 6/2/2014 6/2/2014 6/9/2014
Planned 10/1/2013 4/1/2014 4/3/2014 4/24/2014 5/15/2014 6/12/2014 6/26/2014
Revised
Actual 10/1/2013 5/6/2014* 5/8/2014 5/27/2014 6/4/2014 6/4/2014 6/11/2014
Planned 10/1/2013 4/1/2014 4/3/2014 4/24/2014 5/15/2014 6/12/2014 6/26/2014
Revised
Actual
Planned 12/15/2014 1/5/2015 1/7/2015 1/28/2015 2/25/2015 3/25/2015 4/22/2015
Revised
Actual
Stakes
(Planting
Materials-)
NCB
BFD/G96
Supply of
compost/deco
mposed
cowdung for
plantation
NCB
BFD/G115Supply of
FurnitureNCB
BFD/G95
BFD/G99
BFD/G74
Stakes (2.5m)
(Planting
Materials)
55440 nos;
Stakes (2m)
NCB
BFD/G86
Compost/
Decomposed
Cowdung for
plantations
NCB
BFD/G69
Poly-
propylene bags
(7´´x 5´´)
684480 nos;
Poly-propylene
NCB
BFD/G73
Cow-dung
(Nursery
Materials)
356.1cum;Cow-
dung
NCB
BFD/G66
Fertilizer
(Planting
Materials)
NCB
BFD/G67
Cowdung
(Planting
Materials-)
NCB
Supply of Urea
for Plantation NCB
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 44
Procurement Processing Schedule for Prior Review Contracts - Works
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission
of the
Bidding
Document to
the Bank
Bank's No
Objection to
draft bidding
document
Publication of
IFB in
Newspapers
and UNDB (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission
of Bid
Evaluation
Report
(BER) to the
Bank
Bank's No
Objection to
BER
Issue of
notification
of Award
Signing of the
contract
contract
award
publication on
UNDB (if
Applicable)
work
completion
Completion of
contractual
obligations
Planned date will be put once and shall remain unchanged
Procurement Processing Schedule for Post Review Contracts (NCB only)- Works
Package No. Description Method of
Procurement
Stage Initiate
preparation of
Specification
and Bid
Document
Submission
of the
Bidding
Document to
the Bank
Bank's No
Objection to
draft bidding
document
Publication of
IFB in
Newspapers
and UNDB (if
applicable)
Beginning of
Sale of
Bidding
document
Opening of
Bids
Submission
of Bid
Evaluation
Report
(BER) to the
Bank
Bank's No
Objection to
BER
Issue of
notification
of Award
Signing of the
contract
contract
award
publication on
UNDB (if
Applicable)
work
completion
Completion of
contractual
obligations
Planned 1/1/2014 2/1/2014 2/3/2014 2/22/2014 3/15/2014 4/12/2014 6/12/2014
Revised
Actual 3/1/2014 5/11/2014* 5/12/2014 5/29/2014 6/2/2014 6/2/2014 6/9/2014
Planned 9/15/2013 2/1/2014 2/3/2014 2/22/2014 3/15/2014 4/12/2014 6/12/2014
Revised
Actual 9/15/2013 5/22/2014* 5/23/2014 6/9/2014 6/12/2014 6/18/2014 6/23/2014
Planned 9/1/2013 4/1/2014 4/3/2014 4/18/2014 5/9/2014 6/6/2014 8/6/2014
Revised
Actual 9/1/2013 4/9/2014* 4/12/2014 4/24/2014 5/12/2014 5/12/2014 6/27/2014
Planned 9/1/2013 11/1/2013 11/3/2013 11/22/2013 12/13/2013 1/10/2014 3/10/2014
Revised
Actual 9/1/2013 11/18/2013* 11/20/2013 12/8/2013 1/6/2014 2/11/2014 5/30/2014
Planned 2/1/2014 3/1/2014 3/3/2014 3/22/2014 4/12/2014 5/10/2014 6/10/2014
Revised
Actual 2/1/2014 3/16/2014* 3/18/2014 4/2/2014 4/8/2014 4/28/2014 6/9/2014
NCB
BFD/W9Earth work for
making moundNCB
NCB
BFD/W14
Construction of
mounds for
Plantation.
NCB
BFD/W3
Earth Work for
15 ha Mound
Plantation in
Patuakhali
District
NCB
BFD/W11
Making of
Mounds & site
cleaning.
BFD/W5
Installation of
Plantation
signboards at
various sites.
Procurement Processing Schedule for Prior Review Contracts - Consultancy Service
Package No. Description Method of
Procurement
Stage Start Drafting
of TOR,
REOI and
(RFP in case
of firm)
Start
Preparation
of Estimate
Complete
Draft TOR,
REOI and
Estimate
Submission
of TOR,
REOI and
detailed
estimate to
the Bank
Bank's No
Objection
on TOR
Publication
of REOI in
Newspapers
and UNDB,
CPTU (if
applicable)
EOI
submission
Deadline
Completion
of Shortlist
Submission
of shortlist
& (RFP in
case of firm)
to the Bank
Bank's No
Objection to
shortlist &
(RFP in case
of firm)
Issue RFP to
short listed
consultants
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/13/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 6/16/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/17/2014 7/22/2014 8/26/2014 9/2/2014 9/11/2014 9/16/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 7/15/2014 8/11/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/13/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 6/16/2014
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
Planned 5/1/2013 5/1/2013 5/16/2013 5/18/2013 5/27/2013
Revised
Actual 5/3/2013 5/3/2013 5/7/2013 5/7/2013 5/8/2013
Planned 6/17/2014 6/17/2014 6/17/2014
Revised
Actual
Procurement Processing Schedule for Post Review Contracts - Consultancy Service
Package No. Description Method of
Procurement
Stage Start Drafting
of TOR,
REOI and
(RFP in case
of firm)
Start
Preparation
of Estimate
Complete
Draft TOR,
REOI and
Estimate
Submission
of TOR,
REOI and
detailed
estimate to
the Bank
Bank's No
Objection
on TOR
Publication
of REOI in
Newspapers
and UNDB,
CPTU (if
applicable)
EOI
submission
Deadline
Completion
of Shortlist
Submission
of shortlist
& (RFP in
case of firm)
to the Bank
Bank's No
Objection to
shortlist &
(RFP in case
of firm)
Issue RFP to
short listed
consultants
Planned 4/1/2014 4/1/2014 9/1/2014 9/3/2014 9/12/2014 9/19/2014 10/10/2014 11/7/2014 11/9/2014 11/18/2014 11/20/2014BFD/S1 CQSConsultancy services on administering
training programs for BFD officials and
project beneficiaries on various aspects of
CRPAR Project
IC
BFD/S9
BFD/S15 Financial Management Specialist (Senior
Individual Consultant)- 54 mm
BFD/S7 Resource Assessment Specialist
(Individual International)
IC
Forest Management policy/ Institution
(Individual International)
Updating Forestry Master Plan for
Bangladesh: Technical Study for Review
of Forestry Master Plan and different
Sectoral Studies for Forestry Master Plan
Updating and Technical Study for
QCBS
IC
Procurement Specialist (Senior Individual
Consultant) -36 months
Procurement Specialist (Senior Individual
Consultant) - 2 positions, 06 months each
IC
IC
BFD/S16
BFD/S11
BFD/S22
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 46
Package No. Description Method of
Procurement
Stage Start Drafting
of TOR,
REOI and
(RFP in case
of firm)
Start
Preparation
of Estimate
Complete
Draft TOR,
REOI and
Estimate
Submission
of TOR,
REOI and
detailed
estimate to
the Bank
Bank's No
Objection
on TOR
Publication
of REOI in
Newspapers
and UNDB,
CPTU (if
applicable)
EOI
submission
Deadline
Completion
of Shortlist
Submission
of shortlist
& (RFP in
case of firm)
to the Bank
Bank's No
Objection to
shortlist &
(RFP in case
of firm)
Issue RFP to
short listed
consultants
Revised
Actual
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/13/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 5/29/2014 6/1/2014 6/5/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/17/2014 7/8/2014 8/12/2014 8/14/2014 8/23/2014 8/25/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 6/21/2014 7/8/2014
Planned12/5/2013
12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/17/2014 7/8/2014 8/12/2014 8/14/2014 8/23/2014 8/25/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 6/21/2014 7/8/2014
Planned 12/5/2013 12/5/2013 8/1/2014 8/22/2014 8/31/2014 9/14/2014 10/5/2014 11/9/2014 11/11/2014 11/20/2014 11/22/2014
Revised
Actual 11/1/2013 11/1/2013
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/17/2014 7/8/2014 8/5/2014 8/7/2014 8/16/2014 8/18/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 7/4/2014 7/22/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/13/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 5/29/2014 6/1/2014 6/5/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/13/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 5/29/2014 6/1/2014 6/5/2014
Planned 12/5/2013 12/5/2013 5/4/2014 5/25/2014 6/3/2014 6/17/2014 7/8/2014 8/5/2014 8/7/2014 8/16/2014 8/18/2014
Revised
Actual 11/1/2013 11/1/2013 5/15/2014 6/1/2014 6/3/2014 7/4/2014 7/22/2014
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
BFD/S1 CQS
Capacity Development Specialist-
Individual Local
Forest Management policy/ Institution
(Individual National)
BFD/S12 IC
BFD/S6
Consultancy services on administering
training programs for BFD officials and
project beneficiaries on various aspects of
CRPAR Project
BFD/S5
IC
FBS
IC
Technical Study for third party monitoring
Technical Study for Landuse mapping,
assessment and monitoring of proposed
afforestation/reforestation sites
Technical Study for strengthening RIMS
and development of Forest Resource
Assessment and monitoring protocol
FBS
BFD/S8 MIS/GIS Specialist (Individual Local)
BFD/S13 Design, Supervision and Monitoring
Consultant for field infrastructure
BFD/S14 Project Manager (Senior Individual
Consultant)- 54 mm
FBS
BFD/S4
Technical Study for developing
communication strategy, awareness
campaign and web-based information
dissemination system
BFD/S2
BFD/S3
FBS
IC
FBS
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 47
Package No. Description Method of
Procurement
Stage Start Drafting
of TOR,
REOI and
(RFP in case
of firm)
Start
Preparation
of Estimate
Complete
Draft TOR,
REOI and
Estimate
Submission
of TOR,
REOI and
detailed
estimate to
the Bank
Bank's No
Objection
on TOR
Publication
of REOI in
Newspapers
and UNDB,
CPTU (if
applicable)
EOI
submission
Deadline
Completion
of Shortlist
Submission
of shortlist
& (RFP in
case of firm)
to the Bank
Bank's No
Objection to
shortlist &
(RFP in case
of firm)
Issue RFP to
short listed
consultants
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
Planned 5/3/2013 5/3/2013 8/1/2013 8/3/2013 8/12/2013 8/19/2013
Revised
Actual 5/1/2013 5/1/2013 8/4/2013 8/4/2013 8/6/2013 8/11/2013
Planned 4/1/2014 4/1/2014 9/1/2014 9/3/2014 9/12/2014 9/19/2014 10/10/2014 11/7/2014 11/9/2014 11/18/2014 11/20/2014
Revised
Actual
Planned
Revised
Actual
IC
IC
IC
Communication/Information Specialist-
30 mm
BFD/S17
Accounting Expert (Individual
Consultant)- 54 mm
BFD/S20.1 -
20.10
Community Mobilization Officer
(Individual Junior Consultant) – 9 Nos
IC
BFD/S19.1 -
19.10
Accountant (Individual Junior Consultant)
– 8 Nos-
BFD/S18
BFD/S21 Financial Audit Firm FBS
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 48
Proposal
submission
deadline (in
case of IC
application
submission
deadline)
Completion
of Technical
Evaluation
Submission
of Technical
Evaluation
report to the
Bank
Bank's No
Objection to
technical
evaluation
report (in
case of IC
NO on the
Opening of
financial
proposals
Completion of
Combined
Evaluation
Negotiation Bank's no
objection to
draft
negotiated
contract
Signing of
the contract
Publication
of Contract
Award in
UNDB,
CPTU (if
applicable)
Service
Completion
7/11/2014 8/15/2014 8/18/2014 8/27/2014 9/17/2014 9/26/2014 10/24/2014 10/31/2014 4/16/2016
7/15/2014
10/21/2014 11/18/2014 11/20/2014 11/29/2014 12/8/2014 12/29/2014 1/19/2015 2/2/2015 3/2/2015 3/4/2015 12/21/2016
7/11/2014 8/15/2014 8/18/2014 8/27/2014 9/17/2014 9/26/2014 10/24/2014 10/31/2014 10/13/2016
7/15/2014
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 12/31/2016
9/3/2013 12/18/2013 12/31/2013 1/13/2014 2/17/2014 3/6/2013 3/13/2014
6/10/2013 7/1/2013 7/3/2013 7/12/2013 7/26/2013 8/4/2013 9/1/2013 9/8/2013 8/16/2016
5/20/2013 5/22/2014 5/23/2013 11/13/2013 11/28/2013 1/1/2014
7/1/2014 7/3/2014 7/12/2014 7/19/2014 7/28/2014 8/25/2014 2/21/2015
6/26/2014 7/9/2014 7/10/2014 7/17/2014 7/23/2014
Proposal
submission
deadline (in
case of IC
application
submission
deadline)
Completion
of Technical
Evaluation
Submission
of Technical
Evaluation
report to the
Bank
Bank's No
Objection to
technical
evaluation
report (in
case of IC
NO on the
Opening of
financial
proposals
Completion of
Combined
Evaluation
Negotiation Bank's no
objection to
draft
negotiated
contract
Signing of
the contract
Publication
of Contract
Award in
UNDB,
CPTU (if
applicable)
Service
Completion
12/25/2014 1/15/2015 1/29/2015 2/12/2015 2/26/2015 3/7/2015 4/4/2015 4/6/2015 11/24/2016
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 49
Proposal
submission
deadline (in
case of IC
application
submission
deadline)
Completion
of Technical
Evaluation
Submission
of Technical
Evaluation
report to the
Bank
Bank's No
Objection to
technical
evaluation
report (in
case of IC
NO on the
Opening of
financial
proposals
Completion of
Combined
Evaluation
Negotiation Bank's no
objection to
draft
negotiated
contract
Signing of
the contract
Publication
of Contract
Award in
UNDB,
CPTU (if
applicable)
Service
Completion
7/11/2014 8/15/2014 8/18/2014 8/27/2014 9/17/2014 9/26/2014 10/24/2014 10/31/2014 10/13/2016
7/13/2014
9/29/2014 10/20/2014 10/22/2014 10/31/2014 11/9/2014 11/23/2014 12/7/2014 12/16/2014 1/13/2015 1/15/2015 11/3/2016
9/29/2014 10/20/2014 10/22/2014 10/31/2014 11/9/2014 11/23/2014 12/7/2014 12/16/2014 1/13/2015 1/15/2015 11/3/2016
12/27/2014 1/17/2015 1/19/2015 1/28/2015 2/6/2015 2/20/2015 3/6/2015 3/15/2015 4/12/2015 4/14/2015 12/2/2016
9/22/2014 10/13/2014 10/15/2014 10/24/2014 10/31/2014 11/14/2014 11/28/2014 12/7/2014 1/4/2015 1/6/2015 10/25/2016
7/11/2014 8/15/2014 8/18/2014 8/27/2014 9/17/2014 9/26/2014 10/24/2014 10/31/2014 10/13/2016
7/13/2014
7/11/2014 8/15/2014 8/18/2014 8/27/2014 9/17/2014 9/26/2014 10/24/2014 10/31/2014 10/13/2016
7/13/2014
9/22/2014 10/13/2014 10/15/2014 10/24/2014 10/31/2014 11/14/2014 11/28/2014 12/7/2014 1/4/2015 1/6/2015 10/25/2016
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 12/31/2016
9/3/2013 1/15/2014 2/10/2014 2/18/2014 3/3/2014 3/12/2014 3/24/2014
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 50
Proposal
submission
deadline (in
case of IC
application
submission
deadline)
Completion
of Technical
Evaluation
Submission
of Technical
Evaluation
report to the
Bank
Bank's No
Objection to
technical
evaluation
report (in
case of IC
NO on the
Opening of
financial
proposals
Completion of
Combined
Evaluation
Negotiation Bank's no
objection to
draft
negotiated
contract
Signing of
the contract
Publication
of Contract
Award in
UNDB,
CPTU (if
applicable)
Service
Completion
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 9/30/2016
9/3/2013 1/15/2014 1/22/2014 1/28/2014 3/3/2014 3/12/2014 4/1/2014
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 12/31/2016
9/3/2013 11/13/2013 11/23/2013 11/27/2013 1/15/2014 1/28/2014 2/10/2014
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 12/31/2016
9/3/2013 11/13/2013 12/9/2013 1/15/2014 2/16/2014
9/9/2013 10/14/2013 10/16/2013 10/25/2013 11/1/2013 11/10/2013 12/8/2013 12/15/2013 12/31/2016
9/3/2013 11/13/2014 12/19/2013 1/15/2014 2/16/2014
12/25/2014 1/15/2015 1/29/2015 2/12/2015 2/26/2015 3/7/2015 4/4/2015 4/6/2015 11/24/2016
c:\re\000477144_20150217153338_D\original\943710PROP0P120ed0February008002015.xls 51