DESCRIPTION
Fifth Framework Program. Progress meeting Trondheim, June 20-21, 2002. WP7: Models integration, simulator development. Supplying a simulation tool integrating the results of thematic workpackages 1 to 6. WP7: Objectives. Model integration Simulator development and Validation. - PowerPoint PPT PresentationTRANSCRIPT
Progress Meeting - Trondheim - June 20/21th 2002
WP7: Models integration, simulator development
Progress meetingTrondheim, June 20-21, 2002
Progress meetingTrondheim, June 20-21, 2002
Fifth Framework Program
Progress Meeting - Trondheim - June 20/21th 2002
WP7: Objectives
Supplying a simulation tool integrating the results of thematic workpackages 1 to 6
Model integration Simulator developmentand Validation
Progress Meeting - Trondheim - June 20/21th 2002
Models integration
The structure of the simulator has to cope with: the matter characteristics necessary for models the matter characteristics which are not used in the models
The interface must bring the models to life: ask the good questions in a language adapted
and give easy to use results
Seek consistency between phase models for the different treatment ways.
Progress Meeting - Trondheim - June 20/21th 2002
Work description: the different tasks
Task 1: Design of the simulator structure
Task 2: Model implementation for each channel
Task 3: Check for consistency both on available experimental and on theoretical data
Task 4: Definition of parameter estimation methods
Task 5: Description of sampling and analytical procedure
Task 6: Development of methods for parameter adjustment
Task 7: Consolidation between channels
Progress Meeting - Trondheim - June 20/21th 2002
WP7 Deliverables
Documented models for predicting material and energy
balance for all channels.
Documented models and databases for economic balance
calculation.
Software allowing the simulation of all possible
organisation of solid waste management.
Methodology, use and limits of the software;
Report generation options for different types of end-user.
D25
D26
D27
D28
Progress Meeting - Trondheim - June 20/21th 2002
Design a simulator structure
FlowsheetStreamsNodes
Phases modelPhases (physical)
Criteria and/or combinationof several criteria(size classes, components,substances,…)
WP1WP1
MFA levels
Waste matrix
Task 1
WP7WP7
Progress Meeting - Trondheim - June 20/21th 2002
Phase model: integration of waste matricesTask 1
Progress Meeting - Trondheim - June 20/21th 2002
Design a simulator structure (continued)
Streams descriptionFlowratesGrades
Equipment descriptionParameters for each model
of unit operationPerformancesSizesOperating conditionsOthers
Task 1
WP2 to 6 WP2 to 6
Models
WP8, WP9 WP8, WP9
Scenario definition
Progress Meeting - Trondheim - June 20/21th 2002
Library of models and workshops
Unit operationMODEL
Unit operationMODEL
ParametersParameters
Input
Flowrates Sizes, Categories, Metalsetc..
Input
Flowrates Sizes, Categories, Metalsetc..
Output (s)Output (s)
Steady-statesimulator
Steady-statesimulator
System operation
Costs
System operation
Costs
Feed stream description
Equipment configuration
Feed stream description
Equipment configuration
Two types of use for models:
Sizing
Optimisation
Task 1
Progress Meeting - Trondheim - June 20/21th 2002
Example of Landfill modelTask 1
Progress Meeting - Trondheim - June 20/21th 2002
Flowsheet drawing: integration of system definition
Tetrapacks, metal, plasticPaper, carboard
Glass
For Metal, mixed waste, biowaste, glass, road waste, Hazardous waste...Paper, cardboard, plastic
For Glass,Tetrapacks, metal, plastic, Paper, cardboard
For glass
Sewage sludge to spreading
Back to dealer
To type Ihazardous waste
To type II - Non hazardous waste
Glass
Light fraction
Filter cake,Treated ashes
Sorting products
SortingResidues
Bottom ashscrap
Scrap, Compost to spreading
Mixed waste
Mixed waste without secondary materials
LandfillMSWIncineration plant
Paper, cardboard, plastic
Tetrapacks, metal, plasticPaper, cardboard
Glass
Road waste
Metal, mixed waste, biowaste, glass, road wasteHazardous waste...
Collection of mixed waste
Hospital waste
Oil and fat from municipalities
Medicine, batteries, ...
Industry
Compostingplant
Sorting
Tetrapacks, metal, plasticPaper, cardboardGlass
Bulky waste
Collection of other waste
Glass
Separate waste collection- Curbside
Separate waste collection- Collecting point
ORLEANS case study
1 2
3
4
5
6
7
8 9
10
11
12 13
14
15
16
17
18
19
20
21
22
12 3
4
5
6
7
8
910
1112
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29 30
31
32
33
34
35
3637
38
39
4041
42
43
44
45 4647
48
49
50
51
52
53
Task 1
Progress Meeting - Trondheim
System definition
1 Level
Models or Workshops
To another level
Progress Meeting - Trondheim - June 20/21th 2002
Collection workshopTask 1
Progress Meeting - Trondheim - June 20/21th 2002
Simulation results
Streams characteristic
Output parameters of the models
End-users information easily useable filescompilation of the whole of the parameters and
of the data
Development of specific and convivial interfaces(in progress in coordination with the steering committee)
The need:
Deliverable D28
Task 1
ŒŽ
Progress Meeting - Trondheim - June 20/21th 2002
Two simulation methods
Direct simulation: prediction of streams, knowing input data and parameters of the models
Reverse simulation: adjustment of the parameters of the models so that the model predict existing situation
Process 1
Process 2 Process 3 Process 4
Process 1
Process 2 Process 3 Process 4
Supplied data: Calculated data:
Task 1
Progress Meeting - Trondheim - June 20/21th 2002
Supervisor of the simulation
Aim:To achieve global objectives permitting variation for some of parameters
Process 1
Process 2 Process 3 Process 4
Task 1
Supplied data: Calculated data:
Plastic < 2mm
Progress Meeting - Trondheim - June 20/21th 2002
Model implementation
In direct relation with WPs 4 to 6 (cf. had hoc presentations)
Technical meetings with WP’s leaders: Specification of the
biologicalthermalSorting, collection, transport
Development of two models in progress: Collection/transport (in coordination with USTUTT). Landfill.
Meeting planed with WP3 in July Economical models.
models
Task 2
Progress Meeting - Trondheim - June 20/21th 2002
Check for consistency...
Depending of the other workpackages results: Models specifications Models parameters
Real starting with the case studies (WP9): Available data are known for the three cities. They will be supplemented by default values if needed (waste matrix).
...both on available experimental and on theoretical data
Task 3
Progress Meeting - Trondheim - June 20/21th 2002
3 tasks gathered in only one
Tasks 4 to 6
Aim:To define methods to use the models:
- procedures for parameters estimation
- set the limits of parameters values
- give an idea on the quality of model’s predictions according
to the input data
Deliverables D25 and D26
Progress Meeting - Trondheim - June 20/21th 2002
Main difficulty
Integration = light on water:
transfer from WP 1 to 6
a part may be reflected
a part may be absorbed
Progress Meeting - Trondheim - June 20/21th 2002
Conclusion
The structure of the simulator will allow to integrate most of the R&D work,
A preliminary version will be available for the case studies,
WP8 has started to:explain the tool to non-project members,take into account the needs expressed by the steering committee