yuhua 5-year master plan (2016 -2020)

1

Upload: chowkinfai

Post on 14-Apr-2017

241 views

Category:

News & Politics


0 download

TRANSCRIPT

Page 1: Yuhua 5-Year Master Plan (2016 -2020)

Our YuhuaOur Home

Jurong Town Council 5-Year Concept

Master Plan 2016-2020

A Better Environment for All

Page 2: Yuhua 5-Year Master Plan (2016 -2020)

Dear Friends & Residents,

Our Jubilee year is a good time to take stock of developments and plan for our future.

In this small exhibition we show some of the things the Town Council has done, is doing, and will do in the future, to help build a better home for you in Yuhua

A Better Environment

Page 3: Yuhua 5-Year Master Plan (2016 -2020)

Rejuvenating our NeighbourhoodLift Upgrading Programme (LUP)

• LUP provides direct lift access to all the floors & Improves mobility

• 98 % of the eligible flats in Yuhua have completed LUP

• Upcoming LUP – Blk 214 Jurong East Street 21

(3 Benefiting Units)– Blk 346 Jurong East St 31

(3 Benefiting Units)– Blk 348 Jurong East St 31

(8 Benefiting Units)

Page 4: Yuhua 5-Year Master Plan (2016 -2020)

Rejuvenating our NeighbourhoodNeighbourhood Renewal Programme (NRP)

• The NRP was introduced in Aug 2007 focuses on block and precinct improvements.

• 94 % of the eligible precincts (about 8,312 units) have completed Interim Upgrading Programme/NRP or currently undergoing NRP at various stages

NRP at Blk 221 to 228, 221A, 223A and 225A Jurong East St 21

Page 5: Yuhua 5-Year Master Plan (2016 -2020)

Rejuvenating our NeighbourhoodNeighbourhood Renewal Programme (NRP)

Upcoming NRP- Blks 246 to 253

Jurong East St 24

- 3RD Qtr 2016-1st Qtr 2018

BLK 252

BLK 255.

BLK 258

BLK 256

Page 6: Yuhua 5-Year Master Plan (2016 -2020)

Rejuvenating our NeighbourhoodRemaking Our Heartland(ROH)Launched in 2007, ROH aims to rejuvenate public housing estates to bring about a holistic transformation.

Upgrading of Neighbourhood Centre 2 consisting of Blks 252 & 253 Jurong East St 24.

Estimate Completion Date : 3Q 2017

Upgrading of Neighbourhood Centre 3 consisting of Blks 343 to 354 Jurong East St 31.Estimate Completion Date : 1H 2017

Page 7: Yuhua 5-Year Master Plan (2016 -2020)

Interim Estate Upgrading Programme(I-EUP)• I-EUP aimed to improve

the amenities and offer improvement work at the older private housing estates. Under the I-EUP, we have build covered link way outside Ivory Heights Condominium & 2 rain shelters outside Westmere Condominium 2 Rain shelters

outside Westmere

Rejuvenating our NeighbourhoodCovered Linkway from

Bus-stop to Rear Gate of Ivory Heights

Page 8: Yuhua 5-Year Master Plan (2016 -2020)

Renewing Our HomesHome Improvement Programme (HIP)

• HIP addresses common maintenance problems, like the repair of spalling concrete, replacement of waste pipes, upgrading of toilets/bathrooms, replacement entrance door and refuse chute hoppers etc. Highly subsidized by the government

• 24 % of the eligible flats (2,013 units) are currently undergoing HIP at the various stages

• HIP approved in FY 2015– Blocks 241-251 Jurong East St 21– Blocks 101-116 Jurong East St 13

Upgrading of Toilet/ bathroomsReplacement of waste/soil discharge stacks

Page 9: Yuhua 5-Year Master Plan (2016 -2020)

Renewing Our HomesEnhancement for Active Seniors (EASE)

EASE has been offered to HDB flats in all towns since 2013. This will benefit the elderly who may wish to get the improvements earlier before the HIP, or whose blocks did not qualify for HIP.

Page 10: Yuhua 5-Year Master Plan (2016 -2020)

A Better Home for AllCompleted Improvement Projects

• Since 2011, Jurong Town Council has spent $2.5m on various Town Improvement projects to improve the overall living environment

• We have build – Covered linkways– Drop-off points– Sheltered ramps– Block signs & Noticeboards– New design letterboxes– Recreational and exercise facilities such as

hard courts, jogging tracks, playgrounds, multi-generation fitness corners, games courts & Futsal court

– Community gardens – Residents’ corners

• Over the next 5 years , another $ 2.5 m to be spent to provide more improvement works

COVERED LINKWAY FROM BLOCKS 217 TO 215 JURONG EAST STREET 21

COVERED LINKWAYS BLOCKS 328 JURONG EAST STREET 21

Page 11: Yuhua 5-Year Master Plan (2016 -2020)

A Better Home for AllCompleted Improvement Projects

DROP-OFF POINT AT BLK 113 JURONG EAST ST 13

DROP-OFF POINTS AT BLKS 260, 261, 263 & 264 JURONG EAST ST 24

SHELTEREDRAMP AT BLK 260 JURONG EAST STREET 21

SHELTERED RAMP AT BLK 218

JURONG EAST ST 21

Page 12: Yuhua 5-Year Master Plan (2016 -2020)

A Better Home for AllCompleted Improvement Projects

LIGHTED BLOCK NUMBER SIGNS AT JURONG GATEWAY ROAD, JURONG EAST STREET 21 AND JURONG EAST STREET 24

FITNESS CORNER AT BLK 242 JURONG EAST ST 24PLAYGROUND AT BLOCK 317 JURONG EAST STREET 31

UPGRADED JOGGING TRACK, PAVILION AND FOOTPATH NEAR BLOCK 255 JURONG EAST ST 24

Page 13: Yuhua 5-Year Master Plan (2016 -2020)

After

A Better Home for AllUpcoming Improvement Projects from 2016

Construction of 3G Playground at Block 209 Jurong East St 21

Before

Page 14: Yuhua 5-Year Master Plan (2016 -2020)

Before

After

A Better Home for AllUpcoming Improvement Projects from 2016

High Covered Linkway cum drop-off point from - Block 322 to 322A & - Block 323 to 325 Jurong East St 31

Page 15: Yuhua 5-Year Master Plan (2016 -2020)

Before

After

A Better Home for AllUpcoming Improvement Projects from 2016

Modification of Drop-off Points at Blocks 101 to 116 Jurong East St 13

Page 16: Yuhua 5-Year Master Plan (2016 -2020)

After

A Better Home for AllUpcoming Improvement Projects from 2016

Construction of 3G Playground at Block 264 Jurong East St 24

Before

Page 17: Yuhua 5-Year Master Plan (2016 -2020)

After

A Better Home for AllUpcoming Improvement Projects from 2016

Construction of 3G Playground at Block 327 Jurong East St 31

Before

Page 18: Yuhua 5-Year Master Plan (2016 -2020)

A Better Home for AllUpcoming Improvement Projects from 2016

An innovative Sensory Park will be built at the existing Neighbourhood Park near Blks257-263 Jurong East St 24. The sensory park will have a variety of texture which residents could see, feel, touch and smell so as to bring more fun to the residents’ outdoor activities.

Page 19: Yuhua 5-Year Master Plan (2016 -2020)

Taking care of what we have …• Since 2011, Jurong Town Council has spent

$12.1m in:– Repairs and Redecorations (R&R)– Re-roofing work– Replacement of water pipes– Replacement of booster pumps– Replacement of refuse chute flushing system– Replacement of water tanks lining

• Another $9.8m will be spent in the next 5 years

• Upcoming R&R-Blks 254, 317 to 328, 318A, 322A, 342 to 353-Blks 101 to 107, 209 to 214, 130 to 135

Repainting to Blocks 108 to 116 Jurong East St 13

Repainting to Blocks 215 - 231, 215A, 217A, 219A, 221A, 223A & 225A

Repainting to Blocks 255 to 264 Jurong East St 24

Page 20: Yuhua 5-Year Master Plan (2016 -2020)

Replacement of roof membranesReplacement of Lining to Stainless Steel Water Tanks

Replacement of Booster Pumps

Taking care of what we have …

Rescreeding of void deck & apron

Page 21: Yuhua 5-Year Master Plan (2016 -2020)

LED• We are the 1st Town Council to adopt this

innovation for lighting up our common areas. The Town Council has saved about $1.13 m per year since the installation of LED lightings in HDB estates since 2010.

Test bedding new ways to do work …

Solar Leasing Project• HDB has installed solar panels at Blocks 246,

247, 248 and 251 Jurong East St 24 in 2011 as a test bed project to harness solar energy

• The precinct was awarded the BCA Green Mark Gold Plus Award in 2011

• Going forward, another 41 blocks of HDB flats will be installed with solar panels by 1st Qtr2016.

Page 22: Yuhua 5-Year Master Plan (2016 -2020)

Police cameras • To improve security for

our residents, we have a tie-up project with the Police – the Polcam

• 31 Blocks Installed• 80 Blocks for future

installation by 2016

Test bedding new ways to do work …

Page 23: Yuhua 5-Year Master Plan (2016 -2020)

Community Parklet Dual deck bicycle deck

Vertical greenery Solar Panels

Pneumatic Waste Conveyance System

LED lightRainwater Harvesting

Green roof

Launched in 2012, 38 blocks of flats at Blocks 209-240 Jurong East St 21 will be transformed into an eco-friendly neighbourhood by end of 2015.

The project costs $23 m. 1st matured estate to embrace eco-friendly features such as the Pneumatic Waste Conveyance System, solar panels, outdoor

LED street lightings, elevator energy regenerative system, water & electrical sub-meters, rain water harvesting system, green roof, vertical greenery, community garden, dual bicycle racks and community parklets.

Test bedding new ways to do work …

Page 24: Yuhua 5-Year Master Plan (2016 -2020)

Jurong Lake District will become a mini version of a "smart city"

Above-ground boxes connected to fiber-optic lines will be deployed across at street lights or bus stops.

These new boxes can be hooked up to sensors to detect air pollutants, heavy rainfall, traffic jams, Township management etc

Some 9,000 residents living in Jurong East (3,194 flats) will be the first to experience “Smart living”

Residents can also look forward to a more liveable, efficient, sustainable and safe environment.

Test bedding new ways to do work …Solar powered surveillance

cameras, traffic sensors and other instruments will

gather data in Jurongtestbed that all government

agencies can share.

Page 25: Yuhua 5-Year Master Plan (2016 -2020)

Smart Home

Smart Neighbourhood

• Elderly Monitoring Systems• Home Energy Management• Home Water Management

System

• Smart Solar Energy Monitoring System

• Smart Pneumatic Waste Conveyance System

• Smart Electrical Sub-meters• Remote Water Meters• Smart Noticeboards

Test bedding new ways to do work …

Smart Home

Smart Noticeboards

Page 26: Yuhua 5-Year Master Plan (2016 -2020)

Car Park Improvement Work• HDB has upgraded 85% the surface

carparks in Yuhua• HDB has constructed additional car and

motorcycle lots at Blk 101, 222/226, 246/248 & 263

• HDB will be building a temporary car park next to Block 254, a very popular market and food centre to meet the increased demand for parking lots

Making it easier to move around …

Electronic Parking System Implementation• As of August 2015, EPS has been

implemented in 13 car park • 9 carparks in progress (4Q 2015-1 Q2016)

Additional car and motorcycle lots at Blk 101

Electronic Parking System at Blk 234

Page 27: Yuhua 5-Year Master Plan (2016 -2020)

Road & Improvement• LTA has widened Jurong Town Hall Road

and Jurong East St 11/21 & constructed new roads Jurong Gateway Road and Gateway Drive

• Introducing cycling path as part of JurongLake ROH programme

• Covered walkway within 400m radius from Chinese Garden MRT Station under the Walk-2-Ride scheme

Making it easier to move around …

Adding ramps and shelter to the existing pedestrianoverhead bridge across Boon Lay Way near Yuhua CC

Widened Jurong Town Hall Road

• Adding ramps and shelter to the existing pedestrian overhead bridge across Boon Lay Way near Yuhua CC Adding ramps and shelter

Page 28: Yuhua 5-Year Master Plan (2016 -2020)

MRT Rail Improvement • Installation of noise barrier at the

MRT viaduct along Boon Lay Way near to Blk 110 Jurong East St 13 and Jurong East Central

• A new platform and track have been build at Jurong East MRT station to hasten the traffic boarding and alighting to and from the North South (NS) Line and East West(EW) Line trains

• Another 57 trains to the NS and EW lines

• Opening of Downtown Line Stage 2 in Dec 2015

• Jurong Region Line and Cross Island Line in future by 2025

Making it easier to move around …

Noise barrier at the MRT viaduct along Boon Lay Way near to Blk 110

A new platform and track have been build at Jurong East MRT station

Page 29: Yuhua 5-Year Master Plan (2016 -2020)

New Public Housing• HDB will be building 2

residential blocks ( 225 dwelling units) at the open space infront of Blk 236 Jurong East St 21

• It is served with a 6-storey MSCP and well connected covered linkway, and facilities such as precinct pavilion, playgrounds and roof garden at MSCP

• The project will start in 2Q 2015 and complete by 2Q 2019

Page 30: Yuhua 5-Year Master Plan (2016 -2020)

Bringing People Closer to Nature …

A beautiful & natural Jurong Lake Gardens will be a reality in a few years.

1st Phase- Completion of Jurong Lake Gardens West (beside Taman Jurong) by 2017

2nd Phase- Jurong Lake Gardens East and Jurong Lake Gardens Central in 2020

Jurong Lake Gardens

Page 31: Yuhua 5-Year Master Plan (2016 -2020)

Jurong Lake District• In the next 10-15 years, the

Jurong Lake District is poised to be the next destination for leisure and business

• From public parks to water front hotels, the district brims with new and comprehensive developments

• It will also be the terminus for the Singapore/Kuala Lumpur High-speed rail to facilitate seamless travel between Kuala Lumpur and Singapore, and bring the people of Malaysia and Singapore closer together

Page 32: Yuhua 5-Year Master Plan (2016 -2020)

New Development In Jurong Gateway• In 2008, the URA unveiled the

blue print to transform Jurong into the biggest regional centre outside of the Central Business District

• When fully completed, the District will have more than 500,000 sqm of office space and 250,000 sqm of retail space, 1,000 more homes and at least 2,800 hotel rooms.

J-Cube & Canopy

Big BoxDevan Nair Institute for Employment

and Employability

Ng Teng Fong General Hospital and Jurong Community Hospital

Genting Hotel

JEM

Westgate

Page 33: Yuhua 5-Year Master Plan (2016 -2020)

More Community Gardens will be built in our Town.

From neighbours to friends …

The Town Council will organise more such NRP exhibitions to allow residents to discuss with their neighbours & friends on the facilities that they desire under the programme

More Sports & Recreational Facilities and communal space will be built to encourage community bonding

Futsal court at Blk 209 Community parklet at Blk 229

Page 34: Yuhua 5-Year Master Plan (2016 -2020)

Our Social Service Centres1. Yuhua Neighbourhood Link2. Blue Cross Thong Kheng Home3. Aspiration Wan Qing Lodge4. Singapore Buddhist Free Clinic5. St Luke’s Eldercare (Jurong East Centre)6. Tzu Chi Free Health Screening Centre7. All Saints Nursing Home – Jurong East8. Loving Heart Multi-Service Centre

Caring for those who need our help …All Saints

Nursing Home – Jurong East

New Year Hong Bao for the Elderlies Prosperity Rice Distribution Visit to Thong Kheng Home